GENERAL CONCEPT
PLAN OF DETAIL MANUFACTURE
PLAN OF SITE INSTALLATION
APPLICATION CASES
INDEX
1. What Is GANG FORM?
This is large form unit by using modulaized standard form panel and waller, cage, steel plank, ladder.
With Apartment Buildings Rising Higher Than Ever Contractors Need To Consider Various Aspects Such As Material Costs, safety, Duration Of Work and Labor Costs.
- Safety Construction
- Improved Concrete Quality
- Reduction Cost
- Parallet Concrete Finishing
- Since The Waler Demension Is 100x50x3.0t
(top & Bottom), Its Has An Excellent Straightness
- With Lower Brackets Connected Each Other With A
Square Pipe, There Is No Solder Modification
- Metalboard & Mash Metal Plank Can Be Re-used On
Other Jodsites By Using Simply Scaffolding Accessories
- If The Jobsite Has Any Unused Scaffolding Pipies, They Can Be Attached To The Single Clamps Which Are
Welded On The Frame Of Steel Plank
- If Scaffolding Pipes Are Used As Handrail, The Steel
Plank Can Be Used On Other Jobsites
- System To Arrive At Your Site
- The Remainings Of The Gang Form And Its Accessori
es Of A Completed Site Can Be Re-used After Detailed Plan Naing And Drawing. Those Less Waste Is Produce
d Compared To Conventional Types Of Formwork
DIFINITION & ADVANTAGE of GANG FORM
GENERAL CONCEPT
NO ITEM NO ITEM NO ITEM NO ITEM
1 Lifting Hook 4 Waller(upper Part) 7 Vertical Bar 10 Toe Board
2 St’l Plate 3.2t 5 Horizontal Bar 8 Waller(lower Part) 11 Working Board
3 Width Armature 6 Flat Steel 9 Cage 12 Hand Rail
1
8
9
7
12
10
11
6
53
2
41
2
4
5
7
8
3
611
10
9
12
GANG FORMS SUB ITEM & TECHNICAL TERMS
2) GANG FORM 원.부자재 표준규격
ITEM DESCRIPTION REMARKS
UNEVENNESS PLATE Plate 2.0thk
FLAT PLATE Plate 3.2thk
HORIZONTAL BAR-UPPER PART (WALER) 2ㄷ-channel 100x50x5x7thk
HORIZONTAL ARMATURE Pipe-50x30x2.3thk
VERTICAL ARMATURE Pipe-50x30x2.3thk
LIFTING HOOK Ss400 Φ22mm Pilling Bar
TOP & BOTTOM CAGE FRAME S.Q Pipe(40x40x1.6thk)
CAGE HANDRAIL S.Q Pipe(40x20x1.4thk)
MATERIAL KEEPING BOX Steel 3.2thk
WORKING BOARD FRAME S.Q Pipe:40x40x1.6thk
CORNER FLAT BAR Steel Flat 75x6thk&100x6thk
CORNER ANGLE 65x65x6thk
WORKING BOARD Sg-362 Exp.Metal & Pierced Steel Plate (P.S.P)
GENERAL CONCEPT
GANG FORMS Main Description
ITEMBASED CACULATION
<IRON CONTENT : 7.85KG/M2>WEIGHT ITEM
BASED CACULATION
<IRON CONTENT : 7.85KG/M2>WEIGHT
<1>
GANG
FORM
UNPATTERN PLATE 12.89× 3× 3.2T 971.4kg<3>
CRANE
HOOK
SQUARE PIPE ㄷ-75× 45× 2.3T× 3M× 2EA 17.9kg
CENTER LINE {(0.069X27M)+(0.049X29M)}× 2T 51.5kg PILLING BAR ¢22× 4.2MX2EA 25kg
HORIZONTAL ARMATURE
C-75× 45× 15× 2.3T× 12.89M× 11단 499.2kg 3. SUB TOTAL 43kg
VERTICAL ARMATURE
C-75× 45× 15× 2.3T× 3.8M× 2EA× 22 668kg<4>
HAND
RAIL
HORIZONTALITY ㅁ-20× 40× 1.4T× 15M× 11SH 217.6kg
WALLER ㄷ-100× 50× 7T× 12.89M× 2EA 283.3kg VERTICALITY ㅁ-20× 40× 1.4T× 9.2M× 2EA 24.3kg
FLAT STEEL 75× 6T× 3M× 2EA 21.20kg 4. SUB TOTAL 242kg
LOWER PART-HORIZONTAL ARMATURE C-75× 45× 15× 2.3T× 12.89M× 2단 45.38kg
<5>
WORKING
BOARD
METAL BOARD
W=450 4SH× 15M× 20kg/M2 378kg
SLANTING LINE SQUARE PIPE
ㅁ-50× 30× 1.8T× 3.8M× 2EA 17.2kg W=600 1SH× 15M× 20kg/M2 168kg
TOE BOARD 50× 100× 1.2T 106kg
1. SUB TOTAL 2557kg 5. SUB TOTAL 652kg
<2>
CAGE
UPPER PART
(GENERAL)ㅁ-40× 40× 1.6T× 7.43M× 10EA 149.3kg <6> LADDER ㅁ-40× 40× 1.6T× 9M 18.1kg
SLANTING LINES ㅁ-40× 40× 1.6T× 8.18M× 2EA 32.9kg <7> BOLT M12× 120 ETC. 50kg
LOWER PART
(GENERAL)ㅁ-40× 40× 1.6T× 10.95M× 10EA 220kg
<8>
BOLT TIEINCLUDING WING NUT, WASHER 12× 700L× 5× 20 100kg
SLANTING LINES ㅁ-40× 40× 1.6T× 11.70M× 2EA 47kg
2. SUB TOTAL 449kg 6. SUB TOTAL 168kg
GRAND TOTAL 4111kg
* * 4,111kg / 38.67㎡ = 106.3kg / M2 (110KG/M2)
WEIGHT CALCULATION SHEET ( 135.3M2 SIDE WALL / HEIGHT : 3M)
■ WELD PILLING BAR (D22)■ 2EA OR MORE INSTALLATION PER 1PLACE (SIDE WALL)■ LENGTH OF LIFTING HOOK FOR INSTALLATION (H)
Crossing Of Horiaontal BarLength Of Weding : More Than 25mmTime Of Welding : More Than 4Point
DETAIL PLAN OF MANUFACTURE
Lifting Ring-Pilling bar(22mm)
Gang Form 6m Or
More
Gang Form Below The 6m ~ 3m Or
More
Gang Form Below The 3m
High Balcony Form 4m Or More
Lobby Balcony Form 5m Or More
2M 1.5M 0.7M 1.5M 0.7M
1. ``
HAND RAIL
WORKINGBOARD
CAGE SPACE OF INSTALLATION
BELOW THE 150MM
DETAIL PLAN OF MANUFACTURE
Cage & Working Board
DIF
FE
RE
NT
CA
GE
AD
DIT
ION
AL D
IFF
ER
EN
TC
AG
E
A REASON FOR INSTALLATION
1. PROTECTION FROM WORKERS SLIDING ACCIDENT
2. PROTECTION FROM FALLING TOOLS & MATERIALS
3. INSTALLATION TO 5TH WORKING BOARD
4. INSTALLATION PLACE
- PIPE OF WORKING BOARD + HAND RAIL
THE TOTAL INSTALLATION 5 STEP
외측내측
100
DETAIL PLAN OF MANUFACTURE
Toe Board
APPLICATION CASE
Side Wall Cage, Installation Working Board
Application GCS of Side Wall
APPLICATION CASE
Application GCS of Side Wall
APPLICATION CASE
Application Specialized Pattern of Side Wall
APPLICATION CASE
5. 측벽 특화문양(오산 원동현장) Application Specialized Pattern of Side Wall
APPLICATION CASE
Application Joint Concrete Pavement of Outside Wall
APPLICATION CASE
Application of Elev-Pit Box Form
APPLICATION CASE
Before the Installation
APPLICATION CASE
Before the Installation
APPLICATION CASE