    PEMBELIAN & PEMASANGAN FASILITAS KOMPRESORUNTUK GAS MUSI TIMUR

    FIELD PENDOPO

    APVD

    PT. INDOTURBINE PT. PERTAMINA EPREV DESCRIPTION DATE

    BY CHKD APVD CHKD

    ISSUED FOR REVIEW 03/10/2014 AYP TR ZN

    B ISSUED FOR APPROVAL 28/11/2014 NGM AYP ZN

    A

    Document No. Rev. Contract No : EP37-M12LL0122D

    GCMT-13-CIV-CN-016 B Job. No : 31-12008PO002

    Civil Calculation Sheet for KO Drum Foundation

  • 7/24/2019 GCMT-13-CIV-CN-0016 Civil Calculation Sheet for KO Drum IFA REV B

    2/22

    2 of 22 .

    Document No. Rev. Contract No : EP37-M12LL0122D

    GCMT-13-CIV-CN-016 B Job. No : 31-12008PO002

    Civil Calculation Sheet for KO Drum Foundation

    A B 0 A B 0

    X

    X

    X

    X

    1 35

    APPROVAL SHEET

    PAGEREVISIONS

    REMARKS PAGEREVISIONS

    REMARKS

    2 36

    3 37

    57

    58

    30

    34 68

    18

    16

    17

    38

    40

    4

    43

    7

    8

    9

    15

    39

    6

    5

    14

    50

    25

    26

    27

    63

    64

    33 67

    53

    54

    10 44

    49

    4511

    12

    13

    46

    47

    48

    55

    66

    59

    60

    61

    62

    24

    31 65

    41

    42

    51

    52

    19

    20

    56

    21

    22

    23

    32

    28

    29

  • 7/24/2019 GCMT-13-CIV-CN-0016 Civil Calculation Sheet for KO Drum IFA REV B

    3/22

    3 of 22 .

    Document No. Rev. Contract No : EP37-M12LL0122D

    GCMT-13-CIV-CN-016 B Job. No : 31-12008PO002

    Civil Calculation Sheet for KO Drum Foundation

    ISSUED FOR REVIEWA

    REVISION SHEET

    Rev.

    No.Date Description

  • 7/24/2019 GCMT-13-CIV-CN-0016 Civil Calculation Sheet for KO Drum IFA REV B

    4/22

    4 of 22 .

    Document No. Rev. Contract No : EP37-M12LL0122D

    GCMT-13-CIV-CN-016 B Job. No : 31-12008PO002

    Civil Calculation Sheet for KO Drum Foundation

    COMMENT SHEET

    Comments :

    B 23/10/2014 Attach pile properties (Revised)

    Pile group efficiency (Revised)

    REV NO. DATE DESCRIPTION

  • 7/24/2019 GCMT-13-CIV-CN-0016 Civil Calculation Sheet for KO Drum IFA REV B

    5/22

    5 of 22 .

    Document No. Rev. Contract No : EP37-M12LL0122D

    GCMT-13-CIV-CN-016 B Job. No : 31-12008PO002

    Civil Calculation Sheet for KO Drum Foundation

    Page

    1.0 INTRODUCTION .............................................. 6

    2.0 DEFINITION OF TERMS ....................................... 6

    2.1 Applicable Documents ..................................... 6

    2.2 International Code ................................................ 6

    2.3 Reference ..................................................................... 6

    3.0 GENERAL REQUIREMENTS ............... 7

    3.1 Material ............................................. 7

    3.2 Unit Weight ................................................... 7

    4.0 LOADING ANALYSIS ....................................... 7

    4.1 Load ......................................... 8

    4.2 Temporary Load ......................................... 8

    4.3 Load from Pile Cap (Each Support) ......................................... 8

    5.0 SOIL DATA PROPERTIES ..................................... 9

    6.0 PILING DESIGN ......................................... 9

    6.1 Mini Pile Properties .................................. 9

    6.2 Resume Allowable Capacity .......................... 9

    6.3 Pile Group Plan ......................................... 9

    7.0 PILE CAP REINFORCEMENT .............................. 11

    8.0 SKETCH ......................................... 13

    Table Of Contents

  • 7/24/2019 GCMT-13-CIV-CN-0016 Civil Calculation Sheet for KO Drum IFA REV B

    6/22

    6 of 22 .

    Document No. Rev. Contract No : EP37-M12LL0122D

    GCMT-13-CIV-CN-016 B Job. No : 31-12008PO002

    Civil Calculation Sheet for KO Drum Foundation

    1.0 INTRODUCTION

    2.0 DEFINITION OF TERMS

    2.1 Applicable Documents

    GCMT-13-MS-DS-002 : Mechanical Data Sheet LP Separator

    GCMT-13-CIV-SPC-002 : Civil Specification for Concrete Design and Materials

    GCMT-13-CIV-SPC-004 : Civil Specification for Foundation

    GCMT-13-CIV-SPC-012 : Civil Specification for Piles

    2.2 International Code

    a. ASCE 7-02 : Minimum Design Loads for Buildings and Other Structures

    b. UBC 97 : Uniform Building Code 1997

    c. ACI 381-05 : American Concrete Institute

    2.3 Reference

    a. Soil Report

    b. Principles of Foundation Engineering by Braja M Das, 1990

    c. Analisis dan Perancangan Fondasi II by Hary Christady Hardiyatmo, 2010

    d. Renforced Concrete : A Fundamental Approach by Edward G. Nawy, 2008

    The purpose of this calculation is to design of KO Drum Foundation for Gas Compressors Facilities Musi Timur Field Pendopo

    Project which is owned and operated by PT. Pertamina EP.

    The following words if found elsewhere in this document shall have the meaning

    as follow :

    PERTAMINA EP PT. Pertamina EP Asset 2 as the owners and users of the facility.

    SUB-CONTRACTOR

    Companies or entities specified and as representative CONTRACTOR to carry out

    some or all of the work Pembelian & Pemasangan Fasilitas Kompresor Untuk Gas

    Musi Timur Field Pendopo.

    VENDOR / SUPPLIER

    Companies or entities that provide materials, equipment, documents / drawings and

    technical service to carry out the work specified by the CONTRACTOR or Pertamina

    EP.

    CONTRACTOR

    PT. Indoturbine, company or entity designated by Pertamina EP to carry out all the

    work Pembelian & Pemasangan Fasilitas Kompresor Untuk Gas Musi Timur Field

    Pendopo.

    CONSULTANTParties who have been appointed by Pertamina EP as an engineering consultant for

    this project.

    MIGASRepresentatives from the Indonesian government that is responsible in issuing

    licenses and permits oil and gas facilities.

    PROJECT Pembelian & Pemasangan Fasilitas Kompresor Untuk Gas Musi Timur Field

    Pendopo

  • 7/24/2019 GCMT-13-CIV-CN-0016 Civil Calculation Sheet for KO Drum IFA REV B

    7/22

    7 of 22 .

    Document No. Rev. Contract No : EP37-M12LL0122D

    GCMT-13-CIV-CN-016 B Job. No : 31-12008PO002

    Civil Calculation Sheet for KO Drum Foundation

    3.0 GENERAL REQUIREMENTS

    3.1 Material

    a) Bolt Connector :

    b) Concrete :

    Concrete, 28 days cylinder compressive strength : 250 kg/cm2

    Cement for upper ground portion : ASTM C150 Type I

    Cement for under ground portion : ASTM C150 Type II

    c) Rebar Reinforcement :

    Deformed high yield steel bar : ASTM A615 Gr. 60 or equal

    Plain round steel bar : ASTM A615 Gr. 40 or equal

    d) Piles

    3.2 Unit Weight

    Unit weight of major construction materials shall be as follows :

    Steel : 7850 kg/m3 (KS Brochure)

    Mortar : 2000 kg/m3

    Reinforcement Concrete : 2400 kg/m3 (SNI-03-2847-2002 Tata Cara Perencanaan

    Struktur Beton untuk Bangunan Gedung)

    Plain Concrete : 2200 kg/m3 (SNI-03-2847-2002 Tata Cara Perencanaan

    Struktur Beton untuk Bangunan Gedung)

    Soil : 1700 kg/m3 (Soil Test Investigation, BH1)

    4.0 LOADING ANALYSIS

    Diameter Spec d = mm

    Bolts shall comply with ASTM A307 Grade A, JIS B1180 Class 4.6 with tensile minimum is 413 MPa.

    2500

    Unit weight other than above mentioned shall be as per "Pedoman Perencanan Pembebanan Untuk Rumah dan Gedung

    1987".

    Concrete piles shall comply with ACI 543-00 Design, Manufacture and Installation for Concrete Piles. Pre-stressed

    concrete material with minimum 28 days compressive strength fc' : 500 kg/cm2

    B

    ID : 2500 mm

    7210mm

    10300 mm T/T

    2500 mm 2500 mm

  • 7/24/2019 GCMT-13-CIV-CN-0016 Civil Calculation Sheet for KO Drum IFA REV B

    8/22

    8 of 22 .

    Document No. Rev. Contract No : EP37-M12LL0122D

    GCMT-13-CIV-CN-016 B Job. No : 31-12008PO002

    Civil Calculation Sheet for KO Drum Foundation

    4.1 Load

    Axial Load , Pp = kN

    Horizontal Load , Hp = kN

    Moment Load , Mp = kN-m

    4.2 Temporary Load

    Axial Load , Pt = kN

    Horizontal Load , Ht = kN

    Moment Load , Mt = kN-m

    4.3 Load from Pile Cap (Each Support)

    Bottom Pile Cap Top Pile Cap

    Height , Hpc = mm Height , Hpd = mm

    Length , Lpc = mm Length , Lpd = mm

    Breadth , Bpc = mm Breadth , Bpd = mm

    Weight = kN Weight = kN

    mm KO Drum saddle

    mm

    mm

    mm

    Foundation

    mm

    KO Drum saddle Pedestal

    1500

    Wpc 144 37,8

    Temporary load applied to structure comes from load during hydrotest and load caused by the effect of earthquake at area.

    (each support)

    175,59

    Permanent load applied to structure comes from load during operation. (each support)

    1500

    327,26

    1,35

    2500

    300

    3500

    1,22

    600

    4000

    300

    43,23

    48,04

    2500 mm

    Wpd

    600

    4000

    Load applied to this structure based on analysis by mechanical engineer on document number : GCMT-13-MS-DS-

    011:KO Drum

    3500

    Pedestal

    Foundation

    2375 mm

    450 mm

  • 7/24/2019 GCMT-13-CIV-CN-0016 Civil Calculation Sheet for KO Drum IFA REV B

    9/22

    9 of 22 .

    Document No. Rev. Contract No : EP37-M12LL0122D

    GCMT-13-CIV-CN-016 B Job. No : 31-12008PO002

    Civil Calculation Sheet for KO Drum Foundation

    5.0 SOIL DATA PROPERTIES

    Based on Geotechnical analysis report (GCMT-13-GE-GEO-001)

    Unit weight of soil, g = 17 kN/m3

    Soil cohessivity, cu = 32 kN/m2

    Internal angle friction, j = 0 0

    6.0 PILING DESIGN

    6.1 Mini Pile Properties

    Mini Pile Properties : Mini Pile = x

    The pile will be at level to meter, and embedded into the pile cap 0,6 m depth,

    so the length is meter. Level of pile decided by considered the data from SPT

    6.2 Resume Allowable Capacity

    Based on Geotechnical analysis report (GCMT-13-GE-GEO-001)

    Temporary Condition

    Compressive Capacity

    Tension Capacity

    Lateral Force Capacity

    Displacement

    6.3 Pile Group Plan

    Number of piles needed due to permanent condition

    Number of piles needed due to temporary condition

    Then, use 4 units (each support) of pile, with the plan below :

    (Each Support)

    (Each Support)

    0,709

    507

    250

    -0,60 -18,0

    17,40

    250

    n =

    Symbol Unit Permanent Condition

    Pa kN

    d cm

    Parameter

    338

    Ha kN

    units

    Ta kN 190

    507,0001,004053925

    Pa

    Pp + Wpc+ Wpd

    Pt + Wpc+ Wpd=

    327,25534 + 144 + 37,8=

    285

    116

    1,057356006=175,58633 + 144 + 37,8

    338,000=

    78

    units

    n =Pa

    B

  • 7/24/2019 GCMT-13-CIV-CN-0016 Civil Calculation Sheet for KO Drum IFA REV B

    10/22

    10 of 22 .

    Document No. Rev. Contract No : EP37-M12LL0122D

    GCMT-13-CIV-CN-016 B Job. No : 31-12008PO002

    Civil Calculation Sheet for KO Drum Foundation

    Check Pile Group Efficiency

    Efficiency (Converse-Labare)

    D = m

    m = 2

    n = 2

    s = 1,5 m

    = arctan (D/s)

    = 9,46

    Eg =

    Pile Group Capacity

    Compression Strength = Number of piles x capacity per piles x efficiency group

    = 1815 kN > kN

    Control pile safety due to moment and horizontal load

    Permanent Load

    Pp

    n

    Pp

    n

    89,3465825

    Pmaks = +Mp. X

    750

    1500 500

    < Pall ==357,39

    4

    +

    Mp. X

    500

    338,000 Ok

    Pmin

    0,25

    89,49%

    357,39

    -

    x2

    2500

    ok

    =

    4000

    =

    2500

    750

    43,233534x0

    12,5

    x2

    Mini

    pile

    Mini

    pile

    nm

    nmmnEg

    .90

    )1()1(1

    B

    Mini

    pile

    Mini

    pile

  • 7/24/2019 GCMT-13-CIV-CN-0016 Civil Calculation Sheet for KO Drum IFA REV B

    11/22

    11 of 22 .

    Document No. Rev. Contract No : EP37-M12LL0122D

    GCMT-13-CIV-CN-016 B Job. No : 31-12008PO002

    Civil Calculation Sheet for KO Drum Foundation

    Ok

    Horizontal Load

    Hp

    n

    Horizontal Load

    Hp

    n

    7.0 PILE CAP REINFORCEMENT

    a = mm

    a1 = mm

    b = mm

    kN/m

    kN/m

    = kN/m

    To find the maximum moment on the pile cap, used SAP 2000.

    Moment of pile cap

    qdl

    93,50152571

    3,50

    = < 1.5 qa

    37,80

    3,5

    qpcWeight of Bottom Pile Cap

    Pedestal Width

    < qa

    12,009

    250

    500

    2500

    =

    48,037

    =

    357,39

    - = 89,3465825

    Load from KO Drum

    Pedestal Width

    -190,021

    =327,26

    =

    =

    4 = kN

    =

    1,3517

    116,5

    Pall tens=

    =

    Pedestal Width

    0,3379

    H

    17 ton.m long pile

    =

    f =

    (SQs + 0.9 x W)/SF

    The pile is designed as free edge piles, and the embedded part is about 0.4 m. Broms assumed that free-

    end pile failure mechanism for long pile and short pile shown in Broms Graphic.

    = = 69,6

    = = 0,4

    = 60

  • 7/24/2019 GCMT-13-CIV-CN-0016 Civil Calculation Sheet for KO Drum IFA REV B

    19/22

    19 of 22.......Rev.

    B

    CIVIL CALCULATION SHEET FOR GENSET SHELTER

    Document No

    GCMT-13-CIV-CN-016

    Contract No : EP37-M12LL0122D

    Job. No : 31-12008PO002

    - Long pile

    My = Mmax = 406,41 kNmMy 406,41

    cud3

    2,84 x 0,25^

    e 0,1

    d 0,25

    From figure:

    Hu

    cud2

    Then:

    Hu = 60 x 82,84 x 0,25^2

    = 310,63 kN

    Using safety factor = 4 , then the allowable lateral force to the pile is:

    Hu 310,63

    SF 4

    -Displacement control

    Pile deflection calculation using Broms (1964) method

    where:

    kh =

    = (80 to 320) x cu/d

    = 250 x cu/d

    = 82835,16 kN/m2

    Ep = Elastic modulus of pile (concrete)

    = 4700 fc'

    = 27805575 kN/m2

    Ip = Inertia moment of pile

    = (1/12) x l x h^3

    = 0,0003255 m4

    Then:

    b = 0,870

    b x L = 15,13 > 2,5

    = 0,007090 m

    = 0,708962 cm < 1 cm OK

    kN

    Coefficient of horizontal subgrade reaction, from Skempton (1951) we will find

    Based on Broms (1964), for bL > 2.5 and pile designed as free-end in cohessive soil, the pile deflection is:

    y0 =2 x Ha x b (e x b+1)

    kh x d

    = 60

    Ha = = = 77,66

    = = 314

    = = 0,4

  • 7/24/2019 GCMT-13-CIV-CN-0016 Civil Calculation Sheet for KO Drum IFA REV B

    20/22

    20 of 22.......Rev.

    B

    CIVIL CALCULATION SHEET FOR GENSET SHELTER

    Document No

    GCMT-13-CIV-CN-016

    Contract No : EP37-M12LL0122D

    Job. No : 31-12008PO002

    Then Ha is determined By Deflection Control, Yo Max = 1 cm

    146,817

    1,891

    = 77,658 kN

    5. Pile Capacity based on Structure

    6. Resume Allowable Capacity

    Based on strcutural and soil analysis, the most conservative values were taken. The most conservative means

    the smallest capacities between soil and pile structure.

    Ha = yo x kh x d2 x b (e x b +1)

    =

  • 7/24/2019 GCMT-13-CIV-CN-0016 Civil Calculation Sheet for KO Drum IFA REV B

    21/22

    21 of 22.......Rev.

    B

    CIVIL CALCULATION SHEET FOR GENSET SHELTER

    Document No

    GCMT-13-CIV-CN-016

    Contract No : EP37-M12LL0122D

    Job. No : 31-12008PO002

    Symbol Unit

    Compresive capacity Pa kNTension capacity Ta kN

    Lateral force capacity Ha kN

    Displacement d cm

    7. Soil Data

    DCPT (Point S-10)

    77,658 116,49

    0,708962

    Parameter Permanent Condition Temporary Condition

    408,30 612,44190,021 285,03

  • 7/24/2019 GCMT-13-CIV-CN-0016 Civil Calculation Sheet for KO Drum IFA REV B

    22/22

    22 of 22.......Rev.

    B

    CIVIL CALCULATION SHEET FOR GENSET SHELTER

    Document No

    GCMT-13-CIV-CN-016

    Contract No : EP37-M12LL0122D

    Job. No : 31-12008PO002