PORT OF MELBOURNE PLANNING SCHEME SCHEDULE TO CLAUSE 51.01 SPECIFIC SITES AND EXCLUSIONS 1.0 Specific sites and exclusions Address of land Title of incorporated document 263-329 Lorimer Street, Port Melbourne, comprising the land contained in Lease 441/Licence 1643 from the Port of Melbourne Corporation (Pier 35) Pier 35 Marina Village Masterplan, July2005 The eastern extremity of the land known as Perce White Reserve, and controlled by Port of Melbourne Corporation, consisting of land 75 metres wide parallel to, and extending west from the eastern boundary of the reserve as defined on plan TP 201 dated May 1999 prepared by Demaine Partnership Architects State Centre for Life Saving Victoria, February 2005 Land comprising the ‘Dynon Port Rail Link Project area’ generally bounded by Footscray Road (west of the City Link off ramp) and land to the south in the Port of Melbourne Dynon Port Rail Link Project The Webb Dock Precinct bounded by Todd Road to the east, the Howe Parade reservation (planning scheme boundary) to the north, the Yarra River to the west and Hobsons Bay to the south. Port Capacity Project, Webb Dock Precinct, Incorporated Document, October 2012 (Amended August 2016) The land identified in clause 3 of the West Gate Tunnel Project Incorporated Document, December 2017. West Gate Tunnel Project Incorporated Document, December 2017 PARTICULAR PROVISIONS - CLAUSE 51.01 - SCHEDULE PAGE 1 OF 1 31/07/201 8 31/07/201 8

Transcript of GC93 52_03s_pmel Approval Final -...

PORT OF MELBOURNE PLANNING SCHEME

SCHEDULE TO CLAUSE 51.01 SPECIFIC SITES AND EXCLUSIONS

1.0 Specific sites and exclusions

Address of land Title of incorporated document

263-329 Lorimer Street, Port Melbourne, comprising the land contained in Lease 441/Licence 1643 from the Port of Melbourne Corporation (Pier 35)

Pier 35 Marina Village Masterplan, July2005

The eastern extremity of the land known as Perce White Reserve, and controlled by Port of Melbourne Corporation, consisting of land 75 metres wide parallel to, and extending west from the eastern boundary of the reserve as defined on plan TP 201 dated May 1999 prepared by Demaine Partnership Architects

State Centre for Life Saving Victoria, February 2005

Land comprising the ‘Dynon Port Rail Link Project area’ generally bounded by Footscray Road (west of the City Link off ramp) and land to the south in the Port of Melbourne

Dynon Port Rail Link Project

The Webb Dock Precinct bounded by Todd Road to the east, the Howe Parade reservation (planning scheme boundary) to the north, the Yarra River to the west and Hobsons Bay to the south.

Port Capacity Project, Webb Dock Precinct, Incorporated Document, October 2012 (Amended August 2016)

The land identified in clause 3 of the West Gate Tunnel Project Incorporated Document, December 2017.

West Gate Tunnel Project Incorporated Document, December 2017

PARTICULAR PROVISIONS - CLAUSE 51.01 - SCHEDULE PAGE 1 OF 1

31/07/2018VC148

31/07/2018VC148