Gdtr mul w35

29
Global Drive Test Report – Multan – W-35 Confidential Page 1 Alcatel-Lucent Pakistan Ltd GLOBAL DRIVE TEST REPORT MULTAN CITY W35-2010

description

 

Transcript of Gdtr mul w35

Page 1: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 1 Alcatel-Lucent Pakistan Ltd

GLOBAL DRIVE TEST REPORT

MULTAN CITY

W35-2010

Page 2: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 2 Alcatel-Lucent Pakistan Ltd

Table of contents 1 EXECUTIVE SUMMARY .............................................................................................................. 4

2 DRIVE TEST RESULTS ................................................................................................................. 5

3 COVERAGE PLOTS ..................................................................................................................... 6

3.1 COVERAGE PLOT #1 ..................................................................................................................... 6

3.2 COVERAGE PLOT #2 ..................................................................................................................... 7

3.3 RX_LEV DISTRIBUTION: ................................................................................................................. 8

4 QUALITY PLOTS ......................................................................................................................... 9

4.1 QUALITY PLOT #1 ........................................................................................................................ 9

4.2 QUALITY PLOT # 2 ...................................................................................................................... 10

FIGURE 5: QUALITY PLOT #2 OF MOBILINK MULTAN NETWORK ..................................................................... 10

4.2.1 Bad Rx_Qual Patches in Plot #1 .................................................................................... 11

4.2.2 Bad Rx_Qual Patches in Plot # 2 ................................................................................... 12

4.3 RX_QUAL DISTRIBUTION: ............................................................................................................ 13

5 VOICE QUALITY ........................................................................................................................ 14

5.1 FER PLOT #1: ........................................................................................................................... 14

5.2 FER PLOT #2: ........................................................................................................................... 15

5.3 FER DISTRIBUTION: .................................................................................................................... 16

6 C/I WORST PLOTS .................................................................................................................... 17

6.1 C/I WORST PLOT #1: ................................................................................................................. 17

6.2 C/I WORST PLOT #2: ................................................................................................................. 18

6.2.1 Bad C/I Patches in Plot #1 ............................................................................................. 19

6.2.2 Bad C/I Patches in Plot #2 ............................................................................................. 21

6.3 C/I WORST DISTRIBUTION: .......................................................................................................... 23

7 TIMING ADVANCE: ................................................................................................................... 24

8 NETWORK KPIS: ....................................................................................................................... 25

9 PROBLEMS & SUGGESTIONS .................................................................................................... 26

9.1 HO FAILURES ............................................................................................................................ 26

9.2 CALL DROPS .............................................................................................................................. 27

9.3 MUTE CALLS: ............................................................................................................................ 28

10 SUMMARY & CONCLUSION .................................................................................................. 29

Page 3: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 3 Alcatel-Lucent Pakistan Ltd

List of figures

Figure 1: Coverage Plot #1 of Mobilink Multan Network ................................................................... 6

Figure 2: Coverage Plot #2 of Mobilink Multan Network ................................................................... 7

Figure 3: Rx_Lev (Sub) Distribution ................................................................................................... 8

Figure 4: Quality Plot #1 of Mobilink Multan Network ...................................................................... 9

Figure 5: Quality Plot #2 of Mobilink Multan Network ..................................................................... 10

Figure 6: Rx_Qual (Sub) Distribution ................................................................................................ 13

Figure 7: FER Plot #1 of Mobilink Multan Network ........................................................................... 14

Figure 8: FER Plot #2 of Mobilink Multan Network ........................................................................... 15

Figure 9: FER Distribution ................................................................................................................ 16

Figure 10: C/I Worst Plot #1 of Mobilink Multan Network ................................................................ 17

Figure 11: C/I Worst Plot #2 of Mobilink Multan Network ................................................................ 18

Figure 12: C/I Worst Distribution ..................................................................................................... 23

Figure 13: Timing Advance Distribution ........................................................................................... 24

Figure 14: KPIs of Mobilink Multan Network .................................................................................... 25

Page 4: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 4 Alcatel-Lucent Pakistan Ltd

1 EXECUTIVE SUMMARY

This report is based on the Global Drive Test that was performed for Multan city in W35-2010 (25-08-2010 to 27-08-2010) under the scope of the Optimization Services Contract.

Page 5: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 5 Alcatel-Lucent Pakistan Ltd

2 DRIVE TEST RESULTS

This section presents the Coverage & Quality of Mobilink network which has been measured during the global drive test. In addition to the Coverage & Quality plots, Network KPIs have also been included in the report.

Alcatel has used TEMS Investigation Drive Test tool for this Air Interface Measurement

and the KPIs have been processed using TEMS Reporter Generator. However, CSSR & CDR are calculated on real count basis so as to have more accurate KPIs.

Page 6: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 6 Alcatel-Lucent Pakistan Ltd

3 Coverage Plots 3.1 Coverage Plot #1

Figure 1: Coverage Plot #1 of Mobilink Multan Network

Page 7: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 7 Alcatel-Lucent Pakistan Ltd

3.2 Coverage Plot #2

Figure 2: Coverage Plot #2 of Mobilink Multan Network

Page 8: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 8 Alcatel-Lucent Pakistan Ltd

3.3 Rx_Lev Distribution:

Figure 3: Rx_Lev (Sub) Distribution

Page 9: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 9 Alcatel-Lucent Pakistan Ltd

4 Quality Plots

4.1 Quality Plot #1

Figure 4: Quality Plot #1 of Mobilink Multan Network

dsjf

Page 10: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 10 Alcatel-Lucent Pakistan Ltd

4.2 Quality Plot # 2

Figure 5: Quality Plot #2 of Mobilink Multan Network

Page 11: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 11 Alcatel-Lucent Pakistan Ltd

4.2.1 Bad Rx_Qual Patches in Plot #1

Case # Problem Recommendation

1

Call was HO from MUL0887C to remote cell OM8969B for some time which served with degraded quality & level; next HO to potential MUL7926C was ok; 0827_22 Log file

No severe issue observed in stats as well; except for an illogical HO at the time of DT probably due to some UL emergency cause; Change Source: MUL0887C Dest: OMR8969B HOMarginQual from -2 to 0 and will be monitored further in the next DT.

2

Call dragged on MUL3377B, better condition HO triggered late towards MUL3377C; 0827_01 Log file

To avoid intra cell HO at low levels instead of inter cell; Change Offset_HO_Margin_inner from 10 to 8 on MUL3377B; Change Source: MUL3377B Dest: MUL3377C HOMargin from 5 to 3

Page 12: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 12 Alcatel-Lucent Pakistan Ltd

4.2.2 Bad Rx_Qual Patches in Plot # 2

Problem Recommendation

Call was HO on to MUL0128F which degraded the quality/SQI due to HW issues on the site. 0827_33 Log file

1- Coverage issue already reported to CP 2- MUL0128 HW issues reported to OAN; HW is

very degraded due to Fluctuations

Page 13: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 13 Alcatel-Lucent Pakistan Ltd

4.3 Rx_Qual Distribution:

Figure 6: Rx_Qual (Sub) Distribution

Page 14: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 14 Alcatel-Lucent Pakistan Ltd

5 Voice Quality Voice quality is judged upon the Frame erasure rate. Even while experiencing bad Rx_Qual, the voice Quality still could be maintained.

5.1 FER Plot #1:

Figure 7: FER Plot #1 of Mobilink Multan Network

Page 15: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 15 Alcatel-Lucent Pakistan Ltd

5.2 FER Plot #2:

Figure 8: FER Plot #2 of Mobilink Multan Network

Page 16: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 16 Alcatel-Lucent Pakistan Ltd

5.3 FER Distribution:

Figure 9: FER Distribution

Page 17: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 17 Alcatel-Lucent Pakistan Ltd

6 C/I Worst Plots

6.1 C/I Worst Plot #1:

Figure 10: C/I Worst Plot #1 of Mobilink Multan Network

Page 18: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 18 Alcatel-Lucent Pakistan Ltd

6.2 C/I Worst Plot #2:

Figure 11: C/I Worst Plot #2 of Mobilink Multan Network

Page 19: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 19 Alcatel-Lucent Pakistan Ltd

6.2.1 Bad C/I Patches in Plot #1

Problem Recommendation

Faulty TRE 11 TRX 3 for MUL3364C. 0826_30 Log file

KPIs are fine for the TRE but the quality and SQI serving of the TRE is poor, reported earlier as well. Pending for replacement

Page 20: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 20 Alcatel-Lucent Pakistan Ltd

DL_RXQual Distribution : TRX 1 DL_RXQual Distribution : TRX 2

DL_RXQual Distribution : TRX 3 [Faulty]

Page 21: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 21 Alcatel-Lucent Pakistan Ltd

6.2.2 Bad C/I Patches in Plot #2

Problem Recommendation

Faulty TRE 3 TRX 1 for MUL4605B. 0826_16 Log file

KPIs are fine for the TRE but the quality and SQI serving of the TRE is poor, reported earlier as well. Pending for replacement

Page 22: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 22 Alcatel-Lucent Pakistan Ltd

DL_RXQual Distribution : TRX 1 [Faulty]

DL_RXQual Distribution : TRX 2 DL_RXQual Distribution : TRX 3

Page 23: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 23 Alcatel-Lucent Pakistan Ltd

6.3 C/I Worst Distribution:

Figure 12: C/I Worst Distribution

Page 24: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 24 Alcatel-Lucent Pakistan Ltd

7 Timing Advance:

Figure 13: Timing Advance Distribution

Page 25: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 25 Alcatel-Lucent Pakistan Ltd

8 Network KPIs:

Figure 14: KPIs of Mobilink Multan Network

CALLS ATTEMPTED (A) 406

CALLS SETUP SUCCESSFULLY (B) 402

CALL SETUP FAILURES (C) 04

CALLS DROPPED (D) 0

HANDOVER ATTEMPTS (E) 501

HANDOVERS SUCCESSFUL (F) 501

HANDOVER FAILURES (G) 0

Location Updates 45

KPIs

CSSR (B/A) 99.01 %

CDR (D/B) 0.00 %

HSR (F/E) 100 %

HFR (G/E) 0.00 %

Page 26: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 26 Alcatel-Lucent Pakistan Ltd

9 PROBLEMS & SUGGESTIONS

9.1 HO Failures

X = HO FAILURES NO Hand over Failure was encountered during the complete Global Drive Test of Multan City during the Week 35-2010.

Page 27: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 27 Alcatel-Lucent Pakistan Ltd

9.2 Call Drops

= CALL DROPS NO drop call was encountered during the complete Global Drive Test of Multan City during the Week 35-2010.

Page 28: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 28 Alcatel-Lucent Pakistan Ltd

9.3 Mute Calls:

No Mute call was encountered during the complete Global Drive Test of Multan City during the Week 35-2010.

Page 29: Gdtr mul w35

Global Drive Test Report – Multan – W-35

Confidential Page 29 Alcatel-Lucent Pakistan Ltd

10 Summary & Conclusion The CSSR has maintained on 99.01%.Around 406 calls were attempted and 04 calls were blocked. The HSR remains at 100% with 501 HO attempts. 0 HO failure and 0 Call Drop occurred which were deeply analyzed and Recommendation and actions were also taken accordingly. Bad Quality and Coverage Areas are also highlighted and necessary actions are also taken to resolve the problem.

Region Week start

WEEK No

Area

Total Drops

Dropped Calls

(Quality)

Dropped Calls

(Coverage)

Dropped Calls (H

W)

Dropped Calls

(Outages)

Dropped Calls

(Netw

ork)

Total Quality Issues

Quality Issues

Quality Issues

(Outage)

Quality Issues (H

W)

HO Attempts

HO Failures

HSR

Poor Coverage Issues

Multan 30-08-10

WEEK 35

Central III

0 0 0 0 0 0 5 2 1 2 501 0 100% 1

Call Drop Summary

NO Call drop encountered during the complete Global Drive Test of Multan City during the Week 35-2010.

HO Fail Summary

NO H O Failures found during the complete Global Drive Test of Multan City during the Week 35-2010.

Mute Calls:

No Mute call was encountered during the complete Global Drive Test of Multan City during the Week 35-2010.