GE Hitachi Nuclear Energy Craig Ihrke Vice President, Commercial Operations March 3, 2011 The Nuclear Energy Option

Transcript of GE-NuclearOption

Page 1: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 1/24

GE Hitachi Nuclear Energy

Craig IhrkeVice President, Commercial Operations

March 3, 2011

The Nuclear

Energy Option

Page 2: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 2/24

2

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reservedCopyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

Why nuclear?

… consider the energy

demand landscape

Page 3: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 3/24

3

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

Demand – 2007

2007

Page 4: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 4/24

4

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

2030

Demand – 2030

Page 5: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 5/24

5

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

Global trends …

Population Energy Security EnvironmentLifestyle

… create big challenges

Page 6: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 6/24

6

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

Energy demand and resultingemissions

Global energy demand CO2 emissions

Source: International Energy Agency, World Energy Outlook 2008

Current energy mix is not environmentallysustainable

2008 actual= 29.4 Gt

Page 7: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 7/24

7

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

Nuclear – a necessary energy source

• ~14% of the world’s electricity is generated by nuclear

• One nuclear plant is capable of generating about as muchelectricity as is consumed by one million U.S. households eachyear

• Provides stable-cost, base load power

Today

• 441 reactors in 29 countries• 375 GW of nuclear

generation worldwide

• 104 reactors in U.S.

U.S.

France

Japan

RestofWorld12%

13%

24%

51%

Nuclear PlantsWorldwide

Source: International Atomic Energy Agency, International Status and Prospects ofNuclear Power, 2 September 2010; WNA Optimized Capacity: Global Trends andIssues

Nuclear energy generation has no CO2 emissions!

Page 8: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 8/24

8

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

Nuclear worldwide – trends 2008-2020

PWRBWR

PHWR

Other

BWR PWR

PHWR

Other

-2

18

38

58

78

98

118

   U   S   A

   F  r  a  n  c  e

   J  a  p  a  n

   R  u  s  s   i  a

   S   K  o  r  e  a

   U   K

   C  a  n  a   d  a

   G  e  r  m  a  n  y

   I  n   d   i  a

   U   k  r  a   i  n  e

   C   h   i  n  a

   S  w  e   d  e  n

   S  p  a   i  n

   B  e   l  g   i  u  m

   C  z  e  c   h

   T  a   i  w  a  n

   S   l  o  v  a   k   i  a

   S  w   i   t  z

   F   i  n   l  a  n   d

   H  u  n  g  a  r  y

   A  r  g  e  n   t   i  n  a

   B  r  a  z   i   l

   B  u   l  g  a  r   i  a

   M  e  x   i  c  o

   P  a   k   i  s   t  a  n

   R  o  m  a  n   i  a

   S   A   f  r   i  c  a

   O   t   h  e  r  s

439 units (372 GWe) – 2008 576 units (526 GWe) - 2020

emerging countries 60 nuclear units = 58 GWe under construction today

Sources: UxC “Nuclear Power Outlook, Q3 2009”;International Atomic Energy Agency, “International Status and

Prospects of Nuclear Power, 2 September 2010”

(# units)

Page 9: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 9/24

9

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reservedCopyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

Nuclear “barriers”

Page 10: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 10/24

10

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reservedCopyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

“Barriers” to nuclear energy

• Lack of supportive national policies

• Higher upfront capital costs

•Used nuclear fuel

•Public concerns about nuclear safety

Page 11: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 11/24

11

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reservedCopyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

Overcoming the “barriers”

Page 12: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 12/24

12

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

National policyTop Ten Nuclear Countries2008

Top Ten Nuclear Countries2020

Top Ten Nuclear Countries2030

National sponsorship+ favorable legislation =

nuclear growth and success!

Source: UxC Nuclear Power Outlook Q2-2010*includes recent Japan gov’t announcement of 14 additional NPP by 2030

Rank Country # of Units MWe net

1 United States 104 100,367

2 France 59 63,363

3 Japan 55 47,587

4 Russia 31 21,743

5 Germany 17 20,379

6 South Korea 20 17,500

7 Ukraine 15 13,195

8 Canada 18 12,652

9 United Kingdom 19 10,230

10 Sweden 10 9,037

Rank Country # of Units MWe net

1 United States 110 111,425

2 China 69 70,216

3 France 60 68,140

4 Japan 58 53,827

5 Russia 43 32,854

6 South Korea 30 29,380

7 Germany 17 20,379

8 India 37 18,362

9 Canada 21 15,237

10 Ukraine 17 15,095

Rank Country # of Units MWe net

1 China 129 133,216

2 United States 120 126,567

3 France 63 76,480

4 Japan 69* 56,945

5 Russia 49 40,9336 South Korea 36 38,187

7 India 50 35,786

8 Canada 20 17,860

9 Ukraine 19 17,535

10 United Kingdom 13 14,656

Page 13: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 13/24

13

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

Costs

Source: International Energy Agency / Nuclear Energy Agency “Projected

Costs of Generating Electricity: 2010 Edition”

0 0

Page 14: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 14/24

14

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reservedCopyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

• A new nuclear reactor fuel bundle produces electricity for 4-6 years

• At the end of this period, only ~5% of the potential energy in nuclearfuel has been harnessed

Used nuclear fuel (UNF)

management

6 years

95% uraniumremaining

4% short-lived isotopes1% long-lived isotopes

Freshfuel

UNF

Page 15: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 15/24

15

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

What to do about used nuclear fuel …

“the 3 R’s”Repository-- Reclaims none of the remainingenergy-- Politically difficult siting decisions-- Wasted uranium resource

Reprocessing-- Only reclaims <10% of total energy-- Separates plutonium (proliferationconcern)-- High level waste remains

Recycling-- Reclaims >90% of total energy-- No proliferation issues-- Dramatically shortens end repositorylifetime

Page 16: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 16/24

16

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reservedCopyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

Public concerns about nuclear safety

Summary of severe accidents by energy industry(1969-2000)

Sources: Nuclear Energy Agency, Organization for Economic Cooperation and Development,2010; Nuclear Energy Institute

Non-OECD countriesOECD countries

Nuclear energy is safe energy!

1, 14 0, 0 1, 31

Page 17: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 17/24

17

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reservedCopyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

GE Hitachi Nuclear

Energy Portfolio

Page 18: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 18/24

18

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reservedCopyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

First test reactor:

Vallecitos, CA

First Test Reactor:JPDR

First CommercialPlants: Dresden 1,

KRB, Tsuruga

GE

Hitachi

Higher PowerLevels: Peach

Bottom 2, Tokai 2

Standard Designs:Grand Gulf,

Fukushima Daiichi 6

Hitachi completes firstJapanese CommercialReactor: Shimane 1

1 9 5 0 s 1 9 6 0 s 1 9 7 0 s 1 9 8 0 s  

Making history together

First ExperimentalReactor: JRR-3

Two BWR5s begin

operation:Fukushima Daini

units 2 & 4

Page 19: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 19/24

19

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reservedCopyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

2007GE & Hitachi

formglobal nuclearalliance

Global Nuclear

Fuel *

Advanced

Designs: ABWR,SBWR, Prism

First ABWRsconstructed:Kashiwazaki-

Kariwa units 6 & 7

Laser

Enrichment

Multiple ABWRs inparallel construction

1 9 9 0 s   2000s 

GE

Hitachi

Making history together

Page 20: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 20/24

20

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

• Boiling water reactor & mixedoxide fuels

• Candu reactor fuel & handlingequipment

• Fuel engineering services• Nuclear isotopes• Used nuclear fuel recycling• Enrichment of natural uranium

• Generation III AdvancedBoiling Water Reactor(ABWR)

• Generation III+

Economically SimplifiedBoiling Water Reactor(ESBWR)

• Power Reactor InnovativeSmall Modular (PRISM)

• Reactors & balance of plant• Life extension• Power uprates• Performance services

• Outages and inspections

The GE Hitachi businessNuclear Power

PlantsNuclearServices Fuel Cycle

Page 21: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 21/24

21

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

New units product line

• Original design cert valid to 6/2012

• Renewal application by 11/2010

• 4 in operation with 4 under construction

• NRC design cert expected Sept 2011

• U.S. and Europe applications pending

GE ecomagination products to meet customerneeds

Licensing status …

ABWR ESBWR

• Experience … cost & schedule confidence

• Safety … active system is desired

• Design … latest Gen III+

• Value … passive safety & lowercosts

A global presence …

Page 22: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 22/24

22

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reservedCopyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

Tokyo Electric Power Co.Kashiwazaki-Kariwa NPS

Hokuriku Electric Power Co.Shika NPS

The Japan Atomic Power Co.Tokai Daini PS

Tokyo Electric Power Co.Fukushima Daini NPS

Tokyo Electric Power Co.Fukushima Daiichi NPS

Tohoku Electric Power Co.Onagawa NPS

The Chugoku Electric Power Co.Shimane NPS

Chubu Electric Power Co.Hamaoka NPS

The Japan Atomic Power CO.Tsuruga PS

Uninterrupted construction

Page 23: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 23/24

23

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

Advanced Recycling Center Alternatives

Recycling Reprocessing

Uses up spent fuel

Non-proliferation

Storage req’s 500 yrs 10,000+ yrs

Generates electricity

What it is …• Electrometallurgical separations … small

electric current in a salt bath

• 3 streams: ~4% fission … ~1% actinides …~95% uranium

• Liquid sodium cooled reactor (PRISM) …scalable modular 311 MWe blocks

What is delivered …• Non-proliferation … no plutonium separation

• Environmentally responsible … dry process

• Clean energy … 400MM tons of carbonemissions avoided per year (per ARC)

• Spent fuel … recycles 90%+ of nuclearmaterials … reduces storage needs

Used nuclear fuel solution

Page 24: GE-NuclearOption

8/3/2019 GE-NuclearOption

http://slidepdf.com/reader/full/ge-nuclearoption 24/24

24

Copyright 2011 GE Hitachi Nuclear Energy International - All rights reservedCopyright 2011 GE Hitachi Nuclear Energy International - All rights reserved

Questions?