SUBMITTED BY :GAURAV BOSE
![Page 2: Gaurav Final Ppt](https://reader033.fdocuments.us/reader033/viewer/2022052208/551555e64a7959d2028b51de/html5/thumbnails/2.jpg)
INTRODUCTIONBirla group and the Indian
history are intertwined.Ghanshyam Dasji Birla, the
first of the Birla's was closely associated with freedom struggle.
BCW is a unit of mp MP Birla group of Birla corporation Limited.
The product “BIRLA PLUS CEMENT” is one of the market leaders and continuous to consolidate it’s leading position in the market.
BCW is one of the most modern cement plants.
ISO 9001:2001 and ISO -14001 Certifications.
![Page 3: Gaurav Final Ppt](https://reader033.fdocuments.us/reader033/viewer/2022052208/551555e64a7959d2028b51de/html5/thumbnails/3.jpg)
MINESThe basic raw material required is limestone.
This limestone requirement of cement plant is met from captive mines.
Mining Lease of 760.692 hectare.
![Page 4: Gaurav Final Ppt](https://reader033.fdocuments.us/reader033/viewer/2022052208/551555e64a7959d2028b51de/html5/thumbnails/4.jpg)
STACKER & RECLAIMER Linear luffing non-slewing type of stacker is
used. This makes roof type stockpile. Stacker can move to and fro on the rail by
means of motor. A control room for speed, boom distance and other activities.
![Page 5: Gaurav Final Ppt](https://reader033.fdocuments.us/reader033/viewer/2022052208/551555e64a7959d2028b51de/html5/thumbnails/5.jpg)
LIMESTONE RECLAIMER (BRIDGE TYPE) Reclaimer we loosened the material of pile. Materials loosened by the harrows slides down the pile slope. At the base of the pile it is scrapped by the shovels of the scraper and carried away to the belt conveyor.
PARTS OF A RECLAIMER:Travel BogiesBridge GidersHead GidersScraper chain guideImpact tableHarrows
![Page 6: Gaurav Final Ppt](https://reader033.fdocuments.us/reader033/viewer/2022052208/551555e64a7959d2028b51de/html5/thumbnails/6.jpg)
RAW & COAL MILLMaterial gets grind by VRM in powder form.VRM is ideally suited for combined grinding and
drying.Capacity : 300TPH (RAW MILL)
40 TPH (COAL MILL)
![Page 7: Gaurav Final Ppt](https://reader033.fdocuments.us/reader033/viewer/2022052208/551555e64a7959d2028b51de/html5/thumbnails/7.jpg)
Main units of Mill sections are as follows:
Vertical Roller Mill Dy. Separator Bag house Bucket elevator Air slide & screw conveyors MAIN PARTS OF ROLLER MILL HOUSING ROLLER PAIR NOZZLE RING HYDRAULIC INSTALLATION DAM RING
![Page 8: Gaurav Final Ppt](https://reader033.fdocuments.us/reader033/viewer/2022052208/551555e64a7959d2028b51de/html5/thumbnails/8.jpg)
STORAGE SILO
Silo consists of : Silo Material distribution Central chamber Outer chamber
SILO DETAILS SILO HEIGHT : 76 m SILO DIAMETE : 22m CAPACITY : 26,000 T
![Page 9: Gaurav Final Ppt](https://reader033.fdocuments.us/reader033/viewer/2022052208/551555e64a7959d2028b51de/html5/thumbnails/9.jpg)
KILN SYSTEMMost essential part of a cement plant and has to be
operated continuously for as long as possibleThe major components of the kiln system are. Preheater Pre calciness Kiln Tube Clinker grate cooler The main function of the Preheater cyclone is the preheating of the raw meal, from outlet hot gases of kiln.Every stage cyclone performs the two functions. It heats up the raw meal in the gas stream. It separates the raw meal and discharges it via the meal chutes.
![Page 10: Gaurav Final Ppt](https://reader033.fdocuments.us/reader033/viewer/2022052208/551555e64a7959d2028b51de/html5/thumbnails/10.jpg)
KILNThe rotary kiln consists of a steel tube with a length to
diameter (L/D) ratio between 10 and 38.The inclination of 2.5 to 4.5% together with a drive to
rotate the kiln about its axis at 0.5 to 4.5 revolutions per minute.
Kiln has these parts: Rotary kiln tube Supporting roller stations Kiln tyre Rotary kiln drives Rotary kiln longitudinal guide (Thruster block)
![Page 11: Gaurav Final Ppt](https://reader033.fdocuments.us/reader033/viewer/2022052208/551555e64a7959d2028b51de/html5/thumbnails/11.jpg)
CLINKER COOLING & STORAGEGrate coolers are preferably used in modern installationsThe speed of cooling influences the ratio between the
content of crystalline & liquid phase in the clinker.CLINKER STORAGE PILE Capacity : 60000 MT
![Page 12: Gaurav Final Ppt](https://reader033.fdocuments.us/reader033/viewer/2022052208/551555e64a7959d2028b51de/html5/thumbnails/12.jpg)
CEMENT MILL In the cement mill various equipment’s are used for various
purposes. In cement mill area we first mix gypsum in clinker and then effeminate the mixture to make cement.
WEIGH FEEDER BELT CONVEYORS
POLYCOM SEPARATOR
![Page 13: Gaurav Final Ppt](https://reader033.fdocuments.us/reader033/viewer/2022052208/551555e64a7959d2028b51de/html5/thumbnails/13.jpg)
CEMENT MILL CARDAN SHAFT
BUCKET ELEVATOR CLINKER HOPPER
![Page 14: Gaurav Final Ppt](https://reader033.fdocuments.us/reader033/viewer/2022052208/551555e64a7959d2028b51de/html5/thumbnails/14.jpg)
PACKING PLANT
The EEPL HAVER ROTO PACKER, is rotating valve bag filling machine for packing easy flowing powdery material and granular bulk material into bags with simultaneous weighing of the bulk material from 10 – 50 Kg.
Capacity : 180 tphNozzle Dia. : 55 mmSpouts No.s : 12
![Page 15: Gaurav Final Ppt](https://reader033.fdocuments.us/reader033/viewer/2022052208/551555e64a7959d2028b51de/html5/thumbnails/15.jpg)
POLLUTION CONTROL EQUIPMENTBAG FILTERS cyclone
ELECTRO STATIC PRECIPITATOR
![Page 16: Gaurav Final Ppt](https://reader033.fdocuments.us/reader033/viewer/2022052208/551555e64a7959d2028b51de/html5/thumbnails/16.jpg)
SAFETY Safety is utmost requirement for any plant because by taking proper
measures against accident we can increase the profit of company and can save manpower from injury.
ACCIDENT: Unwanted undesirable events which has potential to hit injury to a person or a loss of property”
CAUSE OF ACCIDENT: Unsafe act- 85-90% Unsafe condition- 10-15% UNSAFE ACT: UNSAFE CONDITION: Lack of knowledge No provision of safety
attachment Lack of attention Leakage of oil, water, steam etc Hurry Dust fumes & temperature Violating safety Condition of Ladder/scrapped/stair Overconfidence Worry, Lack of experience, Fatigue
![Page 17: Gaurav Final Ppt](https://reader033.fdocuments.us/reader033/viewer/2022052208/551555e64a7959d2028b51de/html5/thumbnails/17.jpg)
Significant learning during the training period Three Cement Mill Shutdowns
![Page 18: Gaurav Final Ppt](https://reader033.fdocuments.us/reader033/viewer/2022052208/551555e64a7959d2028b51de/html5/thumbnails/18.jpg)
One Raw Mill Shutdown
![Page 19: Gaurav Final Ppt](https://reader033.fdocuments.us/reader033/viewer/2022052208/551555e64a7959d2028b51de/html5/thumbnails/19.jpg)
PROJECT (EXTENSION) AT A GLANCE