G2 Annex 2 Project Workbook 2012-04-2 Update

download G2 Annex 2 Project Workbook 2012-04-2 Update

of 60

Transcript of G2 Annex 2 Project Workbook 2012-04-2 Update

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    1/60

    Outcome Targets Indicator Plan

    Project Name Resilient Intensified and Diversified A Resilient Intensified and Diversified A Resil

    Date updated 30 Mar 2012

    No. ACTOR and how they will CHANGE Outcome target(s) 2014 Outcome target(s) 2018 Outc

    ASSU

    CON

    Taken from the OLM: Actor group and

    the practice, knowledge, attitude or skills

    change

    Specific description(s) of who/ how many

    exactly the project expects to change

    (Practice and/or KAS) and by how much,

    by the end of the Project. There can be

    more than one Outcome Target per each

    Outcome line (first column- actor +

    expected final change)

    Specific description(s) of who/ how many

    exactly the project expects to change

    (Practice and/or KAS) and by how much,

    by the end of the Project. There can be

    more than one Outcome Target per each

    Outcome line (first column- actor +

    expected final change)

    Specif

    exact

    (Prac

    by the

    more

    Outco

    expec

    1 Farmers relying on rice-based and

    aquaculture-based production

    systems use improved varieties (rice,

    fish etc.) and technologies in

    productive and diversified agriculture

    and aquaculture systems

    A total of 300 farmers have adopted

    improved rice varieties; 50 farmers

    have adopted improved technology

    for rice-rabi cropping systems; 50farmers have adopted improved

    brackish water aquaculture systems -

    in project villages and nearby villages

    A total of 100,000 farmers have

    adopted improved rice varieties;

    10,000 farmers have adopted

    improved technology for rice-rabicropping systems; 5,000 farmers

    have adopted improved brackish

    water aquaculture systems - in

    project villages and nearby villages

    A tot

    adop

    30,00

    improcropp

    have

    wate

    proje

    2 Households, with focus on women

    adopt integrated farming systems

    and new technologies in homestead

    A total of 100 households adopt

    integrated farming systems and new

    technologies in homesteads - in

    project villages and nearby villages

    A total of5,000 households adopt

    integrated farming systems and new

    technologies in homesteads - in

    project villages and nearby villages

    A tot

    integ

    tech

    proje

    3 Projects and organisations involved

    in seed production/dissemination

    4 projects/schemes and

    organisations & private sector

    involved in seedproduction/dissemination (e.g.

    CSISA, FTF, GOs & NGOs) adopt

    recommendations based on results

    of our rice variety and fish

    species/quality evaluation

    8 projects/schemes and

    organisations & private sector

    involved in seedproduction/dissemination (e.g.

    CSISA, FTF, GOs & NGOs, private

    companies) adopt recommendations

    based on results of our rice variety

    and fish species/quality evaluation

    10 pr

    orga

    involprod

    CSISA

    comp

    base

    and f

    4 Extension workers and development

    agencies (e.g. GOs, NGOs, private

    sector, CSISA, STRASA, FTF) are

    promoting new technologies, training

    farmers, and taking ownership of the

    technologies disseminated

    New technologies promoted in

    Bangladesh by BRRI, DAE, DOF, BFRI,

    BRAC and other projects, and in India

    by CIBA, CSSRI, DOF, DA, Tiger

    Reserve Project, Sundarban Devt

    Board, and other NGOs in both

    countries

    New technologies promoted in

    Bangladesh by BRRI, DAE, DOF, BFRI,

    BRAC and other projects, and in India

    by CIBA, CSSRI, DOF, DA, Tiger

    Reserve Project, Sundarban Devt

    Board, and other NGOs in both

    countries

    New

    more

    BRRI

    and i

    Tiger

    Devt

    COM

    coun

    The Outcome Target Indicators Plan (OTIP) contains specific description(s), for each Outcome Pathway (from OLM), of who/ how many exactly

    measure. THe expected output in this OTIP is a list of indicators ONLY for the Outcome Targets that the Indicators and tools to measure them a

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    2/60

    Project Workbook

    Table of Contents

    1 Title Page with Reviewers' Comments

    Tab Name: PNX Title Page

    2 Project Partners and Contact Information

    Tab Name: PNX Contacts

    3 Outcomes Logic Model

    Tab Name: PNX OLM

    For more information, visit:

    4 Outcome Target Indicators PlanTab Name: PNX OTIP

    For more information, visit:

    5 Milestone Plan

    Tab Name: PNX Milestone Plan

    For more information, visit:

    CPWF M&E Guide- Milestone Plan

    The milestone plan focuses on the end-dates by which your activities need to be completed and outputs need to

    be delivered. It contains the project start and end date, and other important milestones. Progress reporting is

    directly made on the original milestones as defined in the milestone plan.

    This file contains spreadsheets of information submitted to the CPWF by the project team, and spreadsheets that we have

    developed to aid our review process. Please change the 'PNX' to identify your project, e.g. Ganges Project 3 would be G3

    This page contains main project information and the contracting and inception reviewers' comments.

    Please list all your project participants with their contact details. This information will be fed into the CPWFcontact database. Please ensure that you inform the CPWF about any changes in your team.

    The OLM is a table that describes the project's theory of change (ToC), or how the project is expected to work. It

    is a description of the projects activities, outputs, outcomes and impact and their inter-relationships. Each line

    describes an Outcome Pathway, with a short narrative description. The last row in the model is a narrative

    description of how the project predicts that the outcomes it achieves are likely to reinforce each other and

    eventually contribute to longer-term impact.

    CPWF M&E Guide- Outcome Indicators Plan

    CPWF M&E Guide- OLMs

    The Outcome Target Indicators Plan (OTIP) contains specific description(s), for each Outcome Pathway (from

    OLM), of who/ how many exactly the project expects to change (Practice and/or KAS) and by how much, by the

    end of the Project. Indicators and tools to measure them are included for each outcome target.

    CPWF Project Workbook Table of Contents Page 2

    https://sites.google.com/a/cpwf.info/m-e-guide/indicator-and-milestone-planhttps://sites.google.com/a/cpwf.info/m-e-guide/indicator-and-milestone-planhttps://sites.google.com/a/cpwf.info/m-e-guide/outcome-pathways-and-outcome-logic-modelhttps://sites.google.com/a/cpwf.info/m-e-guide/outcome-pathways-and-outcome-logic-modelhttps://sites.google.com/a/cpwf.info/m-e-guide/indicator-and-milestone-planhttps://sites.google.com/a/cpwf.info/m-e-guide/indicator-and-milestone-plan
  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    3/60

    6 Gantt Chart

    Tab Name: PNX Gantt Chart

    For more information, visit:

    7 Schedule of Reports and Payments = filled by CPWF Finance Officer for contracting

    Tab Name: PNX $ Schedule

    8 Budget Summary

    Tab Name: PNX $ Summary

    9 Budget Comments

    Tab Name: PNX $ Comments

    10 Staff Time Allocation and Breakdown of Personnel Costs

    Tab Name: PNX $ Time Allocation

    11 Indicative Breakdown of Budget by Outputs

    Tab Name: PNX $ By Outputs

    12 Indicative Breakdown of Budget by Institution

    Tab Name: PNX $ By Institution

    This table shows the distribution of budget by output then by institution. The overhead costs are not included in

    the distribution.

    This table shows a summary of the budget allocated to the project partner institutions (left part). The right part

    of the table could be of support to work out each project partners budget share by line item.

    This spreadsheet shows the breakdown of the project budget per line item and per year.

    The comments worksheet is where budget explanations and details are explained.

    In this worksheet the project team compositon is listed with their names, institution, expertise and contribution

    to the project (e.g., Output 1, Communication, Policy, etc.), the number of days per year, and the daily rate per

    staff.

    The Gantt Chart focuses on the activities to be carried out to complete the project. This chart contains the

    project schedule, work breakdown structure, i.e. activities with their milestones as the terminal elements, their

    start and finish dates, responsible project team member and their affiliations.

    CPWF M&E Guide- Gantt Chart

    This spreadsheet will be filled out by CPWF finance officer for contracting according to the budget details the

    project has submitted. It shows the schedule of budget release, which depends on the satisfactory submission

    and approval of the required progress reports.

    CPWF Project Workbook Table of Contents Page 3

    https://sites.google.com/a/cpwf.info/m-e-guide/gantt-charthttps://sites.google.com/a/cpwf.info/m-e-guide/gantt-chart
  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    4/60

    Title Page with Reviewers' Comments

    Project Leader

    Project Number

    Project Short Title

    Reporting Period

    Starting Date

    Completion Date

    Review Questions (RQ) Reviewer Remarks on status (inlcude

    date)

    Changes required to proceed

    to contracting

    Response from the Project

    Leader (include date)

    Status of chan

    after resubmis

    filled in by the

    RQ1: Are documents in order,

    provide information required,

    and is there consistency

    between them?

    Cells highlighted in yellow must be

    dealt with for contracting

    Documents according to Standard

    Clauses and Procedures 3.02 and

    3.03 (see list below)

    Cells highlighted in orange must be

    dealt with by time of inception

    report

    Revised proposal First submission 2011.03.03

    Contact sheet First submission 2011.03.03 please submit CVs of the other

    partners (WFC)

    please add the names of the

    partners who are still to be

    hired as well as the consultants

    04 April 2011

    Additional CVs are now

    submitted with the revised

    Proposal. Position of PDF,

    consultant, Graduate students

    are to be determined and are

    added

    Gantt chart First submission 2011.03.03

    Milestone plan First submission 2011.03.03

    OLM First submission 2011.03.03

    OTIP not submitted

    KM Point

    Person

    To Phuc Tuong

    Productive, profitable, and resilient agriculture and aquaculture systems

    G2

    April 30, 2011

    April 30, 2014

    CPWF Project Workbook Title Page with Reviewers' Comments

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    5/60

    Review Questions (RQ) Reviewer Remarks on status (inlcude

    date)

    Changes required to proceed

    to contracting

    Response from the Project

    Leader (include date)

    Status of chang

    after resubmiss

    filled in by the r

    Budget First submission 2011.03.03 Proposed budget exceeds the

    amount in the EOI by $45,947

    Suggested changes were made

    to the spreadsheets (in red ink)

    to show consistency of

    information across the

    spreadsheets in the workbook

    Please indicate the baseline for

    the Daily Charge Out $ (it is

    understood that the

    succeeding year's personnel

    budget includes the 3% and 5%

    annual increment)

    04 April 2011

    The proposed budget is now

    adjusted. The

    changes are in red and blue

    Daily charge Out $ is now

    added, with note of increasing

    3% for IRS and 5% for NRS

    Plan for baselining of outcome

    targets

    Signed MOUs corresponding to

    milestone plan

    Third party intellectual audit

    CPWF Project Workbook Title Page with Reviewers' Comments

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    6/60

    Review Questions (RQ) Reviewer Remarks on status (inlcude

    date)

    Changes required to proceed

    to contracting

    Response from the Project

    Leader (include date)

    Status of chang

    after resubmiss

    filled in by the

    RQ2: Have there been changes

    in budget share going to

    partners, and if so, are they

    consistent with the changes in

    responsibilities?

    Program

    Manager

    RQ3: Does the budget appear

    consistent with the promised

    outputs?

    Program

    Manager

    RQ4: Looking at the people

    responsible for producing the

    outputs, do these teams

    contain people with the

    requisite skill and is team size

    appropriate?

    MT Point

    Person

    RQ5: Is there a clear

    assignment of responsibility

    for producing outputs and

    milestones to both individuals

    and organizations?

    MT Point

    Person

    RQ6: Have reviewers'

    comments been addressed?

    MT Point

    Person

    CPWF Project Workbook Title Page with Reviewers' Comments

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    7/60

    Review Questions (RQ) Reviewer Remarks on status (inlcude

    date)

    Changes required to proceed

    to contracting

    Response from the Projec

    Leader (include date)

    From Standard Clauses and Procedures

    3.02 The documents required for contract signature are:

    Revised project proposal that has addressed reviewers comments in particular negotiation points and incorpora

    from workshops and other consultation processes.

    Revised budget reflecting changes in project proposal

    Gantt Chart

    Milestone plan developed for at least the first year of operations

    Draft Outcome Logic Model

    Any other documentation agreed to between the Project Leader and the CPWF

    3.03 The following documents are to be provided in electronic form to CPWF Basin Leader with the Inception Repo

    Outcome Logic Model agreed with partners

    Milestone plan developed for the duration of the project

    Outcome target indicators plan

    Plan for base lining of outcome targets

    Signed MOUs corresponding to milestone plan

    Third Party Intellectual Asset Audit

    Any other documentation agreed to between the Project Leader and the CPWF.

    CPWF Project Workbook Title Page with Reviewers' Comments

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    8/60

    Project Partners and Contact Details

    Please remember to provide a CV for each person listed below as Annex B to your proposal. Indicate in particular who has responsibility for communications, M&E, know

    Given Name Family Name Institution Role in the

    project

    Professional

    discipline

    Email Alternate Email Work Phone

    To Phuc Tuong International Rice

    Research Institute

    Consultant Water science [email protected] [email protected]

    om

    n/a

    Elizabeth Humphreys International Rice

    Research Institute

    Project Leader (after

    Aug 2011); Principal

    Investigator (Int'l)

    Senior Scientist e.humphreys@cgiar.

    org

    63 2 5805600

    Adelbagi Ismail International Rice

    Research Institute

    Principal Investigator

    (Int'l)

    Senior Scientist abdelbagi.ismail@cgi

    ar.org

    63 2 5805600

    Glenn Gregorio International Rice

    Research Institute

    Other Project

    Participant

    Senior Scientist [email protected]

    g

    63 2 5805600

    Manoranjan Mondal IRRI Co-ordinator for IRRI

    in BGD

    Collaborative

    Research Scientist

    manoranjan_km@ya

    hoo.com

    manoranjan.km@br

    ac.net

    880 2 9886608

    Mohammed Rafiqul Islam International Rice

    Research Institute

    Other Project

    Participant

    Post doc [email protected]

    g

    63 2 5805600

    Tao Li International Rice

    Research Institute

    Other Project

    Participant

    Scientist-Crop

    modeller

    [email protected] 63 2 5805600

    Michael John Phillips The WorldFish

    Center

    Project Lead

    Scientist for WFC

    Senior Scientist [email protected] 60 46202160

    Benoy Kumar Barman The WorldFish

    Center

    Principal Investigator

    (Reg'l)

    Field Coordinator/

    Researcher

    b.barman@cgxchan

    ge.org

    880 2 8813250

    William J Collis The WorldFish

    Center

    Principal Investigator

    (Int'l)

    Director-Bangladesh

    and South

    Asia/Aquaculture

    Specialist

    [email protected] 880 2 8813251

    Manjurul Karim The WorldFish

    Center

    Principal Investigator

    (Int'l)

    Scientist/Project

    Coordinator

    m.karim@cgxchange

    .org

    880-2 8813250

    Kazi Ahmed Kabir The WorldFish

    Center

    Technical

    Specialist

    Research Assistant [email protected]

    om

    n/a

    TBA Consultant to the

    WorldFish Center

    Consultant Data Management

    Assistant

    CPWF Project Workbook Project Partners and Contact Details

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]
  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    9/60

    Given Name Family Name Institution Role in the

    project

    Professional

    discipline

    Email Alternate Email Work Phone

    Jitendra Kumar Sundaray Central Institute of

    Brackishwater

    Aquaculture

    Principal Investigator

    (Nat'l)

    Principal Scientist-

    Aquaculture

    [email protected]

    m

    91-3210-255072

    Shyamalendu Bikash Saha Bangladesh Fisheries

    Research Institute

    Principal

    Investigator

    (National)

    ChiefScientific

    Officer (cc)

    [email protected]

    m

    M. Akhlasur Rahman Bangladesh Rice

    Research Institute

    Principal Investigator

    (Nat'l)

    Senior Scientific

    Officer-Plant

    Breeding

    [email protected]

    m

    880-2-9257401-5

    Sanjida Ritu Bangladesh Rice

    Research Institute

    Principal Investigator

    (Nat'l)

    Senior Scientific

    Officer, Irrigation

    Water Management

    [email protected]

    m

    880 2 9252429

    Khairul Bashar BRRI Coordinator Director Research mkbashar.brri@gma

    il.com

    mkbashar.brri@yah

    oo.com

    880 2 9252429

    Abdur Rashid BRRI Principal Investigator

    (Nat'l)

    Head, Irrigation and

    water management

    arashidiwm@yahoo.

    com

    880 2 9263669

    Sirajul Islam BRAC Principal Investigator

    (Nat'l)

    Program Head,

    Agriculture and Food

    Security

    [email protected] [email protected] 880 2 9881265

    91-3210-25507ashutoshddeo@g

    mail.com

    Ashutosh D. Deo Central Institute

    of Brackishwater

    Aquaculture

    Associate

    Investigator (Nat'l)

    Senior Scientist-

    Aquaculture

    CPWF Project Workbook Project Partners and Contact Details

    mailto:[email protected]:[email protected]:[email protected]:[email protected]
  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    10/60

    Expertise Responsible for

    Soil and water

    management

    consultant - water

    mgt, cropping

    systems,

    governance, linking

    with G1Soil and water

    management

    overall in-charge;

    responsible for

    communication,

    M&ECrop physiology in-charge of

    germplasm

    validation and seed

    distribution network

    Crop physiology germplasm

    validation and seed

    distribution network

    Water Management resource

    management for rice

    based cropping

    systems

    Ban ladeshCrop physiology germplasm

    validation and seed

    distribution network

    Crop and production

    system modeling

    in-charge of

    modeling

    Aquaculture in charge of WFC-led

    and -partnered

    activitiesAquaculture coordinator of

    aquaculture

    activities; M&EAquaculture Aquaculture

    specialist/Overall

    management of

    activities/GOB

    liaison/Donor

    communication etc

    Integrated

    Agriculture-

    Aquaculture

    oversight

    aquaculture

    activities;

    communication

    Aquaculture co-ordinator of fieldactivities in all 3

    polders; monitoring;

    writing drafts

    CPWF Project Workbook Project Partners and Contact Details

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    11/60

    Expertise Responsible for

    Aquaculture aquaculture systems

    (India)

    Brackish water aquac Saline aquaculture

    (polder 3); HH

    survey (polder 30)

    Plant Breeding germplasm

    validation and seed

    distribution network

    (Bangladesh)

    Water Management Water management

    and intensification of

    rice-based cropping

    systems

    Plant Breeder Genetic resources

    conservation and

    seed technologyWater management Water management

    in rice based

    cropping systems

    Agronomist Adaptive research

    on rice based

    cropping systems

    Ban ladesh

    Aquaculture aquaculture

    systems (India)

    CPWF Project Workbook Project Partners and Contact Details

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    12/60

    Outcomes Logic Model

    Project Name Productive, profitable, and resilient agriculture and aquaculture systems

    Date

    Actor(s) Desired change in actor(s)

    practice

    Required change in actor KAS

    for change to happen

    Project strategies and

    prototypes for bringing about

    changes

    Outcome

    Pathway 1

    Farmers relying on rice-based

    and aquaculture-based

    production systems

    Use improved varieties (rice,

    fish etc.) and technologies in

    productive and diversified

    agriculture and aquaculture

    systems

    Awareness of benefits of new

    varieties, cultural practices,

    and cropping systems suitable

    to the resource profile of their

    land. Willing to invest more in

    relevant inputs and changes in

    practices

    Develop, demonstrate, and

    participatory evaluate new

    cropping systems with

    improved varieties in different

    target zones (with different

    land and water characteristics)

    Narrative

    2011-02-26; revised 2011-04-04; revised 2011-10-30

    Land and water productivity in the fresh-/brackish-water environments in the coastal zones in India and Bangladesh is low. The m

    fishermen cultivate only one crop per year (e.g., rice in wet season or shrimp in dry season). One reason is the lack of suitable vari

    yield, stress-tolerant) and technologies to diversify and increase their cropping intensities. Through participatory evaluation and s

    experiments (on-station and on-farm), the project will develop crop intensification/diversification technologies appropriate to diff

    from low to high salinity) available to farmers.

    CPWF Project Workbook Outcomes Logic Model Page 12 of 60

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    13/60

    Project Name Productive, profitable, and resilient agriculture and aquaculture systems

    Date

    Actor(s) Desired change in actor(s)

    practice

    Required change in actor KAS

    for change to happen

    Project strategies and

    prototypes for bringing about

    changes

    2011-02-26; revised 2011-04-04; revised 2011-10-30

    Outcome

    Pathway 2

    Households, withfocus on

    women

    Adapt integrated farming

    systems and new technologies

    in homestead

    Awareness of the value of

    improved homestead

    technologies and production

    systems in enhancing

    livelihood and nutrition;

    improve their skill in applying

    suitable technologies

    Production systems research,

    participatory demonstration

    and evaluation of homestead

    technologies, production

    systems with suitable

    aquaculture species and

    varieties; model systems

    designed based on available

    resources

    Narrative

    Outcome

    Pathway 3

    Crop and aquaculture seed

    producers (GOs, NGOs, private)and seed suppliers

    Provision of high-quality seeds

    of improved rice varieties andaqaculture species

    Knowledge of value and

    benefits of high-quality seedsof improved varieties and

    aquaculture species.

    Participate in seed production

    systems

    Provide quality seeds of

    improved rice varieties.Communication to improve

    awareness and knowledge on

    seeds of new rice varieties and

    suitable aquaculture species

    appropriate to target groups

    Narrative

    Narrative: The homestead often occupies a small proportion of farmers' land, yet it can contribute a great deal to improving liveli

    households, especially for children and women. Homestead activities also offer job opportunities (often unreported and unaccou

    will develop/test available integrative farming systems of crop productionanimal husbandryaquaculture that households, espe

    improve homestead productivity and enhance the nutritional value of homestead products. Households will participate in testing

    training will be carried out to improve farmers' awareness of the benefits of the available technologies.

    Narrative: One of the main constraints for farmers' adaptation of new technologies is the lack of seeds of suitable varieties. The p

    breeder seeds of improved varieties to selected public and private seed producers and encourage them to participate in the seed

    network to ensure an adequate supply of seeds of suitable varieties to farmers.

    CPWF Project Workbook Outcomes Logic Model Page 13 of 6

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    14/60

    Project Name Productive, profitable, and resilient agriculture and aquaculture systems

    Date

    Actor(s) Desired change in actor(s)

    practice

    Required change in actor KAS

    for change to happen

    Project strategies and

    prototypes for bringing about

    changes

    2011-02-26; revised 2011-04-04; revised 2011-10-30

    Outcome

    Pathway 4

    Extension workers and

    development agencies (GOs,

    NGOs, private sector, CSISA)

    Promoting new technologies,

    training farmers, and taking

    ownership of the technologies

    disseminated

    Awareness of the benefits and

    profitability of new varieties,

    suitable aquatic species, and

    production systems. Train and

    disseminate new technologies

    to farmers and aquaculturists

    Collaboration in the conduct of

    field trials and development

    and dissemination of extension

    materials and knowledge;

    Invite potential partners to

    participatory evaluation of

    technologies and to visit

    demonstration trials.

    Narrative

    Outcome

    Pathway 5

    Microfinance agencies

    (includes NGOs, banks who

    provide agricultural finance -

    RCD, Rural Credit Department)

    Provide microfinance for inputs

    of new technologies; Increase

    loans to farmers who apply

    new technologies

    Awareness that new

    technologies may need higher

    input but will increase farmers'

    profits and may shorten the

    return period.

    Communicate the financial

    benefits of new varieties (crops

    and fisheries) and

    technologies. Invite potential

    partners to participatory

    evaluation of technologies and

    to visit demonstration trials.

    Narrative

    The uptake of technologies often occurs after the end of the project. This can be ensured only if the extension workers at differen

    zones are aware of and take ownership of the technologies and build their own program to disseminate the technologies. The pro

    workers to join the participatory testing and evaluation of new germplasm and technologies. They will take part in producing exte

    farmers.

    Farmers and households in coastal areas normally do not have adequate financial resources to buy new seeds (or aquaculture sto

    new and intensive cropping systems. Finance agencies (GOs, NGOs) will be invited to participate in the evaluation of new technol

    financial analyses of new technologies will be carried out to convincingly show that farmers who use new, improved varieties, tec

    systems will have higher profit and be likely to pay back loans in a shorter time. Financers will therefore increase loans to farmers

    in fields and in homestead activities.

    CPWF Project Workbook Outcomes Logic Model Page 14 of 6

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    15/60

    Project Name Productive, profitable, and resilient agriculture and aquaculture systems

    Date

    Actor(s) Desired change in actor(s)

    practice

    Required change in actor KAS

    for change to happen

    Project strategies and

    prototypes for bringing about

    changes

    2011-02-26; revised 2011-04-04; revised 2011-10-30

    Outcome

    Pathway 6

    Local and state governments

    and ministries of agriculture

    and fisheries in Bangladesh and

    India

    Provide enabling directives and

    policies for seed production

    and adoption of new

    technologies

    Knowledge of value and

    benefits of high-quality seeds

    of improved varieties and

    suitable aquaculture species,

    technologies, and cropping

    systems. Understand the

    importance of enabling policies

    Timely inform governments of

    different research findings.

    Organize policy dialogues with

    state governments and

    relevant ministries, and

    conferences. Invite

    government officials to

    experimental sites,

    demonstrations, and site visits.

    Produce policy briefs

    Narrative

    Outcome

    Pathway 7

    Researchers, research for

    development Programs (e.g.

    CSISA, IFAD), especially those

    dealing with cropping and

    brackish water aquaculture

    systems

    Develop, evaluate, and adapt

    new cropping and improved

    aquaculture systems with

    appropriate varieties and

    aquatic species

    New knowledge and skills Collaborative research;

    communication of research

    strategies and findings via

    publications and in national

    and international

    fora/conferences

    Narrative Study sites of the project cover only a small portion of the coastal zones in the Ganges, and an even smaller portion of the world f

    lands. Efforts similar to those in the project have to be performed over other coastal areas. Through publications and communica

    the project will inform the scientific community of the research strategies, methodologies, and findings. Other researchers will be

    in designing new cropping systems using appropriate varieties to increase the productivity of land and water, especially in the coa

    Narrative: Large-scale adaptation of new technologies can occur only with appropriate policies on infrastructure investment, land

    financing, investment in extension, and enforcement of recommendations, besides others. Together with Project G5, this project

    with decision-makers at the local level and policymakers at the ministerial level to timely inform them of the research findings, an

    enabling policies. We will produce policy briefs for a wider audience. We hope the outcome will be the recognition of the import

    strengthen the adaptation of new varieties, new technologies, and cropping systems in fields and in homesteads.

    CPWF Project Workbook Outcomes Logic Model Page 15 of 6

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    16/60

    Project outputs

    G2.1: New rice varieties and

    suitable aquaculture speciesvalidated, and seed production

    of new rice varieties initiated

    locally

    G2.2: More productive,

    profitable, resilient, and

    diversified rice-based cropping

    systems;

    G2.4: Brackish-water aquatic

    production systems

    ajority of farmers and

    eties (short-duration, high-

    lection of varieties, and

    erent target zones (ranging

    CPWF Project Workbook Outcomes Logic Model Page 16 of 6

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    17/60

    Project outputs

    G2.3: Improved homestead

    production systems

    G2.1: New rice varieties and

    suitable aquaculture speciesvalidated, and seed production

    of new rice varieties initiated

    locally

    G2.2: More productive,

    profitable, resilient, and

    ood, income, and nutrition of

    ted for) to women. The project

    ially women, can use to

    the new technologies and

    roject partners will provide

    multiplication and distribution

    CPWF Project Workbook Outcomes Logic Model Page 17 of 6

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    18/60

    Project outputs

    G2.5: Technology and policy

    recommendations

    G2.5: Technology and policy

    recommendations

    t levels and especially in coastal

    ject will invite extension

    nsion materials and training

    cking) and other inputs for the

    gies. Careful economic and

    nologies, and cropping

    who practice new technologies

    CPWF Project Workbook Outcomes Logic Model Page 18 of 6

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    19/60

    Project outputs

    G2.5: Technology and policy

    recommendations (together

    with Project G5)

    Publications on scientific

    knowledge and process

    understanding of all outputs

    resh-/brackish-water coastal

    tion at international forums,

    able to use the new knowledge

    stal zones.

    use, input linearization and

    ill organize frequent meetings

    d to discuss with them possible

    ance of suitable policies to

    CPWF Project Workbook Outcomes Logic Model Page 19 of 6

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    20/60

    Outcome Targets Indicator Plan

    Project Name Resilient Intensified and Diversified Agriculture and

    Date updated 30 Mar 2012

    No. ACTOR and how they will CHANGE Outcome target(s) 2014 Indicator(s)

    Outcome Ta

    Taken from the OLM: Actor group and

    the practice, knowledge, attitude or

    skills change

    Specific description(s) of who/ how

    many exactly the project expects to

    change (Practice and/or KAS) and by

    how much, by the end of the Project.

    There can be more than one Outcome

    Target per each Outcome line (first

    column- actor + expected final change)

    What you will

    know you are

    Outcome Targ

    milestones)?

    1 Farmers relying on rice-based and

    aquaculture-based production

    systems use improved varieties (rice,

    fish etc.) and technologies in

    productive and diversified agricultureand aquaculture systems

    A total of 300 farmers have adopted

    improved rice varieties; 50 farmers

    have adopted improved technology

    for rice-rabi cropping systems; 50

    farmers have adopted improved

    brackish water aquaculture systems -in project villages and nearby villages

    Number of a

    2 Households, with focus on women

    adopt integrated farming systems and

    new technologies in homestead

    A total of 100 households adopt

    integrated farming systems and new

    technologies in homesteads - in

    project villages and nearby villages

    Number of a

    3 Projects and organisations involved in

    seed production/dissemination

    4 projects and organisations involved

    in seed production/dissemination

    (e.g. CSISA, FTF, GOs & NGOs) adopt

    recommendations based on results of

    our rice variety and fish

    species/quality evaluation

    Recommend

    incorporated

    multiplicatio

    and/or disse

    projects/orga

    4 Extension workers and development

    agencies (e.g. GOs, NGOs, private

    sector, CSISA) are promoting new

    technologies, training farmers, and

    taking ownership of the technologies

    disseminated

    New technologies promoted in

    Bangladesh by BRRI, DAE, BFRI, BRAC,

    CSISA, and in India by CIBA, CSSRI,

    DOF, DA, Sundarban Devt Board

    Number of d

    promoting n

    The Outcome Target Indicators Plan (OTIP) contains specific description(s), for each Outcome Pathway (fro

    (Practice and/or KAS) and by how much, by the end of the Project. roject is committing to measure. THe ex

    Outcome Targets that the Indicators and tools to measure them are included for each outcome target.

    CPWF Project Workbook Outcome Targets Indicator Plan

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    21/60

    Milestone Plan

    Project Name

    Date

    No. Milestones = your progress markers Deadline ResponsiblePartner Institution

    Responsible StaffProject Member

    Outputs requiredby other projects

    Means of veri

    0

    0.a Sites selected, research team at each site identified and

    engaged

    2011/04/15 IRRI and all

    partners

    TPT and PIs G1 LOA with Partn

    reported in inc

    0.b Workplan reported and approved in inception workshop 2011/05/15 IRRI and allpartners

    TPT and PIs No Project workpdetailed workp

    0.c Project progress reported and annual workplan approved in the

    annual BDC reflection workshops

    2011-12-15

    2012-12-15

    2013-12-15

    IRRI and all

    partners

    EH and PIS G5 Progress repor

    0.d Project completion report and publications 2014/04/30 IRRI and allpartners

    EH and PIs G5 Completion re

    0.e Baseline information - review of secondary data, situation

    appraisals, village and key informant interviews (DAE, BRRI

    "extensionists", BRAC, DOF, BFRI "extensionists"); survey on

    southern part of polder 3 - NB household survey is a separate

    activity below

    6/30/2012 IRRI and all

    partners

    EH and PIS G1 , G3 Report

    0.f Adoption surveys in project villages and nearby villages, key

    informant interviews

    4/30/2014 IRRI and all

    partners

    EH and PIS No Report

    1

    1.a Seeds of new varieties and breeding lines exchanged through

    IRRI (IRRI)

    2011-06-30

    2012-06-30

    2013-06-30

    IRRI, BRRI, CSSRI GG (MRI, AR, BKB) No Seed received

    reports

    1.b Seeds for wet and dry seasons (BGD, IND) and early monsoon

    season (BGD) multiplied and distributed to network partners

    2012-03-31

    2013-03-31

    BRRI, CSSRI AR, BKB No Seeds distribut

    evaluation

    New germplasm validated and seed distribution network established

    Productive, profitable, and resilient agriculture and aquaculture systems

    February 26, 2011

    To be filled by PLs and Project Teams

    Project well monitored and Implemented

    CPWF Project Workbook Milestone Plan

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    22/60

    Project Name

    Date

    No. Milestones = your progress markers Deadline Responsible

    Partner Institution

    Responsible Staff

    Project Member

    Outputs required

    by other projects

    Means of ver

    Productive, profitable, and resilient agriculture and aquaculture systems

    February 26, 2011

    To be filled by PLs and Project Teams

    1.c Salt and submergence tolerant wet season varieties evaluated

    on-station and on-farm (BGD, IND)

    2011-12-31

    2012-12-31

    2013-12-31

    BRRI, CSSRI, BRAC BKB, AR No Field visits and

    1.d Salt tolerant dry season varieties evaluated on station and on-

    farm (BGD, IND)

    2012-06-30

    2013-06-30

    BRRI BKB, AR No Field visits and

    1.e Early monsoon season varieties evaluated on station and on-

    farm (BGD)

    2012-09-30

    2013-09-30

    BRRI, CSSRI, BRAC AR No Field visits and

    1.f Farmers field days for PVS evaluation accomplished (BGD,IND)

    2011-12-312012-04-30

    2012-07-31

    2012-12-31

    2013-04-30

    2013-07-31

    2013-12-31

    BRRI, CSSRI, BRAC BKB, AR G3, G5 Reports, farmfeedback repo

    1.g Results of evaluation documented in project progress report

    (BGD, IND)

    2011-12-15

    2012-06-30

    2012-12-15

    2013-06-30

    2013-12-15

    BRRI, CSSRI GG (MRI, AR, BKB) No Progress repo

    1.h Synthesizing reports and publications 2014/04/30 IRRI, BRRI, BRAC,

    CSSRI

    AI (GG, MRI, AR,

    BKB)

    No Reports and p

    2

    2.a Experiment protocols (annually) 2011-04-15

    2012-03-31

    2013-03-31

    IRRI, BRRI, BRAC,

    CSSRI, WFC, CIBA,

    BFRI

    EH, TPT, MM, SR,

    AR, BKB

    No Protocols of e

    target zones

    2.b Experiment results and participatory evaluation documented in

    6 month and annual project progress report (BGD, IND)

    2011-12-15

    2012-06-30

    2012-12-15

    2013-16-30

    2013-12-15

    IRRI, BRRI, BRAC,

    CSSRI, WFC, CIBA,

    BFRI

    EH, TPT, MM, SR,

    BKB

    No Progress Repo

    perception fee

    2.c Draft and final versions of cropping system technical package -

    systems, germplasm, management tailored to different sitesituations

    2014/04/30 IRRI, BRRI, BRAC,

    CSSRI, WFC, CIBA,BFRI

    EH, TPT, MM, SR,

    AR, BKB, AI, GG,MRI

    No Reports and p

    3

    3.a Literature review and knowledge gaps identified 2012/03/31 WFC, BFRI,CSSRI,

    CIBA

    MK, MP, JA, BB,

    JKS, BKB, SBS

    No Literature rev

    Improved homestead production systems

    More productive, profitable, resilient & diversified rice-based cropping systems

    CPWF Project Workbook Milestone Plan

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    23/60

    Project Name

    Date

    No. Milestones = your progress markers Deadline Responsible

    Partner Institution

    Responsible Staff

    Project Member

    Outputs required

    by other projects

    Means of ver

    Productive, profitable, and resilient agriculture and aquaculture systems

    February 26, 2011

    To be filled by PLs and Project Teams

    3.b Report of survey findings, strategies for improving homestead

    identified

    2012/03/31 IRRI, WFC,

    BFRI,CSSRI, CIBA

    MK, MP, JA, BB,

    JKS, BKB, SBS

    No Survey report

    3.c Experiment/study protocol (revised annually) 2012-03-31

    2013-03-31

    IRRI, WFC,

    BFRI,CSSRI, CIBA

    MK, MP, JA, BB,

    JKS, BKB, SBS, EH

    No Protocols of e

    target zones

    3.d Experiment results and participatory evaluation documented in

    6 month and annual project progress report (BGD, IND)

    2011-12-15

    2012-06-30

    2012-12-15

    2013-06-302013-12-15

    IRRI, WFC,

    BFRI,CSSRI, CIBA

    MK, MP, JA, BB,

    JKS, BKB, SBS

    No Progress Repo

    perception fee

    3.e Draft and final versions of homestead farming systems

    technical package

    2014/04/30 IRRI, WFC,

    BFRI,CSSRI, CIBA

    MK, MP, JA, BB,

    JKS, BKB, SBS, EH

    No Reports and p

    4

    4.a Literature review and Experiment protocols (annually) 2011-11-30

    (protocols)

    2012-02-15

    (review)

    WFC, BFRI, CIBA MK, MP, JA, JKS,

    SBS

    No Protocols of e

    water zone in

    4.b Experiment results and participatory evaluation documented in

    6 month and annual project progress report (BGD, IND)

    2012-06-30

    2012-12-15

    2013-06-30

    2013-12-15

    WFC, BFRI, CIBA MK, MP, JA, JKS,

    SBS

    No Progress Repo

    perception fee

    4.c Draft and final versions of brackish aquaculture system

    technical package - systems, species/varieties, management

    2014/04/30 WFC, BFRI, CIBA MK,MP, JA, JKS,

    SBS

    No Reports and p

    5

    5.a Training materials and reports produced 2012-06-30

    2012-12-31

    2013-06-30

    IRRI, WFC, BRRI,

    BFRI, CSSRI, CIBA

    AI, EH, MP G3 Training mate

    courses

    5.b Extension materials produced 2012-12-31

    2013-12-31

    IRRI, WFC, BRRI,

    BFRI, CSSRI, CIBA

    AI, EH, MP G3 Leaflets, proc

    5.c Policy dialogues organized 2012-12-31

    2013-12-31

    IRRI, WFC, BRRI,

    BFRI, CSSRI, CIBA

    AI, EH, MP G5 Policy briefs,

    Brackish water aquatic production systems

    Technology and policy recommendations for up- and out-scaling

    CPWF Project Workbook Milestone Plan

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    24/60

    Gantt Chart

    Project Name

    Date

    No.

    Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1

    0 Project well monitored and Implemented

    Activities 0.1 Formation of research team, selection sites

    0.2 (i) Launch and (ii) Inception workshops i ii

    0.3 project implementation, monitoring and reporting

    0.4 Annual BDC meeting & annual G2 review & planning meeting

    0.5 Project conclusion

    Milestones 0.a Sites selected, research team at each site identified and engaged 0.a

    0.b Workplan reported and approved in inception workshop 0.b 0.b

    0.c Project progress reported and annual workplan approved in the annual BDC

    reflection workshops

    0.c 0.c

    0.d Project completion report and publications

    Productive, profitable, and resilient agriculture and aquaculture systems

    February 26, 2011

    2011 2012

    PWF Project Workbook Gantt Chart

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    25/60

    Project Name

    Date

    No.

    Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1

    Productive, profitable, and resilient agriculture and aquaculture systems

    February 26, 2011

    2011 2012

    1 New germplasm validated and seed distribution network established

    Activities 1.1 Exchange of seeds with partners through IRRI (BGD, IND)

    1.2 On-station and on-farm seed multiplication for the wet (aman) and dry

    (boro) seasons (BGD, IND), and early monsoon (aus) season (BGD)

    1.3 On-farm and on-station evaluation of salt and submergence tolerant wet

    season varieties (BGD, IND)

    1.4 On-station and on-farm evaluation of salt tolerant dry season varieties

    (BGD, IND)

    1.5 On station and on-farm evaluation of early monsoon varieties (BGD)

    1.6 Farmers field days for PVS evaluation (BGD, IND)

    1.7 Results of evaluation documented in project progress report (BGD, IND)

    1.8 Synthesizing findings of Activities under output 1

    Milestones 1.a Seeds of new varieties and breeding lines exchanged through IRRI (IRRI)1.a 1.a

    1.b Seeds for wet and dry seasons (BGD, IND) and early monsoon season (BGD)

    multiplied and distributed to network partners1.b 1.b

    1.c Salt and submergence tolerant wet season varieties evaluated on-station

    and on-farm (BGD, IND)1.c 1.c

    1.d Salt tolerant dry season varieties evaluated on station and on-farm (BGD,

    IND)1.d

    1.e Early monsoon season varieties evaluated on station and on-farm (BGD)1.e

    1.f Farmers field days for PVS evaluation accomplished (BGD, IND) 1.f 1.f 1.f 1.f

    1.g Results of evaluation documented in project progress report (BGD, IND.

    IRRI)1.g 1.g 1.g

    1.h Synthesizing reports and publications

    PWF Project Workbook Gantt Chart

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    26/60

    Project Name

    Date

    No.

    Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1

    Productive, profitable, and resilient agriculture and aquaculture systems

    February 26, 2011

    2011 2012

    2 More productive, profitable, resilient & diversified rice-based cropping systems

    Activities 2.1 Hypothesis formation, design of on station and on farm experiments for 3

    sites in BDG and 2 sites in IND; revise annually

    2.2 Implementing experiments

    2.3 Data analysis and interpretation

    2.4 Participatory evaluation of the experimented cropping systems and

    technologies

    2.5 Documenting experiment results and evaluation in 6 month and annual

    project progress report (BGD, IND)

    2.6 Production of technical cropping system package

    Milestones 2.a Experiment protocols (annually) 2.a 2.a 2.a

    2.b Experiment results and participatory evaluation documented in 6 month

    and annual project progress report (BGD, IND)2.b 2.b 2.b

    2.c Draft and final versions of cropping system technical package - systems,germplasm, management tailored to different site situations

    PWF Project Workbook Gantt Chart

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    27/60

    Project Name

    Date

    No.

    Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1

    Productive, profitable, and resilient agriculture and aquaculture systems

    February 26, 2011

    2011 2012

    3 Improved homestead production systems

    Activities 3.1 Literature review of homestead iconology and farming systems in the

    coastal of BGD and IND

    3.2 Household Survey of homestead economy and farming systems at the

    study sites in BDG and IND

    3.3 Proposal/experiment design for testing varieties/technologies and farming

    systems to increase productivity and nutrition value of products from

    homestead (revised annually)

    3.4 Participatory experiment and evaluation of the experimented homestead

    technologies and production systems

    3.5 Documenting experiment results and evaluation in 6 month and annual

    project progress report (BGD, IND)

    3.6 Production of technical homestead packages

    Milestones 3.a Literature review and knowledge gaps identified 3.a.

    3.b Report of survey findings, strategies for improving homestead identified3.b

    3.c Experiment/study protocol (revised annually) 3.c 3.c

    3.d Experiment results and participatory evaluation documented in 6 month

    and annual project progress report (BGD, IND)3.d 3.d

    3.e Draft and final versions of homestead farming systems technical package

    PWF Project Workbook Gantt Chart

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    28/60

    Project Name

    Date

    No.

    Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1

    Productive, profitable, and resilient agriculture and aquaculture systems

    February 26, 2011

    2011 2012

    Output 4 Brackish water aquatic production systems

    Activities 4.1 Literature review, hypothesis formation, design of on station and on farm

    experiments in BDG IND; revise annually

    4.2 Implementing experiments

    4.3 Data analysis and interpretation

    4.4 Participatory evaluation of the experimented brackish aquaculture systems

    and technologies

    4.5 Documenting experiment results and evaluation in 6 month and annual

    project progress report (BGD, IND)

    4.6 Production of technical aquaculture system package

    Milestones 4.a Literature review and Experiment protocols (annually) 4.a 4.a

    4.b Experiment results and participatory evaluation documented in 6 month

    and annual project progress report (BGD, IND)4.b 4.b

    4.c Draft and final versions of brackish aquaculture system technical package -

    systems, species/varieties, management

    Output 5 Technology and policy recommendations for up- and out-scaling

    Activities 5.1 Farmers training for management of new varieties, technologies and

    cropping systems

    5.2 Preparation of extension material (leaflets, procures, etc) for the new

    varieties, technologies and cropping systems in local languages

    5.3 Policy dialogues with decision makers and ministerial level policy makers

    Milestones 5.a Training materials and reports produced 5.a 5.a

    5.b Extension materials produced 5.b

    5.c Policy dialogues organized 5.c

    PWF Project Workbook Gantt Chart

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    29/60

    Schedule of Reports and Payments

    Project Name Productive, profitable, and resilient agriculture and aquaculture systems

    Date

    No. Amount (US$) Comment Due Date

    1

    Paid on return of the signed Award Letter. These funds are to

    cover the first six months activities of the Project

    2Paid following satisfactory assessment of progress of the first 6

    months of project implementation.

    3Paid following satisfactory assessment of progress of the first

    12 months of project implementation.

    4Paid following satisfactory assessment of progress of the 18

    months of project implementation.

    5

    Paid following satisfactory assessment of progress of the 24

    months of project implementation. The milestone plan for the

    following two years of project activities must also be approved.

    6Paid following satisfactory assessment of progress of 30

    months of project implementation.

    7

    Paid following satisfactory assessment of progress of 36

    months of project implementation. A review may also be

    undertaken at this point at the discretion of the CPWF.

    8Paid on acceptance of the Project Completion Report and an

    external audit report.

    This worksheet will be filled by CPWF Finance Officer for contracting

    CPWF Project Workbook Schedule of Reports and Payments Page 29

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    30/60

    Budget Summary

    Project Name

    Date

    2011 2012 2013 2014 TOTAL

    1 PERSONNEL REMUNERATION, TRAVEL AND ACCOMMODATION

    1.1 PERSONNEL

    1.1.1 Project Leader 13,125 14,319 14,749 3,714 45,907

    1.1.2 Principal Investigators (Int'L & Reg'l) 18,070 16,680 17,180 4,326 56,256

    1.1.3 Principal Investigators (National) - - - -

    1.1.4 Consultants 4,649 6,199 6,199 1,550 18,597

    1.1.5 Support Staff 13,523 18,705 19,642 4,970 56,840

    1.1.6 Other Project Participants 27,308 47,147 51,868 13,063 139,386

    1.2 TRAVEL AND ACCOMMODATION

    1.2.1 Project Leader 1,209 1,649 1,698 428 4,984

    1.2.2 Principal Investigators (Int'L & Reg'l) 1,211 1,652 1,701 428 4,992

    1.2.3 Principal Investigators (National) -

    1.2.4 Consultants 1,125 1,500 1,500 375 4,500

    1.2.5 Support Staff 2,655 3,633 3,757 947 10,992

    1.2.6 Other Project Participants 1,615 2,245 2,368 600 6,828

    2 RESEARCH OPERATION

    2.1 EQUIPMENT

    2.1.1 Office equipment -

    2.1.2 Laboratory equipment -

    2.1.3 Field equipment -

    2.2 CONSUMABLES

    2.2.1 General communication expenses -

    2.2.2 Office supplies -2.2.3 Laboratory supplies 2,184 2,977 3,067 772 9,000

    2.2.4 Field research supplies 3,640 4,962 5,111 1,287 15,000

    2.2.5 Other support services (IT services,

    public areas, facilities) 26,287 35,576 35,259 8,774 105,896

    2.3 COMMUNICATIONS

    2.3.1 Communications products -

    2.3.2 Team meetings -

    2.3.3 Stakeholders workshops -

    2.3.4 Participation in Reflection Workshops 3,375 4,500 4,125 1,000 13,000

    2.3.5 Participation in IFWF3 and IFWF4 7,000 - 7,000 - 14,000

    3 LUMP SUM CONTRACT AGREEMENTS FOR SPECIFIC DELIVERABLES

    3.1 WFC 49,010 73,790 71,343 17,397 211,540

    3.2 BRRI 36,236 45,316 43,940 10,954 136,446

    3.3 BRAC 10,905 18,176 12,117 2,424 43,622

    3.4 BFRI 20,816 29,112 29,490 7,366 86,784

    3.5 CSSRI (india) 21,211 25,731 25,406 6,395 78,7433.6 CIBA (India) 21,511 25,231 25,131 6,370 78,243

    3.7 Others in BGD (including students) 11,633 15,510 13,329 3,150 43,622

    4 MISCELLANEOUS

    4.1 CONTINGENCY (% OF BUDGET) -

    4.2 OVERHEADS 22,677 29,688 29,937 7,520 89,822

    Administrative cost (12%) 16,349 20,623 21,252 5,398 63,622

    Management fee (4%) 6,328 9,065 8,685 2,122 26,200[INSTITUTION (% ] -

    [INSTITUTION (% ] -

    [INSTITUTION (% ]

    G2: Productive, profitable, and resilient agriculture and aquaculture systems

    2011-02-26; revised 2011-04-04

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    31/60

    Budget CommentsPlease provide as much information as possible to enable a good understanding of the key expenditures required.

    Project Name

    Project G2: Resilient Intensified and Diversified Agriculture and

    Aquaculture Systems

    Date

    COMMENTS

    MATCHING FUND (if any) IRRI's Project STRASA works in the same same area and will

    provide matching fund 10% of time of Dr. Ismail and Tao Li in 3

    years. Some amount will be designated to attendance of IFWF

    1

    PERSONNEL REMUNERATION, TRAVEL AND

    ACCOMMODATION

    1.1 PERSONNEL

    1.1.1 Project Leader Dr. Tuong is the project Leader until August, 2011, requests

    fund to cover 5% of his time. After that, Dr. Liz Humphreys will

    be the Project Leader, requesting 10% of her salary for the

    whole three years.

    1.1.2 Principal Investigators (Int'L & Reg'l) Funds are requested to support Dr Ismail 10% time per year forthree years .Personnel costs are based on actual annual

    salaries and benefits for on-board employees and on IRRIs

    standard personnel costs for new staff. The subsequent years

    include estimated escalations for merits adjustments which is

    3% per year for the IRS.

    1.1.3 Principal Investigators (National)

    1.1.4 Consultants Dr. Tuong (after his retirement with IRRI) will share 5% of his

    time each year for 3 years as a consultant for this project.

    1.1.5 Support Staff Funds are also requested to support three nationally recruited

    staff (NRS) that will assist the project leader and principal

    investigator in monitoring the project. Cabangon and Parreowho will be based in IRRI Philippines will allocate 30% of their

    time each year while the Level 3 TBD staff who will be based in

    Bangladesh will allot 100% of his time for the project.Personnel

    costs are based on actual annual salaries and benefits for on-

    board employees and on IRRIs standard personnel costs for

    new staff. The subsequent years include estimated escalations

    for merits adjustments which is 5% per year for the NRS.

    1.1.6 Other Project Participants Funds are also requested to support Dr. Tao Li's 10% time for

    year 2 to year 3.One Post doc fellow (PDF) will be hired and

    based to Bangladesh to monitor the project. 60% of his time

    will be charged here, 40% will be covered by Project CPWF G1.Personnel costs are based on actual annual salaries and

    benefits for on-board employees and on IRRIs standard

    personnel costs for new staff. The subsequent years include

    estimated escalations for merits adjustments which is 3% per

    year for the IRS and PDF.

    CPWF Project Workbook Budget Comments Page 31 of 60

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    32/60

    1.2 TRAVEL AND ACCOMMODATION

    1.2.1 Project Leader This includes cost for the PL once a year visit in Bangladesh to

    monitor the project and attend annual meeting. Other trips

    will be supported by other Projects in Bangladesh and India

    where Dr. Tuong and Humphreys also works

    1.2.2 Principal Investigators (Int'L & Reg'l) This consists of all costs related to once a year visit of one PI in

    Bangladesh to monitor the project including their

    accommodation and per diem. At least one other trip will bepaid by other IRRI projects in the same area

    1.2.3 Principal Investigators (National)

    1.2.4 Consultants For the consultant to visit the field. Other trips will be

    shouldered by IRRI projects in the same area

    1.2.5 Support Staff This is the travel cost of level 3 staff (based in BGD) for

    monitoring the field including his accommodation and per

    diem for 20 days stay there.

    1.2.6 Other Project Participants This consists of all costs related to field visit of the Postdoc

    fellow based in Bangladesh including their accommodation and

    per diem. At least one other trip will be paid by other IRRI

    projects in the same area

    2 RESEARCH OPERATION

    2.1 EQUIPMENT

    2.1.1 Office equipment

    2.1.2 Laboratory equipment

    2.1.3

    Field equipment To be used in Bangladesh and India which is included in NARES

    lumpsum contract.

    2.2 CONSUMABLES

    2.2.1 General communication expenses

    2.2.2 Office supplies

    2.2.3

    Laboratory supplies A total of $9,000 for 3 years is requested for consumables,

    chemicals and enzymes in the lab, and other laboratory

    supplies

    2.2.4

    Field research supplies This will cover cost for seed increase and shipment of breeding

    lines.

    2.2.5 Other support services (IT services, public

    areas, facilities)

    These are identified direct costs which includes information

    technology services such as desktop and network connection

    and operational and research support services . The

    operational support services are expenses for safety, security,

    energy cost, depreciation , rent, insurance and building

    maintenance. The research support services include the library,

    risk management and quality assurance, communication and

    publications,intellectual property management, country office

    coordination,support from office of the Deputy Director

    General for Research, External Relation, Seed Health and

    Project Coordination office. The above items are not part ofrefer overhead under 4.2

    2.3 COMMUNICATIONS

    2.3.1 Communications products

    2.3.2 Team meetings Will be combined with trips for Reflection Workshop

    2.3.3 Stakeholders workshops Will be combined with trips for Reflection Workshop

    CPWF Project Workbook Budget Comments Page 32 of 60

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    33/60

    2.3.4

    Participation in Reflection Workshops This also covers cost for annual meetings and semi annual

    meeting. The amount for NARES attendance are included in

    their lump sum contract

    2.3.5

    Participation in IFWF3 and IFWF4 This covers cost to attend the IFWF3 and 4. The amount for

    NARES attendance are included in their lump sum contract

    CPWF Project Workbook Budget Comments Page 33 of 60

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    34/60

    3

    LUMP SUM CONTRACT AGREEMENTS FOR

    SPECIFIC DELIVERABLES

    3.1

    WFC Assist in project management, monitoring and communication,

    especially in aquaculture activities. Signing appropriate

    subcontracts with, and responsible for timely fund

    disbursement to, BFRI and CIBA. In charge of improving

    aquaculture technologies for ponds in homestead; Oversee the

    implementation of experiments and field works in aquaculturesystems. Responsible for data analysis and interpretation; and

    high quality reports and scientific publications relating to

    aquaculture. give due guidance to BFRI and CIBA. The budget

    for WFC includes $20,000 for BFRI and CIBA to participate in

    Reflection workshop and the International Forum for Water

    and Food

    3.2

    BRRI In charge of field experiments in rice based systems and

    agriculture in homesteads in BGD, especially in germplasm

    testing and seed multiplication/delivery network

    3.3BRAC collaborate in field experiments in cropping systems and

    variety testing

    3.4

    BFRI (sub contract with WFC) Under the sub contract with WFC,In charge of field

    experiments relating to brackish water aquaculture systems

    and aquaculture components in homestead, BGD

    3.5

    CSSRI (India) In charge of field experiments in rice based systems and

    agriculture in homesteads in India, especially in germplasm

    testing and seed multiplication/delivery network

    3.6

    CIBA (India - sub contract with WFC) Under the sub contract with WFC,In charge of field

    experiments relating to brackish water aquaculture systems

    and aquaculture components in homestead, India

    3.7

    Others in BGD (including graduate students) These may include Khulna University, Bangladesh Agricultural

    University, Calcutta University where students working with

    the project register. Others e.g. SocioConsult may be asked to

    carry out household survey of homestead production systems

    and economy

    4 MISCELLANEOUS

    4.1 CONTINGENCY (% OF BUDGET)

    4.2 OVERHEADS

    Indirect cost The indirect cost will include the other necessaryadministrative costs which cannot be specifically identified as

    direct costs of the activity such as support from Director

    General Office, Finance, Procurement, Legal services, Human

    Resourse services, etc.

    [INSTITUTION (% ]

    [INSTITUTION (% ]

    [INSTITUTION (% ]

    [INSTITUTION (% ]

    CPWF Project Workbook Budget Comments Page 34 of 60

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    35/60

    taff Time Allocation and Breakdown of Personnel Costs

    roject Name

    ate

    2011 2012 2013 2014 TOTAL

    1.1 PL To Phuc Tuong (Liz Humphreys

    in year 2 and 3)

    IRRI CGIAR Oversight: project M&E,

    communication; contribute to

    resource management of rice

    based cropping systems

    18 22 22 6 68

    1.2 PI (Int'l) Abdelbagi Ismail IRRI CGIAR Oversight: germplasm

    validation and seed distribution

    network

    16 22 22 6 66

    Elizabeth Humphreys IRRI CGIAR contribute to resourcemanagement of rice based

    cropping systems

    9 9

    Manjurul Karim WFC CGIAR oversight: aquaculture

    activities, communication in

    aquaculture

    0

    Michael John Phillips WFC CGIAR aquaculture technologies 0

    under "lump sum contract" with WFC

    under "lump sum contract" with WFC

    2011-03-10; revised 2011-04-04

    No. Personnel Name Institution Days per YearType of

    Institution

    Brief Description of Contribution

    to Project, as described in G1

    Contacts (Project Workbook)

    Productive, profitable, and resilient agriculture and aquaculture systems

    WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Page 3

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    36/60

    taff Time Allocation and Breakdown of Personnel Costs

    roject Name

    ate

    2011 2012 2013 2014 TOTAL

    2011-03-10; revised 2011-04-04

    No. Personnel Name Institution Days per YearType of

    Institution

    Brief Description of Contribution

    to Project, as described in G1

    Contacts (Project Workbook)

    Productive, profitable, and resilient agriculture and aquaculture systems

    1.2 PI (Reg'l) Benoy Kumar Barman WFC CGIAR M&E; coordinator of

    aquaculture activities

    0

    1.3 PI (Nat'l) Rafiqul Islam BRRI NARES germplasm validation and seed

    distribution network, BGD

    0

    Alamgir Alam BFRI NARES Aquaculture technologies and

    systems, BGD

    0

    Bimal K. Bandyopadhyay CSSRI NARES Germ plasm and Rice based

    cropping systems, IND

    0

    Jitendra Kumar Sundary CIBA NARES aquaculture systems, IND 0

    1.4 Consultants To Phuc Tuong 8 11 11 3 33

    Under "lump sum" contract

    under "lump sum contract" with WFC

    WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Page 3

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    37/60

    taff Time Allocation and Breakdown of Personnel Costs

    roject Name

    ate

    2011 2012 2013 2014 TOTAL

    2011-03-10; revised 2011-04-04

    No. Personnel Name Institution Days per YearType of

    Institution

    Brief Description of Contribution

    to Project, as described in G1

    Contacts (Project Workbook)

    Productive, profitable, and resilient agriculture and aquaculture systems

    .1.5 Support

    Staff

    Rexie Jane Parreo IRRI CGIAR involved in facilitating supply of

    seeds for objective 1, purchase

    of supplies and equipments,

    arrangement of travel for

    meetings and site visits for IRRI

    partners and in compiling of

    reports and in other

    communication activities

    49 65 65 16 195

    Romeo Cabangon IRRI CGIAR directly involved in planning,

    execution and monitoring of

    research activities of most ofG2, specially objectives 2, 3 and

    5. He will regularly visit the

    project sites for monitoring

    with local staff

    49 65 65 16 195

    Research Technician(TBD) in

    Bangladesh

    IRRI CGIAR assist PL and PI in project

    monitoring and field visit

    163 217 217 54 651

    WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Page 3

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    38/60

    taff Time Allocation and Breakdown of Personnel Costs

    roject Name

    ate

    2011 2012 2013 2014 TOTAL

    2011-03-10; revised 2011-04-04

    No. Personnel Name Institution Days per YearType of

    Institution

    Brief Description of Contribution

    to Project, as described in G1

    Contacts (Project Workbook)

    Productive, profitable, and resilient agriculture and aquaculture systems

    1.6 Other

    Project

    Participants

    Tao Li IRRI CGIAR Crop modeling 16 22 6 44

    Postdoc (TBD) IRRI CGIAR Based in BGD; day to day

    management of the project,

    contribute to rice-based

    cropping systems

    98 130 130 32 390

    WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Page 3

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    39/60

    taff Time Allocation and Breakdown of

    roject Name

    ate

    1.1 PL To Phuc Tuong (Liz Humphreys

    in year 2 and 3)

    1.2 PI (Int'l) Abdelbagi Ismail

    Elizabeth Humphreys

    Manjurul Karim

    Michael John Phillips

    2011-03-10; revised 2011-04-04

    No. Personnel Name

    Productive, profitable, and resili

    2011 2012 2013 2014

    730 for TPT

    and 648 for

    EH; annual

    increase 3%

    13,125 14,319 14,749 3,714 45,907

    764 ;

    annual

    increase 3%

    12,235 16,680 17,180 4,326 50,421

    648 ;annual

    increase 3%

    5,835 - 5,835

    -

    -

    18,070 16,680 17,180 4,326 56,256

    Total (US$)Personnel CostsDaily

    Charge Out

    (US$)

    WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Page 39

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    40/60

    taff Time Allocation and Breakdown of

    roject Name

    ate 2011-03-10; revised 2011-04-04

    No. Personnel Name

    Productive, profitable, and resili

    1.2 PI (Reg'l) Benoy Kumar Barman

    1.3 PI (Nat'l) Rafiqul Islam

    Alamgir Alam

    Bimal K. Bandyopadhyay

    Jitendra Kumar Sundary

    1.4 Consultants To Phuc Tuong

    2011 2012 2013 2014

    Total (US$)Personnel CostsDaily

    Charge Out

    (US$)

    -

    - - - - -

    -

    -

    -

    -

    - - - -

    4,649 6,199 6,199 1,550 18,597

    4,649 6,199 6,199 1,550 18,597

    WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Page 40

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    41/60

    taff Time Allocation and Breakdown of

    roject Name

    ate 2011-03-10; revised 2011-04-04

    No. Personnel Name

    Productive, profitable, and resili

    1.5 Support

    Staff

    Rexie Jane Parreo

    Romeo Cabangon

    Research Technician(TBD) in

    Bangladesh

    2011 2012 2013 2014

    Total (US$)Personnel CostsDaily

    Charge Out

    (US$)

    54 ; annual

    increase 5%

    2,475 3,423 3,595 910 10,403

    87.5 ;

    annual

    increase 5%

    4,055 5,609 5,889 1,490 17,043

    45 ; annual

    increase 5%

    6,993 9,673 10,158 2,570 29,394

    13,523 18,705 19,642 4,970 56,840

    WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Page 41

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    42/60

    taff Time Allocation and Breakdown of

    roject Name

    ate 2011-03-10; revised 2011-04-04

    No. Personnel Name

    Productive, profitable, and resili

    1.6 Other

    Project

    Participants

    Tao Li

    Postdoc (TBD)

    2011 2012 2013 2014

    Total (US$)Personnel CostsDaily

    Charge Out

    (US$)

    610 ;

    annual

    increase 3%

    9,919 13,522 3,406 26,847

    288 ;

    annual

    increase 3%

    27,308 37,228 38,346 9,657 112,539

    27,308 47,147 51,868 13,063 139,386

    TOTAL 76,675 103,050 109,638 27,623 316,986

    WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Page 42

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    43/60

    taff Time Allocation and Breakdown of

    roject Name

    ate

    1.1 PL To Phuc Tuong (Liz Humphreys

    in year 2 and 3)

    1.2 PI (Int'l) Abdelbagi Ismail

    Elizabeth Humphreys

    Manjurul Karim

    Michael John Phillips

    2011-03-10; revised 2011-04-04

    No. Personnel Name

    Productive, profitable, and resili

    1 2 3 4 5 6

    1 1 1 1 1 5

    1 1 1 1 4

    1 1 1 1 4

    1 1 1 3

    1 1 1 3

    Outputs

    Entries from Column S are added for reviewers'

    comments and to note items for clarification. There

    should be a clear assignment of outputs. Mark (with

    1) lead and contributed outputs in columns (S) to (X)

    Total

    WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Pag

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    44/60

    taff Time Allocation and Breakdown of

    roject Name

    ate 2011-03-10; revised 2011-04-04

    No. Personnel Name

    Productive, profitable, and resili

    .1.2 PI (Reg'l) Benoy Kumar Barman

    1.3 PI (Nat'l) Rafiqul Islam

    Alamgir Alam

    Bimal K. Bandyopadhyay

    Jitendra Kumar Sundary

    .1.4 Consultants To Phuc Tuong

    1 2 3 4 5 6

    Outputs

    Entries from Column S are added for reviewers'

    comments and to note items for clarification. There

    should be a clear assignment of outputs. Mark (with

    1) lead and contributed outputs in columns (S) to (X)

    Total

    1 1 1 3

    1 1 1 3

    1 1 1 3

    1 1 1 1 4

    1 1 1 1 4

    1 1 1 1 1 5

    WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Pag

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    45/60

    taff Time Allocation and Breakdown of

    roject Name

    ate 2011-03-10; revised 2011-04-04

    No. Personnel Name

    Productive, profitable, and resili

    .1.5 Support

    Staff

    Rexie Jane Parreo

    Romeo Cabangon

    Research Technician(TBD) in

    Bangladesh

    1 2 3 4 5 6

    Outputs

    Entries from Column S are added for reviewers'

    comments and to note items for clarification. There

    should be a clear assignment of outputs. Mark (with

    1) lead and contributed outputs in columns (S) to (X)

    Total

    1 1 1 1 1 5

    1 1 2

    1 1 1 1 4

    WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Pag

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    46/60

    taff Time Allocation and Breakdown of

    roject Name

    ate 2011-03-10; revised 2011-04-04

    No. Personnel Name

    Productive, profitable, and resili

    1.6 Other

    Project

    Participants

    Tao Li

    Postdoc (TBD)

    1 2 3 4 5 6

    Outputs

    Entries from Column S are added for reviewers'

    comments and to note items for clarification. There

    should be a clear assignment of outputs. Mark (with

    1) lead and contributed outputs in columns (S) to (X)

    Total

    1 1

    1 1 1 1 1 5

    10 11 13 9 12 0 55

    WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Pag

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    47/60

    Indicative Breakdown of Budget by OutputBudget does not include overhead costs

    Project Name

    Date

    Output Institution $ value of the budget % share of the budget

    IRRI 160,865 13%

    WFC - 0%

    BRRI 61,818 5%

    BRAC 16,275 1%

    BFRI - 0%

    CSSRI 31,659 2%

    CIBA - 0%

    Other BD 11,254 1%

    Total for Output 1 281,871 22%

    IRRI 182,643 14%

    WFC 21,459 2%

    BRRI 37,083 3%

    BRAC 27,347 2%

    BFRI 12,274 1%

    CSSRI 25,450 2%

    CIBA 12,139 1%

    Other BD 5,810 0%

    Total for Output 2 324,206 25%

    IRRI 119,023 9%

    WFC 44,816 4%

    BRRI 22,924 2%

    BRAC - 0%BFRI 17,384 1%

    CSSRI 13,111 1%

    CIBA 16,682 1%

    Other BD 26,557 2%

    Total for Output 3 260,496 20%

    IRRI 51,749 4%

    WFC 117,447 9%

    BRRI - 0%

    BRAC - 0%

    BFRI 49,960 4%

    CSSRI - 0%CIBA 41,826 3%

    Other BD - 0%

    Total for Output 4 260,982 20%

    IRRI 81,720 6%

    WFC 27,818 2%

    BRRI 14,622 1%

    BRAC - 0%

    BFRI 7,165 1%

    2011-02-26; revised 2011-04-04

    Productive, profitable, and resilient agriculture and aquaculture systems

    Output No. 5: Technology and policy

    recommendations

    Output No. 1: new germplasm

    validated and seed distribution

    network established)

    Output No. 2: 2. More productive,profitable, resilient & diversified rice-

    based cropping systems

    Output No. 3: 3. Improved homestead

    production systems

    Output No. 4: Brackish water aquatic

    production systems

    CPWF Project Workbook Indicative Breakdown of Budget by Output Page 47 of 60

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    48/60

    Project Name

    Date

    Output Institution $ value of the budget % share of the budget

    2011-02-26; revised 2011-04-04

    Productive, profitable, and resilient agriculture and aquaculture systems

    CSSRI 8,522 1%CIBA 7,596 1%

    Other BD - 0%

    Total for Output 5 147,444 12%

    TOTAL 1,275,000

    CPWF Project Workbook Indicative Breakdown of Budget by Output Page 48 of 60

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    49/60

    Indicative Breakdown of Budget by Institution

    Project Name

    Date

    Institution Total $ value Total % share Comments

    IRRI 596,000 47% Includes institutional cost and

    management fee

    WFC 211,540 17% This include $20,000 funds for BFRIand CIBA to attend reflection

    workshop and Water Forum

    BRRI 136,446 11% This include $3,500 to be kept at IRRI

    but used by NARES to attend the

    Reflection workshops and Water

    Forum

    BRAC 43,622 3%

    BFRI (sub contract

    with WFC)

    86,784 7%

    CSSRI (india) 78,743 6% This includes $3,500 to be kept at IRRI

    for the use of NARES to attend the

    Reflection workshops and WaterForum

    CIBA (India - sub

    contract with

    WFC)

    78,243 6%

    Others in BGD

    (including

    students)

    43,622 3%

    TOTAL 1,275,000 1

    Productive, profitable, and resilient agriculture and aquaculture systems

    2011-02-26; revised 2011-04-04

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    50/60

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    51/60

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    52/60

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    53/60

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    54/60

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    55/60

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    56/60

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    57/60

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    58/60

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    59/60

    by institute by output Adjustments to be made

    IRRI 596,000 596,000 (0)

    WFC 211,540 211,540 (0)

    BRRI 136,446 136,446 (0)

    BRAC 43,622 43,622 (0)

    BFRI 86,784 86,784 (0)CSSRI (india) 78,743 78,743 0

    CIBA (India) 78,243 78,243 (0)

    Others in BGD (including students) 43,622 43,622 0

    TOTAL 1,275,000 1,275,000 (0)

  • 7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update

    60/60

    (0)

    (0)

    (0)

    (0)

    (0)0

    (0)

    0