Activity ID Activity Name OriginalDuration
Remaining Duration
Start Finish
First Commercial Production (FCP) - Garraf Field Development ProjectFirst Commercial Production (FCP) - Garraf Field Development Proj... 132 129 15-Aug-10 09-Feb-11
Detail Design EngineeringDetail Design Engineering 132 129 15-Aug-10 09-Feb-11
CoordinationCoordination 132 65 15-Aug-10 11-Nov-10
DECGD0001 Technical Document Register 132 65 15-Aug-10 11-Nov-10*
DECGD0002 Master Project Schedule (for Detaul Design activities) 88 23 15-Aug-10 14-Sep-10*
DECPR0001 Document Numbering Procedure 81 23 15-Aug-10 14-Sep-10*
DECRE0001 Engineering Decision Register 72 22 15-Aug-10 13-Sep-10*
DECSP0001 Basic Engineering Design Data (BEDD) becomes Job Design Specification 82 23 15-Aug-10 14-Sep-10*
DECSP0003 Project Scope of Work (Excluding Pipelines/ Drilling) 80 22 15-Aug-10 13-Sep-10*
DECSP0004 Modularization Strategy Document 49 22 15-Aug-10 13-Sep-10*
CIVILSCIVILS 80 76 15-Aug-10 28-Nov-10
SpecificationsSpecifications 80 33 15-Aug-10 28-Sep-10
DECVSP0001 Civil Structural Design Basis 80 23 15-Aug-10 14-Sep-10*
DECVSP0002 General Specification for Excavation and Filling 73 23 15-Aug-10 14-Sep-10*
DECVSP0006 General Specification for Concrete Works 73 23 15-Aug-10 14-Sep-10*
DECVSP0007 General Specification for Structural Steel 73 23 15-Aug-10 14-Sep-10*
DECVSP0012 General Specification for Steel Piled Foundation 38 23 15-Aug-10 14-Sep-10*
DECVSP0013 Civil Structural Scope of Work for Construction Works at EPS 22 22 30-Aug-10 28-Sep-10*
DECVSP0016 Architectural Scope of Work 22 22 30-Aug-10 28-Sep-10*
General Civil DrawingsGeneral Civil Drawings 33 33 30-Aug-10 13-Oct-10
DECVDW0116 General Notes Sheets (2 Sheets) 33 33 30-Aug-10 13-Oct-10*
DECVDW0117 EPS Site Layout and GA 33 33 30-Aug-10 13-Oct-10*
DECVDW0118 EPS Surface Drainage Plans (13 sheets) 33 33 30-Aug-10 13-Oct-10*
DECVDW0119 EPS Underground Closed Drains Piping Network (6 sheets) 33 33 30-Aug-10 13-Oct-10*
DECVDW0120 Details for Collection Sumps, Pits and Drainage Man-holes (3 Sheets) 33 33 30-Aug-10 13-Oct-10*
DECVDW0121 EPS Foundation Plan - Piles (17 Sheets) 33 33 30-Aug-10 13-Oct-10*
DECVDW0122 EPS Foundation Plan - Concrete (8 Shees) 33 33 30-Aug-10 13-Oct-10*
DECVDW0123 Tank Foundations, Concrete Rings and Slabs and AB Layouts 22 22 30-Aug-10 28-Sep-10*
DECVDW0124 Details for Steel Piles (6 Sheets) 33 33 30-Aug-10 13-Oct-10*
DECVDW0125 Reinforced Concrete Foundation Details (6 Sheets) 33 33 30-Aug-10 13-Oct-10*
Building drawingsBuilding drawings 76 76 15-Aug-10 28-Nov-10
DECVDW0209 Switch Gear, Battery UPS Building General Arrangement 66 45 15-Aug-10 14-Oct-10*
DECVDW0210 Switch Gear, Battery UPS Building Views and Sections 66 45 15-Aug-10 14-Oct-10*
DECVDW0223 Control Room Plans & Details (10 Sheets, Arch & Struct) 42 42 30-Sep-10 28-Nov-10*
DECVDW0224 Electrical Substation Plans & Details (12 Sheets, Arch & Struct) 42 42 30-Sep-10 28-Nov-10*
DECVDW0225 Process Interface Building Plans & Details (6 Sheets, Arch & Struct) 42 42 30-Sep-10 28-Nov-10*
ConcreteConcrete 73 73 15-Aug-10 23-Nov-10
DECVDW0303 Tank Foundation Plan, Section & Detail 50 13 15-Aug-10 31-Aug-10*
DECVDW0304 Foundation for Flare 39 39 30-Sep-10 23-Nov-10*
DECVDW0305 Vessel Foundations (KO Drums, Closed Drain, etc) 39 39 30-Sep-10 23-Nov-10*
STRUCTURALSTRUCTURAL 76 76 15-Aug-10 28-Nov-10
DES DW0101 Module Size and Configuration 43 21 15-Aug-10 12-Sep-10*
DES DW0109 Pipe Rack Plans and Details, PAR's 42 42 30-Sep-10 28-Nov-10*
DES DW0110 Pipe Rack Plans and Details, Stick-built & Sleepers 42 42 30-Sep-10 28-Nov-10*
DES DW0111 Structural Steel Drawings for PAU's 42 42 30-Sep-10 28-Nov-10*
DES DW0112 Structural Steel Details for Lifting and Transporting PAU's and PAR's 42 42 30-Sep-10 28-Nov-10*
ELECTRICALELECTRICAL 99 98 15-Aug-10 28-Dec-10
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2010 2011
First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 1 of 19 12-Aug-10 13:02
Actual Work
Remaining Work
Critical Remaining Work
Milestone
First Commercial Production (FCP) - Garraf Field
Development Project
TASK filter: Item.
Oracle Corporation
-
Activity ID Activity Name OriginalDuration
Remaining Duration
Start Finish
Electrical CalculationsElectrical Calculations 50 50 30-Aug-10 07-Nov-10
DEELCCA0004 Protection Relay Settings and Coordination Study Report 50 50 30-Aug-10 07-Nov-10*
Electrical DatasheetElectrical Datasheet 98 98 15-Aug-10 28-Dec-10
DEELCDS0010 General - Datasheet for LV Electrical Motors 89 55 15-Aug-10 28-Oct-10*
DEELCDS0011 General - Datasheet for MV Electrical Motors 89 55 15-Aug-10 28-Oct-10*
DEELCDS0031 Main Substation 6.6kV Switchgear Datasheet 89 55 15-Aug-10 28-Oct-10*
DEELCDS0032 Main Substation 400V Switchgear Datasheet 89 55 15-Aug-10 28-Oct-10*
DEELCDS0034 Process Substation 400V Switchgear Datasheet 89 55 15-Aug-10 28-Oct-10*
DEELCDS0037 Well Cluster 1 Substation 400V Switchgear Datasheet 89 55 15-Aug-10 28-Oct-10*
DEELCDS0038 Well Cluster 2 Substation 400V Switchgear Datasheet 89 55 15-Aug-10 28-Oct-10*
DEELCDS0039 Admin Substation 400V Switchgear Datasheet (SB-7720) 89 55 15-Aug-10 28-Oct-10*
DEELCDS0040 Water Intake Substation 400V Switchgear Datasheet (SB-7760) 89 55 15-Aug-10 28-Oct-10*
DEELCDS0042 Personnel Camp Substation 400V Switchgear Datasheet (SB-7730) 89 55 15-Aug-10 28-Oct-10*
DEELCDS0050 Substation 110VDC Uninterruptible Power Supply Datasheet Book(Commo... 89 55 15-Aug-10 28-Oct-10*
DEELCDS0051 Plant 230VAC Uninterruptible Power Supply Datasheet Book(Common DS ... 89 55 15-Aug-10 28-Oct-10*
DEELCDS0060 Transformer Datasheet Book (Common DS for Facility) 89 55 15-Aug-10 28-Oct-10*
DEELCDS0100 Personnel Camp 6.6kV Ring Main Unit No.1 Datasheet (RMU-7530) 89 55 15-Aug-10 28-Oct-10*
DEELCDS0101 Personnel Camp 6.6kV Ring Main Unit No.2 Datasheet (RMU-7531) 89 55 15-Aug-10 28-Oct-10*
DEELCDS0102 Well Cluster No.1 6.6kV Ring Main Unit No.1 Datasheet (RMU-7540) 89 55 15-Aug-10 28-Oct-10*
DEELCDS0103 Well Cluster No.1 6.6kV Ring Main Unit No.2 Datasheet (RMU-7541) 89 55 15-Aug-10 28-Oct-10*
DEELCDS0104 Well Cluster No.2 6.6kV Ring Main Unit No.1 Datasheet (RMU-7550) 89 55 15-Aug-10 28-Oct-10*
DEELCDS0105 Well Cluster No.2 6.6kV Ring Main Unit No.2 Datasheet (RMU-7551) 89 55 15-Aug-10 28-Oct-10*
DEELCDS0106 Water Intake Station 6.6kV Ring Main Unit Datasheet (RMU-7560) 89 55 15-Aug-10 28-Oct-10*
DEELCDS0200 Busduct Datasheet Book (Common datasheet for facility) 53 53 17-Oct-10 28-Dec-10*
Electrical DrawingsElectrical Drawings 99 98 15-Aug-10 28-Dec-10
DEELCDW0001 Single Line Diagrams 78 45 15-Aug-10 14-Oct-10*
DEELCDW0102 Switchgear Symbols Legend (Added 14-Jun-10) 78 45 15-Aug-10 14-Oct-10*
DEELCDW0120 Main Substation 6.6kV Switchboard Metering & Protection Diagram (SB-75... 42 42 29-Sep-10 25-Nov-10*
DEELCDW0130 Main Substation 400V Switchboard Metering and Protection Diagram (SB-... 42 42 29-Sep-10 25-Nov-10*
DEELCDW0131 Process Substation 400V Switchboard Metering and Protection Diagram (S... 42 42 29-Sep-10 25-Nov-10*
DEELCDW0132 Admin. Substation 400V Switchboard Metering and Protection Diagram (S... 42 42 29-Sep-10 25-Nov-10*
DEELCDW0133 Well Cluster No.1 Substation 400V Switchboard Metering and Protection D... 42 42 29-Sep-10 25-Nov-10*
DEELCDW0134 Well Cluster No.2 Substation 400V Switchboard Metering and Protection D... 42 42 29-Sep-10 25-Nov-10*
DEELCDW0140 Main Substation 230VAC Uninterruptible Power Supply Single Line Diagram 42 42 29-Sep-10 25-Nov-10*
DEELCDW0141 Process Substation 230VAC Uninterruptible Power Supply Single Line Dia... 42 42 29-Sep-10 25-Nov-10*
DEELCDW0142 Admin. Substation 230VAC Uninterruptible Power Supply Single Line Diagr... 42 42 29-Sep-10 25-Nov-10*
DEELCDW0143 Well Cluster No.1 Substation 230VAC Uninterruptible Power Supply Single... 42 42 29-Sep-10 25-Nov-10*
DEELCDW0144 Well Cluster No.2 Substation 230VAC Uninterruptible Power Supply Single... 42 42 29-Sep-10 25-Nov-10*
DEELCDW0150 Main Substation 110VDC Uninterruptible Power Supply Single Line Diagram 42 42 29-Sep-10 25-Nov-10*
DEELCDW0151 Process Substation 110VDC Uninterruptible Power Supply Single Line Dia... 42 42 29-Sep-10 25-Nov-10*
DEELCDW0152 Admin. Substation 110VDC Uninterruptible Power Supply Single Line Diagr... 42 42 29-Sep-10 25-Nov-10*
DEELCDW0153 Well Cluster No.1 Substation 110VDC Uninterruptible Power Supply Single... 42 42 29-Sep-10 25-Nov-10*
DEELCDW0154 Well Cluster No.2 Substation 110VDC Uninterruptible Power Supply Single... 42 42 29-Sep-10 25-Nov-10*
DEELCDW0200 Main Substation Layout 99 65 15-Aug-10 11-Nov-10*
DEELCDW0201 Process Substation Layout 99 65 15-Aug-10 11-Nov-10*
DEELCDW0202 Admin. Substation Layout 42 42 01-Nov-10 28-Dec-10*
DEELCDW0203 Well Cluster No.1 Substation Layout 42 42 01-Nov-10 28-Dec-10*
DEELCDW0204 Well Cluster No 2 Substation Layout 77 45 15-Aug-10 14-Oct-10*
DEELCDW0206 Personnel Camp 6.6kV Substation Layout 31 31 01-Nov-10 13-Dec-10*
DEELCDW0220 CPS Electric al Equipment Layout Key Plan 31 31 01-Nov-10 13-Dec-10*
DEELCDW0221 CPS Area 1 Electrical Equipment Layout 31 31 01-Nov-10 13-Dec-10*
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2010 2011
First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 2 of 19 12-Aug-10 13:02
-
Activity ID Activity Name OriginalDuration
Remaining Duration
Start Finish
DEELCDW0222 CPS Area 2 Electrical Equipment Layout 31 31 01-Nov-10 13-Dec-10*
DEELCDW0223 CPS Area 3 Electrical Equipment Layout 31 31 01-Nov-10 13-Dec-10*
DEELCDW0224 CPS Area 4 Electrical Equipment Layout 31 31 01-Nov-10 13-Dec-10*
DEELCDW0225 CPS Area 5 Electrical Equipment Layout 31 31 01-Nov-10 13-Dec-10*
DEELCDW0241 CPS Area 1 Cable Routing Nodal Layout 31 31 01-Nov-10 13-Dec-10*
DEELCDW0242 CPS Area 2 Cable Routing Nodal Layout 31 31 01-Nov-10 13-Dec-10*
DEELCDW0243 CPS Area 3 Cable Routing Nodal Layout 31 31 01-Nov-10 13-Dec-10*
DEELCDW0244 CPS Area 4 Cable Routing Nodal Layout 31 31 01-Nov-10 13-Dec-10*
DEELCDW0245 CPS Area 5 Cable Routing Nodal Layout 31 31 01-Nov-10 13-Dec-10*
DEELCDW0300 Well Cluster No.1 Cable Routing Nodal Layout 68 45 15-Aug-10 14-Oct-10*
Electrical Lists and SchedulesElectrical Lists and Schedules 97 87 15-Aug-10 13-Dec-10
DEELCLS0001 Electrical Load List 97 45 15-Aug-10 14-Oct-10*
DEELCLS0002 Electrical Equipment List 73 45 15-Aug-10 14-Oct-10*
DEELCLS0004 Electrical Cable Schedule 73 45 15-Aug-10 14-Oct-10*
DEELCLS0005 Essential Power Generation Electrical Load List 73 45 15-Aug-10 14-Oct-10*
DEELCLS0006 Electrical Material Take-off 31 31 01-Nov-10 13-Dec-10*
Electrical Specifications and PhilosophiesElectrical Specifications and Philosophies 88 45 15-Aug-10 14-Oct-10
DEELCSP0001 Electrical System Design Philosophy 78 45 15-Aug-10 14-Oct-10*
DEELCSP0003 Specification for Electrical Installation 88 45 15-Aug-10 14-Oct-10*
DEELCSP0004 Earthing and Lightning Protection Philosophy 83 45 15-Aug-10 14-Oct-10*
DEELCSP0005 Technical Specification for Electrical Requirements on Packaged Equipment 88 45 15-Aug-10 14-Oct-10*
DEELCSP0030 Specification for Low Voltage Switchgear and Controlgear 88 45 15-Aug-10 14-Oct-10*
DEELCSP0031 Specification for Medium Voltage Switchgear and Controlgear 88 45 15-Aug-10 14-Oct-10*
DEELCSP0033 Specification for Power Transformers and Neutral Earthing Resistors 88 45 15-Aug-10 14-Oct-10*
DEELCSP0035 Specification for Cathodic Protection Equipment and Materials 83 45 15-Aug-10 14-Oct-10*
DEELCSP0039 Technical Specification for Uninterruptible Power Supplies 83 45 15-Aug-10 14-Oct-10*
DEELCSP0040 Technical Specification for DC Batteries and Chargers 83 45 15-Aug-10 14-Oct-10*
DEELCSP0043 Technical Specification for Transportable Packaged Substations 88 45 15-Aug-10 14-Oct-10*
DEELCSP0044 Technical Specification for Ring Main Units (Added 8-Jul-10) 83 45 15-Aug-10 14-Oct-10*
DEELCSP0150 Specification for Low Voltage Power and Control Cables 83 45 15-Aug-10 14-Oct-10*
DEELCSP0151 Specification for Medium Voltage Power and Control Cables 83 45 15-Aug-10 14-Oct-10*
DEELCSP0281 Specification for Low Voltage Induction Motors 83 45 15-Aug-10 14-Oct-10*
DEELCSP0282 Specification for Medium Voltage Induction Motors 83 45 15-Aug-10 14-Oct-10*
Electrical Equipment RequistionsElectrical Equipment Requistions 22 22 01-Nov-10 30-Nov-10
DEELCMR0001 Equipment Requisition for Switchgear 22 22 01-Nov-10 30-Nov-10*
DEELCMR0002 Equipment Requisition for Power Transformers and Neutral Earthing Resist... 22 22 01-Nov-10 30-Nov-10*
DEELCMR0003 Equipment Requisition for Uninterruptible Power Supplies 22 22 01-Nov-10 30-Nov-10*
DEELCMR0004 Equipment Requisition for Electrical Cables 22 22 01-Nov-10 30-Nov-10*
HSEHSE 110 65 15-Aug-10 11-Nov-10
DEHSLS0001 Schedule of Hazardous Sources (Added 28-Jun-10) 65 45 15-Aug-10 14-Oct-10*
DEHSPL0001 Project QHSSE Plan 65 22 15-Aug-10 13-Sep-10*
DEHSPL0002 Pipeline HSSE Plan 65 22 15-Aug-10 13-Sep-10*
DEHSPL0003 Project Health Plan 65 22 15-Aug-10 13-Sep-10*
DEHSPL0004 Environmental Plan 65 22 15-Aug-10 13-Sep-10*
DEHSPL0005 Waste Management Plan 65 22 15-Aug-10 13-Sep-10*
DEHSPL0006 Facility Operations Plan 65 22 15-Aug-10 13-Sep-10*
DEHSPL0007 Construction HSE Plan 65 22 15-Aug-10 13-Sep-10*
DEHSPR0001 HSE Plan 77 34 15-Aug-10 29-Sep-10*
DEHSPR0002 Health Risk Assessment 77 34 15-Aug-10 29-Sep-10*
DEHSRE0001 QRA Study 110 65 15-Aug-10 11-Nov-10*
DEHSRE0002 Design Safety Philosophy 95 45 15-Aug-10 14-Oct-10*
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2010 2011
First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 3 of 19 12-Aug-10 13:02
-
Activity ID Activity Name OriginalDuration
Remaining Duration
Start Finish
DEHSRE0003 Overall System description and philosophy report 95 45 15-Aug-10 14-Oct-10*
DEHSRE0004 Utility System description and philosophy report 95 45 15-Aug-10 14-Oct-10*
DEHSRE0005 HAZID Terms of Reference Updated for DD 88 45 15-Aug-10 14-Oct-10*
DEHSRE0006 HAZOP Procedure (Report) Updated for DD 76 45 15-Aug-10 14-Oct-10*
DEHSRE0007 SIL (Instrumented Protected Function) Assessment Report 88 45 15-Aug-10 14-Oct-10*
DEHSRE0008 Operating control and safeguarding philosophy 88 45 15-Aug-10 14-Oct-10*
DEHSRE0009 Alarm and Shutdown & Controller set up point 88 45 15-Aug-10 14-Oct-10*
DEHSRE0010 Flare Radiation Study (in conjunction with Process) 88 45 15-Aug-10 14-Oct-10*
DEHSRE0011 Overall System dDescription and Philosophy Report 89 45 15-Aug-10 14-Oct-10*
DEHSRE0012 Utility System Description & Philosophy Report 89 45 15-Aug-10 14-Oct-10*
DEHSRE0013 Operating Control & Safeguarding Philosophy 89 45 15-Aug-10 14-Oct-10*
DEHSRE0014 Alarm and Shutdown & Controller Set-Up Point 69 45 15-Aug-10 14-Oct-10*
DEHSRE0015 HAZOP Study Report - Updated for DD 69 45 15-Aug-10 14-Oct-10*
DEHSRE0016 HAZID Study Report Updated for DD 69 45 15-Aug-10 14-Oct-10*
DEHSSP0001 Specification for Fire Fighting System 88 45 15-Aug-10 14-Oct-10*
INSTRUMENTATIONINSTRUMENTATION 98 97 15-Aug-10 27-Dec-10
DEINSDW0001 Control System Overall Architecture Diagram (Sheet 1 of 2) 55 11 15-Aug-10 29-Aug-10*
DEINSDW0002 Process Control System Architecture 54 11 15-Aug-10 29-Aug-10*
DEINSDW0003 ESD System Architecture 53 11 15-Aug-10 29-Aug-10*
DEINSDW0004 Custody Metering System Architecture (Sheet 1 of 3) 51 11 15-Aug-10 29-Aug-10*
DEINSDW0005 Well Site/Cluster Control Architecture 50 11 15-Aug-10 29-Aug-10*
DEINSDW0006 Fire & Gas System Architecture 52 11 15-Aug-10 29-Aug-10*
DEINSDW0007 Pipeline Leak Detection System Architecture 48 11 15-Aug-10 29-Aug-10*
DEINSDW0008 Cause and Effect Matrix 43 11 15-Aug-10 29-Aug-10*
DEINSDW0009 General Arrangement for Control & interface rooms 98 65 15-Aug-10 11-Nov-10*
DEINSLS0001 Instrument Index 95 65 15-Aug-10 11-Nov-10*
Instrument DatasheetsInstrument Datasheets 56 56 15-Aug-10 31-Oct-10
DEINSDS100 Data Sheets for Analysers 22 22 15-Sep-10 14-Oct-10*
DEINSDS101 Data Sheets for Control Valves 24 22 16-Aug-10 14-Sep-10*
DEINSDS102 Data Sheets for DP Flow Transmitters 22 22 15-Sep-10 14-Oct-10*
DEINSDS103 Data Sheets for Fire Detectors 22 22 16-Aug-10 14-Sep-10*
DEINSDS104 Data Sheets for Flow Meters 22 22 16-Aug-10 14-Sep-10*
DEINSDS105 Data Sheets for Flow Switch 22 22 30-Sep-10 31-Oct-10*
DEINSDS106 Data Sheets for Gas Detectors (LOS) 22 22 16-Aug-10 14-Sep-10*
DEINSDS107 Data Sheets for Gas Detectors (Point) 22 22 30-Sep-10 31-Oct-10*
DEINSDS108 Data Sheets for Level Switches (External) 22 22 30-Sep-10 31-Oct-10*
DEINSDS109 Data Sheets for Level Switches (Insertion) 22 22 30-Sep-10 31-Oct-10*
DEINSDS110 Data Sheets for Level Transmitters (Displacer) 22 22 30-Sep-10 31-Oct-10*
DEINSDS111 Data Sheets for Level Transmitters (Insertion) 22 22 15-Sep-10 14-Oct-10*
DEINSDS112 Data Sheets for Level Transmitters (Tankage) 22 22 15-Sep-10 14-Oct-10*
DEINSDS113 Data Sheets for MOVs 24 24 15-Aug-10 15-Sep-10*
DEINSDS114 Data Sheets for Orifice Plates 24 24 15-Aug-10 15-Sep-10*
DEINSDS115 Data Sheets for Pig Detectors 22 22 15-Sep-10 14-Oct-10*
DEINSDS116 Data Sheets for Pressure gauges 22 22 15-Sep-10 14-Oct-10*
DEINSDS117 Data Sheets for Pressure Switches 22 22 15-Sep-10 14-Oct-10*
DEINSDS118 Data Sheets for Pressure Transmitters 22 22 15-Sep-10 14-Oct-10*
DEINSDS119 Data Sheets for Regulators 22 22 16-Aug-10 14-Sep-10*
DEINSDS120 Data Sheets for Relief Valves 24 24 15-Aug-10 15-Sep-10*
DEINSDS121 Data Sheets for Restriction Orifice Plates 24 24 15-Aug-10 15-Sep-10*
DEINSDS122 Data Sheets for Shut Down Valves 24 24 15-Aug-10 15-Sep-10*
DEINSDS123 Data Sheets for Temperature Gauges 22 22 15-Sep-10 14-Oct-10*
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2010 2011
First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 4 of 19 12-Aug-10 13:02
-
Activity ID Activity Name OriginalDuration
Remaining Duration
Start Finish
DEINSDS124 Data Sheets for Temperature Transmitters 22 22 15-Sep-10 14-Oct-10*
DEINSDS125 Data Sheets for Thermowells 24 24 15-Aug-10 15-Sep-10*
DEINSDS126 Data Sheets for Vibration Switches 22 22 15-Sep-10 14-Oct-10*
Instrument RequistionsInstrument Requistions 73 73 16-Sep-10 27-Dec-10
DEINSMR200 Requisition for Level Interface Transmitters 22 22 28-Nov-10 27-Dec-10*
DEINSMR201 Requisition for Analysers 22 22 28-Nov-10 27-Dec-10*
DEINSMR202 Requisition for Building Fire Detection System 22 22 16-Sep-10 17-Oct-10*
DEINSMR203 Requisition for CCTV 22 22 28-Nov-10 27-Dec-10*
DEINSMR204 Requisition for Control Valves 22 22 16-Sep-10 17-Oct-10*
DEINSMR205 Requisition for DP Flow Transmitters 22 22 28-Nov-10 27-Dec-10*
DEINSMR206 Requisition for ESD System 22 22 16-Sep-10 17-Oct-10*
DEINSMR207 Requisition for Fire & gas System 22 22 16-Sep-10 17-Oct-10*
DEINSMR208 Requisition for Fire Detectors 22 22 28-Nov-10 27-Dec-10*
DEINSMR209 Requisition for Flow Computer System 22 22 16-Sep-10 17-Oct-10*
DEINSMR210 Requisition for Flow Metering Skid 22 22 16-Sep-10 17-Oct-10*
DEINSMR211 Requisition for Flow Meters 22 22 16-Sep-10 17-Oct-10*
DEINSMR212 Requisition for Flow Switch 22 22 28-Nov-10 27-Dec-10*
DEINSMR213 Requisition for Gas Detectors (LOS) 22 22 16-Sep-10 17-Oct-10*
DEINSMR214 Requisition for Gas Detectors (Point) 22 22 28-Nov-10 27-Dec-10*
DEINSMR215 Requisition for High-Sensitivity Smoke Detection System 22 22 16-Sep-10 17-Oct-10*
DEINSMR216 Requisition for Level Gauges 22 22 28-Nov-10 27-Dec-10*
DEINSMR217 Requisition for Level Interface Transmitters 22 22 28-Nov-10 27-Dec-10*
DEINSMR218 Requisition for Level Switches (External) 22 22 28-Nov-10 27-Dec-10*
DEINSMR219 Requisition for Level Switches (Insertion) 22 22 28-Nov-10 27-Dec-10*
DEINSMR220 Requisition for Level Transmitters (Displacer) 22 22 28-Nov-10 27-Dec-10*
DEINSMR221 Requisition for Level Transmitters (Insertion) 22 22 27-Oct-10 25-Nov-10*
DEINSMR222 Requisition for Level Transmitters (Tankage) 22 22 27-Oct-10 25-Nov-10*
DEINSMR223 Requisition for MOVs 22 22 23-Sep-10 24-Oct-10*
DEINSMR224 Requisition for Orifice Plates 22 22 23-Sep-10 24-Oct-10*
DEINSMR225 Requisition for Pig Detectors 22 22 27-Oct-10 25-Nov-10*
DEINSMR226 Requisition for Pipeline Block Valve Stations PCS 22 22 23-Sep-10 24-Oct-10*
DEINSMR227 Requisition for Pipeline Leak detection system 22 22 23-Sep-10 24-Oct-10*
DEINSMR228 Requisition for Pipeline Leak Detection System 22 22 23-Sep-10 24-Oct-10*
DEINSMR229 Requisition for Pressure gauges 22 22 27-Oct-10 25-Nov-10*
DEINSMR230 Requisition for Pressure Switches 22 22 27-Oct-10 25-Nov-10*
DEINSMR231 Requisition for Pressure Transmitters 22 22 27-Oct-10 25-Nov-10*
DEINSMR232 Requisition for Process Control System 22 22 23-Sep-10 24-Oct-10*
DEINSMR233 Requisition for Regulators 22 22 23-Sep-10 24-Oct-10*
DEINSMR234 Requisition for Relief Valves 22 22 23-Sep-10 24-Oct-10*
DEINSMR235 Requisition for Restriction Orifice Plates 22 22 23-Sep-10 24-Oct-10*
DEINSMR236 Requisition for Security System 22 22 27-Oct-10 25-Nov-10*
DEINSMR237 Requisition for Shut Down Valves 22 22 23-Sep-10 24-Oct-10*
DEINSMR238 Requisition for Temperature Gauges 22 22 27-Oct-10 25-Nov-10*
DEINSMR239 Requisition for Temperature Transmitters 22 22 27-Oct-10 25-Nov-10*
DEINSMR240 Requisition for Thermowells 22 22 23-Sep-10 24-Oct-10*
DEINSMR241 Requisition for Vibration Switches 22 22 27-Oct-10 25-Nov-10*
Instrument SpecificationsInstrument Specifications 38 38 05-Sep-10 26-Oct-10
DEINSSP400 Functional Design Specification for Buildings Fire Detection System 19 19 30-Sep-10 26-Oct-10*
DEINSSP401 Functional Design Specification for CCTV 19 19 30-Sep-10 26-Oct-10*
DEINSSP402 Functional Design Specification for ESD System 20 20 05-Sep-10 30-Sep-10*
DEINSSP403 Functional Design Specification for Fire & gas System 20 20 05-Sep-10 30-Sep-10*
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2010 2011
First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 5 of 19 12-Aug-10 13:02
-
Activity ID Activity Name OriginalDuration
Remaining Duration
Start Finish
DEINSSP404 Functional Design Specification for Flow Computer System 20 20 05-Sep-10 30-Sep-10*
DEINSSP405 Functional Design Specification for Flow Metering Skid 20 20 05-Sep-10 30-Sep-10*
DEINSSP406 Functional Design Specification for High-Sensitivity Smoke Detection System 20 20 05-Sep-10 30-Sep-10*
DEINSSP407 Functional Design Specification for Pipeline Block Valve Stations PCS 19 19 30-Sep-10 26-Oct-10*
DEINSSP408 Functional Design Specification for Pipeline Leak detection system 20 20 05-Sep-10 30-Sep-10*
DEINSSP409 Functional Design Specification for Pipeline Leak Detection System 20 20 05-Sep-10 30-Sep-10*
DEINSSP410 Functional Design Specification for Process Control System 20 20 05-Sep-10 30-Sep-10*
Instrument DrawingsInstrument Drawings 43 43 29-Aug-10 26-Oct-10
DEINSDW500 ESD Cause and Effects Matrix 20 20 29-Aug-10 23-Sep-10*
DEINSDW501 F&G Cause and Effects Matrix 20 20 29-Aug-10 23-Sep-10*
DEINSDW502 Layout Drawing of EPS AMS system 19 19 30-Sep-10 26-Oct-10*
DEINSDW503 Layout Drawing of EPS Cable Routes 19 19 30-Sep-10 26-Oct-10*
DEINSDW504 Layout Drawing of EPS CCR Equipment 19 19 30-Sep-10 26-Oct-10*
DEINSDW505 Layout Drawing of EPS ESD Network 20 20 29-Aug-10 23-Sep-10*
DEINSDW506 Layout Drawing of EPS F&G detectors 19 19 30-Sep-10 26-Oct-10*
DEINSDW507 Layout Drawing of EPS FGS Matrix Panel 19 19 30-Sep-10 26-Oct-10*
DEINSDW508 Layout Drawing of EPS FGS Network 20 20 29-Aug-10 23-Sep-10*
DEINSDW509 Layout Drawing of EPS Fibre Optic Cables 19 19 30-Sep-10 26-Oct-10*
DEINSDW510 Layout Drawing of EPS Instrument locations 19 19 30-Sep-10 26-Oct-10*
DEINSDW511 Layout Drawing of EPS PCS Equipment Room 19 19 30-Sep-10 26-Oct-10*
DEINSDW512 Layout Drawing of EPS PCS Network 19 19 07-Sep-10 03-Oct-10*
DEINSDW513 Layout Drawing of EPS PCS Remote Equipment Rooms 19 19 30-Sep-10 26-Oct-10*
DEINSDW514 Layout Drawing of MCC IRP panels 19 19 30-Sep-10 26-Oct-10*
DEINSDW515 Layout Drawing of Water Intake Station Cable Routes 19 19 30-Sep-10 26-Oct-10*
DEINSDW516 Layout Drawing of Water Intake Station Equipment Room 19 19 30-Sep-10 26-Oct-10*
DEINSDW517 Layout Drawing of Water Intake Station ESD Network 19 19 30-Sep-10 26-Oct-10*
DEINSDW518 Layout Drawing of Water Intake Station F&G detectors 19 19 30-Sep-10 26-Oct-10*
DEINSDW519 Layout Drawing of Water Intake Station FGS Network 19 19 30-Sep-10 26-Oct-10*
DEINSDW520 Layout Drawing of Water Intake Station Fibre Optic Cables 19 19 30-Sep-10 26-Oct-10*
DEINSDW521 Layout Drawing of Water Intake Station Instrument locations 19 19 30-Sep-10 26-Oct-10*
DEINSDW522 Layout Drawing of Water Intake Station PCS Network 19 19 30-Sep-10 26-Oct-10*
DEINSDW523 Layout Drawing of WellSites Cable Routes 19 19 30-Sep-10 26-Oct-10*
DEINSDW524 Layout Drawing of WellSites Equipment Room 19 19 30-Sep-10 26-Oct-10*
DEINSDW525 Layout Drawing of WellSites ESD Network 19 19 30-Sep-10 26-Oct-10*
DEINSDW526 Layout Drawing of WellSites F&G detectors 19 19 30-Sep-10 26-Oct-10*
DEINSDW527 Layout Drawing of WellSites FGS Network 19 19 30-Sep-10 26-Oct-10*
DEINSDW528 Layout Drawing of WellSites Fibre Optic Cables 19 19 30-Sep-10 26-Oct-10*
DEINSDW529 Layout Drawing of WellSites Instrument locations 19 19 30-Sep-10 26-Oct-10*
DEINSDW530 Layout Drawing of WellSites PCS Network 19 19 30-Sep-10 26-Oct-10*
DEINSDW531 Loop Drawings for Block Valve Stations IO Field Devices 19 19 30-Sep-10 26-Oct-10*
DEINSDW532 Loop Drawings for EPS ESD IO Field Devices 19 19 07-Sep-10 03-Oct-10*
DEINSDW533 Loop Drawings for EPS FGS IO Field Devices 19 19 14-Sep-10 10-Oct-10*
DEINSDW534 Loop Drawings for EPS PCS IO Field Devices 19 19 14-Sep-10 10-Oct-10*
DEINSDW545 Standard Drawings for Control Valve Hookup 19 19 14-Sep-10 10-Oct-10*
DEINSDW547 Standard Drawings for Flow Transx (DP) Hookup 19 19 14-Sep-10 10-Oct-10*
DEINSDW549 Standard Drawings for Instrument Air Hookup 19 19 14-Sep-10 10-Oct-10*
DEINSDW550 Standard Drawings for Instrument Mountings 19 19 14-Sep-10 10-Oct-10*
DEINSDW551 Standard Drawings for Junction Box Mounting 19 19 14-Sep-10 10-Oct-10*
DEINSDW552 Standard Drawings for Level Transx (DP) Hookup 19 19 14-Sep-10 10-Oct-10*
DEINSDW553 Standard Drawings for MOV Hookup 19 19 14-Sep-10 10-Oct-10*
DEINSDW555 Standard Drawings for Orifice Plates 19 19 14-Sep-10 10-Oct-10*
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2010 2011
First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 6 of 19 12-Aug-10 13:02
-
Activity ID Activity Name OriginalDuration
Remaining Duration
Start Finish
DEINSDW557 Standard Drawings for Pressure Switch Hookups 19 19 14-Sep-10 10-Oct-10*
DEINSDW558 Standard Drawings for Pressure Trx Hookups 19 19 21-Sep-10 17-Oct-10*
DEINSDW559 Standard Drawings for Shut Down Valve Hookup 19 19 21-Sep-10 17-Oct-10*
DEINSDW560 Standard Drawings for Thermowell 19 19 21-Sep-10 17-Oct-10*
DEINSDW561 Standard Drawings for Thermowell Installations 19 19 21-Sep-10 17-Oct-10*
ListList 41 41 30-Sep-10 25-Nov-10
DEINSLS707 EPS ESD Control System IO Allocations 19 19 30-Sep-10 26-Oct-10*
DEINSLS708 EPS FGS Control System IO Allocations 19 19 30-Sep-10 26-Oct-10*
DEINSLS709 EPS Instrument drawing list 19 19 01-Nov-10 25-Nov-10*
DEINSLS710 EPS Instrument Index 19 19 01-Nov-10 25-Nov-10*
DEINSLS711 EPS MTO List 19 19 01-Nov-10 25-Nov-10*
DEINSLS712 EPS PCS Control System IO Allocations 19 19 07-Oct-10 02-Nov-10*
DEINSLS713 EPS Preliminary MTO List 19 19 07-Oct-10 02-Nov-10*
Technical NoteTechnical Note 12 12 30-Sep-10 17-Oct-10
DEINSTN800 Technical Note for DCS Configuration Standard 12 12 30-Sep-10 17-Oct-10*
DEINSTN801 Technical Note for DCS HMI Standard 12 12 30-Sep-10 17-Oct-10*
DEINSTN802 Technical Note for DCS HMI Layout 12 12 30-Sep-10 17-Oct-10*
DEINSTN804 Technical Note for Interface Requirement to Oil Heaters UCP 12 12 30-Sep-10 17-Oct-10*
DEINSTN806 Technical Note for Interface Requirements to Local Panels 12 12 30-Sep-10 17-Oct-10*
DEINSTN807 Technical Note for Interface Requirements to Pipe Line Leak Detection 12 12 30-Sep-10 17-Oct-10*
DEINSTN808 Technical Note for Interface Requirements to Flow Computers 12 12 30-Sep-10 17-Oct-10*
DEINSTN812 Technical Note for Interface Requirements to PCS by 3rd Party 12 12 30-Sep-10 17-Oct-10*
DEINSTN813 Technical Note for Instrumentation Requirements for Package Equipment 12 12 30-Sep-10 17-Oct-10*
CalculationsCalculations 13 13 14-Sep-10 30-Sep-10
DEINSCA900 Thermowell Wake & Stress Calc 13 13 14-Sep-10 30-Sep-10*
DEINSCA901 Level Setting diagrams 13 13 14-Sep-10 30-Sep-10*
DEINSCA902 SIL testing time calcs 13 13 14-Sep-10 30-Sep-10*
DEINSCA903 SIL Calculation Report 13 13 14-Sep-10 30-Sep-10*
DEINSCA904 Orifice Plate Calculations 13 13 14-Sep-10 30-Sep-10*
DEINSCA905 Choke Valve Sizing Calculations 13 13 14-Sep-10 30-Sep-10*
DEINSCA906 Flow Meter Sizing 13 13 14-Sep-10 30-Sep-10*
DEINSCA907 Control Valve Sizing 13 13 14-Sep-10 30-Sep-10*
DEINSCA908 Intrinsically Safe Integrity Calculations 13 13 14-Sep-10 30-Sep-10*
MECHANICALMECHANICAL 88 60 15-Aug-10 04-Nov-10
Datasheets - Heat ExchangersDatasheets - Heat Exchangers 65 38 15-Aug-10 05-Oct-10
DEMDS0001 Mechanical Datasheet for Train 1 & 2 Crude/Crude Heat Exchanger 1E-10... 65 22 15-Aug-10 13-Sep-10*
DEMDS0002 Mechanical Datasheet for Train 1 & 2 Crude Rundown Air Cooler 1E-1415 ... 65 22 15-Aug-10 13-Sep-10*
DEMDS0003 Mechanical Datasheet for Train 1 & 2 Wash Water Heater 1E-5110 & 2E-5... 65 22 15-Aug-10 13-Sep-10*
DEMMR0200 Requisition Crude / Crude Heat Exchangers 16 16 14-Sep-10 05-Oct-10*
DEMMR0201 Requisition Air Cooler 16 16 14-Sep-10 05-Oct-10*
DEMMR0202 Requisition Wash Water Heater 16 16 14-Sep-10 05-Oct-10*
Datasheets - HeatersDatasheets - Heaters 65 38 15-Aug-10 05-Oct-10
DEMDS0030 Mechanical Datasheet for Train 1 & 2 Crude Heater 1F-1010 & 2F-1010 65 22 15-Aug-10 13-Sep-10*
DEMDS0031 Mechanical Datasheet for Fuel Gas Scrubber 65 22 15-Aug-10 13-Sep-10*
DEMMR0203 Requisition Crude Heater 16 16 14-Sep-10 05-Oct-10*
DEMMR0204 Requisition Fuel Gas Scrubber 16 16 14-Sep-10 05-Oct-10*
Datasheets - PumpsDatasheets - Pumps 83 38 15-Aug-10 05-Oct-10
DEMDS0050 Mechanical Datasheet for Crude Oil Booster Pumps P-1300 A/S 60 22 15-Aug-10 13-Sep-10*
DEMDS0051 Mechanical Datasheet for Crude Oil Export Pumps P-1310 A/S 60 22 15-Aug-10 13-Sep-10*
DEMDS0052 Mechanical Datasheet for Offspec Crude Oil Transfer Pumps P-1320 A/S 60 22 15-Aug-10 13-Sep-10*
DEMDS0053 Mechanical Datasheet for Water Intake Pump (Diesel) P-4000 83 33 15-Aug-10 28-Sep-10*
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2010 2011
First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 7 of 19 12-Aug-10 13:02
-
Activity ID Activity Name OriginalDuration
Remaining Duration
Start Finish
DEMDS0054 Mechanical Datasheet for Water Intake Pump (Electric) P-4010 83 33 15-Aug-10 28-Sep-10*
DEMDS0055 Mechanical Datasheet for Water Transfer Pumps P-4020 A/S 83 33 15-Aug-10 28-Sep-10*
DEMDS0056 Mechanical Datasheet for Produced Water Transfer Pumps P-4200 A/S 83 33 15-Aug-10 28-Sep-10*
DEMDS0057 Mechanical Datasheet for Produced Water Eductor Pumps P-4210-A/S 83 33 15-Aug-10 28-Sep-10*
DEMDS0058 Mechanical Datasheet for Service Water Distribution Pumps P-5100 A/S 83 33 15-Aug-10 28-Sep-10*
DEMDS0059 Mechanical Datasheet for Potable Water Distribution Pumps P-5200 A/S 83 33 15-Aug-10 28-Sep-10*
DEMDS0060 Mechanical Datasheet for Fire Water Pump (Diesel) P-5300 60 22 15-Aug-10 13-Sep-10*
DEMDS0061 Mechanical Datasheet for Fire Water Pump (Diesel) P-5310 60 22 15-Aug-10 13-Sep-10*
DEMDS0062 Mechanical Datasheet for Fire Water Jocky Pumps P-5320 A/S 83 33 15-Aug-10 28-Sep-10*
DEMDS0063 Mechanical Datasheet for LP Flare KO Drum Pumps P-6200 A/S 83 33 15-Aug-10 28-Sep-10*
DEMDS0064 Mechanical Datasheet for ATM Flare KO Drum Pumps P-6210 A/S 83 33 15-Aug-10 28-Sep-10*
DEMDS0066 Mechanical Datasheet for Diesel Transfer Pumps P-6710 A/B 83 33 15-Aug-10 28-Sep-10*
DEMDS0067 Mechanical Datasheet for Train 1 & 2 Charge Pumps 1P-1010 A/S & 2P-1... 60 22 15-Aug-10 13-Sep-10*
DEMDS0068 Mechanical Datasheet for Train 1 & 2 Wash Water Recirculation Pumps 1... 60 22 15-Aug-10 13-Sep-10*
DEMDS0069 Mechanical Datasheet for Well Cluster 1 & 2 Corrosion Inhibitor Injection P... 83 33 15-Aug-10 28-Sep-10*
DEMMR0205 Requistion Pumps-1 16 16 14-Sep-10 05-Oct-10*
DEMMR0206 Requistion Pumps-2 4 4 29-Sep-10 04-Oct-10*
Datasheets - Filters/StrainersDatasheets - Filters/Strainers 83 60 15-Aug-10 04-Nov-10
DEMDS0090 Mechanical Datasheet for Diesel Strainer S-6700 A/S 83 45 15-Aug-10 14-Oct-10*
DEMDS0091 Mechanical Datasheet for Water Intake Filter Unit SQ-4000 83 45 15-Aug-10 14-Oct-10*
DEMMR0207 Requisition Filters / strainers 16 15 17-Oct-10 04-Nov-10*
Datasheets - TanksDatasheets - Tanks 78 60 15-Aug-10 04-Nov-10
DEMDS0110 Mechanical Datasheet for Crude Oil Storage Tank 1 & 2 T-1400 A/B 65 22 15-Aug-10 13-Sep-10*
DEMDS0112 Mechanical Datasheet for Crude Oil Off Spec Tank T-1420 65 22 15-Aug-10 13-Sep-10*
DEMDS0113 Mechanical Datasheet for Produced Water Buffer Tank T-4200 55 22 15-Aug-10 13-Sep-10*
DEMDS0114 Mechanical Datasheet for Service Water Tank T-5100 78 45 15-Aug-10 14-Oct-10*
DEMDS0115 Mechanical Datasheet for Potable Water Storage Tank T-5210 78 45 15-Aug-10 14-Oct-10*
DEMDS0116 Mechanical Datasheet for Fire Water Storage Tank T-5300 55 22 15-Aug-10 13-Sep-10*
DEMDS0117 Mechanical Datasheet for Diesel Storage Tank T-6700 55 22 15-Aug-10 13-Sep-10*
DEMDS0118 Mechanical Datasheet for Well Cluster 1 Corrosion Inhibitor Storage Tank ... 78 45 15-Aug-10 14-Oct-10*
DEMMR0208 Requistion Tanks -1 16 16 14-Sep-10 05-Oct-10*
DEMMR0209 Requistion Tanks-2 16 15 17-Oct-10 04-Nov-10*
Drawings - TanksDrawings - Tanks 16 16 30-Sep-10 21-Oct-10
DEMCA0008 Calculation API650 16 16 30-Sep-10 21-Oct-10*
DEMDW0001 General arrangements 16 16 30-Sep-10 21-Oct-10*
DEMDW0002 Roof Structure 16 16 30-Sep-10 21-Oct-10*
DEMDW0003 Roof Plates 16 16 30-Sep-10 21-Oct-10*
DEMDW0004 Bottom Plates 16 16 30-Sep-10 21-Oct-10*
DEMDW0005 Shell Plates 16 16 30-Sep-10 21-Oct-10*
DEMDW0006 Ladder and Railings 16 16 30-Sep-10 21-Oct-10*
DEMDW0007 Anchor Bolts 16 16 30-Sep-10 21-Oct-10*
Datasheets - VesselsDatasheets - Vessels 88 50 15-Aug-10 21-Oct-10
DEMDS0140 Mechanical Datasheet for Gathering Station 1 Test Separator V-1000 70 22 15-Aug-10 13-Sep-10*
DEMDS0141 Mechanical Datasheet for Crude Oil Storage Tank 1 & 2 Degassing Boots ... 50 22 15-Aug-10 13-Sep-10*
DEMDS0142 Mechanical Datasheet for Crude Oil Off Spec Tank Degassing Boot V-1420 50 22 15-Aug-10 13-Sep-10*
DEMDS0143 Mechanical Datasheet for Corrugated Plate Interceptor V-4200 50 22 15-Aug-10 13-Sep-10*
DEMDS0144 Mechanical Datasheet for Induced Gas Flotation Vessel V-4210 50 22 15-Aug-10 13-Sep-10*
DEMDS0145 Mechanical Datasheet for Fuel Gas KO Drum V-6000 50 22 15-Aug-10 13-Sep-10*
DEMDS0146 Mechanical Datasheet for LP Flare KO Drum V-6200 50 22 15-Aug-10 13-Sep-10*
DEMDS0147 Mechanical Datasheet for ATM Flare KO Drum V-6210 50 22 15-Aug-10 13-Sep-10*
DEMDS0148 Mechanical Datasheet for Closed Drain Drum V-6400 50 22 15-Aug-10 13-Sep-10*
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2010 2011
First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 8 of 19 12-Aug-10 13:02
-
Activity ID Activity Name OriginalDuration
Remaining Duration
Start Finish
DEMDS0149 Mechanical Datasheet for Train 1 & 2 1st Stage Separators 1V-1010 & 2V-... 70 22 15-Aug-10 13-Sep-10*
DEMDS0150 Mechanical Datasheet for Train 1 & 2 2nd Stage Separators 1V-1020 & 2V... 70 22 15-Aug-10 13-Sep-10*
DEMDS0151 Mechanical Datasheet for Train 1 & 2 Fuel Gas Scrubers 1V-1030 & 2V-1030 50 22 15-Aug-10 13-Sep-10*
DEMDS0152 Mechanical Datasheet for Train 1 & 2 Dehydrators 1V-1510 & 2V-1510 70 22 15-Aug-10 13-Sep-10*
DEMDS0153 Mechanical Datasheet for Train 1 & 2 Desalters 1V-1520 & 2V-1520 70 22 15-Aug-10 13-Sep-10*
DEMDS0160 Mechanical Datasheet for Emergency Diesel Generator 68 45 15-Aug-10 14-Oct-10*
DEMLS0001 Mechanical Equipment List 75 22 15-Aug-10 13-Sep-10*
DEMMR0210 Requistion Vessels 16 16 14-Sep-10 05-Oct-10*
DEMMR0211 Requistion Emergency Diesel Generator 15 15 26-Sep-10 14-Oct-10*
DEMMR0212 Requsition Chemical Injection skids 16 16 30-Sep-10 21-Oct-10*
DEMRE0001 Material Selection Report 65 22 15-Aug-10 13-Sep-10*
DEMSP0001 Mechanical Specification for Daearator Package 75 22 15-Aug-10 13-Sep-10*
DEMSP0002 General Specification for Unfired Pressure Vessels (Static) 65 22 15-Aug-10 13-Sep-10*
DEMSP0003 General Mechanical Specification for Centrifugal Pumps (Rotating) 65 22 15-Aug-10 13-Sep-10*
DEMSP0004 Specification for Packaged Skidded Equipment (Static & Rotating) 65 22 15-Aug-10 13-Sep-10*
DEMSP0006 General Specification for Air Coolers (Rotating) 88 45 15-Aug-10 14-Oct-10*
DEMSP0007 Specification for Piping and Valve Materials (Static) 65 22 15-Aug-10 13-Sep-10*
DEMSP0008 Specification for Piping Design (Static) 65 22 15-Aug-10 13-Sep-10*
DEMSP0009 Specification for Piping Fabrication and Installation (Static) 88 45 15-Aug-10 14-Oct-10*
DEMSP0010 Specification for Piping Testing and Completion (Static) 88 45 15-Aug-10 14-Oct-10*
DEMSP0011 Specification for Shell & Tube Heat Exchanger (Previously Spec for HVAC) 65 22 15-Aug-10 13-Sep-10*
DEMSP0013 Specification for Emergency Diesel Generator 78 45 15-Aug-10 14-Oct-10*
DEMSP0014 Specification for Instrument Air Compressor Package 72 45 15-Aug-10 14-Oct-10*
DEMSP0015 Specification for Potable Water Membrane Package 70 45 15-Aug-10 14-Oct-10*
DEMSP0016 Specifiation for Allowable Loads at Equipment Nozzles & Flanged 47 22 15-Aug-10 13-Sep-10*
DEMSP0017 Flare Ignition System 16 16 30-Sep-10 21-Oct-10*
PIPELINEPIPELINE 129 129 15-Aug-10 09-Feb-11
DEPLDW0002 Key Plan - Export Pipeline Option 1 (KP0-AHDEB Tie-In Point) 65 22 15-Aug-10 13-Sep-10*
DEPLDW0003 Overall Gathering Line & Export Pipeline System 60 22 15-Aug-10 13-Sep-10*
DEPLDW0015 Route Map - Option 1 KP 00 -05 65 22 15-Aug-10 13-Sep-10*
DEPLDW0016 Route Map - Option 1 KP 05 - AHDEB Tie-In Point 65 22 15-Aug-10 13-Sep-10*
DEPLDW0018 Typical Trench & Backfilling Details - Open Cut 65 22 15-Aug-10 13-Sep-10*
DEPLDW0019 Typical Waterway/Creek Crossing Details - Open Cut 65 22 15-Aug-10 13-Sep-10*
DEPLDW0020 Typical Road Crossing Details - Open Cut 65 22 15-Aug-10 13-Sep-10*
DEPLDW0021 Typical Road Crossing Details - Bored 65 22 15-Aug-10 13-Sep-10*
DEPLDW0022 Typical Crossing Details - Horizontal Directional Drilling (HDD) 65 22 15-Aug-10 13-Sep-10*
DEPLDW0023 Typical Block Valve Station 60 22 15-Aug-10 13-Sep-10*
DEPLDW0024 Crossing Location Plan 60 22 15-Aug-10 13-Sep-10*
DEPLDW0025 Pipeline Route Option Layout 54 22 15-Aug-10 13-Sep-10*
DEPLDW0026 Alignment Sheets 39 39 31-Aug-10 24-Oct-10*
CalculationsCalculations 60 22 15-Aug-10 13-Sep-10
DEPLCA0001 Wall Thickness Calculation 60 22 15-Aug-10 13-Sep-10*
DEPLCA0002 Pipeline Sizing Calculation 60 22 15-Aug-10 13-Sep-10*
DEPLCA0003 Calculation for Pipeline Stress Analysis 60 22 15-Aug-10 13-Sep-10*
ListsLists 75 22 15-Aug-10 13-Sep-10
DEPLLS0001 Pipeline Drawing Index 75 22 15-Aug-10 13-Sep-10*
DEPLLS0002 Pipeline Materials Take-off including Major Long Lead Items 60 22 15-Aug-10 13-Sep-10*
ReportsReports 88 45 15-Aug-10 14-Oct-10
DEPLRE0002 Pipeline Internal/External Corrosion Mitigation Philosophy 88 45 15-Aug-10 14-Oct-10*
DEPLRE0003 Cathodic Protection Design Philosopy 88 45 15-Aug-10 14-Oct-10*
DEPLRE0004 Site Investigation Plan - Pipeline 88 45 15-Aug-10 14-Oct-10*
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2010 2011
First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 9 of 19 12-Aug-10 13:02
-
Activity ID Activity Name OriginalDuration
Remaining Duration
Start Finish
DEPLRE0005 Route Definition Report 71 45 15-Aug-10 14-Oct-10*
Scope of WorkScope of Work 66 45 15-Aug-10 14-Oct-10
DEPLRE0001 Pipeline Construction Scope of Work 66 45 15-Aug-10 14-Oct-10*
SpecificationsSpecifications 99 55 15-Aug-10 28-Oct-10
DEPLSP0002 1) Specification for Line Pipe 77 45 15-Aug-10 14-Oct-10*
DEPLSP0003 2) Specifications for External Coating of Line Pipe 77 45 15-Aug-10 14-Oct-10*
DEPLSP0004 3) Specifications for Hot Induction Bends 77 45 15-Aug-10 14-Oct-10*
DEPLSP0005 4) Specifications for Pig Launchers / Receivers 77 45 15-Aug-10 14-Oct-10*
DEPLSP0006 5) Specifications for Fiber Optic Cable & Installation 77 45 15-Aug-10 14-Oct-10*
DEPLSP0007 6) Specifications for Barred Tees 77 45 15-Aug-10 14-Oct-10*
DEPLSP0008 7) Specifications for Insulating Joints 77 45 15-Aug-10 14-Oct-10*
DEPLSP0009 8) Specifications for Anchor Flanges 88 55 15-Aug-10 28-Oct-10*
DEPLSP0010 9) Specifications for Fittings and Flanges 88 55 15-Aug-10 28-Oct-10*
DEPLSP0011 10) Specification for Onshore Pipeline Construction 88 55 15-Aug-10 28-Oct-10*
DEPLSP0012 11) Specification for Field Joint Coating 88 55 15-Aug-10 28-Oct-10*
DEPLSP0013 12) Specification for Coating of Bends & Fittings 88 55 15-Aug-10 28-Oct-10*
DEPLSP0014 13) Specification for Pipeline welding 88 55 15-Aug-10 28-Oct-10*
DEPLSP0016 15) Specification for Topographic Survey Works 99 55 15-Aug-10 28-Oct-10*
DEPLSP0017 16) Specification for Geotechnical Survey 99 55 15-Aug-10 28-Oct-10*
DEPLSP0018 17) Specification for Leak Monitoring System 94 55 15-Aug-10 28-Oct-10*
DatasheetsDatasheets 94 55 15-Aug-10 28-Oct-10
DEPLDS0001 1) Data Sheet for Line Pipe & Coating 94 55 15-Aug-10 28-Oct-10*
DEPLDS0002 2) Datasheet for Hot Induction bends 94 55 15-Aug-10 28-Oct-10*
DEPLDS0003 3) Data Sheet for Pig Launchers / Receivers 94 55 15-Aug-10 28-Oct-10*
DEPLDS0004 4) Data Sheet for Barred Tees 94 55 15-Aug-10 28-Oct-10*
DEPLDS0005 5) Data Sheet for Insulating Joints 94 55 15-Aug-10 28-Oct-10*
DEPLDS0006 6) Data Sheet for Anchor Flanges (Preliminary) 94 55 15-Aug-10 28-Oct-10*
P&ID(IPC)P&ID(IPC) 89 89 15-Aug-10 15-Dec-10
DEPLDW1000 Overall Pipeline System P&ID 72 72 15-Aug-10 22-Nov-10*
DEPLDW1001 Pipeline P&ID 72 72 15-Aug-10 22-Nov-10*
DEPLDW1002 BV P&ID for BV1 72 72 05-Sep-10 13-Dec-10*
DEPLDW1003 BV P&ID for BV2 72 72 07-Sep-10 15-Dec-10*
CalculationCalculation 110 110 15-Aug-10 13-Jan-11
DEPLCA1004 Stress Analysis Calculation for HDD Crossing 92 92 15-Aug-10 20-Dec-10*
DEPLCA1005 Stress Analysis Calculation for Road Crossing 92 92 05-Sep-10 10-Jan-11*
DEPLCA1006 Anchor Flange Calculation 92 92 15-Aug-10 20-Dec-10*
DEPLCA1007 Pipeline Load Case Analysis Calculation 92 92 06-Sep-10 11-Jan-11*
DEPLCA1008 Concrete Coating Thickness Calculation 92 92 06-Sep-10 11-Jan-11*
DEPLCA1009 Buoyancy Control Calculation 92 92 15-Aug-10 20-Dec-10*
DEPLCA1010 Set-on Weight Spacing Calculation 92 92 06-Sep-10 11-Jan-11*
DEPLCA1011 Screw Anchor Spacing Calculation 92 92 08-Sep-10 13-Jan-11*
DEPLCA1012 Control Valve Sizing Calculation 92 92 15-Aug-10 20-Dec-10*
DEPLCA1013 PSV Sizing Calculation 92 92 06-Sep-10 11-Jan-11*
DEPLCA1014 Pipeline Transient Analysis (Hydraulic Detail Study) 92 92 15-Aug-10 20-Dec-10*
DEPLCA1015 Cathodic Protection Calculation 92 92 15-Aug-10 20-Dec-10*
Data SheetData Sheet 112 112 15-Aug-10 17-Jan-11
DEPLDS1016 Data Sheet for Control Valve 92 92 12-Sep-10 17-Jan-11*
DEPLDS1017 Data Sheet for Pig Detector 92 92 15-Aug-10 20-Dec-10*
DEPLDS1018 Data Sheet for On-Off Valve (Motor Actuator) 92 92 15-Aug-10 20-Dec-10*
DEPLDS1019 Data Sheet for On-Off Valve (G/H Actuator) 92 92 15-Aug-10 20-Dec-10*
DEPLDS1020 Data Sheet for Pig Signaller 92 92 15-Aug-10 20-Dec-10*
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2010 2011
First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 10 of 19 12-Aug-10 13:02
-
Activity ID Activity Name OriginalDuration
Remaining Duration
Start Finish
DEPLDS1021 Data Sheet for Heat Shrink Sleeves 92 92 06-Sep-10 11-Jan-11*
DEPLDS1022 Data Sheet for Pressure Transmitter 16" Pipeline Pig Launcher at Garraf F... 92 92 06-Sep-10 11-Jan-11*
DEPLDS1023 Data Sheet for Pressure Transmitter 16" Pipeline Pig Receiver at Ahdab Ti... 92 92 06-Sep-10 11-Jan-11*
DEPLDS1024 Data Sheet for Pressure Gauge at Block valve stations 92 92 06-Sep-10 11-Jan-11*
DEPLDS1025 Data Sheet for Pressure Transmitter at BVS-1 92 92 09-Sep-10 16-Jan-11*
DEPLDS1026 Data Sheet for Pressure Transmitter at BVS-2 92 92 09-Sep-10 16-Jan-11*
DEPLDS1027 Data Sheet for Pressure Gauge Pipeline Pig Launcher at Garraf FCP 5 5 15-Aug-10 19-Aug-10*
DEPLDS1028 Data Sheet for Pressure Gauge Pipeline Pig Receiver at Ahdab Tie-in 5 5 15-Aug-10 19-Aug-10*
DrawingDrawing 125 125 15-Aug-10 03-Feb-11
Alignment SheetAlignment Sheet 125 125 15-Aug-10 03-Feb-11
DEPLDS1029 Stanadard Symbols and Abbreviations on Alignment Sheets 108 108 15-Aug-10 11-Jan-11*
DEPLDS1030 Alignment Sheet Key Plan 108 108 15-Aug-10 11-Jan-11*
DEPLDS1031 Alignment Sheets - KP 0 + 000 - KP 1 + 400 108 108 02-Sep-10 31-Jan-11*
DEPLDS1032 Alignment Sheets - KP 1 + 400 - KP 2 + 800 108 108 02-Sep-10 31-Jan-11*
DEPLDS1033 Alignment Sheets - KP 2 + 800 - KP 4 + 200 108 108 05-Sep-10 01-Feb-11*
DEPLDS1034 Alignment Sheets - KP 4 + 200 - KP 5 + 600 108 108 05-Sep-10 01-Feb-11*
DEPLDS1035 Alignment Sheets - KP 5 + 600 - KP 7 + 000 108 108 06-Sep-10 02-Feb-11*
DEPLDS1036 Alignment Sheets - KP 7 + 000 - KP 8 + 400 108 108 06-Sep-10 02-Feb-11*
DEPLDS1037 Alignment Sheets - KP 8 + 400 - KP 9 + 800 108 108 07-Sep-10 03-Feb-11*
DEPLDS1038 Alignment Sheets - KP 9 + 800 - KP 10 + 500 (Ahdab Tie-in) 108 108 07-Sep-10 03-Feb-11*
Crossing DrawingCrossing Drawing 105 105 15-Aug-10 06-Jan-11
DEPLDW1039 Road (Bored) KP 4+802 81 81 14-Sep-10 04-Jan-11*
DEPLDW1040 Garraf River (HDD) KP 8+547 81 81 16-Sep-10 06-Jan-11*
DEPLDW1041 Highway 7 (Bored) KP 9+141 81 81 15-Aug-10 05-Dec-10*
Typical DrawingTypical Drawing 120 120 15-Aug-10 27-Jan-11
DEPLDW1042 Typical for Power Transmission Lines 91 91 15-Aug-10 19-Dec-10*
DEPLDW1043 Typical for Concrete Slab 91 91 15-Aug-10 19-Dec-10*
DEPLDW1044 Typical for Construction Site Preparation for Bored crossing 91 91 15-Aug-10 19-Dec-10*
DEPLDW1045 Typical for Construction Site Preparation for Horizontal Directional Drilling (... 91 91 06-Sep-10 10-Jan-11*
DEPLDW1046 Typical Installation of FOC Manhole 91 91 06-Sep-10 10-Jan-11*
DEPLDW1047 Typical Set-on Weight 91 91 06-Sep-10 10-Jan-11*
DEPLDW1048 Typical Pipeline Warning Tape 91 91 09-Sep-10 13-Jan-11*
DEPLDW1049 Typical Warning Sign for FOC Manhole 91 91 09-Sep-10 13-Jan-11*
DEPLDW1050 Typical for Hot Bend General Arrangement Drawing 91 91 09-Sep-10 13-Jan-11*
DEPLDW1051 Typical for Pipeline Marker 91 91 14-Sep-10 18-Jan-11*
DEPLDW1052 TTypical for Aerial Marker 91 91 20-Sep-10 24-Jan-11*
DEPLDW1053 Typical for Cable trench/routing and inst. Location layout at Pig stations 91 91 20-Sep-10 24-Jan-11*
DEPLDW1054 Typical for Cable trench/routing and inst. Location layout at block valve stat... 91 91 23-Sep-10 27-Jan-11*
Block Valve StationBlock Valve Station 129 129 15-Aug-10 09-Feb-11
Block Valve Station 1Block Valve Station 1 129 129 15-Aug-10 09-Feb-11
DEPLDW1055 Piping Arrangement Drawing 106 106 15-Aug-10 09-Jan-11*
DEPLDW1056 Piping Isometric Drawing 106 106 05-Sep-10 30-Jan-11*
DEPLDW1057 Plot Plan, Access Road and Section 106 106 07-Sep-10 01-Feb-11*
DEPLDW1058 Cross section and Details 106 106 09-Sep-10 03-Feb-11*
DEPLDW1059 Block Valve Station Foundation Plan reinfocement and details 106 106 13-Sep-10 07-Feb-11*
DEPLDW1060 Typical Pipe Support 106 106 15-Sep-10 09-Feb-11*
DEPLDW1061 Details of Security fence 5 5 15-Aug-10 19-Aug-10*
DEPLDW1062 Details of Security gate and safety barrier 5 5 15-Aug-10 19-Aug-10*
DEPLDW1063 Details of Stair and Handrail 5 5 15-Aug-10 19-Aug-10*
Block Valve Station 2Block Valve Station 2 129 129 15-Aug-10 09-Feb-11
DEPLDW1064 Piping Arrangement Drawing 106 106 15-Aug-10 09-Jan-11*
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2010 2011
First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 11 of 19 12-Aug-10 13:02
-
Activity ID Activity Name OriginalDuration
Remaining Duration
Start Finish
DEPLDW1065 Piping Isometric Drawing 106 106 05-Sep-10 30-Jan-11*
DEPLDW1066 Plot Plan, Access Road and Section 106 106 07-Sep-10 01-Feb-11*
DEPLDW1067 Cross section and Details 106 106 09-Sep-10 03-Feb-11*
DEPLDW1068 Block Valve Station Foundation Plan reinfocement and details 106 106 13-Sep-10 07-Feb-11*
DEPLDW1069 Typical Pipe Support 106 106 15-Sep-10 09-Feb-11*
DEPLDW1070 Details of Security fence 5 5 15-Aug-10 19-Aug-10*
DEPLDW1071 Details of Security gate and safety barrier 5 5 15-Aug-10 19-Aug-10*
DEPLDW1072 Details of Stair and Handrail 5 5 15-Aug-10 19-Aug-10*
List&ReportList&Report 92 92 15-Aug-10 20-Dec-10
DEPLDW1073 Detailed Pipeline Material Take-Off 92 92 15-Aug-10 20-Dec-10*
SpecificationSpecification 108 108 15-Aug-10 11-Jan-11
DEPLSP1074 Specification for Pipe Class Summary and Piping Classes 92 92 15-Aug-10 20-Dec-10*
DEPLSP1075 Specification for Mechanical Completion and Commissioning 92 92 15-Aug-10 20-Dec-10*
DEPLSP1076 Specification for Requirement of Spares 92 92 15-Aug-10 20-Dec-10*
DEPLSP1077 Specification for Site Preparation 92 92 15-Aug-10 20-Dec-10*
DEPLSP1078 Specification for Above Ground Painting 92 92 06-Sep-10 11-Jan-11*
DEPLSP1079 Specification for Under Ground Painting 92 92 15-Aug-10 20-Dec-10*
DEPLSP1080 Specification for Blasting 92 92 15-Aug-10 20-Dec-10*
DEPLSP1081 Specification for Horizontal Directional Drilled Crossings 92 92 15-Aug-10 20-Dec-10*
DEPLSP1082 Specification for Pipe Boring/Pipe Jack Construction 92 92 15-Aug-10 20-Dec-10*
DEPLSP1083 Specification for Linepipe 3LPE Coating Repair 92 92 15-Aug-10 20-Dec-10*
DEPLSP1084 Specification for Welding Pipe for Stations 92 92 15-Aug-10 20-Dec-10*
DEPLSP1085 Specification for Reinforced Concrete Pipe 92 92 15-Aug-10 20-Dec-10*
DEPLSP1086 Specification for Supply and Installation of Fencing and Gates 92 92 15-Aug-10 20-Dec-10*
DEPLSP1087 Specification for Pig Detector 92 92 15-Aug-10 20-Dec-10*
DEPLSP1088 Specification for Pipeline Ball Valves (API 6D) 92 92 15-Aug-10 20-Dec-10*
DEPLSP1089 Specification for Pipeline Plug Valve 92 92 15-Aug-10 20-Dec-10*
DEPLSP1090 Specification for Pipeline Check Valves (Full Bore) 92 92 15-Aug-10 20-Dec-10*
DEPLSP1091 Specification for Pig Signaller 92 92 15-Aug-10 20-Dec-10*
DEPLSP1092 Specification for pre-commissioning of Onshore Pipeline 92 92 15-Aug-10 20-Dec-10*
DEPLSP1093 Specification for pre-commissioning of Block Valve Station 92 92 15-Aug-10 20-Dec-10*
DEPLSP1094 Specification for Block Valve Station Construction 92 92 15-Aug-10 20-Dec-10*
DEPLSP1095 Specification for Radiographic Test 92 92 15-Aug-10 20-Dec-10*
DEPLSP1096 Specification for Magnetic Particle Test 92 92 15-Aug-10 20-Dec-10*
DEPLSP1097 Specification for Liquid Penetrate Test 92 92 15-Aug-10 20-Dec-10*
DEPLSP1098 Specification for Ultrasonic Test 92 92 15-Aug-10 20-Dec-10*
DEPLSP1099 Specification for Buoyancy Control 92 92 15-Aug-10 20-Dec-10*
DEPLSP1100 Specification for Continued Concrete Coating 92 92 15-Aug-10 20-Dec-10*
DEPLSP1101 Specification for Set on Weight 92 92 15-Aug-10 20-Dec-10*
DEPLSP1102 Specification for Reinforced Concrete Structure 92 92 15-Aug-10 20-Dec-10*
DEPLSP1103 Specification for Pipe Haulage, Storage and Stockpiling 92 92 15-Aug-10 20-Dec-10*
DEPLSP1104 Specification for Solar Panel 92 92 15-Aug-10 20-Dec-10*
DEPLSP1105 Specification for Pipeline Baseline Survey 92 92 15-Aug-10 20-Dec-10*
Cathodic ProtectionCathodic Protection 127 127 15-Aug-10 07-Feb-11
DEPLDW1106 Typical Power Source Unit Installation Details 106 106 15-Aug-10 09-Jan-11*
DEPLDW1107 Typical Power Source Unit Schematic 106 106 15-Aug-10 09-Jan-11*
DEPLDW1108 Typical Power Source Unit Remote Monitoring Schematic 106 106 05-Sep-10 30-Jan-11*
DEPLDW1109 Typical Ground Bed Construction Detail 106 106 05-Sep-10 30-Jan-11*
DEPLDW1110 Typical Exothermic Welding Details 106 106 07-Sep-10 01-Feb-11*
DEPLDW1111 Typical Test Post Fabrication and Construction Details 106 106 07-Sep-10 01-Feb-11*
DEPLDW1112 Typical Test Post Installation Details 106 106 09-Sep-10 03-Feb-11*
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2010 2011
First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 12 of 19 12-Aug-10 13:02
-
Activity ID Activity Name OriginalDuration
Remaining Duration
Start Finish
DEPLDW1113 Typical Zinc Ribbon Installation Details 106 106 09-Sep-10 03-Feb-11*
DEPLDW1114 AC & DC Mitigation System Overall Schematic 106 106 13-Sep-10 07-Feb-11*
DEPLDW1115 Layout/location plan of CP network 106 106 13-Sep-10 07-Feb-11*
DEPLDW1116 Temporary Sacrificial Anodes (where required) 5 5 15-Aug-10 19-Aug-10*
DEPLDW1117 Typical AC/DC Mitigation Installation Detail (As required) 5 5 15-Aug-10 19-Aug-10*
DEPLDW1118 Typical Foreign Pipeline Crossing Installation Detail (Where required) 5 5 15-Aug-10 19-Aug-10*
DEPLDW1119 Typical Isolating Flange/Joint Detail 5 5 15-Aug-10 19-Aug-10*
PIPINGPIPING 115 88 15-Aug-10 14-Dec-10
DELDW0001 Piping Drawing Index 49 22 15-Aug-10 13-Sep-10*
DELDW0002 EPS - Overall Site Layout 65 22 15-Aug-10 13-Sep-10*
DELDW0003 EPS - General Site Layout Plan (Sheet 1 & 2) 65 22 15-Aug-10 13-Sep-10*
DELDW0004 Raw Water Intake - Site Layout Plan 65 22 15-Aug-10 13-Sep-10*
DELDW0006 Cluster Well Pad - Typical Site Layout 65 22 15-Aug-10 13-Sep-10*
DELDW0007 Single Well Pad - Typical Site Layout 65 22 15-Aug-10 13-Sep-10*
DELDW0020 EPS - Oil Line Study Transposition 49 22 15-Aug-10 13-Sep-10*
DELDW0021 EPS - Gas Line Study Transposition 49 22 15-Aug-10 13-Sep-10*
DELDW0022 EPS - Produced Water Line Study Transposition 49 22 15-Aug-10 13-Sep-10*
DELDW0023 EPS - Raw Water Line Study Transposition 49 22 15-Aug-10 13-Sep-10*
DELDW0024 EPS - Firewater Ring Main Line Study Transposition 49 22 15-Aug-10 13-Sep-10*
DELDW0030 Equipment Location Key Plan 33 33 30-Aug-10 13-Oct-10*
DELDW0031 Equipment Location Plan - WC-1 33 33 30-Aug-10 13-Oct-10*
DELDW0032 Equipment Location Plan -WC-2 33 33 30-Aug-10 13-Oct-10*
DELDW0033 Equipment Location Plan - EPS - Area 1 33 33 30-Aug-10 13-Oct-10*
DELDW0034 Equipment Location Plan - EPS - Area 2 33 33 30-Aug-10 13-Oct-10*
DELDW0035 Equipment Location Plan - EPS - Area 3 33 33 30-Aug-10 13-Oct-10*
DELDW0036 Equipment Location Plan - EPS- Area 4 33 33 30-Aug-10 13-Oct-10*
DELDW0037 Equipment Location Plan - EPS - Area 5 33 33 30-Aug-10 13-Oct-10*
DELDW0038 Equipment Location Plan -EPS- Area 6 33 33 30-Aug-10 13-Oct-10*
DELDW0039 Equipment Location Plan - EPS - Area 7 33 33 30-Aug-10 13-Oct-10*
DELDW0040 Equipment Location Plan - EPS- Area 6 33 33 30-Aug-10 13-Oct-10*
DELDW0041 Equipment Location Plan - EPS - Area 8 33 33 30-Aug-10 13-Oct-10*
DELDW0042 Equipment Location Plan - EPS - Area 9 33 33 30-Aug-10 13-Oct-10*
DELDW0043 Equipment Location Plan - EPS - Area 10 33 33 30-Aug-10 13-Oct-10*
DELDW0044 Equipment Location Plan - EPS - Area 11 33 33 30-Aug-10 13-Oct-10*
DELDW0045 Equipment Location Plan - EPS - Area 12 33 33 30-Aug-10 13-Oct-10*
DELDW0046 Equipment Location Plan - EPS - Area 13 33 33 30-Aug-10 13-Oct-10*
DELDW0047 Equipment Location Plan - EPS - Area 14 33 33 30-Aug-10 13-Oct-10*
DELDW0048 Equipment Location Plan - EPS - Area 15 33 33 30-Aug-10 13-Oct-10*
DELDW0049 Equipment Location Plan - EPS - Area 16 33 33 30-Aug-10 13-Oct-10*
DELDW0050 Equipment Location Plan - Water Intake 33 33 30-Aug-10 13-Oct-10*
DELDW0060 Model Key Plan 33 33 30-Aug-10 13-Oct-10*
DELDW0100 Typical Piping Support Index 115 88 15-Aug-10 14-Dec-10*
DELDW0101 Typical Piping Vent, Drain & Instrument Connection Detail Index 115 88 15-Aug-10 14-Dec-10*
DELDW0102 Specialty Items Index 33 33 30-Aug-10 13-Oct-10*
DELDW0103 Specialty Supports Index 33 33 30-Aug-10 13-Oct-10*
DELDW0104 Isometric Drawing Index 33 33 30-Aug-10 13-Oct-10*
DELDW0105 Tie-in Schedule Index 33 33 30-Aug-10 13-Oct-10*
DELDW0106 Model Drawing Index 33 33 30-Aug-10 13-Oct-10*
DELDW0107 Index 33 33 30-Aug-10 13-Oct-10*
DELDW0108 Index 33 33 30-Aug-10 13-Oct-10*
DELDW0109 Index 33 33 30-Aug-10 13-Oct-10*
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2010 2011
First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 13 of 19 12-Aug-10 13:02
-
Activity ID Activity Name OriginalDuration
Remaining Duration
Start Finish
DELDW0110 Piping MTO 33 33 30-Aug-10 13-Oct-10*
DELDW0200 General Arrangement PAU Area 1 32 32 29-Sep-10 11-Nov-10*
DELDW0201 General Arrangement PAU Area 1 32 32 29-Sep-10 11-Nov-10*
DELDW0202 General Arrangement PAU Area 1 32 32 29-Sep-10 11-Nov-10*
DELDW0203 General Arrangement PAU Area 1 32 32 29-Sep-10 11-Nov-10*
DELDW0204 General Arrangement PAU Area 1 32 32 29-Sep-10 11-Nov-10*
DELDW0205 General Arrangement PAU Area 2 - T1 32 32 29-Sep-10 11-Nov-10*
DELDW0206 General Arrangement PAU Area 2 - T1 32 32 29-Sep-10 11-Nov-10*
DELDW0207 General Arrangement PAU Area 2 - T1 32 32 29-Sep-10 11-Nov-10*
DELDW0208 General Arrangement & Isometrics PAU Area 2 - T1 32 32 29-Sep-10 11-Nov-10*
DELDW0209 General Arrangement & Isometrics PAU Area 2 - T2 14 14 01-Nov-10 18-Nov-10*
DELDW0210 General Arrangement & Isometrics PAU Area 2 - T2 14 14 01-Nov-10 18-Nov-10*
DELDW0211 General Arrangement & isometrics PAU Area 2 - T2 14 14 01-Nov-10 18-Nov-10*
DELDW0212 General Arrangement & Isometrics PAU Area 2 - T2 14 14 01-Nov-10 18-Nov-10*
DELDW0213 General Arrangement & Isometrics PAU Area 3 - T1 15 15 31-Oct-10 18-Nov-10*
DELDW0214 General Arrangement & Isometrics PAU Area 3 - T1 15 15 31-Oct-10 18-Nov-10*
DELDW0215 General Arrangement & Isometrics PAU Area 3 - T1 15 15 31-Oct-10 18-Nov-10*
DELDW0216 General Arrangement & Isometrics PAU Area 3 - T1 15 15 31-Oct-10 18-Nov-10*
DELDW0217 General Arrangement & Isometrics PAU Area 3 - T2 14 14 01-Nov-10 18-Nov-10*
DELDW0218 General Arrangement & Isometrics PAU Area 3 - T2 14 14 01-Nov-10 18-Nov-10*
DELDW0219 General Arrangement & Isometrics PAU Area 3 - T2 14 14 01-Nov-10 18-Nov-10*
DELDW0220 General Arrangement & Isometrics PAU Area 3 - T2 14 14 01-Nov-10 18-Nov-10*
DELDW0221 General Arrangement & Isometrics PAU Area 5 15 15 31-Oct-10 18-Nov-10*
DELDW0222 General Arrangement & Isometrics PAU Area 5 15 15 31-Oct-10 18-Nov-10*
DELDW0223 General Arrangement & Isometrics PAU Area 5 15 15 31-Oct-10 18-Nov-10*
DELDW0224 General Arrangement & Isometrics PAU Area 5 15 15 31-Oct-10 18-Nov-10*
DELDW0225 General Arrangement & Isometrics PAU Area 5 15 15 31-Oct-10 18-Nov-10*
DELDW0226 General Arrangement & Isometrics PAU Area 5 15 15 31-Oct-10 18-Nov-10*
DELDW0227 General Arrangement & Isometrics PAU Area 6 15 15 31-Oct-10 18-Nov-10*
DELDW0228 General Arrangement & Isometrics PAU Area 6 15 15 31-Oct-10 18-Nov-10*
DELDW0229 General Arrangement & Isometrics PAU Area 6 15 15 31-Oct-10 18-Nov-10*
DELDW0230 General Arrangement & Isometrics PAU Area 6 15 15 31-Oct-10 18-Nov-10*
DELDW0231 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*
DELDW0232 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*
DELDW0233 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*
DELDW0234 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*
DELDW0235 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*
DELDW0236 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*
DELDW0237 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*
DELDW0238 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*
DELDW0239 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*
DELDW0240 General Arrangement & Isometrics PAU Area 7 15 15 31-Oct-10 18-Nov-10*
DELDW0300 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0301 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0302 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0303 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0304 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0305 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0306 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0307 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0308 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2010 2011
First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 14 of 19 12-Aug-10 13:02
-
Activity ID Activity Name OriginalDuration
Remaining Duration
Start Finish
DELDW0309 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0310 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0311 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0312 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0313 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0314 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0315 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0316 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0317 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0318 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0319 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0320 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0321 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0322 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0323 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0324 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0325 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0326 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0327 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0328 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0329 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0330 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0331 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0332 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0333 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0334 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0335 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0336 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0337 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0338 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0339 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0340 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0341 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0342 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0343 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0344 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0345 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0346 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0347 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0348 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0349 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0350 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0351 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0352 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0353 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0354 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0355 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0356 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0357 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0358 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
DELDW0359 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2010 2011
First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 15 of 19 12-Aug-10 13:02
-
Activity ID Activity Name OriginalDuration
Remaining Duration
Start Finish
DELDW0360 General Arrangement & Isometrics PAR Area 1 16 16 30-Sep-10 21-Oct-10*
PROCESSPROCESS 93 45 15-Aug-10 14-Oct-10
Calculation - PumpsCalculation - Pumps 56 11 15-Aug-10 29-Aug-10
DEPCA0050 Calculation for Crude Oil Booster Pumps P-1300 A/S 56 11 15-Aug-10 29-Aug-10*
DEPCA0051 Calculation for Crude Oil Export Pumps P-1310 A/S 56 11 15-Aug-10 29-Aug-10*
DEPCA0052 Calculation for Off Spec Crude Oil Transfer Pumps P-1320 A/B/S 56 11 15-Aug-10 29-Aug-10*
DEPCA0053 Calculation for Water Intake Pump (Diesel) P-4000 56 11 15-Aug-10 29-Aug-10*
DEPCA0054 Calculation for Water Intake Pump (Electric) P-4010 56 11 15-Aug-10 29-Aug-10*
DEPCA0055 Calculation for Water Transfer Pumps P-4020 A/S 56 11 15-Aug-10 29-Aug-10*
DEPCA0056 Calculation for Produced Water Transfer Pumps P-4200 A/S 56 11 15-Aug-10 29-Aug-10*
DEPCA0058 Calculation for Service Water Distribution Pumps P-5100 A/S 46 11 15-Aug-10 29-Aug-10*
DEPCA0059 Calculation for Potable Water Distribution Pumps P-5200 A/S 46 11 15-Aug-10 29-Aug-10*
DEPCA0060 Calculation for Fire Water Pump (Diesel) P-5300 46 11 15-Aug-10 29-Aug-10*
DEPCA0061 Calculation for Fire Water Pump (Electric) P-5310 46 11 15-Aug-10 29-Aug-10*
DEPCA0062 Calculation for Fire Water Jockey Pumps P-5320 A/S 46 11 15-Aug-10 29-Aug-10*
DEPCA0063 Calculation for LP Flare KO Drum Pumps P-6200 A/S 46 11 15-Aug-10 29-Aug-10*
DEPCA0064 Calculation for ATM Flare KO Drum Pumps P-6210 A/S 46 11 15-Aug-10 29-Aug-10*
DEPCA0065 Calculation for Closed Drain Pumps P-6400 A/S 46 11 15-Aug-10 29-Aug-10*
DEPCA0066 Calculation for Diesel Transfer Pumps P-6700 A/S 56 11 15-Aug-10 29-Aug-10*
DEPCA0067 Calculation for Train 1 & 2 Charge Pumps 1P-1010 A/S & 2P-1010 56 11 15-Aug-10 29-Aug-10*
DEPCA0068 Calculation for Train 1 & 2 Wash Water Recirculation Pumps 1P-1020 A/S ... 56 11 15-Aug-10 29-Aug-10*
DEPCA0069 Calculation for Well Cluster 1 & 2 Corrosion Inhibitor Injection Pumps P1-6... 56 11 15-Aug-10 29-Aug-10*
Calculation - TanksCalculation - Tanks 65 11 15-Aug-10 29-Aug-10
DEPCA0110 Calculation for Crude Oil Storage Tank 1 & 2 T-1400 A/B 65 11 15-Aug-10 29-Aug-10*
DEPCA0111 Calculation for Nassiriya Depot Mishrif Crude Tank T-1410 56 11 15-Aug-10 29-Aug-10*
DEPCA0112 Calculation for Crude Oil Off Spec Tank T-1420 65 11 15-Aug-10 29-Aug-10*
DEPCA0113 Calculation for Produced Water Buffer Tank T-4200 61 11 15-Aug-10 29-Aug-10*
DEPCA0114 Calculation for Service Water Tank T-5100 56 11 15-Aug-10 29-Aug-10*
DEPCA0115 Calculation for Potable Water Header Tank T-5200 56 11 15-Aug-10 29-Aug-10*
DEPCA0116 Calculation for Fire Water Storage Tank T-5300 44 11 15-Aug-10 29-Aug-10*
DEPCA0117 Calculation for Diesel Storage Tank T-6700 56 11 15-Aug-10 29-Aug-10*
DEPCA0118 Calculation for Well Cluster 1 & 2 Corrosion Inhibitor Storage Tanks T1-68... 56 11 15-Aug-10 29-Aug-10*
Calculation - SeparatorsCalculation - Separators 56 11 15-Aug-10 29-Aug-10
DEPCA0140 Calculation for Test Separator V-1000 56 11 15-Aug-10 29-Aug-10*
DEPCA0141 Calculation for Crude Oil Storage Tank 1 & 2 Degassing Boots V-1400A & ... 56 11 15-Aug-10 29-Aug-10*
DEPCA0142 Calculation for Crude Oil Off Spec Tank Degassing Boot V-1420 56 11 15-Aug-10 29-Aug-10*
DEPCA0146 Calculation for LP Flare KO Drum V-6200 56 11 15-Aug-10 29-Aug-10*
DEPCA0147 Calculation for ATM Flare KO Drum V-6210 56 11 15-Aug-10 29-Aug-10*
DEPCA0148 Calculation for Closed Drain Drum V-6400 56 11 15-Aug-10 29-Aug-10*
DEPCA0149 Calculation for Train 1 & 2 1st Stage Separators 1V-1010 & 2V-1010 56 11 15-Aug-10 29-Aug-10*
DEPCA0150 Calculation for Train 1 & 2 2nd Stage Separators 1V-1020 & 2V-1020 56 11 15-Aug-10 29-Aug-10*
DEPCA0151 Calculation for Train 1 & 2 Fuel Gas Scrubers 1V-1030 & 2V-1030 46 11 15-Aug-10 29-Aug-10*
DEPCA0152 Calculation for Desalters & Dehydrators 56 11 15-Aug-10 29-Aug-10*
Calculation - OthersCalculation - Others 56 11 15-Aug-10 29-Aug-10
DEPCA0181 Flare Radiation Calculation 41 11 15-Aug-10 29-Aug-10*
DEPCA0182 Flare Gas Dispersion Calculation 41 11 15-Aug-10 29-Aug-10*
DEPCA0183 Line Sizing Calculation 56 11 15-Aug-10 29-Aug-10*
DEPCA0184 Process Relief / Blowdown abd PSV Sizing Calculations 41 11 15-Aug-10 29-Aug-10*
Calculation - Relief ValveCalculation - Relief Valve 93 45 15-Aug-10 14-Oct-10
DEPCA0250 Relief Valve Sizing for Test Separator V-1000 PSV 55 22 15-Aug-10 13-Sep-10*
DEPCA0251 Relief Valve Sizing for Train 1 & 2 1st Stage Separators 1V-1010 & 2V-101... 55 22 15-Aug-10 13-Sep-10*
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2010 2011
First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 16 of 19 12-Aug-10 13:02
-
Activity ID Activity Name OriginalDuration
Remaining Duration
Start Finish
DEPCA0252 Relief Valve Sizing for Train 1 & 2 2nd Stage Separators 1V-1020 & 2V-10... 55 22 15-Aug-10 13-Sep-10*
DEPCA0253 Relief Valve Sizing for Train 1 & 2 Dehydrators 1V-1510 & 2V-1510 PSVs 55 22 15-Aug-10 13-Sep-10*
DEPCA0254 Relief Valve Sizing for Train 1 & 2 Desalters 1V-1520 & 2V-1520 PSVs 55 22 15-Aug-10 13-Sep-10*
DEPCA0255 Relief Valve Sizing for Train 1 & 2 Crude Heaters 1F-1010 & 2F-1010 PSVs 55 22 15-Aug-10 13-Sep-10*
DEPCA0256 Relief Valve Sizing for Train 1 & 2 Crude/Crude Heat Exchangers 1E-1010 ... 55 22 15-Aug-10 13-Sep-10*
DEPCA0300 Process Simulation Models (in native format) 93 34 15-Aug-10 29-Sep-10*
DEPCA0350 Transient simulation and Analysis - upstream flow lines 73 34 15-Aug-10 29-Sep-10*
DEPCA0351 Transient simulation and Analysis - Crude export line 73 34 15-Aug-10 29-Sep-10*
DEPDW0003 PFD - Typical Well Details-Base Case 61 22 15-Aug-10 13-Sep-10*
DEPDW0004 PFD - Typical Wellhead Cluster (Mishrif, Well Cluster 1) 75 22 15-Aug-10 13-Sep-10*
DEPDW0005 PFD - Typical Wellhead Cluster (Mishrif, Well Cluster 2) 75 22 15-Aug-10 13-Sep-10*
DEPDW0006 PFD - Gathering Station 1 75 22 15-Aug-10 13-Sep-10*
DEPDW0007 PFD - Crude Oil Processing Train 1 75 22 15-Aug-10 13-Sep-10*
DEPDW0008 PFD - Crude Oil Processing Train 2 75 22 15-Aug-10 13-Sep-10*
DEPDW0009 PFD - Crude Oil Storage & Export 75 22 15-Aug-10 13-Sep-10*
DEPDW0010 PFD - EPS Produced Water Treatment & Disposal 75 22 15-Aug-10 13-Sep-10*
DEPDW0020 Heat & Material Balance Case A Summer (Streams 1-30) 75 22 15-Aug-10 13-Sep-10*
DEPDW0021 Heat & Material Balance Case A Summer (Streams 31-60) 75 22 15-Aug-10 13-Sep-10*
DEPDW0022 Heat & Material Balance Case A Summer (Streams 61-98) 75 22 15-Aug-10 13-Sep-10*
DEPDW0030 Heat & Material Balance Case B Winter (Streams 1-30) 75 22 15-Aug-10 13-Sep-10*
DEPDW0031 Heat & Material Balance Case B Winter (Streams 31-60) 75 22 15-Aug-10 13-Sep-10*
DEPDW0032 Heat & Material Balance Case B Winter (Streams 61-98) 75 22 15-Aug-10 13-Sep-10*
DEPDW0052 UFD - Flare & Blowdown System 81 28 15-Aug-10 21-Sep-10*
DEPDW0053 UFD - Closed Drain System 81 28 15-Aug-10 21-Sep-10*
DEPDW0054 UFD - Open Drain System 81 28 15-Aug-10 21-Sep-10*
DEPDW0055 UFD - Fuel Gas System 81 28 15-Aug-10 21-Sep-10*
DEPDW0056 UFD - Diesel Storage & Distribution 81 28 15-Aug-10 21-Sep-10*
DEPDW0057 UFD - Air Generation & Distribution 81 28 15-Aug-10 21-Sep-10*
DEPDW0058 UFD - River Water Treatment 81 28 15-Aug-10 21-Sep-10*
DEPDW0059 UFD - Nitrogen Generation & Distribution 81 28 15-Aug-10 21-Sep-10*
DEPDW0060 UFD - Service & Potable Water System 81 28 15-Aug-10 21-Sep-10*
DEPDW0100 P&ID - Legend & Symbols Sheet 1 72 28 15-Aug-10 21-Sep-10*
DEPDW0101 P&ID - Legend & Symbols Sheet 2 72 28 15-Aug-10 21-Sep-10*
DEPDW0109 P&ID - Mishrif Single Cluster Wellhead (Added 29-Jun-10) 72 28 15-Aug-10 21-Sep-10*
DEPDW0110 P&ID - Typical Wellhead Cluster(Mishrif, Well Cluster 1) 72 28 15-Aug-10 21-Sep-10*
DEPDW0111 P&ID - Typical Wellhead Cluster Mishrif, Well Cluster 2) 72 28 15-Aug-10 21-Sep-10*
DEPDW0112 P&ID - Wellhead Cluster 1 Chemical Injection (Sheet 1) 72 28 15-Aug-10 21-Sep-10*
DEPDW0113 P&ID - Wellhead Cluster 1 Chemical Injection (Sheet 2) 72 28 15-Aug-10 21-Sep-10*
DEPDW0114 P&ID - Wellhead Cluster 1 Methanol Injection (Sheet 3) 72 28 15-Aug-10 21-Sep-10*
DEPDW0115 P&ID - Well Cluster 1 Inlet Header (Mishrif) 72 28 15-Aug-10 21-Sep-10*
DEPDW0116 P&ID - Well Cluster 1 Production Trunkline Pig Launcher 72 28 15-Aug-10 21-Sep-10*
DEPDW0117 P&ID - Well Cluster 1 Test Trunkline Pig Launcher 72 28 15-Aug-10 21-Sep-10*
DEPDW0118 P&ID - Gathering Station 1 (Well Cluster 1) Production Trunkline Pig Recei... 72 28 15-Aug-10 21-Sep-10*
DEPDW0119 P&ID - Gathering Station 1 (Well Cluster 1) Test Trunkline Pig Receiver 72 28 15-Aug-10 21-Sep-10*
DEPDW0120 P&ID - Well Cluster 1 Closed Drain System 72 28 15-Aug-10 21-Sep-10*
DEPDW0122 P&ID - Mishrif Single Cluster Wellhead Chemical Injection (Sheet 1) 72 28 15-Aug-10 21-Sep-10*
DEPDW0123 P&ID - Mishrif Single Cluster Wellhead Chemical Injection (Sheet 2) 72 28 15-Aug-10 21-Sep-10*
DEPDW0124 P&ID - Mishrif Single Cluster Wellhead Methanol Injection (Sheet 3) 72 28 15-Aug-10 21-Sep-10*
DEPDW0130 P&ID - Mishrif Single Cluster Wellhead Closed Drain System 72 28 15-Aug-10 21-Sep-10*
DEPDW0132 P&ID - Wellhead Cluster 2 Methanol Injection (Sheet 3) 72 28 15-Aug-10 21-Sep-10*
DEPDW0133 P&ID - Wellhead Cluster 2 Chemical Injection (Sheet 1) 72 28 15-Aug-10 21-Sep-10*
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2010 2011
First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 17 of 19 12-Aug-10 13:02
-
Activity ID Activity Name OriginalDuration
Remaining Duration
Start Finish
DEPDW0134 P&ID - Wellhead Cluster 2 Chemical Injection (Sheet 2) 72 28 15-Aug-10 21-Sep-10*
DEPDW0135 P&ID - Well Cluster 2 Inlet Header 72 28 15-Aug-10 21-Sep-10*
DEPDW0136 P&ID - Well Cluster 2 Production Trunkline Pig Launcher 72 28 15-Aug-10 21-Sep-10*
DEPDW0137 P&ID - Well Cluster 2 Test Trunkline Pig Launcher 72 28 15-Aug-10 21-Sep-10*
DEPDW0138 P&ID - Gathering Station 1 (Well Cluster 2) Production Trunkline Pig Recei... 72 28 15-Aug-10 21-Sep-10*
DEPDW0139 P&ID - Gathering Station 1 (Well Cluster 2) Test Trunkline Pig Receiver 72 28 15-Aug-10 21-Sep-10*
DEPDW0140 P&ID - Well Cluster 2 Closed Drain System 72 28 15-Aug-10 21-Sep-10*
DEPDW0155 P&ID - Gathering Station 1 Inlet Header 78 34 15-Aug-10 29-Sep-10*
DEPDW0156 P&ID - Gathering Station 1 Test Separator 73 34 15-Aug-10 29-Sep-10*
DEPDW0157 P&ID - Train 1 1st Stage Separator 73 34 15-Aug-10 29-Sep-10*
DEPDW0158 P&ID - Train 1 1st Crude/Crude Heat Exchanger & Rundown Cooler 73 34 15-Aug-10 29-Sep-10*
DEPDW0159 P&ID - Train 1 Crude Heater 78 34 15-Aug-10 29-Sep-10*
DEPDW0160 P&ID - Train 1 2nd Stage Separator 73 34 15-Aug-10 29-Sep-10*
DEPDW0161 P&ID - Train 1 Charge Pumps 73 34 15-Aug-10 29-Sep-10*
DEPDW0162 P&ID - Train 1 Dehydrator 73 34 15-Aug-10 29-Sep-10*
DEPDW0163 P&ID - Train 1 Desalter/Wash Water Recirculation Pumps 73 34 15-Aug-10 29-Sep-10*
DEPDW0164 P&ID - Train 1 Crude Wash Water Heater 73 34 15-Aug-10 29-Sep-10*
DEPDW0167 P&ID - Train 2 1st Stage Separator 73 34 15-Aug-10 29-Sep-10*
DEPDW0168 P&ID - Train 2 1st Crude/Crude Heat Exchanger & Run Down Cooler 73 34 15-Aug-10 29-Sep-10*
DEPDW0169 P&ID - Train 2 Crude Heater 73 34 15-Aug-10 29-Sep-10*
DEPDW0170 P&ID - Train 2 2nd Stage Separator 73 34 15-Aug-10 29-Sep-10*
DEPDW0171 P&ID - Train 2 Charge Pumps 78 34 15-Aug-10 29-Sep-10*
DEPDW0172 P&ID - Train 2 Dehydrator 73 34 15-Aug-10 29-Sep-10*
DEPDW0173 P&ID - Train 2 Electrostatic Desalter/Wash Water Recirculation Pumps 73 34 15-Aug-10 29-Sep-10*
DEPDW0174 P&ID - Train 2 Crude Wash Water Heater 73 34 15-Aug-10 29-Sep-10*
DEPDW0175 P&ID - Crude Oil Storage Tanks 1 & 2 73 34 15-Aug-10 29-Sep-10*
DEPDW0176 P&ID - Crude Oil Export 73 34 15-Aug-10 29-Sep-10*
DEPDW0177 P&ID - Crude Oil Export Metering Package 73 34 15-Aug-10 29-Sep-10*
DEPDW0178 P&ID - Crude Oil Export Pig Launchers 73 34 15-Aug-10 29-Sep-10*
DEPDW0181 P&ID - Crude Oil Off Spec Tank 73 34 15-Aug-10 29-Sep-10*
DEPDW0185 P&ID - Produced Water Buffer Tank & Transfer Pumps 73 34 15-Aug-10 29-Sep-10*
DEPDW0186 CPI & IGF Packages 78 39 15-Aug-10 06-Oct-10*
DEPDW0190 P&ID - Atmospheric Flare & Train1 LP Headers 78 39 15-Aug-10 06-Oct-10*
DEPDW0191 P&ID - Train 2 LP Flare Header 78 39 15-Aug-10 06-Oct-10*
DEPDW0192 P&ID - MLP Flare Gas KO Drum 78 39 15-Aug-10 06-Oct-10*
DEPDW0193 P&ID - ATM Flare Gas KO Drum 78 39 15-Aug-10 06-Oct-10*
DEPDW0194 P&ID - EPS Closed Drain System Header 78 39 15-Aug-10 06-Oct-10*
DEPDW0195 P&ID - EPS Closed Drain System 83 39 15-Aug-10 06-Oct-10*
DEPDW0198 P&ID - Open Drain System (Sheet 1) 78 39 15-Aug-10 06-Oct-10*
DEPDW0199 P&ID - Open Drain System (Sheet 2) 78 39 15-Aug-10 06-Oct-10*
DEPDW0200 P&ID - Fuel Gas System 78 39 15-Aug-10 06-Oct-10*
DEPDW0208 P&ID - Water Treatment Dearation & Foam Generator Package 78 39 15-Aug-10 06-Oct-10*
DEPDW0210 P&ID - Potable Water System 78 39 15-Aug-10 06-Oct-10*
DEPDW0211 P&ID - Service Water System 78 39 15-Aug-10 06-Oct-10*
DEPDW0212 P&ID - Base Camp Potable Water System 78 39 15-Aug-10 06-Oct-10*
DEPDW0220 P&ID - Diesel Storage & Distribution 78 39 15-Aug-10 06-Oct-10*
DEPDW0221 P&ID - Instrument Air Compressor Package 78 39 15-Aug-10 06-Oct-10*
DEPDW0222 P&ID - Instrument Air & Plant Air Packages Distribution 78 39 15-Aug-10 06-Oct-10*
DEPDW0223 P&ID - Deaeration Package 78 39 15-Aug-10 06-Oct-10*
DEPDW0230 P&ID - Nitrogen Generation Package 78 39 15-Aug-10 06-Oct-10*
DEPDW0231 P&ID - Nitrogen Distribution 78 39 15-Aug-10 06-Oct-10*
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2010 2011
First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 18 of 19 12-Aug-10 13:02
-
Activity ID Activity Name OriginalDuration
Remaining Duration
Start Finish
DEPDW0235 P&ID - EPS Chemical Injection Packages 78 39 15-Aug-10 06-Oct-10*
DEPDW0300 Line List 84 45 15-Aug-10 14-Oct-10*
DEPLS0001 Process Drawing Register (Index) 79 22 15-Aug-10 13-Sep-10*
DEPLS0002 Utility Load List 61 22 15-Aug-10 13-Sep-10*
DEPRE0001 Corrosion Design Basis Memorandum 45 22 15-Aug-10 13-Sep-10*
DEPRE0002 Technology selection for Crude desalter & dewatering unit 45 22 15-Aug-10 13-Sep-10*
DEPRE0003 Process Design Philosophy 71 22 15-Aug-10 13-Sep-10*
DEPRE0004 Process Simulation Report 81 22 15-Aug-10 13-Sep-10*
DEPRE0005 Process Operating, control, start up and shut down philosophy 46 22 15-Aug-10 13-Sep-10*
DEPRE0006 Relief, Flare and Blowdown Report 46 22 15-Aug-10 13-Sep-10*
DEPRE0007 Pipeline and Trunkline Hydraulic Analysis Report 61 22 15-Aug-10 13-Sep-10*
DEPRE0008 HAZOP Close-Out (FEED) Report 46 22 15-Aug-10 13-Sep-10*
DEPRE0009 Transient Analysis Report 46 22 15-Aug-10 13-Sep-10*
DEPSP0001 Technical Specification for Flare System 63 34 15-Aug-10 29-Sep-10*
DEPSP0002 Technical Specification for Dehydrators & Desalters 78 34 15-Aug-10 29-Sep-10*
DEPSP0004 Technical Specification for Fired Gas Crude Heater 78 34 15-Aug-10 29-Sep-10*
DEPSP0005 Technical Specification for Produced Water Treatment System 78 34 15-Aug-10 29-Sep-10*
DEPSP0006 Technical Specification for Raw Water Intake System 78 34 15-Aug-10 29-Sep-10*
DEPSP0007 Technical Specification for Dearator Package 78 34 15-Aug-10 29-Sep-10*
DEPSP0008 Technical Specification for Nutshell Filter Package 78 34 15-Aug-10 29-Sep-10*
DEPSP0009 Technical Specification for Low Pressure & Atmospheric Flare System 78 34 15-Aug-10 29-Sep-10*
DEPSP0010 Technical Specification for IGF Package 78 34 15-Aug-10 29-Sep-10*
DEPSP0011 Technical Specification for Demineralized Water Package 78 34 15-Aug-10 29-Sep-10*
DEPSP0012 Technical Specification for Fuel Gas Sytem 78 34 15-Aug-10 29-Sep-10*
DEPSP0013 Technical Specification for Crude Oil Separators 78 34 15-Aug-10 29-Sep-10*
DEPSP0050 Isolation Philosophy 91 34 15-Aug-10 29-Sep-10*
QUALITY ASSURANCEQUALITY ASSURANCE 37 22 15-Aug-10 13-Sep-10
DEQSP0001 External Surface Preparation & Painting Procedure 37 22 15-Aug-10 13-Sep-10*
TELECOMMUNICATIONTELECOMMUNICATION 98 45 15-Aug-10 14-Oct-10
DETDW0001 Telecommunication System Block Diagram 98 45 15-Aug-10 14-Oct-10*
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2010 2011
First Commercial Production (FCP) - Garraf Field Development Project Classic WBS Layout Page 19 of 19 12-Aug-10 13:02