Transcript of GDF SUEZ and the new regulation of the gas market in France
- 2 -
GDF SUEZ and the new regulation of the gas
market in France
Energy Community gas distribution Conference, Zagreb, 25th of September 2008
Jean-Louis MARTINAUD, Senior Adviser, GDF SUEZ, European International Energy Branch
- 3 -
GDF SUEZ presentation
- 4 -
In July 2008,
&
became
- 5 -
- 6 -
Group position in Europe
- 7 -
A Major Natural Gas OperatorGaz de France datas for 2007
N° of customers15 million customers
Gas sales730 billion kWh
Electricity sales21 billion kWh
Transmission 35,000 km
Distribution210,000 km
Regasification17 bn m3 of capacity
Storage Facilities12 bn m3 of working capacity
2007 Revenues €27.5 bn
Headcount ≈ 47,500 employees
- 8 -
- 9 -
Gas Distribution Market in France
Network
Gas Volume
Customers
GRDF
180,000 Km
30 Bcm
11,00,000
Gaz de Bordeaux
3300 Km
460 Mm3
2,11,000
Gaz électricité de
Grenoble
210 Km
90Mm3
47,500
Gaz de Strasbourg
1610 Km
0.5Bcm
1,19,000
- 10 -
GrDF Network: Industrial tools of a distribution
185 000 km of distribution network
19 300 city gate stations
7 020 000 individual and collective connections
11 million customer connections
12 active suppliers having transmission contract
30 Bcm distributed annually
9 100 municipalities served covering 75% of the French population.
- 11 -
GDF SUEZ and the regulation of the gas market in France
- 12 -
GDF SUEZ and the regulation of the gas market in France
Legal framework
Overview of the French gas market
Policy and regulation adopted and consequences for Gaz de France
• The regulator – CRE
• Minister in charge of Energy
• Gaz de France relationships with the regulator and other national public bodies
• Implementation of the main aspects arising from the European directives
- 13 -
Legal framework
Directive 98/30/EC (06/22/1998) came into force on 10 August 2000. As soon as the 1st Directive came into effect, and despite the delay in transposition in French law, GDF SUEZ implemented a Third parties access to transmission network.
The law of 3 January 2003 : has transposed into French legislation this directive, relating to the gas and electricity markets and to the public service in energy.
The second Gas Directive 2003/55/EC of 26 June 2003 came into force on 1st july 2004
The law of 13 July 2005 relative to the orientation of the energy policy in France
The law of 7 December 2006 prepares the fully opening of the French gas market on 1st july 2007
- 14 -
Overview of the French gas market - organization
Before 10th August 2000 :
• 3 upstream operators (GSO, CFM and TSGF),
• 1 up/down-stream integrated operator (Gaz de France)
• 16 Independent Distribution Companies and some other new LDCs
Since 1st January 2005 - an increase in the number of players :
• Infrastructure operators : TPA, legal or managerial independence, compliance program
Transmission : 2 operators, GRTgaz (100 % GDF SUEZ) and TIGF (Total)
LNG terminals : Gaz de France GDF SUEZ next year STMFC (Gaz de France and Total) and maybe others later…
Storage : 2 operators, GDF SUEZ and TIGF
Distribution : Gaz de France Réseau Distribution and 23 LDCs (3%)
- 15 -
Overview of the French gas market - organization
• Suppliers : Authorisation to supply gas delivered by public authorities
Gas and oil producers (majors and other)
Traditional gas suppliers
Others (electricity suppliers, new retailers…)
• New players - traders : « Gas Exchange Points » (PEG) like hubs
Since 1st July 2007 the french energy market is fully opened
- 16 -
Policy and regulation adopted and consequences for GDF SUEZ
The regulator – CRE
Minister in charge of Energy
Gaz de France relationships with the regulator and other national public bodies
Implementation of the main aspects arising from the directive
- 17 -
The Energy Regulation Commission (CRE)
The law of 3 january 2003 gives the power to regulate gas sector to the « CRE », an independent body previously created to regulate the electricity.
Independent administrative body
The law of 7 december 2006 changes the organization – The CRE is consequently a two-headed body :
• The Commission with 9 members (including the chairman, and 2 vice Presidents) appointed for a non-renewable term of 6 years : 2 of these members are consumers representatives
• The Committee for settlement of disputes and sanctions : composed of 4 magistrates
• Operational resources :126 persons (annual report july 2007), 15,5 M€ for annual credits.
- 18 -
CRE main powers in gas sectorAccess to the network :
• Proposes tariffs for the use of public electricity and natural gas systems and LNG plants, which are then confirmed jointly by the Ministers in charge of energy and economy.
• Grants temporary dispensations for third parties access under strict requirements
• Complement when necessary the regulation rules within the respect of laws and decrees
• Settles disputes on network access (Committee for settlement of disputes and sanctions)
Gives an opinion to the minister on sales tariffs applied to non-eligible consumers
Approves the accounting principles used for unbundling the different activities between production, transmission and distribution, and other activities, in close co-operation with the « Conseil de la Concurrence » (Competition Commission)
Monitors the market operation
Sanctioning powers (Committee for settlement of disputes and sanctions)
- 19 -
Missions of the Minister in charge of EnergyApproves the network access tariffs, based on the CRE
proposal
• « Loi de programme fixant les orientations de la politique énergétique », adopted on 13 july 2005, implement a quicker procedure of approval : if the minister is silent during 2 months, CRE proposal is automatically applicable
Approves the evolution of sales tariffs applied to non-eligible consumers, after the opinion of the CRE was given
Grants authorisations to build and/or operate natural gas facilities and authorisations to supply gas (transparent criteria)
Prepares an indicative pluriannual planning of supply and capacity of gas natural undertakings on a long-term basis. This program is made to meet the demand for natural gas and an investment program for infrastructures
Ensures respect of the public service obligations, in particular security of supply
Sanctioning powers
- 20 -
GDF SUEZ relationships with the regulator and other national public bodies
Relationships between CRE (national energy regulator) and GDF SUEZ
GDF SUEZ maintains regular relationships with other authorities :
• The Competition Commission : « Conseil de la Concurrence »
• The « Direction de la concurrence de la consommation et de la répression des fraudes » – DGCCRF – of the Ministry of Economy
• The Ministries in charge of Economy and Energy…
- 21 -
As a large integrated player GDF SUEZ has significant legal and regulatory obligations
In the context of gas market deregulation, GDF SUEZ has to meet commitments arising from :
• TPA to networks, LNG terminals and storage
• Unbundled accounts or affiliates’ accounts for activities + eligible & non-eligible accounts
• Financial flows between the separate activities : protocols or contracts with the TPA conditions when these exist or business conditions
• Confidentiality of commercial information (separated locations and IT systems)
• Since January 2005, gas transmission system has been a subsidiary company of GDF SUEZ : GRTgaz
• Since January 2008, gas distribution system has been a subsidiary company of GDF SUEZ : GrDF
• Compliance programs and annual CRE review
- 22 -
Access to the transmission network which balances availability to new entrants and security of supply
Transmission network tariff changes : 1st TPA system in mid 2000. Currently French territory is divided into 4 + 1 balancing areas for the transmission facility. There will be 2 +1 areas in the future.
Rules for capacity allocation published in 2004
The last TPA regime for the transmission network tariff has been adopted in november 2006 - the next with the 2 zones tariff in 2009
- 23 -
Access to distribution network for third parties that complies with a full market opening
First TPA conditions published in mid 2000 for large customers
First “CRE tariff” applied in mid-2004
Allocation principles : “capacity follows the customer”
Information regularly updated on the website
Third tariff has been discussed with CRE and has been implemented since July 2008 : pluri-annual regulation (3 years) giving opportunity to share productivity benefits
Very large works conducted from 2003 with all stakeholders of the market under the CRE authority in order to prepare and improve market procedure (information, IT system, day to day quantities allocation, switching process…) at the different stage of market opening (mid 2004 and mid 2007)
- 24 -
Implementation of the main aspects arising from the directive : Separated activities and unbundled accounts 1/2
Separate accounts for 7 activities : Transmission, LNG terminals, Storage, Distribution Network, Non gas Activities (LPG’s public distributions), Electricity (since 2004) and Other Activities, as part of principles approved by the national regulator (CRE)
Separated accounts are transmitted yearly to the regulator (CRE)
• Balance sheet and income statement for each activity
Unbundling grounded on general accounting
Financial flows between the separate activities : protocols or contracts with the TPA conditions when these exist
Sub rules approved by CRE and under its permanent control
- 25 -
Implementation of the main aspects arising from the directive :Tariff building mechanism by CRE (cost plus)
Relevant net operating expenditures (OpEx) with a RPI – 1,3 % mechanism
Capital expenditures (CaPex): economic value for the regulatory asset base and rules for future annual revaluations
Evaluating the capital costs : annual economic depreciation linear during the economic lifetime of the infrastructure
Financial return : depending on the infrastructure. For distribution, RoR = 6,75 %
- 26 -
TSO
DSO
CUSTOMER
TPA CONTRACT
SUPPLIERTPA CONTRACT
« DIRECT » TPA CONTRACT
SUPPLY CONTRACT
(including TPA conditions)
TPA and supply contracts system
STORAGE
- 27 -
Distribution TPA Tariff
Tariff Customer Meter reading Structure
T1Less than
6 000 kWh/yHalf-yearly
Annual subscribtion (€/y)+ proportionnal price (€/kWh)
T26 000 kWh/y
to 300 000 kWh/yHalf-yearly
Annual subscribtion (€/y)+ proportionnal price (€/kWh)
T3300 000 kWh/y
to 5 GWh/yMonthly
Annual subscribtion (€/y)+ proportionnal price (€/kWh)
T4*More than5 GWh/an
Daily
Annual subscribtion (€/y)+ proportionnal price (€/kWh)+ proportionnal price to the subscribed daily flow ((€/(kWh/day))/y)
* For very big customers it is possible to have a special tariff with a term proportionnal to the distance from the network
- 28 -
GrDF TPA Tariffs
- 29 -
Implementation of the main aspects arising from the directive : Independence of the network operators
Transmission : legal unbundling ; status of the subsidiary company
Distribution : legal unbundling ; status of the subsidiary company
For these two activities, respect of the shareholders’s rights
Transmission network operator and distribution network operator have to publish a code of conduct with a number of values that form the basis of their corporate ethical code.
This code and an annual report of compliance are transmitted to the CRE, which publishes an annual report on the respect of the codes by the operators
- 30 -
Consequences of the new regulation and
lessons to be drawn
- 31 -
Consequences of the new regulation
Gas to gas competition
Probably more regulation ( TPA )
Variety of final price designs
New ways of supply : spot markets, hubs
Concentration of the major players of the European energy industry
- 32 -
Lessons to be drawn
The opening up has to be progressive, with a long term view :
to allow the financing of infrastructures,
to ensure supply security,
to avoid an excessive concentration of operators
This is all the more true in a developing system
GDF SUEZ has chosen to develop in an integrated way
- 33 -
Thank you for your attention