Library Management Project Report By Gaurab Roy Choudhury Vignesh Subramanian Mayur Vartak Gaurav V erma Nirav Shah Keta Shah

Transcript of Gaurabh Roy Choudhury Group IX

Page 1: Gaurabh Roy Choudhury Group IX

8/3/2019 Gaurabh Roy Choudhury Group IX

http://slidepdf.com/reader/full/gaurabh-roy-choudhury-group-ix 1/17

Library ManagementProject Report

By

Gaurab Roy Choudhury

Vignesh Subramanian

Mayur Vartak 

Gaurav Verma

Nirav Shah

Keta Shah

Page 2: Gaurabh Roy Choudhury Group IX

8/3/2019 Gaurabh Roy Choudhury Group IX

http://slidepdf.com/reader/full/gaurabh-roy-choudhury-group-ix 2/17

INTRODUCTION

A library management system that provides following

facilities login, register, add category, add / remove

book, search / issue

book, return book.

Library system keeps track of all the transaction that

takes place in the library .Starting from book transaction

to financial transaction.

Page 3: Gaurabh Roy Choudhury Group IX

8/3/2019 Gaurabh Roy Choudhury Group IX

http://slidepdf.com/reader/full/gaurabh-roy-choudhury-group-ix 3/17

PURPOSE

The Library has been designed keeping in mind the

needs of the users (student) and also as per the

requirements given by the Institute.

The library houses all possible books for studies and alsothe subscriptions for almost all possible business papers

and business magazines (National & International).

The interior of the library has been designed keeping in

mind the green initiative making it ecofriendly and

energy efficient, also the Indian Vastu Shastra has been

taken into consideration.

Page 4: Gaurabh Roy Choudhury Group IX

8/3/2019 Gaurabh Roy Choudhury Group IX

http://slidepdf.com/reader/full/gaurabh-roy-choudhury-group-ix 4/17

 PROJECT MANAGER

∞ PROJECT MANAGER (Mayur Vartak)

Fixing the budget, as per the available resources.

Delegation of work to the members.

Scheduling the time sequence.

Application of steps.

Follow up the project.

Page 5: Gaurabh Roy Choudhury Group IX

8/3/2019 Gaurabh Roy Choudhury Group IX

http://slidepdf.com/reader/full/gaurabh-roy-choudhury-group-ix 5/17

Delegation of work 

Projectmanager

(Mayur) 

InteriorManager (Keta

Shah) 

Electrician(Nirav Shah) 

Librarian(Vignesh S /

GauravVerma.) 

Book Incharge(Sampat)

ITManager(Roy)

Page 6: Gaurabh Roy Choudhury Group IX

8/3/2019 Gaurabh Roy Choudhury Group IX

http://slidepdf.com/reader/full/gaurabh-roy-choudhury-group-ix 6/17

INTERIOR MANAGER

Interior Designer (Keta Shah) implies that there is more of an

emphasis on planning, functional design and effective use of 

space involved in this profession.

Selecting a good commercial design.

An interior designer keeps in mind the basic layout of spaces

within a building as well as project requirements, such astechnical issues, acoustics, lighting, temperature and a more into

the Indian Aesthetics.

Page 7: Gaurabh Roy Choudhury Group IX

8/3/2019 Gaurabh Roy Choudhury Group IX

http://slidepdf.com/reader/full/gaurabh-roy-choudhury-group-ix 7/17

Interior manager budget

Number of Chairs: 18 1000per chair=18000Number of table: 3 2000 per table=6000Wall Clock one = 500flooring sheet= 40000(including installation charges)

Color warm white= 12000 including labor chargesShelf 1.4*5=7 (Shelf with 1ftdifference)10*4000=40000Newspaper Stand= 20003 Computer table 3 1500 per table=5500Notice board= 400

Page 8: Gaurabh Roy Choudhury Group IX

8/3/2019 Gaurabh Roy Choudhury Group IX

http://slidepdf.com/reader/full/gaurabh-roy-choudhury-group-ix 8/17

ELECTRICAL ENGINEER

Electrical engineering deals with the study and

application of electricity, electronics andelectromagnetism

It also includes power, electronics, control systems,signal processing and telecommunications

Page 9: Gaurabh Roy Choudhury Group IX

8/3/2019 Gaurabh Roy Choudhury Group IX

http://slidepdf.com/reader/full/gaurabh-roy-choudhury-group-ix 9/17

No:  Particulars: Quan

tity:  Rate:  Total Amount: Electrica

ls: 1  Normal wire 

100

mtrs 14

p.mtr  1680 2  2 pear wire 

5

mtrs  8 p.mtr  40 3  Cat 5 wire 

15

mtrs 22

p.mtr  330 4  Roma Conceal Switch box  3 pcs 

100

p.pc  300 5  Pin Plug 

10

pcs  38 p.pc  380 6  Switches 

18

pcs 25

p.pcs  450 7  Fire Alarm  1 pc 

1200

p.pc  1200 8  Conceal Pipes 

60

mtrs 10

p.mtr  600 9  Pipe Clips 

50

mtrs  2 p.mtr  100 10  Screw  1 Box  250

p.box  250 11  CFL 

10

Pcs 120 p.

pc  1200 12  RCCB/ MCB  1 pc 

1200

p.pc  1200 13  Cement 

3

bags 250

p.bag  750 14  Plaster Of Paris  10000 

Page 10: Gaurabh Roy Choudhury Group IX

8/3/2019 Gaurabh Roy Choudhury Group IX

http://slidepdf.com/reader/full/gaurabh-roy-choudhury-group-ix 10/17

LIBRARY MANAGEMENT

Maintaining detailed record of books issued and

returned.

Keeping contact with suppliers and resellers.

Maintaining detailed report of acquisitions and expenses

on new books and its maintenance

Keeping a track of day to day activities in the library.

Making a note of feedback regarding our Online Library

system.

Page 11: Gaurabh Roy Choudhury Group IX

8/3/2019 Gaurabh Roy Choudhury Group IX

http://slidepdf.com/reader/full/gaurabh-roy-choudhury-group-ix 11/17

Page 12: Gaurabh Roy Choudhury Group IX

8/3/2019 Gaurabh Roy Choudhury Group IX

http://slidepdf.com/reader/full/gaurabh-roy-choudhury-group-ix 12/17

Interior: 1  Chairs 

18

Pcs 1000 p.

pc  18000 2  Tables  3 Pcs 

2000

p.pc  6000 3  Wall Clock  1 pcs  750  750 4  Flooring  40000 5  Paint (Distemper & Polishing)  12000 6  Shelf  

10

Pcs  4000  40000 7  Newspaper Stand  1 Pcs  2000  2000 8  Computer Table  3 pcs  1500  4500 9  Phillips CFL Lights  9 Pcs  300  2700 10  Notice Board  2 Pcs  400  800 

IT

Backup 1  Computer  3 Pcs  37750  113250 2  Library Software Development  100000 3  e-Book Licenses  *  800 4  Kindle Readers  10  7500  75000 5  FTP Site License  1  60000  60000 

Page 13: Gaurabh Roy Choudhury Group IX

8/3/2019 Gaurabh Roy Choudhury Group IX

http://slidepdf.com/reader/full/gaurabh-roy-choudhury-group-ix 13/17

Stationary 1  Requesters  10  200  2000 2  Miscellaneous  NA  NA  500 3  News Papers & Magazines 

15 (8

+7) (125 +

200)  2400 4 

References (Indian & International

Editions)  200000 

Page 14: Gaurabh Roy Choudhury Group IX

8/3/2019 Gaurabh Roy Choudhury Group IX

http://slidepdf.com/reader/full/gaurabh-roy-choudhury-group-ix 14/17

Page 15: Gaurabh Roy Choudhury Group IX

8/3/2019 Gaurabh Roy Choudhury Group IX

http://slidepdf.com/reader/full/gaurabh-roy-choudhury-group-ix 15/17

Executive Summary

This Library management report stresses more on the planning

and operational aspects of the Project where each of the tasks are

interlaced and synchronized in such fashion that the project never

stops and the operation continues without any obstacles.

Once we have got details of the project the project leader

delegated all the tasks to every member in the team based on

their competence.

Every aspect of the project has been properly thought after and

sought in such manner that there is no room for conflict what so

ever and the work never stops.

Page 16: Gaurabh Roy Choudhury Group IX

8/3/2019 Gaurabh Roy Choudhury Group IX

http://slidepdf.com/reader/full/gaurabh-roy-choudhury-group-ix 16/17

Time Guidelines

1st 10 Days – Planning & Gathering Information.

2nd 15 Days – Flooring & Electrician.

3rd 60 Days–

Electrician, POP, Coloring & Furniture.

4th 10 Days – IT Department & Electrician.

5th 20 Days – Gathering of Library Materials.

6th 05 Days – Spare days in case of any delays.

Page 17: Gaurabh Roy Choudhury Group IX

8/3/2019 Gaurabh Roy Choudhury Group IX

http://slidepdf.com/reader/full/gaurabh-roy-choudhury-group-ix 17/17

THANKYOU