Gary M. MorrisGary M. MorrisManager - ITManager - IT
Steel Dynamics, Inc.Steel Dynamics, Inc.Structural & Rail MillStructural & Rail Mill
November, 2006November, 2006
Steel Dynamics, Inc.Steel Dynamics, Inc.
OverviewOverview
“Always producing a high-grade, high quality product at the lowest possible cost.”
- K Busse
‘Dick’ TeetsVice PresidentGeneral Manager – Structural & Rail Div
SDI FOUNDERS
Mark MillettVice PresidentGeneral Manager – Flat Roll Division
Keith BussePresident & CEO
450 Acres
Steel Dynamics – Structural and Rail DivisionColumbia City, IN.
2601 S 700 EColumbia City, IN. 46725(866) 740-8700 Toll Free
On US 30 between Columbia City and Fort Wayne Indiana
Strategically located in the “Rust Belt”
APRIL 2000pre-construction
FEB. 2002~ 7/8 complete
Green-field Site
$ 350 Million$ 350 Million total costtotal cost
~ $ 1 Million investment / ~ $ 1 Million investment / employment positionemployment position
(at full staffing)
Steel Dynamics – Structural and Rail DivisionColumbia City, IN.
Mill Process
ScrapEAF
LMF
VTD
Continuous Caster
Semi - Finished Products
Reheat Furnace
Hot Rolling
Str
uctu
ral
Rail Premium
Sta
ndar
d
Cooling Bed
Straightening
Structural
Rai
l
Inline Inspection
Cut, Pile, & Bundle
Drill, Cut,
End Straighten
Ship to Customer
Designed CapacityDesigned Capacity1.2M tons / eaf / annum1.2M tons / eaf / annum
142.5 ton/hr 50min tap-tap142.5 ton/hr 50min tap-tap
Current environmental permitting allows Current environmental permitting allows operation of only one furnace at a time.operation of only one furnace at a time.
Spring 2003 36 – 45 avg min tap-tapSpring 2003 36 – 45 avg min tap-tap
Electric Arc FurnaceElectric Arc Furnace(s)(s)
Continuous CasterContinuous Caster
Exit of spray chamberExit of spray chamber
Casting beam blanksCasting beam blanksWithdrawal RollsWithdrawal Rolls
Casting beam blanksCasting beam blanks
• Recuperative - Natural gas
• 3 Zones: Charge, Heat, Soak
• 80’x50’ 19’ - 47’ 6 bloom lengths
• Walking Beam
• Deep Charge
Reheat FurnanceReheat Furnance
• Heating Rate:356 Million Btu / hr300 ton/hr – hot charge200 ton/hr – cold charge
A C Leadbetter
Discharging BB2 @ 2250°F
UREDGER
UF
7500 hp5000 hp
7500 hp
Tandem / Combination MillTandem / Combination Mill SMS - SchloemannSMS - Schloemann
TCS’s job is Roll Gap Adjustment
• Roll gap calibration after roll change
• Determination of passline after roll change
• Determination of roll spring
• Calculation of the position of the rolls=> with the static Automatic Gage Control (AGC) before the rolling
• Roll gap control (loop control)=> with the dynamic Automatic Gage Control (AGC) during the rolling( 1 sec cycle rate )
• Position control of the hydraulic cylinders (very fast loop control) in both mode, to keep the setted cylinder position of the rolls
Technology Control System
Precision: ± .05mm / .002”
Precision: ± .02mm / .0008”
Required SkillsRequired Skills
Problem SolvingProblem Solving CommunicationCommunication Highly AnalyticalHighly Analytical Enjoys challengesEnjoys challenges Time ManagementTime Management In-depth business In-depth business
knowledgeknowledge Team orientedTeam oriented
Programming Programming - .NET, - .NET, PowerBuilder, C#, PowerBuilder, C#, C++, PLSQL, TSQLC++, PLSQL, TSQL
Strong GUI designStrong GUI design Database designDatabase design Wireless/RFID Wireless/RFID
architecturearchitecture Project Project
ManagementManagement
Rolling Mill - Required SkillsRolling Mill - Required Skills
Problem SolvingProblem Solving CommunicationCommunication Highly AnalyticalHighly Analytical MathMath Time ManagementTime Management In-depth business In-depth business
knowledgeknowledge Team orientedTeam oriented
Skilled trades: pipe Skilled trades: pipe fitters, hydraulics, fitters, hydraulics, welding, welding, electricians, electricians, mechanical mechanical
MS Office SuiteMS Office Suite Project Project
ManagementManagement CNC machiningCNC machining LeadershipLeadership
Melt Shop Mill - Required Melt Shop Mill - Required SkillsSkills
Problem SolvingProblem Solving CommunicationCommunication Highly AnalyticalHighly Analytical MathMath Time ManagementTime Management In-depth business In-depth business
knowledgeknowledge Team orientedTeam oriented
Skilled trades: pipe Skilled trades: pipe fitters, hydraulics, fitters, hydraulics, welding, welding, electricians, electricians, mechanical mechanical
MS Office SuiteMS Office Suite Project Project
ManagementManagement CNC machiningCNC machining LeadershipLeadership