GAS LIFT MANAGER

Well Site SCADA®

Gas Lift Manager

Page 2: GAS LIFT MANAGER - OilProduction.netoilproduction.net/files/ALS/Dover - Gas Lift Automation - Gas Lift... · and destroy the effectiveness of new installations. ... for Pad Layouts

DOVER ARTIFICIAL LIFT

Setting the standard for Gas Lift Automation.

Benefitting from more than 30 years of Dover Artificial Lift – Gas Lift design expertise, the Gas Lift Manager (GLM) automatically stabilizes injection of your gas lift wells, ensuring optimal well performance and reducing the need for intervention at the well site. As part of our Well Site SCADA™ system, the GLM continuously monitors temperature and pressure while regulating gas injection flow rates to ensure effective and efficient operations.

The GLM is able to control and optimize production of multiple wells simultaneously. It features unique kickoff and restart algorithms to minimize the labor required for initial implementation and routine maintenance. The GLM doesn’t stop there; it also monitors the facility equipment associated with gas lift, including compressors, separators, dehydrators, EFMs, tank levels, and more.

2

Stable Gas InjectionStabilized injection rates are key to efficient gas lift operations. PID loops are an effective method of helping stabilize flow, however application expertise and measurement device knowledge are key to optimized control in any dynamic multivariable system. The GLM design employs a unique method of separating the response time and system dynamics into separate user programmable settings. This allows you to quickly and easily retune injection operations when the dynamics of the system change, all without recalculation of PID mathematical parameters.

Custom ProgrammingUnique operating scenarios often require customization of the well operations. The de facto standard in automation software technology, ISaGRAF® allows you to write custom control programs for operation of virtually any device or facility on your site. Available as an optional upgrade to the PCS Ferguson 8800™ Site Manager controller, the ISaGRAF embedded programming suite will facilitate the best solution for your unique requirements—without the time and expense of typical customization.

Well Design Data CaptureGas Lift Manager stores well design and installation information for each well, such as well bore type, mandrel types, number of valves and their type, closing pressures, installation depths, and pressure design settings. This information may answer critical questions and troubleshooting problems that arise when getting the well into production quickly. With this data available on your smart phone, tablet, or laptop, you will always have the well design on hand.

Automatic KickoffWell startup is a critical moment when running a gas lift system. With fluid in the annulus and production tubing, care must be taken when building pressure to transfer fluid through the valves. Applying high pressure and high volume gas too rapidly can damage the downhole injection valves and destroy the effectiveness of new installations. The GLM provides patent-pending, API compliant selectable or automatic kickoff, ramp, and re-start algorithms, designed to help greatly reduce or eliminate the risk of damage to downhole gas injection valves.

Page 3: GAS LIFT MANAGER - OilProduction.netoilproduction.net/files/ALS/Dover - Gas Lift Automation - Gas Lift... · and destroy the effectiveness of new installations. ... for Pad Layouts

3

GAS LIFT MANAGER

SYSTEM FEATURES

• 24/7 management and control of eight wells and injection points

• Automatic API-compliant startup and kickoff routines

• Integration with leading host providers, including XSPOC by Theta

• Monitoring and control of surface facilities and well site devices

• User configurable data logging and reporting

• Highly flexible alarm features and response actions

• Access to trend and accumulation data, even across power failures or reset scenarios

Flexible Solutions for Pad LayoutsGas Lift Manager runs on the PCS Ferguson 8000 Series®

controller platform. Thanks to a local wireless network, the master controller can be located anywhere on the well pad. Additional gas lift remote devices can be added to the network to manage “dislocated” injection points. Remote I/O is available for wellhead monitoring and control giving you the flexibility you need to accommodate any pad layout.

HOW YOU BENEFIT

• Stabilized gas injection optimizes gas usage and maximizes well production

• Flexible architecture allows easy customization to any pad or site layout

• System redundancy reduces the impact of single points of failure, like lightning strikes

• Increased environmental safety with tank level management and emergency shut down

• Safer monitoring and control through local and long-range communication options

• Simplified gathering of production data used in oil and gas commission reports

Measurement Device Data SmoothingThe precise nature of gas measurement can often create data anomalies that may impact PID control. The GLM offers “data smoothing” options at injection inputs to help stabilize injection, minimize overshoot, and keep PID adjustments to a minimum to increase the life of surface injection valve components.

Page 4: GAS LIFT MANAGER - OilProduction.netoilproduction.net/files/ALS/Dover - Gas Lift Automation - Gas Lift... · and destroy the effectiveness of new installations. ... for Pad Layouts

4

Manage your entire well site.

Gas Lift Manager does more than just manage gas lift operations. Designed with the entire well site in mind, it also provides advanced tank management and other remote measuring and sensing capabilities to help monitor and optimize well surface operations.

DOVER ARTIFICIAL LIFT

Tank ManagementAs a Modbus Master, the PCS Ferguson 8800 Site Manager or the PCS Ferguson 8400™ can poll measurement devices, store tank level data, and calculate fluid volumes. With configurable alarm, shut-in, and restart rules, you can customize alarms and shut-in criteria base on the specific well design and conditions. Tanks and wells can be managed individually or in groups for maximum flexibility.

Remote Measurement & SensingGas Lift Manager can interface with a variety of remote measuring devices. In addition to the local I/O on the controllers, the system can collect data from many other production meters on the well site or pad. You can configure alarms and shut-in criteria based on this data and transmit alarms to the host system, keypad display, the safety shut-in, or any combination designed to fit your needs.

Page 5: GAS LIFT MANAGER - OilProduction.netoilproduction.net/files/ALS/Dover - Gas Lift Automation - Gas Lift... · and destroy the effectiveness of new installations. ... for Pad Layouts

5

Multiple Test Production LoopsMulti-well pads often require two or three production test loops at the same time. Gas Lift Manager supports one test production loop per well and multiple separator test production loops simultaneously. Test loops run for a user-defined duration, and required production data is stored and available for reporting.

Data LoggingFor detailed well analysis, GLM has a large embedded memory capability to accommodate many kinds of data. Injection flow and pressure, as well as corresponding well head pressures and temperatures can be captured for analysis using third-party tools.

User-Friendly InterfaceWellVision® interface allows you to configure your site, fine tune optimization and production, and troubleshoot and correct problems faster and more efficiently while in the office or at the well site. With access to real-time and historical data, you can quickly and efficiently recognize trends or address production issues. For smaller operations, WellVision offers real-time remote well diagnostics, automated data downloads, graphical analysis of well performance, easy to use reporting capabilities, and remote connectivity options.

GAS LIFT MANAGER

ENHANCE SAFETY WITH WELLTREKKER®

Our WellTrekker® mobile app provides

the convenience of WellVision’s

configuration and reporting tools in an

easy-to-use app designed for tablets

and mobile devices. Using Bluetooth®

connectivity, WellTrekker allows you to

easily manage your well pad without

ever having to leave your truck. This

increases manpower efficiency and

means greater safety for your people.

Page 6: GAS LIFT MANAGER - OilProduction.netoilproduction.net/files/ALS/Dover - Gas Lift Automation - Gas Lift... · and destroy the effectiveness of new installations. ... for Pad Layouts

PCS Ferguson 8800® Site Manager Features

Features PCS Ferguson 8800

Customizable PID loops 8

User customizable gas lift startup algorithms Per PID loop

Manages up to 24 production fluid tanks ✓

Modbus data collection from many measurement meters such as buy back, injection, test, and/or production measurement ✓

Custom programming using Rockwell® ISaGRAF® Optional

Dynamic data logging ✓

Bluetooth capability ✓

User configurable alarms per well instance 12

Analog inputs (hardware scalable) 8/12

Analog outputs (hardware scalable) 4/8

Digital inputs/outputs (hardware scalable) 8/6

Communication Ports

LOI USB

Host port RS-232, TTL

Well site communications RS-485, DIGI radio

Bluetooth® Cellphone or tablet

Auxiliary RS-232, RS-485, TTL

Expansion ports (2) card slots for additional functionality

6

Flexible and Robust ControllersThe PCS Ferguson 8000 Series is our next-generation RTU controller family and the backbone of the Well Site SCADA system. Combining the best functions from PCS’ and Ferguson Beauregard’s legacy controls, our new suite of RTUs is more powerful and flexible than ever before.

The PCS Ferguson 8800™ Site Manager is the most robust controller in the 8000 Series. Available with ISaGRAF®, the 8800 marries the smarts of our proven artificial lift control algorithms with the flexibility of a Rockwell® programmable logic controller (PLC).

DOVER ARTIFICIAL LIFT

Page 7: GAS LIFT MANAGER - OilProduction.netoilproduction.net/files/ALS/Dover - Gas Lift Automation - Gas Lift... · and destroy the effectiveness of new installations. ... for Pad Layouts

Partner with the best team in the business.

COMPANY INFORMATION

Dover Artificial Lift offers a comprehensive line of artificial lift equipment, accessories, and services strategically designed to drive the operational excellence of each of our customers.

Dover Artificial Lift products and services are available in the following North American locations:

Administrative & ManufacturingFrederick, CO .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 720.407.3550

AlabamaCitronelle . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 601.649.2551

CaliforniaBakersfield.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 661.316.9255

CanadaCalgary, AB .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 403.266.6139Edson, AB .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 780.723.2759Grand Prairie, AB . .. .. .. .. .. .. .. .. .. .. .. .. .. 780.723.2759Red Deer, AB . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 403.340.3605

ArkansasConway .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 501.932.0449

ColoradoEvans .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 970.539.9003Denver .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 303.710.4191Parachute .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 970.285.9652

LouisianaBroussard .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 337.837.9367 Haynesville . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 318.464.8143

MississippiLaurel .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 601.649.2551

New MexicoFarmington . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 505.326.4239Hobbs .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 575.397.0040

North DakotaMohall . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 701.240.5952Watford City .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 318.540.7715Watford City (Hydraulic Lift) . .. .. .. .. .. .. .. .. 701.842.2231

Oklahoma

Oklahoma City.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 405.440.1015

Oklahoma City.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 405.603.7492

Stigler .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 918.967.3236

Woodward.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 580.256.1317

Pennsylvania

Coraopolis.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 724.227.3263

Texas

Bridgeport .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 940.683.3898

Buffalo.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 903.322.9300

Cleburne . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 817.641.9900

Houston .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 832.691.6907

Perryton .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 405.213.8114

Pleasanton . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 432.582.2335

Karnes City . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 830.299.8508

Kilgore .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 903.984.7624

Odessa (Service & Sales) . .. .. .. .. .. .. .. .. .. 432.582.2335

Odessa (Admin & Manufacturing) . .. .. .. .. .. 432.334.8580

Sonora . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 325.387.6260

Tomball . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 713.906.1980

Tyler .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 903.533.8266

Utah

Roosevelt .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 435.722.4520

Vernal .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 435.828.7175

Wyoming

Rock Springs . .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 435.828.7175

• Decades of experience recommending and servicing lift systems to accommodate changing well conditions

• Unrivaled expertise in plunger lift, gas lift, hydraulic lift, well control, and well unloading

• The best performing, highest quality, and safest products designed, engineered, and manufactured in-house

• Experienced and responsive field support staff with extensive local knowledge

• The highest commitment to the protection and safety of our employees, our customers, and the environment

• Comprehensive customer training and product support

Page 8: GAS LIFT MANAGER - OilProduction.netoilproduction.net/files/ALS/Dover - Gas Lift Automation - Gas Lift... · and destroy the effectiveness of new installations. ... for Pad Layouts

doverals.com