Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
J.D. Power Westlake Village, CA Client Contact Cindy Spencer, Vice President
Atlanta, Georgia
Client Contact Mark Hiatt, Executive Project Manager
Situation Colonial Pipeline, ranked as one of the largest oil and gas firms in the world signed
a lease for 70,000 sq. ft of space and needed to fit out four floors in two months Each station had to be designed to adhere to strict building codes.
BEC and NVISION a Haworth Company teamed to produce final layouts and floor
plans.
Services Provided BEC supplied new modular Nvision (a Haworth Company) workstations and furni-
ture layouts for the new corporate HQ. Plans called for the installation of over 450 workstations in four Phased in floors. CPC also used Trendway floor to ceiling walls instead of drywall. Project Management.
Results BEC designed a modular workstation solution so that Colonial Pipeline could re-
configure each station in the future without adding additional panels Saved CPC over $400,000 in floor to ceiling wall cost
“Your Office Furniture Partner”
;
Office Furniture I Cabling Solutions I Metro Movers Case Study
Situation J D Power needed furniture for it’s new HQ in Westlake Village, CA, and keep the cost within budget. Needs: 45,000 sq. ft. of space/furniture Initial Plans called for new AIS workstations and private office furniture by CMI. Each station had to be designed to adhere to strict building codes.
Services Provided BEC supplied new modular AIS AO2 workstations and furniture layouts for the new corporate HQ. Plans called for the installation of high end casegoods and special millwork custom furniture by mobilia. Project Management.
Results BEC installed over 400 workstations on time and on budget. Additional product was installed in Troy, MI and Phoenix, AZ.
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
FedEx Memphis, TN Client Contact Fred Hackel, Project Manager
Atlanta, Georgia
Client Contact Mark Hiatt, Executive Project Manager
Situation Colonial Pipeline, ranked as one of the largest oil and gas firms in the world signed
a lease for 70,000 sq. ft of space and needed to fit out four floors in two months Each station had to be designed to adhere to strict building codes.
BEC and NVISION a Haworth Company teamed to produce final layouts and floor
plans.
Services Provided BEC supplied new modular Nvision (a Haworth Company) workstations and furni-
ture layouts for the new corporate HQ. Plans called for the installation of over 450 workstations in four Phased in floors. CPC also used Trendway floor to ceiling walls instead of drywall. Project Management.
Results BEC designed a modular workstation solution so that Colonial Pipeline could re-
configure each station in the future without adding additional panels Saved CPC over $400,000 in floor to ceiling wall cost
“Your Office Furniture Partner”
;
Office Furniture I Cabling Solutions I Metro Movers Case Study
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
AT&T Atlanta, GA Client Contact Jim Dadia, Director
Atlanta, Georgia
Client Contact Mark Hiatt, Executive Project Manager
Situation Colonial Pipeline, ranked as one of the largest oil and gas firms in the world signed
a lease for 70,000 sq. ft of space and needed to fit out four floors in two months Each station had to be designed to adhere to strict building codes.
BEC and NVISION a Haworth Company teamed to produce final layouts and floor
plans.
Services Provided BEC supplied new modular Nvision (a Haworth Company) workstations and furni-
ture layouts for the new corporate HQ. Plans called for the installation of over 450 workstations in four Phased in floors. CPC also used Trendway floor to ceiling walls instead of drywall. Project Management.
Results BEC designed a modular workstation solution so that Colonial Pipeline could re-
configure each station in the future without adding additional panels Saved CPC over $400,000 in floor to ceiling wall cost
“Your Office Furniture Partner”
;
Office Furniture I Cabling Solutions I Metro Movers Case Study
Situation Business Environments was retained in July, 2010 to assist with disposing of over 600 workstations on four floors of the Promenade building in Atlanta, Georgia. The contract was contingent upon the ability of the firm to break down, and remove two full floors of workstations in seven days and liquidate over 600 workstations. Responsibility included full project management responsibility to load out 15 tractor trailers, and manage a crew of over 45 installers.
Services Provided Project Management Coordination of Installation team
Results Project completed ahead of schedule. Client moved out and turned over space on time. AT&T saved a considerable amount of money on storage costs due to liquidation.
Atlanta, Georgia
Client Contact Dennis Reding, CEO
Situation AXIS, a spin off of AON Insurance, ranked as one of the largest specialty insurance firms in the nation needed 40,000 sq. ft. of swing space while 80,000 sq. ft. was being built out for their new HQ. Rental furniture was needed for 200 employees temporarily. New corporate standards had to be set since AXIS was a spin off of AON insurance. BEC and KRUG teamed to produce final layouts and floor plans.
Services Provided BEC supplied new modular casegoods manufactured by KRUG for the new HQ and supplied Herman Miller and Steelcase rental stations for AXIS’s swing space. Plans called for the installation of over 130 private office’s in two phased in floors. AXIS also used Keilhauer Seating, HM Aeron Chairs, and Harter Seating. Project Management.
Results BEC designed a modular private office solution so that AXIS could re-configure each station in the future without adding additional components. Saved CPC over $400,000 in floor to ceiling wall cost
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
MITEL Phoenix, AZ Client Contact Andrea Hess, Project Manager
Atlanta, Georgia
Client Contact Mark Hiatt, Executive Project Manager
Situation Colonial Pipeline, ranked as one of the largest oil and gas firms in the world signed
a lease for 70,000 sq. ft of space and needed to fit out four floors in two months Each station had to be designed to adhere to strict building codes.
BEC and NVISION a Haworth Company teamed to produce final layouts and floor
plans.
Services Provided BEC supplied new modular Nvision (a Haworth Company) workstations and furni-
ture layouts for the new corporate HQ. Plans called for the installation of over 450 workstations in four Phased in floors. CPC also used Trendway floor to ceiling walls instead of drywall. Project Management.
Results BEC designed a modular workstation solution so that Colonial Pipeline could re-
configure each station in the future without adding additional panels Saved CPC over $400,000 in floor to ceiling wall cost
“Your Office Furniture Partner”
;
Office Furniture I Cabling Solutions I Metro Movers Case Study
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
Situation ● Mitel grew from 180 corporate employees to over 300 in a very short period of time and needed
to consolidate their USA HQ location into 45,000 sq. ft. in Phoenix, AZ.
● In addition to adding over 300 employees in Phoenix, AZ , Mitel also grew rapidly in New York,
Chicago, Houston, Dallas, and LA.
Services Offered
● Business Environments assisted with the finish selection for the office furniture (fabric, paint,
stain, laminate, steel, wood, and carpet.) Product: Friant workstations, Kimball National.
● Project Management
Results
● Business Environments saved Mitel over $50,000 on new office furniture and provided
installation service on time and under budget.
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
MERIAL Division Atlanta, GA Client Contact Paul Simon, EVP
Office Furniture I Cabling Solutions I Metro Movers Case Study
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
SunTrust Atlanta, GA Client Contact Worth Stuart, Director
Office Furniture I Cabling Solutions I Metro Movers Case Study
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
Situation ● Mitel grew from 180 corporate employees to over 300 in a very short period of time and needed
to consolidate their USA HQ location into 45,000 sq. ft. in Phoenix, AZ.
● In addition to adding over 300 employees in Phoenix, AZ , Mitel also grew rapidly in New York,
Chicago, Houston, Dallas, and LA.
Services Offered
● Business Environments assisted with the finish selection for the office furniture (fabric, paint,
stain, laminate, steel, wood, and carpet.) Product: Friant workstations, Kimball National.
● Project Management
Results
● Business Environments saved Mitel over $50,000 on new office furniture and provided
installation service on time and under budget.
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
GE Capital Atlanta, GA Client Contact Bob Peters, EVP Finance
Office Furniture I Cabling Solutions I Metro Movers Case Study
Situation GE Capital needed furniture for it’s new Regional office in Atlanta, GA, and keep the cost within budget. Needs: 65,000 sq. ft. of space/furniture Initial Plans called for new Evolve workstations and private office furniture by National. Each station had to be designed to adhere to strict building codes.
Services Provided BEC supplied new modular Evolve workstations and furniture layouts for the new corporate HQ. Plans called for the installation of high end casegoods and special millwork custom furniture by Sinclair. Project Management.
Results BEC installed over 200 workstations on time and on budget. Additional product was installed in Stamford, CT.
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
Samsung Plano, TX Client Contact Greg Bryant, Director
Office Furniture I Cabling Solutions I Metro Movers Case Study
Situation Samsung needed furniture for it’s new HQ in Plano, TX, and keep the cost within budget. Needs: 60,000 sq. ft. of space/furniture Initial Plans called for new AIS workstations and private office furniture by OFS. Each station had to be designed to adhere to strict building codes.
Services Provided BEC supplied new modular AIS Divi workstations and furniture layouts for the new corporate HQ. Plans called for the installation of high end casegoods and special millwork custom furniture by mobilia. Project Management.
Results BEC installed over 300 workstations on time and on budget. Additional product was installed in Atlanta, Seattle, Chicago, Kansas, and Houston.
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
Siemens Atlanta, GA Client Contact Cornelius Tica, EVP
Office Furniture I Cabling Solutions I Metro Movers Case Study
Situation Siemens needed furniture for it’s new HQ in Atlanta, GA, and keep the cost within budget. Needs: 80,000 sq. ft. of space/furniture Initial Plans called for new AIS workstations and private office furniture by National. Each station had to be designed to adhere to strict building codes.
Services Provided BEC supplied new modular AIS Matrix workstations and furniture layouts for the new corporate HQ. Plans called for the installation of high end casegoods and special millwork custom furniture. Project Management.
Results BEC installed over 600 workstations on time and on budget. Additional product was installed in San Francisco, Houston, and New York.
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
Bank of America Charlotte, NC Client Contact Bob Prince, EVP Treasury
Atlanta, Georgia
Client Contact Mark Hiatt, Executive Project Manager
Situation Colonial Pipeline, ranked as one of the largest oil and gas firms in the world signed
a lease for 70,000 sq. ft of space and needed to fit out four floors in two months Each station had to be designed to adhere to strict building codes.
BEC and NVISION a Haworth Company teamed to produce final layouts and floor
plans.
Services Provided BEC supplied new modular Nvision (a Haworth Company) workstations and furni-
ture layouts for the new corporate HQ. Plans called for the installation of over 450 workstations in four Phased in floors. CPC also used Trendway floor to ceiling walls instead of drywall. Project Management.
Results BEC designed a modular workstation solution so that Colonial Pipeline could re-
configure each station in the future without adding additional panels Saved CPC over $400,000 in floor to ceiling wall cost
“Your Office Furniture Partner”
;
Office Furniture I Cabling Solutions I Metro Movers Case Study
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
Cantor Colburn Hartford, CT Client Contact Judi Aidukonis, Director
Atlanta, Georgia
Client Contact Mark Hiatt, Executive Project Manager
Situation Colonial Pipeline, ranked as one of the largest oil and gas firms in the world signed
a lease for 70,000 sq. ft of space and needed to fit out four floors in two months Each station had to be designed to adhere to strict building codes.
BEC and NVISION a Haworth Company teamed to produce final layouts and floor
plans.
Services Provided BEC supplied new modular Nvision (a Haworth Company) workstations and furni-
ture layouts for the new corporate HQ. Plans called for the installation of over 450 workstations in four Phased in floors. CPC also used Trendway floor to ceiling walls instead of drywall. Project Management.
Results BEC designed a modular workstation solution so that Colonial Pipeline could re-
configure each station in the future without adding additional panels Saved CPC over $400,000 in floor to ceiling wall cost
“Your Office Furniture Partner”
;
Office Furniture I Cabling Solutions I Metro Movers Case Study
Situation
Situation ● Cantor Colburn grew from a few Attorney’s to over 300 in a short period of time and the y
needed a new HQ to support their staff. CC moved from Bloomfield, CT to Hartford where they
leased a new HQ building for over 60,000 sq. ft. to build out three floors.
● In addition to adding over 300 Patent Attorney’s in Hartford, CT, Cantor Colburn also grew
rapidly in Houston, TX, Detroit, MI, Washington, DC and Atlanta, GA.
Services Offered
● Business Environments assisted with the finish selection for the office furniture (fabric, paint,
stain, laminate, steel, wood, and carpet.) AIS Matrix workstations and Kimball National casegoods
were installed throughout the USA.
● Project Management
Results
● Business Environments saved CC over $130,000 on new office furniture and provided
installation service on time and under budget.
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
Axis Insurance Atlanta, GA Client Contact Dennis Reding, President & COO
Office Furniture I Cabling Solutions I Metro Movers Case Study
Situation AXIS, a spin off of AON Insurance, ranked as one of the largest specialty insurance firms in the nation needed 40,000 sq. ft. of swing space while 80,000 sq. ft. was being built out for their new HQ. Rental furniture was needed for 200 employees temporarily. New corporate standards had to be set since AXIS was a spin off of AON insurance. BEC and KRUG teamed to produce final layouts and floor plans.
Services Provided BEC supplied new modular casegoods manufactured by KRUG for the new HQ and supplied Herman Miller and Steelcase rental stations for AXIS’s swing space. Plans called for the installation of over 130 private office’s in two phased in floors. AXIS also used Keilhauer Seating, HM Aeron Chairs, and Harter Seating. Project Management.
Results BEC designed a modular private office solution so that AXIS could re-configure each station in the future without adding additional components. Saved CPC over $400,000 in floor to ceiling wall cost
Case Study
GE Capital
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
HAGEMEYER Atlanta, GA Client Contact Ray Perlock, VP Finance
Office Furniture I Cabling Solutions I Metro Movers Case Study
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
Alpharetta, Georgia
Client Contact Ray Perlock, VP Finance
Situation Hagemeyer needed to update it’s corporate HQ in Alpharetta, GA and keep the pro-
ject within budget. Needs: 65,000 sq. ft of space/furniture Initial Plans called for used workstations, but BEC came up with a solution from
Nvision, Anderson Hickey, Indiana Desk, and United Chair at the right price. BEC and Nvision, a Haworth Company teamed to produce final layouts and floor
plans.
Services Provided BEC supplied new modular Nvision workstations and furniture layouts for the new
corporate HQ. Plans called for the installation of over 300 workstations in two-Phased in floors
Project Management.
Results BEC designed a modular workstation solution so that Hagemeyer could re-configure
each station in the future without adding additional panels.
“Your Office Furniture Partner”
;
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
Wake Forest University Winston Salem, NC Client Contact John Cowen, Director
Office Furniture I Cabling Solutions I Metro Movers Case Study
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
Situation ● Mitel grew from 180 corporate employees to over 300 in a very short period of time and needed
to consolidate their USA HQ location into 45,000 sq. ft. in Phoenix, AZ.
● In addition to adding over 300 employees in Phoenix, AZ , Mitel also grew rapidly in New York,
Chicago, Houston, Dallas, and LA.
Services Offered
● Business Environments assisted with the finish selection for the office furniture (fabric, paint,
stain, laminate, steel, wood, and carpet.) Product: Friant workstations, Kimball National.
● Project Management
Results
● Business Environments saved Mitel over $50,000 on new office furniture and provided
installation service on time and under budget.
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
Colonial Pipeline Atlanta, GA Client Contact Mark Hiatt, Project Manager
Atlanta, Georgia
Client Contact Mark Hiatt, Executive Project Manager
Situation Colonial Pipeline, ranked as one of the largest oil and gas firms in the world signed
a lease for 70,000 sq. ft of space and needed to fit out four floors in two months Each station had to be designed to adhere to strict building codes.
BEC and NVISION a Haworth Company teamed to produce final layouts and floor
plans.
Services Provided BEC supplied new modular Nvision (a Haworth Company) workstations and furni-
ture layouts for the new corporate HQ. Plans called for the installation of over 450 workstations in four Phased in floors. CPC also used Trendway floor to ceiling walls instead of drywall. Project Management.
Results BEC designed a modular workstation solution so that Colonial Pipeline could re-
configure each station in the future without adding additional panels Saved CPC over $400,000 in floor to ceiling wall cost
“Your Office Furniture Partner”
;
Office Furniture I Cabling Solutions I Metro Movers Case Study
Atlanta, Georgia
Client Contact Mark Hiatt, Executive Project Manager
Situation Colonial Pipeline, ranked as one of the largest oil and gas firms in the world signed
a lease for 70,000 sq. ft of space and needed to fit out four floors in two months Each station had to be designed to adhere to strict building codes.
BEC and NVISION a Haworth Company teamed to produce final layouts and floor
plans.
Services Provided BEC supplied new modular Nvision (a Haworth Company) workstations and furni-
ture layouts for the new corporate HQ. Plans called for the installation of over 450 workstations in four Phased in floors. CPC also used Trendway floor to ceiling walls instead of drywall. Project Management.
Results BEC designed a modular workstation solution so that Colonial Pipeline could re-
configure each station in the future without adding additional panels Saved CPC over $400,000 in floor to ceiling wall cost
“Your Office Furniture Partner”
;
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
SOUTHERN COMPANY Amsterdam, Netherlands Client Contact Todd Taylor, Director
Office Furniture I Cabling Solutions I Metro Movers Case Study
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
Douglas County Law Enforcement Facility Douglasville, GA Client Contact Sheriff Phil Miller, Sheriff Douglas County
Office Furniture I Cabling Solutions I Metro Movers Case Study
Situation Douglas County needed furniture for it’s new Law Enforcement facility (6 Story Building) and keep the cost within budget. Needs: 70,000 sq. ft. of space/furniture Initial Plans called for new AIS workstations and private office furniture by Kimball National. Each station had to be designed to adhere to strict building codes.
Services Provided BEC supplied new modular AIS Divi workstations and furniture layouts for the new Center. Plans called for the installation of high end casegoods and special millwork custom furniture by mobilia. Project Management.
Results BEC installed over six floors and approx. $1 million in new furniture project was on time and on budget. Additional product was installed in Douglasville, GA city center.
Business Environments I 7000 Central Parkway, Suite 1700, Atlanta, GA 30328 I O: 770.667.3338 F: 770.667.0922
www.becusacorp.com
City of Douglasville Judicial Center Douglasville, GA Client Contact Eric Johnson, CPS Advisors
Office Furniture I Cabling Solutions I Metro Movers Case Study
Situation The City of Douglasville needed furniture for it’s new Judicial Center and keep the cost within budget. Needs: 60,000 sq. ft. of space/furniture Initial Plans called for new AIS workstations and private office furniture by National. Each station had to be designed to adhere to strict building codes.
Services Provided BEC supplied new modular AIS Divi workstations and furniture layouts for the new Judicial Center . Plans called for the installation of high end casegoods and special millwork custom furniture by Artilite. Project Management.
Results BEC installed over 3 floors and approx.. $1,million in office furniture. Project was on time and on budget. Additional product was installed in in the Annex downtown Douglasville.