GADCHIROLI CITY : Historical reference GADCHIROLI' District was carved out on the 26 th of August 1982 by the Division of erstwhile Chandrapur District. Gadchiroli district is well known for Naxalite activities. Population of the District is 9,70,294. SC & ST population in the district is 1,08,824 & 3,71,696 ( As per 2001 census). The literacy rate of district is 60% ( As per 2001 census).
A GRANDEUR OF ART VIDARBHAISM KHAJURAHO
MARKANDEO Tribal community population that resides in the district is 38% ( As per 2001 census).
The district is undeveloped district, most of the land covered with forest & hills. District is famous for Bamboo & Tendu leaves. There are no large scale Industry in the entire District.
DIRECTORATE OF VOCATONAL EDUCATION & TRAINING, MAHARASHTRA STATE
INDUSTRIAL TRAINING INSTITUTE, GADCHIROLI.
WORLD BANK ASSISTED VOCATIONAL TRAINING IMPROVEMENT PROJECT
UPGRADATION OF RELATED TRADES(AUG-2006)
&
CENTRE OF EXCELLENCE CONSTRUCTION & WOOD WORKING SECTOR
AUG-2008
INSTITUTE PROFILE
I.T.I.Gadchiroli is one of the old institutes in Maharashtra state. I.T.I.Gadchiroli is one of the old institutes in Maharashtra state.
Established in 1981 and Gadchiroli has dense forest area surrounded & Established in 1981 and Gadchiroli has dense forest area surrounded &
populated by Trible People. Institute is having 8.20 Hecter of premises with populated by Trible People. Institute is having 8.20 Hecter of premises with
administrative building, Boys & Girls Hostel building, well equipped administrative building, Boys & Girls Hostel building, well equipped
workshops, CNC Lab , Computer Lab, Play ground, Library etc. workshops, CNC Lab , Computer Lab, Play ground, Library etc.
Establishment of Institute :- 1st Aug. 1981Establishment of Institute :- 1st Aug. 1981 No. of Trades No. of Trades
Conventional TradeConventional Trade :- 29 :- 29 Under UpgradeUnder Upgrade :- 6 ( 12 Units) :- 6 ( 12 Units) Under COEUnder COE :- 6 ( 6 Modules) :- 6 ( 6 Modules)
Intake cap. Of Institute :- 732Intake cap. Of Institute :- 732 Total Area of Institute :- 8.20 HecterTotal Area of Institute :- 8.20 Hecter TOTAL NO.OF STAFF :- Sactioned - 91TOTAL NO.OF STAFF :- Sactioned - 91
FilledFilled - 61 - 61
Vaccant - 30Vaccant - 30
Schemes Running.Schemes Running. 1. Craftsman Training Scheme ( CTS )
2. Apprenticeship Training Scheme ( ATS )
3. Centre Of Excellence – Construction & Wood Working Sector ( COE )
4. Modular Employable Skill Training ( MES )
5. Production Oriented Training Scheme ( POTS )
6. Artizen To Technocrat Skill Testing Centre
7. National Service Scheme ( NSS )
8. Lokseva Kendra
Established on :- 1st August 2008
COE
BBBT MODULES
ADVANCED MODULES
SPECIALIZED MODULES
( IN INDUSTRY )
CENTRE OF EXCELLENCECONSTRUCTION & WOOD WORKING
SECTOR
1.Basic Architecture
2.Basic Building Construction
3.Basic Carpentry
4.Basic Plumbing
5.Basic Electricals
6.Basic Quantity Surveying
1.Concrete Technology
2.Modern Construction Technique & Management
3.Farm Work & Bar Bending
1.Concrete Technology
2.Modern Construction Technique & Management
3.Farm Work & Bar Bending
Broad Based Basic Training ModulesBroad Based Basic Training Modules
Name of Module Name of Module Duration Duration1.1. Basic ArchitectureBasic Architecture 8 weeks8 weeks
2.2. Basic Building ConstructionBasic Building Construction 8 weeks8 weeks
3.3. Basic CarpentryBasic Carpentry 8 weeks 8 weeks
4.4. Basic PlumbingBasic Plumbing 8 weeks8 weeks
5.5. Basic ElectricalsBasic Electricals 8 weeks8 weeks
6.6. Basic Quantity SurveyingBasic Quantity Surveying 8 weeks8 weeks
Generic Modules:-Generic Modules:-1.1. Basic Computer & AutoCADBasic Computer & AutoCAD 2.2. Workshop Calculations & science Workshop Calculations & science 3.3. Entrepreneurship and Communication Skills Entrepreneurship and Communication Skills
After BBBT NCVT will conduct exam & award certificate.After BBBT NCVT will conduct exam & award certificate.
Advanced Modules In II YearAdvanced Modules In II YearFirst Six MonthsFirst Six Months
M.No. Name of Module M.No. Name of Module DurationDuration
11 Concrete TechnologyConcrete Technology 26 weeks 26 weeks
22 Modern Construction Technique Modern Construction Technique
& Management & Management 26 weeks26 weeks
33 Farm Work & Bar BendingFarm Work & Bar Bending 26 weeks26 weeks
A student has to select one of the above module.A student has to select one of the above module.
After Advanced Module NCVT will conduct exam After Advanced Module NCVT will conduct exam & award certificate.& award certificate.
Next Six Months Specialized module in IndustriesNext Six Months Specialized module in Industries
Admission Details :-
Intake Capacity For BBBT :- 96
Admissions :- (Including 30% supernumery )
2008-2009 :- 110Admissions on SSC Merit Basis
Staff Positions
BBBT MODULES
No.of Instructors Required
Available Vacancy if Any
1 Basic Architecture 01 01 Incharge Faculty Handling the
Trade
2 Basic Building Construction 01 01 Nil
3 Basic Carpentry 01 01 Nil
4 Basic Plumbing 01 01 Incharge Faculty Handling the
Trade
5 Basic Electricals 01 01 Incharge Faculty Handling the
Trade
6 Basic Quantity Surveying 01 01 Nil
Training Career Placement CellTraining Career Placement Cell
Under The Guidance of IMC, TCPC is established & activities under taken are as follows :-
1. Location of seats for placement under specialized modules.
2. Organizing on the job training .
3. Organizing Industrial visits .
4. Organizing campus interviews.
5. Organizing Industry training for Instructors.
TRADES UNDER UPGRADATION
1. ELECTRICIAN - 02 Unit
2. TURNER - 02 Unit
3. MACHINIST - 02 Unit
4. MACHINIST GRINDER - 02 Unit
5. WELDER - 02 Unit
6. MECHANIC MOTOR VEHICLE - 02 Unit
Admission for Upgradations Trades
Trades Intake Admission
2006-2007
Admission
2007-2008
Admission
2008-2009
Electrician 32 19 20 00
Turner 32 13 15 17
Machinist 32 14 16 17
Machinist Grinder
32 14 14 15
Welder 32 28 28 32
Mechanic Motor Vehicle
32 14 21 21
ADMISSION UNDER COE MODULE
SR.NO TRADES INTAKE ADMISSION 2008-09
01 Basic Plumbing 16 19
02 Basic Quantity Surveying
16 17
03 Basic Architecture 16 18
04 Basic Building Construction
16 20
05 Basic Carpentry 16 18
06 Basic Electricals 16 18
Future Action Plan for Next Six Months
On the Job training arrangement for Basic module
trainees in Industries. Civil Work Completion. Procurement of remaining machinery & equipments. Organizing trainers training in Industry. Campus development ( Beautification & other ) Organizing guest lecturer from industries. Orientation training program on T.Q.M. Take support from industries viz. donation. Renovation of institute under up-gradation.