GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

download GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

of 29

Transcript of GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    1/29

    71

    Centre Number

    Candidate Number

    G C B 1 1

    General Certificate of Secondary Education2012

    Construction and the Built Environment

    Unit 1: The Construction Industry for the 21st Century

    [GCB11]

    MONDAY 14 MAY, AFTERNOON

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    2/29

    Examiner Only

    Marks RemarkSection A

    Answer all questions

    Use the Pre-Release Material to assist with answering

    questions 1, 2, 3 and 4.

    1 (a) The following symbols have been used on the Site Plan and GroundFloor Plan contained within the Pre-Release Material.

    Identify what each of these BS1192 symbols or building elementsrepresent:

    1. _____________________________ [1]

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    3/29

    Examiner Only

    Marks Remark

    3. _____________________________ [1]

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    4/29

    Examiner Only

    Marks Remark(b) The following building elements are found in the Pre-Release

    Material. Name one material that can be used to manufacture eachelement.

    1. Front Windows __________________

    2. Damp Proof Membrane (DPM) __________________

    3. Roof Covering __________________

    4. Wall Ties __________________

    5. Rafters __________________

    6. Gutter __________________ [6]

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    5/29

    Examiner Only

    Marks RemarkThe following professionals and craft operatives are employed during thedesign and construction stages of the house shown in the Pre-ReleaseMaterial.

    2 (a) Identify three of the main roles that a Site Engineer would have inrelation to this project.

    Site Engineer

    1. __________________________________________________________________________________________________________

    _____________________________________________________________________________________________________________

    2. __________________________________________________________________________________________________________

    _____________________________________________________________________________________________________________

    3. __________________________________________________________________________________________________________

    _____________________________________________________________________________________________________________[3]

    (b) Identify three of the main roles that the following craft operativeswould have for the project shown in the Pre-Release Material.

    Bricklayer

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    6/29

    Examiner Only

    Marks Remark3 Using the attached Pre-Release Material, give the following dimensions in

    millimetres. Some dimensions may need to be scaled.

    (a) The length and width of the dining room.

    Length __________________ Width __________________ [4]

    (b) The overall width of the conservatory from the outside of the walls, atground floor level, including sill projection.

    Width __________________ [2]

    (c) The width and height of the family room window at the front of thehouse. Take this height at the highest point of the window.

    Width __________________ Height __________________ [4]

    (d) The total number of toilets within the complete building.

    Total number of toilets __________________ [2]

    (e) The gradient of the ramp into the entrance hall.

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    7/29

    Examiner Only

    Marks Remark4 The drawing shown below is of a foundation detail, which will be used in

    the dwelling shown in the Pre-Release Material.

    High densityconcrete blockin sand cementmortar 1:3

    Damp proof Course min 150above G.L.

    Existing/ProposedGround Level

    Lean mix concrete, fillto cavity up to groundlevel, haunched at30 degrees with falltowards the outsideface.

    60 mm thick Quinn ThermWF/Kingspan rigid board insulationfixed to inner skin of blockwork withcavity tie clip

    100 mm thick Quinn-Liteinsulation block laid in,lime mortar 1:1:6

    100 mm thick 20 N/10 mmaggregate Concrete Slap

    1200 guageDamp Proof Membrane

    50 mm thick Quinn ThermQF/Kingspan rigid boardinsulation to underside of floor slab, 25 mm toperimeter of slab

    600 300 Concrete strip foundation,grade 20N/10 mm aggregate, minimumdepth below finished ground level600 mm, or deeper until satisfactoryground bearing strata is reached to

    ti f ti f B ildi C t l ffi

    Centre Lineof Foundation

    150mm min wellcompacted, hardcore25mm Crusher RunStone

    20mm sandblinding

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    8/29

    Examiner Only

    Marks Remark(d) List two functions of the wall construction shown in Fig. 2 .

    _____________________________________________________________________________________________________________

    _____________________________________________________________________________________________________________

    _____________________________________________________________________________________________________________

    _____________________________________________________________________________________________________________[2]

    (e) What is the full name of the material represented by the letters DPM?

    _____________________________________________________________________________________________________________[2]

    (f) State one function of a DPM.

    _____________________________________________________________________________________________________________

    _____________________________________________________________________________________________________________[1]

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    9/29

    Examiner Only

    Marks Remark5 List different examples of work which could commonly be carried out

    under each of the following headings:

    Building , Civil Engineering and Building Services .

    (a) Building

    List five different examples of work:

    1. __________________________________________________________________________________________________________

    2. __________________________________________________________________________________________________________

    3. __________________________________________________________________________________________________________

    4. __________________________________________________________________________________________________________

    5. __________________________________________________________________________________________________________[5]

    (b) Civil Engineering

    List three different examples of work:

    1. __________________________________________________________________________________________________________

    2. __________________________________________________________________________________________________________

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    10/29

    Examiner Only

    Marks Remark6 A requirement of all modern construction is to incorporate services into a

    building.

    (a) Clearly state how you would incorporate electrical services into a

    timber stud wall and secure a socket box in place. In your answer indicate what stage plastering should take place in this process.

    _____________________________________________________________________________________________________________

    _____________________________________________________________________________________________________________

    _____________________________________________________________________________________________________________

    _____________________________________________________________________________________________________________

    _____________________________________________________________________________________________________________[4]

    (b) Clearly state how you would incorporate electrical services into the

    inner leaf of a concrete block cavity wall and secure a socket boxin place. In your answer indicate what stage plastering should takeplace in this process.

    _____________________________________________________________________________________________________________

    _____________________________________________________________________________________________________________

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    11/29

    Examiner Only

    Marks Remark7 State the main reason for having the following elements in a typical

    domestic house.

    (a) The building element shown in Fig. 3 is a foundation trench.

    Fig. 3

    What is the main reason for excavating the foundation trench?

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    12/29

    Examiner Only

    Marks Remark (b) The building elements shown in Fig. 4 are floor joists.

    Fig. 4

    What are the two main reasons for having floor joists in a domestic

    house?

    _____________________________________________________________________________________________________________

    _____________________________________________________________________________________________________________

    _____________________________________________________________________________________________________________

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    13/29

    Examiner Only

    Marks Remark(c) The building element shown in Fig. 5 is a window.

    Fig. 5

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    14/29

    Examiner Only

    Marks RemarkSection B

    Answer all questions

    8 Compare how a solid stone wall in traditional domestic construction is

    different from a modern cavity wall constructed from Brick or Block.

    _________________________________________________________________________________________________________________

    _________________________________________________________________________________________________________________

    _________________________________________________________________________________________________________________

    _________________________________________________________________________________________________________________

    _________________________________________________________________________________________________________________

    _________________________________________________________________________________________________________________

    _________________________________________________________________________________________________________________

    _________________________________________________________________________________________________________________

    _________________________________________________________________________________________________________________

    _________________________________________________________________________________________________________________

    _________________________________________________________________________________________________________________

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    15/29

    Examiner Only

    Marks Remark9 Fig. 6 shows the early stages in the development of the Titanic Signature

    Building in Belfast which will be several storeys high.

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    16/29

    Examiner Only

    Marks RemarkThe domestic site shown in the Pre-Release Material will use TelescopicHandlers such as the one shown in Fig. 7 .

    (b) List five operations which could be carried out by the Telescopic

    Handlers on the domestic building site.

    Fig. 7

    1. __________________________________________________________________________________________________________

    2. __________________________________________________________________________________________________________

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    17/29

    Examiner Only

    Marks RemarkA Contractor organises his/her resources under three main headings:

    PlantLabour

    Materials

    (d) (i) What does the term labour refer to?

    [2]

    (ii) Provide two examples of this.

    [2]

    (e) (i) What does the term materials refer to?

    [2]

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    18/29

    Examiner Only

    Marks Remark10 Fig. 8 below shows a head detail used in cavity wall construction for the

    dwelling shown in the Pre-Release Material.

    Add the following labels to the drawing. Leader lines have been provided

    for your guidance.

    Wet dash on a sand/cement render total thickness is 19 mmCavity InsulationGypsum plaster bonding and finish coat 13 mmStepped DPCDouble Glazed PVCu or Timber Window100 mm blockwork outer leaf Proprietary cavity closer

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    19/29

    Examiner Only

    Marks Remark11 Before the client gives their final approval for the attached pre-release

    drawing and specifications, he has asked you to identify ways in which hecan reduce the use of fossil fuels in the day to day running costs of thehouse.

    Evaluate how this can be achieved under the following headings:

    The building structureRenewable energy

    _________________________________________________________________________________________________________________

    _________________________________________________________________________________________________________________

    _________________________________________________________________________________________________________________

    _________________________________________________________________________________________________________________

    _________________________________________________________________________________________________________________

    _________________________________________________________________________________________________________________

    _________________________________________________________________________________________________________________

    _________________________________________________________________________________________________________________

    _________________________________________________________________________________________________________________

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    20/29

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    21/29

    General Certificate of Secondary Education

    January 2011

    Construction and the Build Environment

    Assessment Unit 1: The ConstructionIndustry for the 21 st Century

    Assessing The Construction Industry[GCB11]

    Available to Candidates 01 November 2010

    Candidate Number

    You must use this clean copy of the Pre-Release Material in the examination and not your

    Construction and the Built EnvironmentPre-Release Material

    Assessment Unit 1: The ConstructionIndustry for the 21 st Century

    [GCB11]

    MONDAY 14 MAY, AFTERNOON

    General Certificate of Secondary Education

    2012

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    22/29

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    23/29

    First floor construction25 mm T & G Boarding, 225 mm 38 mm. Joists at 400 mm centres. All joists built into insideskin of cavity walls to be beam filled and completely sealed between floor void and cavity.Provide one row herringbone bridging to each room, 12.5 mm plaster board and skim to

    ceilings. Provide 30 mm 5 mm restraint straps to all timbers parallel to walls.

    Damp proof coursesVertical DPCs to all window and external door jambs, horizontal DPCs behind and under sillsand stepped between lintels. Wall DPCs to external skin, laid at 150 mm minimum abovefinished ground levels.DPCs to internal walls to overlap and be bonded to the floor DPM by a minimum of 215 mm.

    Foundations600 mm 300 mm foundations to 300 mm walls.450 mm 300 mm foundations to 100 mm walls.The above to be concrete strip foundations. The size and depth of foundations shown are theminimum required. Final sizes and bearing depths to be determined and agreed with buildingcontrol when sub/soil bearing pressures are known.Cavity fill to external walls to stop a minimum of 150 mm below the lowest DPC.

    Roof construction37 degree pitched roof constructionBangor blue natural slate150 38 softwood rafters200 38 softwood ceiling joistWhite PVC gutter and down pipe

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    24/29

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    25/29

    7299.02112127

    GCSE Construction and the

    Built Environment

    Front and Back Elevations

    Unit 1PRE-RELEASE MATERIALS

    Examination Series 2011 / 2012SCALE: 1: 100

    Back Elevation

    Front Elevation

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    26/29

    7299.02112127

    GCSE Construction and the

    Built Environment

    Side Elevations

    Unit 1PRE-RELEASE MATERIALS

    Examination Series 2011 / 2012SCALE: 1: 100

    Solar Panels

    Side Elevation

    Height of window

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    27/29

    7299.02112127

    GCSE Construction and the

    Built Environment

    Sectional Detail

    Unit 1PRE-RELEASE MATERIALS

    Examination Series 2011 / 2012SCALE: 1: 100

    Section AA

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    28/29

  • 7/27/2019 GCSE CONS PP MayJune 2012 Unit 1 the Construction Industry for the 21st Century 2 10682

    29/29

    Lamp Post LampPost

    LampPost

    Sign

    BoundaryWall

    BoundaryFence

    Pedestrian Gate

    FlaggedPath

    TarmacCar Park

    RoughGrassArea

    Rough GrassArea

    Wild Shrubs

    Wild Shrubs

    Wild Shrubs

    Mature Trees600 dia Main Storm Drain owned by Water Service

    Pedestrian Bridge

    P ublic F oot P ath

    Suf f olk S tre et

    N

    PavingBrick

    Tarmac

    Tarmac

    TarmacDrive

    Grass

    Grass

    Grass

    Flower Bed

    Proposed New Dwelling Proposed new tree planting

    Site 1

    Site 3

    TBM 48.566Top of DrivewayLamp

    51.60051.800

    52.590

    52.850

    50.000

    49.000

    47.000

    47.200

    46.900

    47.200

    47.200

    46.800

    Overgrown Flagged Path

    Man hole cover

    7299.02

    GCSE Construction and the

    Built Environment

    Site Plan

    Unit 1PRE-RELEASE MATERIALS

    Examination Series 2011 / 2012NOT TO SCALE