Gary Anderson, ARIPPA, Ebensburg Power, "23 Years of Abandoned Mine Reclamation"
-
Upload
michael-hewitt -
Category
Environment
-
view
236 -
download
0
description
Transcript of Gary Anderson, ARIPPA, Ebensburg Power, "23 Years of Abandoned Mine Reclamation"
Ebensburg Power Company
Twenty-Three Years of Abandoned Mine Reclamation
In Western Pennsylvania
Ebensburg Power CompanyFacility
EPC Reclamation Process
Ebensburg Power Company
• Consume about 500,000 tons coal refuse/yearsince initial operation – 10,700,000 tons
• Utilize about 480,000 tons ash/year for beneficial use
• Neutralize about 15,000,000 lb/year of sulfuric acid with beneficial use ash – since initial operation about 250,000,000 lbs
• Remove about 46,000,000 lbs/year of sulfuric acid away from PA waterways - since initial operation about 1,000,000,000 lbs
Revloc Refuse SitePre Reclamation 1989
Revloc I and II Coal Refuse Sites
• Approximately 86 acres of land• About 4,000,000 tons of coal refuse• Initial operation 1990• Reclamation completed 2012• Removed about 3,000,000 tons coal refuse• Total cost $24,000,000 or $280,000/acre • Site Available for Industrial Development
Revloc Refuse Site Active Reclamation 1999
Revloc Refuse SiteMarch 2004
Revloc Refuse Site 2010
Revloc Final Reclamation 2010
Revloc Sites After Reclamation
• Baseline Pollution Load Reduction to South Branch Blacklick Creek– 93% reduction in acidity– 92% reduction in iron– 71% reduction in manganese– 95% reduction in aluminum
• Restoration of aquatic life to approximately six miles of stream
Nanty Glow East & WestMarch 2004
Nanty Glo WestMarch 2004
Nanty Glo EastMarch 2004
Nanty Glo West and East
• Approximately 100 acres of land• Located along Pergrin Run – Kiski-Conemaugh • About 3,500,000 tons of coal refuse• Initial operation 2005• Reclamation completed ????• Removed about 1,700,000 tons coal refuse to
date• Total cost to date $23,000,000
Nanty Glo West and East2013
Nanty Glo West2013
Nanty Glo West Reclamation Impact on Pergrin Run To Date
• Baseline Pollution Load Reduction to Pergrin Run– 95% reduction in acidity– 93% reduction in iron– 29% reduction in manganese– 94% reduction in aluminum
• Mining parameters Before / Todayph <4 ph / >6 ph
Sulfate >1000 mg/ml / <100 mg/ml Iron/aluminum >100 mg/ml / < 2 mg/ml
Nanty Glo East2013
Mine 37
Mine 37 Coal Refuse Pile
• Located along Paint Creek-tributary of Stonycreek• Approximately 63 acres of land• About 1,600,000 tons of coal refuse• Initial operation ????• Reclamation completed 5 -8 years• Expect to remove about 1,200,000 tons of coal
refuse
Mine 37- Impact on Paint Creek Watershed
• Mine 37 water runoff contributes – 801 tons/yr acidity - 91% of watershed total– 94 tons/yr iron - 87% of watershed total– 33 tons/yr manganese - 93.5% of watershed total– 126 tons/yr aluminum - 95% of watershed total
Values provided by Paint Creek Restoration Plan