GARD PROJECT IN CABO VERDE

15
GARD PROJECT IN CABO VERDE José Rosado Pinto GARD WHO Meeting Beijing 28-29 March 2005 Serviço de Imunoalergologia, Hospital de Dona Estefânia Lisboa, Portugal

description

GARD WHO Meeting Beijing 28-29 March 2005. GARD PROJECT IN CABO VERDE. José Rosado Pinto. Serviço de Imunoalergologia, Hospital de Dona Estefânia Lisboa, Portugal. CABO VERDE. CABO VERDE. 483.000 inhabitants Santiago: 240.000. S. Vicente 67.000 GIP 5.214 USD per capita - PowerPoint PPT Presentation

Transcript of GARD PROJECT IN CABO VERDE

Page 1: GARD PROJECT  IN CABO VERDE

GARD PROJECT IN CABO VERDE

José Rosado Pinto

GARD WHO MeetingBeijing 28-29 March 2005

Serviço de Imunoalergologia, Hospital de Dona Estefânia

Lisboa, Portugal

Page 2: GARD PROJECT  IN CABO VERDE

CABO VERDE

Page 3: GARD PROJECT  IN CABO VERDE

CABO VERDE

• 483.000 inhabitants• Santiago: 240.000. S. Vicente 67.000

• GIP 5.214 USD per capita• Population under 15 y: 40,5%• Live expectancy at birth: 70,4 years• Infantile mortality rate 35/1.000 newborns• Tuberculosis 328/100.000 inhabitants

UNPD 2005

• Phsysicians 340: 228 GP; 2 Pneumologists; 1 Allergologist

Page 4: GARD PROJECT  IN CABO VERDE

Cabo Verde Health System

1 - Central Hospitals: 2 Regional Units: 2

2 - Health Delegacies: 17 Sub-units dependences

3 - Basic Sanitary Units Sanitary agents

Hospital network

Primary care system

Page 5: GARD PROJECT  IN CABO VERDE

Health System: Response to CRD

• Available outpatient facilities

• Available outpatient hospital consultation

(spirometry in each hospital)

• Emergency treatment guidelines

• Nebulizers and spacers available

• Essential drugs available

Page 6: GARD PROJECT  IN CABO VERDE

Official Collaboration Portugal / Cabo Verde

Asthma and Allergic Diseases(Coordination: Hospital de Dona Estefânia – Serviço de

Imunoalergologia)

Targets:

• Clinical assistance care

• Educational activities

• Research projects

• 25 cooperation activities

(involving physicians, psychologists, technicians)

Page 7: GARD PROJECT  IN CABO VERDE

Protocol for Assessment of Prevalence of Major Respiratory

Diseases in Cabo Verde

Isabella Annesi-Maesano, Nikolai Khaltaev and Paulo Matricardi

Objectives:

• Assessment of prevalence and severity of R.D.

• Assessment of under diagnosis and management of R.D.

Page 8: GARD PROJECT  IN CABO VERDE

Stage 1 – Prevalence of Respiratory Diseases at PHC level

Specific objectives:

a) To assess reported prevalence and severity diseases

at PHC level

b) To determine spirometric values

c) To identify factors associated with Respiratory

Diseases

d) To assess prevalence of Major Respiratory Diseases at

E.R. Departments

Page 9: GARD PROJECT  IN CABO VERDE

Stage 1 - Methodology

Population: + 4.000 responders are expected in Santiago and S. Vicente

Islands

Questionnaire: COPD, Asthma, Allergic Rhinitis, TP and Pneumonia.

Factors considered: Tobacco consumption, Toxic occupational agents,

allergens and social class. Migration factors

Spirometry: (sub sample)

Emmergency Room Forms

Evaluation by WHO Expert Team

Page 10: GARD PROJECT  IN CABO VERDE

Stage 2 – Management of Respiratory Diseases at Primary

Health Care LevelSpecific objectives:

a) To evaluate the management of respiratory diseases

at PHC level

b) To estimate the under and over diagnosis and the

under and over treatment of respiratory diseases at

PHC level

Page 11: GARD PROJECT  IN CABO VERDE

Stage 2 - Methodolgy

• Expected: 175 respiratory patients

• GP Forms

• Questionnaire: stage 1

• Spirometry

• Evaluation by WHO Expert Team

Page 12: GARD PROJECT  IN CABO VERDE

Action Plan - Steps

1. Translation of GARD Document

2. Contact between WHO and Cabo Verde Health Ministry

3. Appointment of a national team of specialists under

the responsability of Cabo Verde Health Ministry

4. Training the national team by portuguese experts

5. Starting stage 1 as soon as possible

6. Monitoring of the project by WHO experts

Page 13: GARD PROJECT  IN CABO VERDE

Time Schedule:

• Validation of the Portuguese version of the questionnaire – January 2005

• Meeting of GARD representatives, with local WHO and Cabo Verde Minister of Health and his staff – November 2005

• Training the national team – November 2005

• Visit to the PHC Delegacies in Cabo Verde – November 2005

• Implementation of GARD local organization – December 2005 / January 2006

• Expected date to start the project – January 2006

• Difficulties: delay of WHO GARD financial support

Page 14: GARD PROJECT  IN CABO VERDE

MADEIRA(EUROPE)

14.6 %

74 %

70 %

54.1 %

-

The PAC StudyCABO VERDE (AFRICA)

8.0 %

27 %

50 %

9 %

15 %

MACAU(ASIA)

1.3 %

86 %

88 %

48.6 %

10 %

Ped.Pulm. 2001 Sup 23: 35-7

ACTIVE ASTHMA

% positive SPT % positive BHR test

GLOBAL POPULATION

% positive SPT % positive BHR test

Page 15: GARD PROJECT  IN CABO VERDE

GARD PROJECT WILL BE A REALITY IN CABO VERDE