Long vacuum foil transport
GD X2
Simplified transport system
Contact Making / Packing Long vacuum foil transportGD Machinery GD X2
GD X2 Long vacuum foil transport
Improve the quality of foil alignment with a long vacuum film transport upgrade
Issue • Highmaintenancerequirements • Difficultsetting • Reliabilityissues • QualityissueswithfoilalignmentConsequences • Increaseddowntime • Lossofproduction • Non-conformingproductSolution • RemovalofunwindingsectorsandreplacementwithsuctionbeltsAdvantages • Improvedperformance • Lowmaintenancerequirements • Reduceddowntime • QualityimprovementScope • LongvacuumfoiltransportTimerequired • Approx.machinedowntime:32hours(3workingdays) • Totalmechanicalhours:40hours • Totalelectricalhours:0hours(localelectricalsupportpossible)Guarantee • Oneyearguarantee
Suitable for all GD X2 / GD X2NV
Product No. 1216-34A08 Revision 1.00