EHS-GBP-05 GBF-07 APPLICABILITY This booklet comprises the checklists for various elements of the green building regulations and is meant to be used by the stakeholders concerned for providing accurate information on the project. It comprises the following parts Part-1 Project Summary Part-2 Checklist for Green Building Submission Part-3 Green Building Compliance Statement Part-4 Envelope Commitment Sheet Part-5 AC System Compliance Sheet Disclaimer This checklist has been developed for project teams to use when compiling the submission documentation for EHS Review / Assessment A completed version of this checklist must be included within the Main Submission. Revision: 00 July 2015 Page 1 of 23 SUBMISSIO N BOOKLET Regulation : GB 7. Green Building Regulations – Prescriptive Compliance sheet (Areas < 500 m 2 ) Procedure : EHS-GBP-7 Procedure for NOC-BP Green Building Submission (Prescriptive compliance Areas < 500 m 2 )

Transcript of GBF-07 Submission Booklet [NOC-BP-Small...

Page 1: GBF-07 Submission Booklet [NOC-BP-Small projects]trakhees.ae/en/ehs/gb/...gbp-07,rev.00,jul15.docx  · Web viewSupporting documents for “Category D- Control Systems” as highlighted

EHS-GBP-05 GBF-07

APPLICABILITY

This booklet comprises the checklists for various elements of the green building regulations and is meant to be used by the stakeholders concerned for providing accurate information on the project. It comprises the following parts

Part-1 Project Summary

Part-2 Checklist for Green Building Submission

Part-3 Green Building Compliance Statement

Part-4 Envelope Commitment Sheet

Part-5 AC System Compliance Sheet

DisclaimerThis checklist has been developed for project teams to use when compiling the submission documentation for EHS Review / Assessment

A completed version of this checklist must be included within the Main Submission.

The accuracy and completeness of the submission is entirely the responsibility of the project team. EHS will not be held accountable for incorrect or incomplete submissions sent for assessment.

Revision: 00 July 2015 Page 1 of 16

SUBMISSION

BOOKLETRegulation : GB 7. Green Building Regulations – Prescriptive Compliance sheet (Areas < 500 m2)

Procedure : EHS-GBP-7 Procedure for NOC-BP Green Building Submission (Prescriptive compliance Areas < 500 m2 )

Phase : NOC-BP

Page 2: GBF-07 Submission Booklet [NOC-BP-Small projects]trakhees.ae/en/ehs/gb/...gbp-07,rev.00,jul15.docx  · Web viewSupporting documents for “Category D- Control Systems” as highlighted

EHS-GBP-05 GBF-07

PART-1

PROJECT SUMMARY

Project Name:Click here to enter text. GB Consultant: Click here to enter text.

Plot No: Click here to enter text. Commissioning: Click here to enter text. specialist

Project: Click here to enter text. Engineer of: Click here to enter text.description record

Project Contact Name: Click here to enter text.

Contact E-Mail: Click here to enter text.

I, the Project Contact, hereby confirm that:

a. I have reviewed the submission checklist and the contents therein and ascertained that they align with the main submission package provided to EHS

b. I understand that EHS reserve the right to not assess a submission that is inconsistent with the Regulations, submission procedures and the guidelines

c. I take complete responsibility for the accuracy and completeness of the submission.

Name: Click here to enter text.

Signature: Date: Click here to enter text.

Revision: 00 July 2015 Page 2 of 16

Page 3: GBF-07 Submission Booklet [NOC-BP-Small projects]trakhees.ae/en/ehs/gb/...gbp-07,rev.00,jul15.docx  · Web viewSupporting documents for “Category D- Control Systems” as highlighted

EHS-GBP-05 GBF-07

PART- 2

CHECKLIST FOR GREEN BUILDING SUBMISSION [NOC-BP]Project Name: Click here to enter text.

S.NO DOCUMENT DETAILS ATTACHED(Yes / No) REMARKS

1 Proof of Payment of Green Building Review Fee            

2 A detailed Green Building Project plan with detailed strategy for complying with the credits targeted for the project.            

3 Supporting documents for “ Category A-General Requirements” as highlighted under the section “Evidence Required at Design Stage” of Regulation GB-7            

4 Supporting documents for “ Category B-Envelope & Energy” as highlighted under the section “Evidence Required at Design Stage of Regulation GB 7            

5 Supporting documents for “Category C-Lighting” as highlighted under the section “Evidence Required at Design Stage of Regulation GB 7            

6 Supporting documents for “Category D- Control Systems” as highlighted under the section “Evidence Required at Design Stage of Regulation GB 7            

7 Supporting documents for “Category E- Water” as highlighted under the section “Evidence Required at Design Stage of Regulation GB 7            

8 Supporting documents for “Category F- Environment & Internal Air Quality” as highlighted under the section “Evidence Required at Design Stage of Regulation

           

Revision: 00 July 2015 Page 3 of 16

Page 4: GBF-07 Submission Booklet [NOC-BP-Small projects]trakhees.ae/en/ehs/gb/...gbp-07,rev.00,jul15.docx  · Web viewSupporting documents for “Category D- Control Systems” as highlighted

EHS-GBP-05 GBF-07

S.NO DOCUMENT DETAILS ATTACHED(Yes / No) REMARKS

GB 7

9 Supporting documents for “Category G- Sustainable Site” as highlighted under the section “Evidence Required at Design Stage of Regulation GB 7            

10Supporting documents for “Category H- Operational Sustainability” as highlighted under the section “Evidence Required at Design Stage of Regulation GB 7

           

11 Justification for Non Compliance to any specific credit (if any)            

Notes

1) The above check-list should be filled up in a professional manner devoid of inconsistencies2) It should be ensured that ONLY the latest / most recent version of the forms as reflected in the portal are used for the

submissions. Forms bearing the earlier revisions or those that have been superseded will not be accepted.

Revision: 00 July 2015 Page 4 of 16

Page 5: GBF-07 Submission Booklet [NOC-BP-Small projects]trakhees.ae/en/ehs/gb/...gbp-07,rev.00,jul15.docx  · Web viewSupporting documents for “Category D- Control Systems” as highlighted

EHS-GBP-05 GBF-07

PART- 3

GREEN BUILDING COMPLIANCE STATEMENT [NOC-BP]

Project Name: Click here to enter text.

ITEM DESCRIPTION

TYPE COMPLIANCE REQUIREMENT

COMPLIEDYes / No

LIST OF SUPPORTING DOCUMENTS ATTACHED.

A: General Requirements

1

Integrated Design Approach for achieving energy savings

M AS HIGHLIGHTED IN SECTION A1 OF THE REGULATION GB-7            

2

Post Contract Green Briefing.Sustainability Kick-off

M AS HIGHLIGHTED IN SECTION A2 OF THE REGULATION GB-7            

B: Envelope and Energy

1

Compliance with Thermal Insulation System and Best Practices Energy conservation methods

M AS HIGHLIGHTED IN SECTION B1 OF THE REGULATION GB-7            

2LIMITING / REVERSING THERMAL

M AS HIGHLIGHTED IN SECTION B2 OF THE REGULATION GB-7            

Revision: 00 July 2015 Page 5 of 16

Page 6: GBF-07 Submission Booklet [NOC-BP-Small projects]trakhees.ae/en/ehs/gb/...gbp-07,rev.00,jul15.docx  · Web viewSupporting documents for “Category D- Control Systems” as highlighted

EHS-GBP-05 GBF-07

ITEM DESCRIPTION

TYPE COMPLIANCE REQUIREMENT

COMPLIEDYes / No

LIST OF SUPPORTING DOCUMENTS ATTACHED.

BRIDGES

3

Envelope Tightness (Prescriptive based) THERMAL IMAGING TECHNIQUE

M AS HIGHLIGHTED IN SECTION B3 OF THE REGULATION GB-7            

4 THIS SPACE HAS BEEN INTENTIONALLY LEFT BLANK

5 Efficient SIZING of the HVAC systems M AS HIGHLIGHTED IN SECTION B5 OF THE

REGULATION GB-7            

6 THIS SPACE HAS BEEN INTENTIONALLY LEFT BLANK

7

Selection of A/C unit with HIGH Energy Efficiency Ratio (EER)

M AS HIGHLIGHTED IN SECTION B7 OF THE REGULATION GB-7            

8 THIS SPACE HAS BEEN INTENTIONALLY LEFT BLANK

9INTERIOR LIGHTING LEVELS

M AS HIGHLIGHTED IN SECTION B9 OF THE REGULATION GB-7            

10EXTERIOR LIGHTING LEVELS

M AS HIGHLIGHTED IN SECTION B10 OF THE REGULATION GB-7            

11Use of Renewable sources of energy for domestic heating

VAS HIGHLIGHTED IN SECTION B11 OF THE REGULATION GB-7            

Revision: 00 July 2015 Page 6 of 16

Page 7: GBF-07 Submission Booklet [NOC-BP-Small projects]trakhees.ae/en/ehs/gb/...gbp-07,rev.00,jul15.docx  · Web viewSupporting documents for “Category D- Control Systems” as highlighted

EHS-GBP-05 GBF-07

ITEM DESCRIPTION

TYPE COMPLIANCE REQUIREMENT

COMPLIEDYes / No

LIST OF SUPPORTING DOCUMENTS ATTACHED.

12Use of Renewable sources of energy for power

V AS HIGHLIGHTED IN SECTION B12 OF THE REGULATION GB-7            

13 THIS SPACE HAS BEEN INTENTIONALLY LEFT BLANK

14 COMMISSIONING M AS HIGHLIGHTED IN SECTION B14 OF THE REGULATION GB-7

15

FOR AIR-CONDITIONED SPACESMORE THAN 2000 SQ.M NOT APPLICABLE            BUILDING ENERGY SIMULATIONENERGY MODELING

16

FOR AIR-CONDITIONED SPACESMORE THAN 2000 SQ.M NOT APPLICABLE            

INDEPENDENT COMMISSIONING AGENT

C: Lighting

Revision: 00 July 2015 Page 7 of 16

Page 8: GBF-07 Submission Booklet [NOC-BP-Small projects]trakhees.ae/en/ehs/gb/...gbp-07,rev.00,jul15.docx  · Web viewSupporting documents for “Category D- Control Systems” as highlighted

EHS-GBP-05 GBF-07

ITEM DESCRIPTION

TYPE COMPLIANCE REQUIREMENT

COMPLIEDYes / No

LIST OF SUPPORTING DOCUMENTS ATTACHED.

1

GENERAL

V AS HIGHLIGHTED IN SECTION C1 OF THE REGULATION GB-7            Use of Solar Day

lighting Technologies

2

OFFICE PORTION

M AS HIGHLIGHTED IN SECTION C2 OF THE REGULATION GB-7            Usage of energy

saving high performance lamps

3 Usage of Electronic Ballast M AS HIGHLIGHTED IN SECTION C3 OF THE

REGULATION GB-7            

4

WAREHOUSE PORTION

M AS HIGHLIGHTED IN SECTION C1 OF THE REGULATION GB-7            Usage of energy

saving high performance lamps

5 Usage of Electronic Ballast M AS HIGHLIGHTED IN SECTION C1 OF THE

REGULATION GB-7            

D: Control Systems

1

Use of programmable thermostats for HVAC system

M AS HIGHLIGHTED IN SECTION D1 OF THE REGULATION GB-7            

Revision: 00 July 2015 Page 8 of 16

Page 9: GBF-07 Submission Booklet [NOC-BP-Small projects]trakhees.ae/en/ehs/gb/...gbp-07,rev.00,jul15.docx  · Web viewSupporting documents for “Category D- Control Systems” as highlighted

EHS-GBP-05 GBF-07

ITEM DESCRIPTION

TYPE COMPLIANCE REQUIREMENT

COMPLIEDYes / No

LIST OF SUPPORTING DOCUMENTS ATTACHED.

2 Control of External lights M AS HIGHLIGHTED IN SECTION D2 OF THE

REGULATION GB-7            

3 Interlock of Toilet / Bathroom fans M AS HIGHLIGHTED IN SECTION D3 OF THE

REGULATION GB-7            

4

Use of Occupancy Sensor / Motion Sensor for internal lighting devices

M AS HIGHLIGHTED IN SECTION D4 OF THE REGULATION GB-7            

5

AUTOMATIC DAYLIGHT DIMMING CONTROLS(Warehouse areas > than 2000 m2)

M NOT APPLICABLE            

E: Water

1

Usage of Sewage Treatment Plant (STP) for treating Grey Water and reuse of treated water in flushing toilets and other usage not involving human direct contact.

V NOT APPLICABLE            

Revision: 00 July 2015 Page 9 of 16

Page 10: GBF-07 Submission Booklet [NOC-BP-Small projects]trakhees.ae/en/ehs/gb/...gbp-07,rev.00,jul15.docx  · Web viewSupporting documents for “Category D- Control Systems” as highlighted

EHS-GBP-05 GBF-07

ITEM DESCRIPTION

TYPE COMPLIANCE REQUIREMENT

COMPLIEDYes / No

LIST OF SUPPORTING DOCUMENTS ATTACHED.

2

Performance Requirements for Sanitary fittings (Low Flow / Low Flush Fittings)

M AS HIGHLIGHTED IN SECTION E2 OF THE REGULATION GB-7            

3

Water efficient landscaping and irrigation systemsDrip irrigation methods for vegetation according to climate and seasonal conditions.

M AS HIGHLIGHTED IN SECTION E3 OF THE REGULATION GB-7            

4

Water efficient landscaping and irrigation systemsEliminate potable water use or irrigation

VAS HIGHLIGHTED IN SECTION E4 OF THE REGULATION GB-7

           

F: Environment and Internal Air Quality

1

Building internal ventilation and Minimum Indoor Air Quality (IAQ)

M AS HIGHLIGHTED IN SECTION F1 OF THE REGULATION GB-7            

2Control of Environmental Tobacco Smoke

M AS HIGHLIGHTED IN SECTION F2 OF THE REGULATION GB-7            

Revision: 00 July 2015 Page 10 of 16

Page 11: GBF-07 Submission Booklet [NOC-BP-Small projects]trakhees.ae/en/ehs/gb/...gbp-07,rev.00,jul15.docx  · Web viewSupporting documents for “Category D- Control Systems” as highlighted

EHS-GBP-05 GBF-07

ITEM DESCRIPTION

TYPE COMPLIANCE REQUIREMENT

COMPLIEDYes / No

LIST OF SUPPORTING DOCUMENTS ATTACHED.

3Low Emitting Paints, Coatings, Adhesives and Sealants

M AS HIGHLIGHTED IN SECTION F3 OF THE REGULATION GB-7            

4

Usage of Ozone friendly materials in Air Conditioning equipment, thermal insulation, foam & firefighting equipment.

M

AS HIGHLIGHTED IN SECTION F4 OF THE REGULATION GB-7            

G: Sustainable Site & Management

1 Sustainable Site and Management M AS HIGHLIGHTED IN SECTION G1 OF THE

REGULATION GB-7            

2 Heat Island Effect Non-Roof M AS HIGHLIGHTED IN SECTION G2 OF THE

REGULATION GB-7.            

3

Heat Island Effect Roof (Use of light and heat reflective colours on roofs)

M AS HIGHLIGHTED IN SECTION G3 OF THE REGULATION GB-7            

H: Operational Sustainability

1

Recycling facility -Storage and collection of Recyclables

M AS HIGHLIGHTED IN SECTION H1 OF THE REGULATION GB-7            

2 Energy Efficient Eqt. (White Goods) V AS HIGHLIGHTED IN SECTION GH2 OF

THE REGULATION GB-7            

3 Building user Guide M AS HIGHLIGHTED IN SECTION H3 OF THE            

Revision: 00 July 2015 Page 11 of 16

Page 12: GBF-07 Submission Booklet [NOC-BP-Small projects]trakhees.ae/en/ehs/gb/...gbp-07,rev.00,jul15.docx  · Web viewSupporting documents for “Category D- Control Systems” as highlighted

EHS-GBP-05 GBF-07

ITEM DESCRIPTION

TYPE COMPLIANCE REQUIREMENT

COMPLIEDYes / No

LIST OF SUPPORTING DOCUMENTS ATTACHED.

REGULATION GB-7

4 Facility / Building Services Tuning V AS HIGHLIGHTED IN SECTION H4 OF THE

REGULATION GB-7            

Revision: 00 July 2015 Page 12 of 16

Page 13: GBF-07 Submission Booklet [NOC-BP-Small projects]trakhees.ae/en/ehs/gb/...gbp-07,rev.00,jul15.docx  · Web viewSupporting documents for “Category D- Control Systems” as highlighted

EHS-GBP-05 GBF-07

PART- 4

ENVELOPE COMMITMENT SHEET [NOC-BP]Project Name: Click here to enter text.

BUILDING ELEMENT PARAMETER REQUIREMENTS ENVELOPE DATA (DESIGN)

Non Conditioned Spaces

External WallsU – value (Max)

0.08 Btu/hr-ft2-⁰f

0.45 W/m2-⁰c      

Non Conditioned Spaces

RoofU – value (Max)

0.074 Btu/hr-ft2-⁰f

0.42 W/m2-⁰c     

Air Conditioned Spaces

External WallsU – value (Max)

0.055 Btu/hr-ft2-⁰f

0.3123 W/m2-⁰c     

Roof U – value (Max)0.045 Btu/hr-ft2-⁰f

0.2555W/m2-⁰c     

Floors U – value (Max)0.1 Btu/hr-ft2-⁰f

0.57 W/m2-⁰c     

Fenestration U – value (Max)0.30 Btu/hr-ft2-⁰f

1.7 W/m2-⁰c     

Shading Coefficient 0.29      

Revision: 00 July 2015 Page 13 of 16

Page 14: GBF-07 Submission Booklet [NOC-BP-Small projects]trakhees.ae/en/ehs/gb/...gbp-07,rev.00,jul15.docx  · Web viewSupporting documents for “Category D- Control Systems” as highlighted

EHS-GBP-05 GBF-07

BUILDING ELEMENT PARAMETER REQUIREMENTS ENVELOPE DATA (DESIGN)

(Max)

SHGC (Max)0.252

VLT (Min) 25 %      

Glass

(for skylights architecture)

U – value (Max)0.335 Btu/hr-ft2-⁰f

1.9 W/m2-⁰c     

Shading Coefficient (Max)

SHGC (Max)

0.20

0.174     

VLT (Min) 40 %      

Note

1. The envelope values mentioned above should be supported by appropriate calculations 2. It is important to adhere to these values by ensuring proper controls during the construction phase of the project

Revision: 00 July 2015 Page 14 of 16

Page 15: GBF-07 Submission Booklet [NOC-BP-Small projects]trakhees.ae/en/ehs/gb/...gbp-07,rev.00,jul15.docx  · Web viewSupporting documents for “Category D- Control Systems” as highlighted

EHS-GBP-05 GBF-07

PART- 5

AC SYSTEM COMPLIANCE SHEET [NOC-BP]Project Name: Click here to enter text.

S.NoSpace / Area being Air-conditioned

Design calculationProposed SystemEER

as per EHS Regulation

EERConsidered in

Design

Cooling load (TR)

AirQuantity

Cooling load (TR)

AirQuantity

1                                   

2                                   

3                                   

4                                   

5                                   

6                                   

7                                   

Notes1. The table should be followed for demonstrating compliance to

a. B5 – Efficient Sizing of HVAC systemsb. B7 - Selection of A/C unit with Energy Efficiency Ratio (EER)

2. This table is applicable to all conditioned areas including cases where a single AC unit is catering to multiple spaces and cases

where a single space is being catered by multiple units

Revision: 00 July 2015 Page 15 of 16

Page 16: GBF-07 Submission Booklet [NOC-BP-Small projects]trakhees.ae/en/ehs/gb/...gbp-07,rev.00,jul15.docx  · Web viewSupporting documents for “Category D- Control Systems” as highlighted

EHS-GBP-05 GBF-07

3. It should be ensured that ONLY the latest / most recent version of the forms as reflected in the portal are used for the submissions. Forms bearing the earlier revisions or those that have been superseded will not be accepted

Revision: 00 July 2015 Page 16 of 16