Gary Natural Gas Line Upgrade - NIPSCO¬ed in advance. Gary Natural Gas Line Upgrade Gary, IN In...
Transcript of Gary Natural Gas Line Upgrade - NIPSCO¬ed in advance. Gary Natural Gas Line Upgrade Gary, IN In...
Phase 1• Replacement of existing bare steel natural gas lines and installing
approximately 10 miles of new lines.• The work will take place along roadway, near sidewalks and in alleys.• Phase 1 work to take place within the boundaries of Grant Street
(West), Broadway Avenue (East), 5th Avenue (North) and 9th Avenue (South).
• Construction of Phase 1 expected to begin mid May, early June 2015. • Completion of Phase 1 expected in December 2015.• Potential lane closures on some roadways (signage to be posted).• Site restoration work will follow each phase.
Phases 2 & 3• Remaining installation for an additional 50 miles (approximately) will
occur in 2016 and 2017 (see map). • Phases 2 & 3 work to take place within the boundaries of Clark Road
(West), I-65 (East), I-90 (North) and I-80/94 (South).• Additional details and notification to be provided.
Additional Details• Local union workforce to assist with e�orts.• All NIPSCO-authorized contractors will carry and wear proper
identification. • Work within identified areas will include the installation of new
natural gas lines including main and service lines leading to each property.
• Throughout the course of the project, NIPSCO will identify and retire service lines to uninhabited properties.
• Limited service interruptions may occur—property owners will be notified in advance.
Gary Natural Gas Line UpgradeGary, IN
In 2015, NIPSCO will begin a three-year project to upgrade and replace nearly 60 miles of underground, bare steel natural gas lines in the northwest section of Gary. New lines will be installed to provide safer and more reliable service to area residents and businesses in the future.
Questions about the Infrastructure Modernization Plan? 1-800-464-7726 [email protected] NIPSCO.com/future
MODERNIZATION PROJECT
About NIPSCO’s Infrastructure Modernization PlanJust like the country’s focus on addressing the nation’s aging roads, highways, bridges and transportation infrastructure, NIPSCO is working to modernize our natural gas and electric system in an e�ort to maintain safety, reliability and access to low-cost natural gas prices in the future.
NIPSCO's Infrastructure Modernization Plan takes a long-term look, over the next decade and beyond, at the best approach for prioritizing and identifying system investments that will provide direct benefits to homes and businesses in northern Indiana.
More information can be found at NIPSCO.com/future.
2015 Main Gas Line Replacement
Gary Natural Gas Line UpgradeGary, IN
Questions about the Infrastructure Modernization Plan? 1-800-464-7726 [email protected] NIPSCO.com/future
Project Area (Natural Gas Line Is Not to Scale)
90
90
65
53
L A K E M I C H I G A N
Bro
adw
ay
Gra
nt S
tree
t
2nd Avenue
4th Avenue
5th Avenue
9th Avenue
21st Avenue
17th Avenue
Cla
rk R
oad
Bur
r S
tree
t
1212
12
SCOPE FOR 2017
SCOPE FOR 2016
SCOPE FOR 2015
94
2015 Work Area (10 miles within area to be upgraded)
2016/2017 Work Area (50 miles within area to be upgraded)