G2 Annex 2 Project Workbook 2012-04-2 Update
Transcript of G2 Annex 2 Project Workbook 2012-04-2 Update
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
1/60
Outcome Targets Indicator Plan
Project Name Resilient Intensified and Diversified A Resilient Intensified and Diversified A Resil
Date updated 30 Mar 2012
No. ACTOR and how they will CHANGE Outcome target(s) 2014 Outcome target(s) 2018 Outc
ASSU
CON
Taken from the OLM: Actor group and
the practice, knowledge, attitude or skills
change
Specific description(s) of who/ how many
exactly the project expects to change
(Practice and/or KAS) and by how much,
by the end of the Project. There can be
more than one Outcome Target per each
Outcome line (first column- actor +
expected final change)
Specific description(s) of who/ how many
exactly the project expects to change
(Practice and/or KAS) and by how much,
by the end of the Project. There can be
more than one Outcome Target per each
Outcome line (first column- actor +
expected final change)
Specif
exact
(Prac
by the
more
Outco
expec
1 Farmers relying on rice-based and
aquaculture-based production
systems use improved varieties (rice,
fish etc.) and technologies in
productive and diversified agriculture
and aquaculture systems
A total of 300 farmers have adopted
improved rice varieties; 50 farmers
have adopted improved technology
for rice-rabi cropping systems; 50farmers have adopted improved
brackish water aquaculture systems -
in project villages and nearby villages
A total of 100,000 farmers have
adopted improved rice varieties;
10,000 farmers have adopted
improved technology for rice-rabicropping systems; 5,000 farmers
have adopted improved brackish
water aquaculture systems - in
project villages and nearby villages
A tot
adop
30,00
improcropp
have
wate
proje
2 Households, with focus on women
adopt integrated farming systems
and new technologies in homestead
A total of 100 households adopt
integrated farming systems and new
technologies in homesteads - in
project villages and nearby villages
A total of5,000 households adopt
integrated farming systems and new
technologies in homesteads - in
project villages and nearby villages
A tot
integ
tech
proje
3 Projects and organisations involved
in seed production/dissemination
4 projects/schemes and
organisations & private sector
involved in seedproduction/dissemination (e.g.
CSISA, FTF, GOs & NGOs) adopt
recommendations based on results
of our rice variety and fish
species/quality evaluation
8 projects/schemes and
organisations & private sector
involved in seedproduction/dissemination (e.g.
CSISA, FTF, GOs & NGOs, private
companies) adopt recommendations
based on results of our rice variety
and fish species/quality evaluation
10 pr
orga
involprod
CSISA
comp
base
and f
4 Extension workers and development
agencies (e.g. GOs, NGOs, private
sector, CSISA, STRASA, FTF) are
promoting new technologies, training
farmers, and taking ownership of the
technologies disseminated
New technologies promoted in
Bangladesh by BRRI, DAE, DOF, BFRI,
BRAC and other projects, and in India
by CIBA, CSSRI, DOF, DA, Tiger
Reserve Project, Sundarban Devt
Board, and other NGOs in both
countries
New technologies promoted in
Bangladesh by BRRI, DAE, DOF, BFRI,
BRAC and other projects, and in India
by CIBA, CSSRI, DOF, DA, Tiger
Reserve Project, Sundarban Devt
Board, and other NGOs in both
countries
New
more
BRRI
and i
Tiger
Devt
COM
coun
The Outcome Target Indicators Plan (OTIP) contains specific description(s), for each Outcome Pathway (from OLM), of who/ how many exactly
measure. THe expected output in this OTIP is a list of indicators ONLY for the Outcome Targets that the Indicators and tools to measure them a
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
2/60
Project Workbook
Table of Contents
1 Title Page with Reviewers' Comments
Tab Name: PNX Title Page
2 Project Partners and Contact Information
Tab Name: PNX Contacts
3 Outcomes Logic Model
Tab Name: PNX OLM
For more information, visit:
4 Outcome Target Indicators PlanTab Name: PNX OTIP
For more information, visit:
5 Milestone Plan
Tab Name: PNX Milestone Plan
For more information, visit:
CPWF M&E Guide- Milestone Plan
The milestone plan focuses on the end-dates by which your activities need to be completed and outputs need to
be delivered. It contains the project start and end date, and other important milestones. Progress reporting is
directly made on the original milestones as defined in the milestone plan.
This file contains spreadsheets of information submitted to the CPWF by the project team, and spreadsheets that we have
developed to aid our review process. Please change the 'PNX' to identify your project, e.g. Ganges Project 3 would be G3
This page contains main project information and the contracting and inception reviewers' comments.
Please list all your project participants with their contact details. This information will be fed into the CPWFcontact database. Please ensure that you inform the CPWF about any changes in your team.
The OLM is a table that describes the project's theory of change (ToC), or how the project is expected to work. It
is a description of the projects activities, outputs, outcomes and impact and their inter-relationships. Each line
describes an Outcome Pathway, with a short narrative description. The last row in the model is a narrative
description of how the project predicts that the outcomes it achieves are likely to reinforce each other and
eventually contribute to longer-term impact.
CPWF M&E Guide- Outcome Indicators Plan
CPWF M&E Guide- OLMs
The Outcome Target Indicators Plan (OTIP) contains specific description(s), for each Outcome Pathway (from
OLM), of who/ how many exactly the project expects to change (Practice and/or KAS) and by how much, by the
end of the Project. Indicators and tools to measure them are included for each outcome target.
CPWF Project Workbook Table of Contents Page 2
https://sites.google.com/a/cpwf.info/m-e-guide/indicator-and-milestone-planhttps://sites.google.com/a/cpwf.info/m-e-guide/indicator-and-milestone-planhttps://sites.google.com/a/cpwf.info/m-e-guide/outcome-pathways-and-outcome-logic-modelhttps://sites.google.com/a/cpwf.info/m-e-guide/outcome-pathways-and-outcome-logic-modelhttps://sites.google.com/a/cpwf.info/m-e-guide/indicator-and-milestone-planhttps://sites.google.com/a/cpwf.info/m-e-guide/indicator-and-milestone-plan -
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
3/60
6 Gantt Chart
Tab Name: PNX Gantt Chart
For more information, visit:
7 Schedule of Reports and Payments = filled by CPWF Finance Officer for contracting
Tab Name: PNX $ Schedule
8 Budget Summary
Tab Name: PNX $ Summary
9 Budget Comments
Tab Name: PNX $ Comments
10 Staff Time Allocation and Breakdown of Personnel Costs
Tab Name: PNX $ Time Allocation
11 Indicative Breakdown of Budget by Outputs
Tab Name: PNX $ By Outputs
12 Indicative Breakdown of Budget by Institution
Tab Name: PNX $ By Institution
This table shows the distribution of budget by output then by institution. The overhead costs are not included in
the distribution.
This table shows a summary of the budget allocated to the project partner institutions (left part). The right part
of the table could be of support to work out each project partners budget share by line item.
This spreadsheet shows the breakdown of the project budget per line item and per year.
The comments worksheet is where budget explanations and details are explained.
In this worksheet the project team compositon is listed with their names, institution, expertise and contribution
to the project (e.g., Output 1, Communication, Policy, etc.), the number of days per year, and the daily rate per
staff.
The Gantt Chart focuses on the activities to be carried out to complete the project. This chart contains the
project schedule, work breakdown structure, i.e. activities with their milestones as the terminal elements, their
start and finish dates, responsible project team member and their affiliations.
CPWF M&E Guide- Gantt Chart
This spreadsheet will be filled out by CPWF finance officer for contracting according to the budget details the
project has submitted. It shows the schedule of budget release, which depends on the satisfactory submission
and approval of the required progress reports.
CPWF Project Workbook Table of Contents Page 3
https://sites.google.com/a/cpwf.info/m-e-guide/gantt-charthttps://sites.google.com/a/cpwf.info/m-e-guide/gantt-chart -
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
4/60
Title Page with Reviewers' Comments
Project Leader
Project Number
Project Short Title
Reporting Period
Starting Date
Completion Date
Review Questions (RQ) Reviewer Remarks on status (inlcude
date)
Changes required to proceed
to contracting
Response from the Project
Leader (include date)
Status of chan
after resubmis
filled in by the
RQ1: Are documents in order,
provide information required,
and is there consistency
between them?
Cells highlighted in yellow must be
dealt with for contracting
Documents according to Standard
Clauses and Procedures 3.02 and
3.03 (see list below)
Cells highlighted in orange must be
dealt with by time of inception
report
Revised proposal First submission 2011.03.03
Contact sheet First submission 2011.03.03 please submit CVs of the other
partners (WFC)
please add the names of the
partners who are still to be
hired as well as the consultants
04 April 2011
Additional CVs are now
submitted with the revised
Proposal. Position of PDF,
consultant, Graduate students
are to be determined and are
added
Gantt chart First submission 2011.03.03
Milestone plan First submission 2011.03.03
OLM First submission 2011.03.03
OTIP not submitted
KM Point
Person
To Phuc Tuong
Productive, profitable, and resilient agriculture and aquaculture systems
G2
April 30, 2011
April 30, 2014
CPWF Project Workbook Title Page with Reviewers' Comments
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
5/60
Review Questions (RQ) Reviewer Remarks on status (inlcude
date)
Changes required to proceed
to contracting
Response from the Project
Leader (include date)
Status of chang
after resubmiss
filled in by the r
Budget First submission 2011.03.03 Proposed budget exceeds the
amount in the EOI by $45,947
Suggested changes were made
to the spreadsheets (in red ink)
to show consistency of
information across the
spreadsheets in the workbook
Please indicate the baseline for
the Daily Charge Out $ (it is
understood that the
succeeding year's personnel
budget includes the 3% and 5%
annual increment)
04 April 2011
The proposed budget is now
adjusted. The
changes are in red and blue
Daily charge Out $ is now
added, with note of increasing
3% for IRS and 5% for NRS
Plan for baselining of outcome
targets
Signed MOUs corresponding to
milestone plan
Third party intellectual audit
CPWF Project Workbook Title Page with Reviewers' Comments
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
6/60
Review Questions (RQ) Reviewer Remarks on status (inlcude
date)
Changes required to proceed
to contracting
Response from the Project
Leader (include date)
Status of chang
after resubmiss
filled in by the
RQ2: Have there been changes
in budget share going to
partners, and if so, are they
consistent with the changes in
responsibilities?
Program
Manager
RQ3: Does the budget appear
consistent with the promised
outputs?
Program
Manager
RQ4: Looking at the people
responsible for producing the
outputs, do these teams
contain people with the
requisite skill and is team size
appropriate?
MT Point
Person
RQ5: Is there a clear
assignment of responsibility
for producing outputs and
milestones to both individuals
and organizations?
MT Point
Person
RQ6: Have reviewers'
comments been addressed?
MT Point
Person
CPWF Project Workbook Title Page with Reviewers' Comments
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
7/60
Review Questions (RQ) Reviewer Remarks on status (inlcude
date)
Changes required to proceed
to contracting
Response from the Projec
Leader (include date)
From Standard Clauses and Procedures
3.02 The documents required for contract signature are:
Revised project proposal that has addressed reviewers comments in particular negotiation points and incorpora
from workshops and other consultation processes.
Revised budget reflecting changes in project proposal
Gantt Chart
Milestone plan developed for at least the first year of operations
Draft Outcome Logic Model
Any other documentation agreed to between the Project Leader and the CPWF
3.03 The following documents are to be provided in electronic form to CPWF Basin Leader with the Inception Repo
Outcome Logic Model agreed with partners
Milestone plan developed for the duration of the project
Outcome target indicators plan
Plan for base lining of outcome targets
Signed MOUs corresponding to milestone plan
Third Party Intellectual Asset Audit
Any other documentation agreed to between the Project Leader and the CPWF.
CPWF Project Workbook Title Page with Reviewers' Comments
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
8/60
Project Partners and Contact Details
Please remember to provide a CV for each person listed below as Annex B to your proposal. Indicate in particular who has responsibility for communications, M&E, know
Given Name Family Name Institution Role in the
project
Professional
discipline
Email Alternate Email Work Phone
To Phuc Tuong International Rice
Research Institute
Consultant Water science [email protected] [email protected]
om
n/a
Elizabeth Humphreys International Rice
Research Institute
Project Leader (after
Aug 2011); Principal
Investigator (Int'l)
Senior Scientist e.humphreys@cgiar.
org
63 2 5805600
Adelbagi Ismail International Rice
Research Institute
Principal Investigator
(Int'l)
Senior Scientist abdelbagi.ismail@cgi
ar.org
63 2 5805600
Glenn Gregorio International Rice
Research Institute
Other Project
Participant
Senior Scientist [email protected]
g
63 2 5805600
Manoranjan Mondal IRRI Co-ordinator for IRRI
in BGD
Collaborative
Research Scientist
manoranjan_km@ya
hoo.com
manoranjan.km@br
ac.net
880 2 9886608
Mohammed Rafiqul Islam International Rice
Research Institute
Other Project
Participant
Post doc [email protected]
g
63 2 5805600
Tao Li International Rice
Research Institute
Other Project
Participant
Scientist-Crop
modeller
[email protected] 63 2 5805600
Michael John Phillips The WorldFish
Center
Project Lead
Scientist for WFC
Senior Scientist [email protected] 60 46202160
Benoy Kumar Barman The WorldFish
Center
Principal Investigator
(Reg'l)
Field Coordinator/
Researcher
b.barman@cgxchan
ge.org
880 2 8813250
William J Collis The WorldFish
Center
Principal Investigator
(Int'l)
Director-Bangladesh
and South
Asia/Aquaculture
Specialist
[email protected] 880 2 8813251
Manjurul Karim The WorldFish
Center
Principal Investigator
(Int'l)
Scientist/Project
Coordinator
m.karim@cgxchange
.org
880-2 8813250
Kazi Ahmed Kabir The WorldFish
Center
Technical
Specialist
Research Assistant [email protected]
om
n/a
TBA Consultant to the
WorldFish Center
Consultant Data Management
Assistant
CPWF Project Workbook Project Partners and Contact Details
mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected] -
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
9/60
Given Name Family Name Institution Role in the
project
Professional
discipline
Email Alternate Email Work Phone
Jitendra Kumar Sundaray Central Institute of
Brackishwater
Aquaculture
Principal Investigator
(Nat'l)
Principal Scientist-
Aquaculture
m
91-3210-255072
Shyamalendu Bikash Saha Bangladesh Fisheries
Research Institute
Principal
Investigator
(National)
ChiefScientific
Officer (cc)
m
M. Akhlasur Rahman Bangladesh Rice
Research Institute
Principal Investigator
(Nat'l)
Senior Scientific
Officer-Plant
Breeding
m
880-2-9257401-5
Sanjida Ritu Bangladesh Rice
Research Institute
Principal Investigator
(Nat'l)
Senior Scientific
Officer, Irrigation
Water Management
m
880 2 9252429
Khairul Bashar BRRI Coordinator Director Research mkbashar.brri@gma
il.com
mkbashar.brri@yah
oo.com
880 2 9252429
Abdur Rashid BRRI Principal Investigator
(Nat'l)
Head, Irrigation and
water management
arashidiwm@yahoo.
com
880 2 9263669
Sirajul Islam BRAC Principal Investigator
(Nat'l)
Program Head,
Agriculture and Food
Security
[email protected] [email protected] 880 2 9881265
91-3210-25507ashutoshddeo@g
mail.com
Ashutosh D. Deo Central Institute
of Brackishwater
Aquaculture
Associate
Investigator (Nat'l)
Senior Scientist-
Aquaculture
CPWF Project Workbook Project Partners and Contact Details
mailto:[email protected]:[email protected]:[email protected]:[email protected] -
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
10/60
Expertise Responsible for
Soil and water
management
consultant - water
mgt, cropping
systems,
governance, linking
with G1Soil and water
management
overall in-charge;
responsible for
communication,
M&ECrop physiology in-charge of
germplasm
validation and seed
distribution network
Crop physiology germplasm
validation and seed
distribution network
Water Management resource
management for rice
based cropping
systems
Ban ladeshCrop physiology germplasm
validation and seed
distribution network
Crop and production
system modeling
in-charge of
modeling
Aquaculture in charge of WFC-led
and -partnered
activitiesAquaculture coordinator of
aquaculture
activities; M&EAquaculture Aquaculture
specialist/Overall
management of
activities/GOB
liaison/Donor
communication etc
Integrated
Agriculture-
Aquaculture
oversight
aquaculture
activities;
communication
Aquaculture co-ordinator of fieldactivities in all 3
polders; monitoring;
writing drafts
CPWF Project Workbook Project Partners and Contact Details
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
11/60
Expertise Responsible for
Aquaculture aquaculture systems
(India)
Brackish water aquac Saline aquaculture
(polder 3); HH
survey (polder 30)
Plant Breeding germplasm
validation and seed
distribution network
(Bangladesh)
Water Management Water management
and intensification of
rice-based cropping
systems
Plant Breeder Genetic resources
conservation and
seed technologyWater management Water management
in rice based
cropping systems
Agronomist Adaptive research
on rice based
cropping systems
Ban ladesh
Aquaculture aquaculture
systems (India)
CPWF Project Workbook Project Partners and Contact Details
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
12/60
Outcomes Logic Model
Project Name Productive, profitable, and resilient agriculture and aquaculture systems
Date
Actor(s) Desired change in actor(s)
practice
Required change in actor KAS
for change to happen
Project strategies and
prototypes for bringing about
changes
Outcome
Pathway 1
Farmers relying on rice-based
and aquaculture-based
production systems
Use improved varieties (rice,
fish etc.) and technologies in
productive and diversified
agriculture and aquaculture
systems
Awareness of benefits of new
varieties, cultural practices,
and cropping systems suitable
to the resource profile of their
land. Willing to invest more in
relevant inputs and changes in
practices
Develop, demonstrate, and
participatory evaluate new
cropping systems with
improved varieties in different
target zones (with different
land and water characteristics)
Narrative
2011-02-26; revised 2011-04-04; revised 2011-10-30
Land and water productivity in the fresh-/brackish-water environments in the coastal zones in India and Bangladesh is low. The m
fishermen cultivate only one crop per year (e.g., rice in wet season or shrimp in dry season). One reason is the lack of suitable vari
yield, stress-tolerant) and technologies to diversify and increase their cropping intensities. Through participatory evaluation and s
experiments (on-station and on-farm), the project will develop crop intensification/diversification technologies appropriate to diff
from low to high salinity) available to farmers.
CPWF Project Workbook Outcomes Logic Model Page 12 of 60
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
13/60
Project Name Productive, profitable, and resilient agriculture and aquaculture systems
Date
Actor(s) Desired change in actor(s)
practice
Required change in actor KAS
for change to happen
Project strategies and
prototypes for bringing about
changes
2011-02-26; revised 2011-04-04; revised 2011-10-30
Outcome
Pathway 2
Households, withfocus on
women
Adapt integrated farming
systems and new technologies
in homestead
Awareness of the value of
improved homestead
technologies and production
systems in enhancing
livelihood and nutrition;
improve their skill in applying
suitable technologies
Production systems research,
participatory demonstration
and evaluation of homestead
technologies, production
systems with suitable
aquaculture species and
varieties; model systems
designed based on available
resources
Narrative
Outcome
Pathway 3
Crop and aquaculture seed
producers (GOs, NGOs, private)and seed suppliers
Provision of high-quality seeds
of improved rice varieties andaqaculture species
Knowledge of value and
benefits of high-quality seedsof improved varieties and
aquaculture species.
Participate in seed production
systems
Provide quality seeds of
improved rice varieties.Communication to improve
awareness and knowledge on
seeds of new rice varieties and
suitable aquaculture species
appropriate to target groups
Narrative
Narrative: The homestead often occupies a small proportion of farmers' land, yet it can contribute a great deal to improving liveli
households, especially for children and women. Homestead activities also offer job opportunities (often unreported and unaccou
will develop/test available integrative farming systems of crop productionanimal husbandryaquaculture that households, espe
improve homestead productivity and enhance the nutritional value of homestead products. Households will participate in testing
training will be carried out to improve farmers' awareness of the benefits of the available technologies.
Narrative: One of the main constraints for farmers' adaptation of new technologies is the lack of seeds of suitable varieties. The p
breeder seeds of improved varieties to selected public and private seed producers and encourage them to participate in the seed
network to ensure an adequate supply of seeds of suitable varieties to farmers.
CPWF Project Workbook Outcomes Logic Model Page 13 of 6
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
14/60
Project Name Productive, profitable, and resilient agriculture and aquaculture systems
Date
Actor(s) Desired change in actor(s)
practice
Required change in actor KAS
for change to happen
Project strategies and
prototypes for bringing about
changes
2011-02-26; revised 2011-04-04; revised 2011-10-30
Outcome
Pathway 4
Extension workers and
development agencies (GOs,
NGOs, private sector, CSISA)
Promoting new technologies,
training farmers, and taking
ownership of the technologies
disseminated
Awareness of the benefits and
profitability of new varieties,
suitable aquatic species, and
production systems. Train and
disseminate new technologies
to farmers and aquaculturists
Collaboration in the conduct of
field trials and development
and dissemination of extension
materials and knowledge;
Invite potential partners to
participatory evaluation of
technologies and to visit
demonstration trials.
Narrative
Outcome
Pathway 5
Microfinance agencies
(includes NGOs, banks who
provide agricultural finance -
RCD, Rural Credit Department)
Provide microfinance for inputs
of new technologies; Increase
loans to farmers who apply
new technologies
Awareness that new
technologies may need higher
input but will increase farmers'
profits and may shorten the
return period.
Communicate the financial
benefits of new varieties (crops
and fisheries) and
technologies. Invite potential
partners to participatory
evaluation of technologies and
to visit demonstration trials.
Narrative
The uptake of technologies often occurs after the end of the project. This can be ensured only if the extension workers at differen
zones are aware of and take ownership of the technologies and build their own program to disseminate the technologies. The pro
workers to join the participatory testing and evaluation of new germplasm and technologies. They will take part in producing exte
farmers.
Farmers and households in coastal areas normally do not have adequate financial resources to buy new seeds (or aquaculture sto
new and intensive cropping systems. Finance agencies (GOs, NGOs) will be invited to participate in the evaluation of new technol
financial analyses of new technologies will be carried out to convincingly show that farmers who use new, improved varieties, tec
systems will have higher profit and be likely to pay back loans in a shorter time. Financers will therefore increase loans to farmers
in fields and in homestead activities.
CPWF Project Workbook Outcomes Logic Model Page 14 of 6
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
15/60
Project Name Productive, profitable, and resilient agriculture and aquaculture systems
Date
Actor(s) Desired change in actor(s)
practice
Required change in actor KAS
for change to happen
Project strategies and
prototypes for bringing about
changes
2011-02-26; revised 2011-04-04; revised 2011-10-30
Outcome
Pathway 6
Local and state governments
and ministries of agriculture
and fisheries in Bangladesh and
India
Provide enabling directives and
policies for seed production
and adoption of new
technologies
Knowledge of value and
benefits of high-quality seeds
of improved varieties and
suitable aquaculture species,
technologies, and cropping
systems. Understand the
importance of enabling policies
Timely inform governments of
different research findings.
Organize policy dialogues with
state governments and
relevant ministries, and
conferences. Invite
government officials to
experimental sites,
demonstrations, and site visits.
Produce policy briefs
Narrative
Outcome
Pathway 7
Researchers, research for
development Programs (e.g.
CSISA, IFAD), especially those
dealing with cropping and
brackish water aquaculture
systems
Develop, evaluate, and adapt
new cropping and improved
aquaculture systems with
appropriate varieties and
aquatic species
New knowledge and skills Collaborative research;
communication of research
strategies and findings via
publications and in national
and international
fora/conferences
Narrative Study sites of the project cover only a small portion of the coastal zones in the Ganges, and an even smaller portion of the world f
lands. Efforts similar to those in the project have to be performed over other coastal areas. Through publications and communica
the project will inform the scientific community of the research strategies, methodologies, and findings. Other researchers will be
in designing new cropping systems using appropriate varieties to increase the productivity of land and water, especially in the coa
Narrative: Large-scale adaptation of new technologies can occur only with appropriate policies on infrastructure investment, land
financing, investment in extension, and enforcement of recommendations, besides others. Together with Project G5, this project
with decision-makers at the local level and policymakers at the ministerial level to timely inform them of the research findings, an
enabling policies. We will produce policy briefs for a wider audience. We hope the outcome will be the recognition of the import
strengthen the adaptation of new varieties, new technologies, and cropping systems in fields and in homesteads.
CPWF Project Workbook Outcomes Logic Model Page 15 of 6
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
16/60
Project outputs
G2.1: New rice varieties and
suitable aquaculture speciesvalidated, and seed production
of new rice varieties initiated
locally
G2.2: More productive,
profitable, resilient, and
diversified rice-based cropping
systems;
G2.4: Brackish-water aquatic
production systems
ajority of farmers and
eties (short-duration, high-
lection of varieties, and
erent target zones (ranging
CPWF Project Workbook Outcomes Logic Model Page 16 of 6
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
17/60
Project outputs
G2.3: Improved homestead
production systems
G2.1: New rice varieties and
suitable aquaculture speciesvalidated, and seed production
of new rice varieties initiated
locally
G2.2: More productive,
profitable, resilient, and
ood, income, and nutrition of
ted for) to women. The project
ially women, can use to
the new technologies and
roject partners will provide
multiplication and distribution
CPWF Project Workbook Outcomes Logic Model Page 17 of 6
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
18/60
Project outputs
G2.5: Technology and policy
recommendations
G2.5: Technology and policy
recommendations
t levels and especially in coastal
ject will invite extension
nsion materials and training
cking) and other inputs for the
gies. Careful economic and
nologies, and cropping
who practice new technologies
CPWF Project Workbook Outcomes Logic Model Page 18 of 6
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
19/60
Project outputs
G2.5: Technology and policy
recommendations (together
with Project G5)
Publications on scientific
knowledge and process
understanding of all outputs
resh-/brackish-water coastal
tion at international forums,
able to use the new knowledge
stal zones.
use, input linearization and
ill organize frequent meetings
d to discuss with them possible
ance of suitable policies to
CPWF Project Workbook Outcomes Logic Model Page 19 of 6
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
20/60
Outcome Targets Indicator Plan
Project Name Resilient Intensified and Diversified Agriculture and
Date updated 30 Mar 2012
No. ACTOR and how they will CHANGE Outcome target(s) 2014 Indicator(s)
Outcome Ta
Taken from the OLM: Actor group and
the practice, knowledge, attitude or
skills change
Specific description(s) of who/ how
many exactly the project expects to
change (Practice and/or KAS) and by
how much, by the end of the Project.
There can be more than one Outcome
Target per each Outcome line (first
column- actor + expected final change)
What you will
know you are
Outcome Targ
milestones)?
1 Farmers relying on rice-based and
aquaculture-based production
systems use improved varieties (rice,
fish etc.) and technologies in
productive and diversified agricultureand aquaculture systems
A total of 300 farmers have adopted
improved rice varieties; 50 farmers
have adopted improved technology
for rice-rabi cropping systems; 50
farmers have adopted improved
brackish water aquaculture systems -in project villages and nearby villages
Number of a
2 Households, with focus on women
adopt integrated farming systems and
new technologies in homestead
A total of 100 households adopt
integrated farming systems and new
technologies in homesteads - in
project villages and nearby villages
Number of a
3 Projects and organisations involved in
seed production/dissemination
4 projects and organisations involved
in seed production/dissemination
(e.g. CSISA, FTF, GOs & NGOs) adopt
recommendations based on results of
our rice variety and fish
species/quality evaluation
Recommend
incorporated
multiplicatio
and/or disse
projects/orga
4 Extension workers and development
agencies (e.g. GOs, NGOs, private
sector, CSISA) are promoting new
technologies, training farmers, and
taking ownership of the technologies
disseminated
New technologies promoted in
Bangladesh by BRRI, DAE, BFRI, BRAC,
CSISA, and in India by CIBA, CSSRI,
DOF, DA, Sundarban Devt Board
Number of d
promoting n
The Outcome Target Indicators Plan (OTIP) contains specific description(s), for each Outcome Pathway (fro
(Practice and/or KAS) and by how much, by the end of the Project. roject is committing to measure. THe ex
Outcome Targets that the Indicators and tools to measure them are included for each outcome target.
CPWF Project Workbook Outcome Targets Indicator Plan
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
21/60
Milestone Plan
Project Name
Date
No. Milestones = your progress markers Deadline ResponsiblePartner Institution
Responsible StaffProject Member
Outputs requiredby other projects
Means of veri
0
0.a Sites selected, research team at each site identified and
engaged
2011/04/15 IRRI and all
partners
TPT and PIs G1 LOA with Partn
reported in inc
0.b Workplan reported and approved in inception workshop 2011/05/15 IRRI and allpartners
TPT and PIs No Project workpdetailed workp
0.c Project progress reported and annual workplan approved in the
annual BDC reflection workshops
2011-12-15
2012-12-15
2013-12-15
IRRI and all
partners
EH and PIS G5 Progress repor
0.d Project completion report and publications 2014/04/30 IRRI and allpartners
EH and PIs G5 Completion re
0.e Baseline information - review of secondary data, situation
appraisals, village and key informant interviews (DAE, BRRI
"extensionists", BRAC, DOF, BFRI "extensionists"); survey on
southern part of polder 3 - NB household survey is a separate
activity below
6/30/2012 IRRI and all
partners
EH and PIS G1 , G3 Report
0.f Adoption surveys in project villages and nearby villages, key
informant interviews
4/30/2014 IRRI and all
partners
EH and PIS No Report
1
1.a Seeds of new varieties and breeding lines exchanged through
IRRI (IRRI)
2011-06-30
2012-06-30
2013-06-30
IRRI, BRRI, CSSRI GG (MRI, AR, BKB) No Seed received
reports
1.b Seeds for wet and dry seasons (BGD, IND) and early monsoon
season (BGD) multiplied and distributed to network partners
2012-03-31
2013-03-31
BRRI, CSSRI AR, BKB No Seeds distribut
evaluation
New germplasm validated and seed distribution network established
Productive, profitable, and resilient agriculture and aquaculture systems
February 26, 2011
To be filled by PLs and Project Teams
Project well monitored and Implemented
CPWF Project Workbook Milestone Plan
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
22/60
Project Name
Date
No. Milestones = your progress markers Deadline Responsible
Partner Institution
Responsible Staff
Project Member
Outputs required
by other projects
Means of ver
Productive, profitable, and resilient agriculture and aquaculture systems
February 26, 2011
To be filled by PLs and Project Teams
1.c Salt and submergence tolerant wet season varieties evaluated
on-station and on-farm (BGD, IND)
2011-12-31
2012-12-31
2013-12-31
BRRI, CSSRI, BRAC BKB, AR No Field visits and
1.d Salt tolerant dry season varieties evaluated on station and on-
farm (BGD, IND)
2012-06-30
2013-06-30
BRRI BKB, AR No Field visits and
1.e Early monsoon season varieties evaluated on station and on-
farm (BGD)
2012-09-30
2013-09-30
BRRI, CSSRI, BRAC AR No Field visits and
1.f Farmers field days for PVS evaluation accomplished (BGD,IND)
2011-12-312012-04-30
2012-07-31
2012-12-31
2013-04-30
2013-07-31
2013-12-31
BRRI, CSSRI, BRAC BKB, AR G3, G5 Reports, farmfeedback repo
1.g Results of evaluation documented in project progress report
(BGD, IND)
2011-12-15
2012-06-30
2012-12-15
2013-06-30
2013-12-15
BRRI, CSSRI GG (MRI, AR, BKB) No Progress repo
1.h Synthesizing reports and publications 2014/04/30 IRRI, BRRI, BRAC,
CSSRI
AI (GG, MRI, AR,
BKB)
No Reports and p
2
2.a Experiment protocols (annually) 2011-04-15
2012-03-31
2013-03-31
IRRI, BRRI, BRAC,
CSSRI, WFC, CIBA,
BFRI
EH, TPT, MM, SR,
AR, BKB
No Protocols of e
target zones
2.b Experiment results and participatory evaluation documented in
6 month and annual project progress report (BGD, IND)
2011-12-15
2012-06-30
2012-12-15
2013-16-30
2013-12-15
IRRI, BRRI, BRAC,
CSSRI, WFC, CIBA,
BFRI
EH, TPT, MM, SR,
BKB
No Progress Repo
perception fee
2.c Draft and final versions of cropping system technical package -
systems, germplasm, management tailored to different sitesituations
2014/04/30 IRRI, BRRI, BRAC,
CSSRI, WFC, CIBA,BFRI
EH, TPT, MM, SR,
AR, BKB, AI, GG,MRI
No Reports and p
3
3.a Literature review and knowledge gaps identified 2012/03/31 WFC, BFRI,CSSRI,
CIBA
MK, MP, JA, BB,
JKS, BKB, SBS
No Literature rev
Improved homestead production systems
More productive, profitable, resilient & diversified rice-based cropping systems
CPWF Project Workbook Milestone Plan
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
23/60
Project Name
Date
No. Milestones = your progress markers Deadline Responsible
Partner Institution
Responsible Staff
Project Member
Outputs required
by other projects
Means of ver
Productive, profitable, and resilient agriculture and aquaculture systems
February 26, 2011
To be filled by PLs and Project Teams
3.b Report of survey findings, strategies for improving homestead
identified
2012/03/31 IRRI, WFC,
BFRI,CSSRI, CIBA
MK, MP, JA, BB,
JKS, BKB, SBS
No Survey report
3.c Experiment/study protocol (revised annually) 2012-03-31
2013-03-31
IRRI, WFC,
BFRI,CSSRI, CIBA
MK, MP, JA, BB,
JKS, BKB, SBS, EH
No Protocols of e
target zones
3.d Experiment results and participatory evaluation documented in
6 month and annual project progress report (BGD, IND)
2011-12-15
2012-06-30
2012-12-15
2013-06-302013-12-15
IRRI, WFC,
BFRI,CSSRI, CIBA
MK, MP, JA, BB,
JKS, BKB, SBS
No Progress Repo
perception fee
3.e Draft and final versions of homestead farming systems
technical package
2014/04/30 IRRI, WFC,
BFRI,CSSRI, CIBA
MK, MP, JA, BB,
JKS, BKB, SBS, EH
No Reports and p
4
4.a Literature review and Experiment protocols (annually) 2011-11-30
(protocols)
2012-02-15
(review)
WFC, BFRI, CIBA MK, MP, JA, JKS,
SBS
No Protocols of e
water zone in
4.b Experiment results and participatory evaluation documented in
6 month and annual project progress report (BGD, IND)
2012-06-30
2012-12-15
2013-06-30
2013-12-15
WFC, BFRI, CIBA MK, MP, JA, JKS,
SBS
No Progress Repo
perception fee
4.c Draft and final versions of brackish aquaculture system
technical package - systems, species/varieties, management
2014/04/30 WFC, BFRI, CIBA MK,MP, JA, JKS,
SBS
No Reports and p
5
5.a Training materials and reports produced 2012-06-30
2012-12-31
2013-06-30
IRRI, WFC, BRRI,
BFRI, CSSRI, CIBA
AI, EH, MP G3 Training mate
courses
5.b Extension materials produced 2012-12-31
2013-12-31
IRRI, WFC, BRRI,
BFRI, CSSRI, CIBA
AI, EH, MP G3 Leaflets, proc
5.c Policy dialogues organized 2012-12-31
2013-12-31
IRRI, WFC, BRRI,
BFRI, CSSRI, CIBA
AI, EH, MP G5 Policy briefs,
Brackish water aquatic production systems
Technology and policy recommendations for up- and out-scaling
CPWF Project Workbook Milestone Plan
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
24/60
Gantt Chart
Project Name
Date
No.
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
0 Project well monitored and Implemented
Activities 0.1 Formation of research team, selection sites
0.2 (i) Launch and (ii) Inception workshops i ii
0.3 project implementation, monitoring and reporting
0.4 Annual BDC meeting & annual G2 review & planning meeting
0.5 Project conclusion
Milestones 0.a Sites selected, research team at each site identified and engaged 0.a
0.b Workplan reported and approved in inception workshop 0.b 0.b
0.c Project progress reported and annual workplan approved in the annual BDC
reflection workshops
0.c 0.c
0.d Project completion report and publications
Productive, profitable, and resilient agriculture and aquaculture systems
February 26, 2011
2011 2012
PWF Project Workbook Gantt Chart
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
25/60
Project Name
Date
No.
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
Productive, profitable, and resilient agriculture and aquaculture systems
February 26, 2011
2011 2012
1 New germplasm validated and seed distribution network established
Activities 1.1 Exchange of seeds with partners through IRRI (BGD, IND)
1.2 On-station and on-farm seed multiplication for the wet (aman) and dry
(boro) seasons (BGD, IND), and early monsoon (aus) season (BGD)
1.3 On-farm and on-station evaluation of salt and submergence tolerant wet
season varieties (BGD, IND)
1.4 On-station and on-farm evaluation of salt tolerant dry season varieties
(BGD, IND)
1.5 On station and on-farm evaluation of early monsoon varieties (BGD)
1.6 Farmers field days for PVS evaluation (BGD, IND)
1.7 Results of evaluation documented in project progress report (BGD, IND)
1.8 Synthesizing findings of Activities under output 1
Milestones 1.a Seeds of new varieties and breeding lines exchanged through IRRI (IRRI)1.a 1.a
1.b Seeds for wet and dry seasons (BGD, IND) and early monsoon season (BGD)
multiplied and distributed to network partners1.b 1.b
1.c Salt and submergence tolerant wet season varieties evaluated on-station
and on-farm (BGD, IND)1.c 1.c
1.d Salt tolerant dry season varieties evaluated on station and on-farm (BGD,
IND)1.d
1.e Early monsoon season varieties evaluated on station and on-farm (BGD)1.e
1.f Farmers field days for PVS evaluation accomplished (BGD, IND) 1.f 1.f 1.f 1.f
1.g Results of evaluation documented in project progress report (BGD, IND.
IRRI)1.g 1.g 1.g
1.h Synthesizing reports and publications
PWF Project Workbook Gantt Chart
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
26/60
Project Name
Date
No.
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
Productive, profitable, and resilient agriculture and aquaculture systems
February 26, 2011
2011 2012
2 More productive, profitable, resilient & diversified rice-based cropping systems
Activities 2.1 Hypothesis formation, design of on station and on farm experiments for 3
sites in BDG and 2 sites in IND; revise annually
2.2 Implementing experiments
2.3 Data analysis and interpretation
2.4 Participatory evaluation of the experimented cropping systems and
technologies
2.5 Documenting experiment results and evaluation in 6 month and annual
project progress report (BGD, IND)
2.6 Production of technical cropping system package
Milestones 2.a Experiment protocols (annually) 2.a 2.a 2.a
2.b Experiment results and participatory evaluation documented in 6 month
and annual project progress report (BGD, IND)2.b 2.b 2.b
2.c Draft and final versions of cropping system technical package - systems,germplasm, management tailored to different site situations
PWF Project Workbook Gantt Chart
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
27/60
Project Name
Date
No.
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
Productive, profitable, and resilient agriculture and aquaculture systems
February 26, 2011
2011 2012
3 Improved homestead production systems
Activities 3.1 Literature review of homestead iconology and farming systems in the
coastal of BGD and IND
3.2 Household Survey of homestead economy and farming systems at the
study sites in BDG and IND
3.3 Proposal/experiment design for testing varieties/technologies and farming
systems to increase productivity and nutrition value of products from
homestead (revised annually)
3.4 Participatory experiment and evaluation of the experimented homestead
technologies and production systems
3.5 Documenting experiment results and evaluation in 6 month and annual
project progress report (BGD, IND)
3.6 Production of technical homestead packages
Milestones 3.a Literature review and knowledge gaps identified 3.a.
3.b Report of survey findings, strategies for improving homestead identified3.b
3.c Experiment/study protocol (revised annually) 3.c 3.c
3.d Experiment results and participatory evaluation documented in 6 month
and annual project progress report (BGD, IND)3.d 3.d
3.e Draft and final versions of homestead farming systems technical package
PWF Project Workbook Gantt Chart
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
28/60
Project Name
Date
No.
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
Productive, profitable, and resilient agriculture and aquaculture systems
February 26, 2011
2011 2012
Output 4 Brackish water aquatic production systems
Activities 4.1 Literature review, hypothesis formation, design of on station and on farm
experiments in BDG IND; revise annually
4.2 Implementing experiments
4.3 Data analysis and interpretation
4.4 Participatory evaluation of the experimented brackish aquaculture systems
and technologies
4.5 Documenting experiment results and evaluation in 6 month and annual
project progress report (BGD, IND)
4.6 Production of technical aquaculture system package
Milestones 4.a Literature review and Experiment protocols (annually) 4.a 4.a
4.b Experiment results and participatory evaluation documented in 6 month
and annual project progress report (BGD, IND)4.b 4.b
4.c Draft and final versions of brackish aquaculture system technical package -
systems, species/varieties, management
Output 5 Technology and policy recommendations for up- and out-scaling
Activities 5.1 Farmers training for management of new varieties, technologies and
cropping systems
5.2 Preparation of extension material (leaflets, procures, etc) for the new
varieties, technologies and cropping systems in local languages
5.3 Policy dialogues with decision makers and ministerial level policy makers
Milestones 5.a Training materials and reports produced 5.a 5.a
5.b Extension materials produced 5.b
5.c Policy dialogues organized 5.c
PWF Project Workbook Gantt Chart
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
29/60
Schedule of Reports and Payments
Project Name Productive, profitable, and resilient agriculture and aquaculture systems
Date
No. Amount (US$) Comment Due Date
1
Paid on return of the signed Award Letter. These funds are to
cover the first six months activities of the Project
2Paid following satisfactory assessment of progress of the first 6
months of project implementation.
3Paid following satisfactory assessment of progress of the first
12 months of project implementation.
4Paid following satisfactory assessment of progress of the 18
months of project implementation.
5
Paid following satisfactory assessment of progress of the 24
months of project implementation. The milestone plan for the
following two years of project activities must also be approved.
6Paid following satisfactory assessment of progress of 30
months of project implementation.
7
Paid following satisfactory assessment of progress of 36
months of project implementation. A review may also be
undertaken at this point at the discretion of the CPWF.
8Paid on acceptance of the Project Completion Report and an
external audit report.
This worksheet will be filled by CPWF Finance Officer for contracting
CPWF Project Workbook Schedule of Reports and Payments Page 29
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
30/60
Budget Summary
Project Name
Date
2011 2012 2013 2014 TOTAL
1 PERSONNEL REMUNERATION, TRAVEL AND ACCOMMODATION
1.1 PERSONNEL
1.1.1 Project Leader 13,125 14,319 14,749 3,714 45,907
1.1.2 Principal Investigators (Int'L & Reg'l) 18,070 16,680 17,180 4,326 56,256
1.1.3 Principal Investigators (National) - - - -
1.1.4 Consultants 4,649 6,199 6,199 1,550 18,597
1.1.5 Support Staff 13,523 18,705 19,642 4,970 56,840
1.1.6 Other Project Participants 27,308 47,147 51,868 13,063 139,386
1.2 TRAVEL AND ACCOMMODATION
1.2.1 Project Leader 1,209 1,649 1,698 428 4,984
1.2.2 Principal Investigators (Int'L & Reg'l) 1,211 1,652 1,701 428 4,992
1.2.3 Principal Investigators (National) -
1.2.4 Consultants 1,125 1,500 1,500 375 4,500
1.2.5 Support Staff 2,655 3,633 3,757 947 10,992
1.2.6 Other Project Participants 1,615 2,245 2,368 600 6,828
2 RESEARCH OPERATION
2.1 EQUIPMENT
2.1.1 Office equipment -
2.1.2 Laboratory equipment -
2.1.3 Field equipment -
2.2 CONSUMABLES
2.2.1 General communication expenses -
2.2.2 Office supplies -2.2.3 Laboratory supplies 2,184 2,977 3,067 772 9,000
2.2.4 Field research supplies 3,640 4,962 5,111 1,287 15,000
2.2.5 Other support services (IT services,
public areas, facilities) 26,287 35,576 35,259 8,774 105,896
2.3 COMMUNICATIONS
2.3.1 Communications products -
2.3.2 Team meetings -
2.3.3 Stakeholders workshops -
2.3.4 Participation in Reflection Workshops 3,375 4,500 4,125 1,000 13,000
2.3.5 Participation in IFWF3 and IFWF4 7,000 - 7,000 - 14,000
3 LUMP SUM CONTRACT AGREEMENTS FOR SPECIFIC DELIVERABLES
3.1 WFC 49,010 73,790 71,343 17,397 211,540
3.2 BRRI 36,236 45,316 43,940 10,954 136,446
3.3 BRAC 10,905 18,176 12,117 2,424 43,622
3.4 BFRI 20,816 29,112 29,490 7,366 86,784
3.5 CSSRI (india) 21,211 25,731 25,406 6,395 78,7433.6 CIBA (India) 21,511 25,231 25,131 6,370 78,243
3.7 Others in BGD (including students) 11,633 15,510 13,329 3,150 43,622
4 MISCELLANEOUS
4.1 CONTINGENCY (% OF BUDGET) -
4.2 OVERHEADS 22,677 29,688 29,937 7,520 89,822
Administrative cost (12%) 16,349 20,623 21,252 5,398 63,622
Management fee (4%) 6,328 9,065 8,685 2,122 26,200[INSTITUTION (% ] -
[INSTITUTION (% ] -
[INSTITUTION (% ]
G2: Productive, profitable, and resilient agriculture and aquaculture systems
2011-02-26; revised 2011-04-04
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
31/60
Budget CommentsPlease provide as much information as possible to enable a good understanding of the key expenditures required.
Project Name
Project G2: Resilient Intensified and Diversified Agriculture and
Aquaculture Systems
Date
COMMENTS
MATCHING FUND (if any) IRRI's Project STRASA works in the same same area and will
provide matching fund 10% of time of Dr. Ismail and Tao Li in 3
years. Some amount will be designated to attendance of IFWF
1
PERSONNEL REMUNERATION, TRAVEL AND
ACCOMMODATION
1.1 PERSONNEL
1.1.1 Project Leader Dr. Tuong is the project Leader until August, 2011, requests
fund to cover 5% of his time. After that, Dr. Liz Humphreys will
be the Project Leader, requesting 10% of her salary for the
whole three years.
1.1.2 Principal Investigators (Int'L & Reg'l) Funds are requested to support Dr Ismail 10% time per year forthree years .Personnel costs are based on actual annual
salaries and benefits for on-board employees and on IRRIs
standard personnel costs for new staff. The subsequent years
include estimated escalations for merits adjustments which is
3% per year for the IRS.
1.1.3 Principal Investigators (National)
1.1.4 Consultants Dr. Tuong (after his retirement with IRRI) will share 5% of his
time each year for 3 years as a consultant for this project.
1.1.5 Support Staff Funds are also requested to support three nationally recruited
staff (NRS) that will assist the project leader and principal
investigator in monitoring the project. Cabangon and Parreowho will be based in IRRI Philippines will allocate 30% of their
time each year while the Level 3 TBD staff who will be based in
Bangladesh will allot 100% of his time for the project.Personnel
costs are based on actual annual salaries and benefits for on-
board employees and on IRRIs standard personnel costs for
new staff. The subsequent years include estimated escalations
for merits adjustments which is 5% per year for the NRS.
1.1.6 Other Project Participants Funds are also requested to support Dr. Tao Li's 10% time for
year 2 to year 3.One Post doc fellow (PDF) will be hired and
based to Bangladesh to monitor the project. 60% of his time
will be charged here, 40% will be covered by Project CPWF G1.Personnel costs are based on actual annual salaries and
benefits for on-board employees and on IRRIs standard
personnel costs for new staff. The subsequent years include
estimated escalations for merits adjustments which is 3% per
year for the IRS and PDF.
CPWF Project Workbook Budget Comments Page 31 of 60
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
32/60
1.2 TRAVEL AND ACCOMMODATION
1.2.1 Project Leader This includes cost for the PL once a year visit in Bangladesh to
monitor the project and attend annual meeting. Other trips
will be supported by other Projects in Bangladesh and India
where Dr. Tuong and Humphreys also works
1.2.2 Principal Investigators (Int'L & Reg'l) This consists of all costs related to once a year visit of one PI in
Bangladesh to monitor the project including their
accommodation and per diem. At least one other trip will bepaid by other IRRI projects in the same area
1.2.3 Principal Investigators (National)
1.2.4 Consultants For the consultant to visit the field. Other trips will be
shouldered by IRRI projects in the same area
1.2.5 Support Staff This is the travel cost of level 3 staff (based in BGD) for
monitoring the field including his accommodation and per
diem for 20 days stay there.
1.2.6 Other Project Participants This consists of all costs related to field visit of the Postdoc
fellow based in Bangladesh including their accommodation and
per diem. At least one other trip will be paid by other IRRI
projects in the same area
2 RESEARCH OPERATION
2.1 EQUIPMENT
2.1.1 Office equipment
2.1.2 Laboratory equipment
2.1.3
Field equipment To be used in Bangladesh and India which is included in NARES
lumpsum contract.
2.2 CONSUMABLES
2.2.1 General communication expenses
2.2.2 Office supplies
2.2.3
Laboratory supplies A total of $9,000 for 3 years is requested for consumables,
chemicals and enzymes in the lab, and other laboratory
supplies
2.2.4
Field research supplies This will cover cost for seed increase and shipment of breeding
lines.
2.2.5 Other support services (IT services, public
areas, facilities)
These are identified direct costs which includes information
technology services such as desktop and network connection
and operational and research support services . The
operational support services are expenses for safety, security,
energy cost, depreciation , rent, insurance and building
maintenance. The research support services include the library,
risk management and quality assurance, communication and
publications,intellectual property management, country office
coordination,support from office of the Deputy Director
General for Research, External Relation, Seed Health and
Project Coordination office. The above items are not part ofrefer overhead under 4.2
2.3 COMMUNICATIONS
2.3.1 Communications products
2.3.2 Team meetings Will be combined with trips for Reflection Workshop
2.3.3 Stakeholders workshops Will be combined with trips for Reflection Workshop
CPWF Project Workbook Budget Comments Page 32 of 60
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
33/60
2.3.4
Participation in Reflection Workshops This also covers cost for annual meetings and semi annual
meeting. The amount for NARES attendance are included in
their lump sum contract
2.3.5
Participation in IFWF3 and IFWF4 This covers cost to attend the IFWF3 and 4. The amount for
NARES attendance are included in their lump sum contract
CPWF Project Workbook Budget Comments Page 33 of 60
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
34/60
3
LUMP SUM CONTRACT AGREEMENTS FOR
SPECIFIC DELIVERABLES
3.1
WFC Assist in project management, monitoring and communication,
especially in aquaculture activities. Signing appropriate
subcontracts with, and responsible for timely fund
disbursement to, BFRI and CIBA. In charge of improving
aquaculture technologies for ponds in homestead; Oversee the
implementation of experiments and field works in aquaculturesystems. Responsible for data analysis and interpretation; and
high quality reports and scientific publications relating to
aquaculture. give due guidance to BFRI and CIBA. The budget
for WFC includes $20,000 for BFRI and CIBA to participate in
Reflection workshop and the International Forum for Water
and Food
3.2
BRRI In charge of field experiments in rice based systems and
agriculture in homesteads in BGD, especially in germplasm
testing and seed multiplication/delivery network
3.3BRAC collaborate in field experiments in cropping systems and
variety testing
3.4
BFRI (sub contract with WFC) Under the sub contract with WFC,In charge of field
experiments relating to brackish water aquaculture systems
and aquaculture components in homestead, BGD
3.5
CSSRI (India) In charge of field experiments in rice based systems and
agriculture in homesteads in India, especially in germplasm
testing and seed multiplication/delivery network
3.6
CIBA (India - sub contract with WFC) Under the sub contract with WFC,In charge of field
experiments relating to brackish water aquaculture systems
and aquaculture components in homestead, India
3.7
Others in BGD (including graduate students) These may include Khulna University, Bangladesh Agricultural
University, Calcutta University where students working with
the project register. Others e.g. SocioConsult may be asked to
carry out household survey of homestead production systems
and economy
4 MISCELLANEOUS
4.1 CONTINGENCY (% OF BUDGET)
4.2 OVERHEADS
Indirect cost The indirect cost will include the other necessaryadministrative costs which cannot be specifically identified as
direct costs of the activity such as support from Director
General Office, Finance, Procurement, Legal services, Human
Resourse services, etc.
[INSTITUTION (% ]
[INSTITUTION (% ]
[INSTITUTION (% ]
[INSTITUTION (% ]
CPWF Project Workbook Budget Comments Page 34 of 60
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
35/60
taff Time Allocation and Breakdown of Personnel Costs
roject Name
ate
2011 2012 2013 2014 TOTAL
1.1 PL To Phuc Tuong (Liz Humphreys
in year 2 and 3)
IRRI CGIAR Oversight: project M&E,
communication; contribute to
resource management of rice
based cropping systems
18 22 22 6 68
1.2 PI (Int'l) Abdelbagi Ismail IRRI CGIAR Oversight: germplasm
validation and seed distribution
network
16 22 22 6 66
Elizabeth Humphreys IRRI CGIAR contribute to resourcemanagement of rice based
cropping systems
9 9
Manjurul Karim WFC CGIAR oversight: aquaculture
activities, communication in
aquaculture
0
Michael John Phillips WFC CGIAR aquaculture technologies 0
under "lump sum contract" with WFC
under "lump sum contract" with WFC
2011-03-10; revised 2011-04-04
No. Personnel Name Institution Days per YearType of
Institution
Brief Description of Contribution
to Project, as described in G1
Contacts (Project Workbook)
Productive, profitable, and resilient agriculture and aquaculture systems
WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Page 3
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
36/60
taff Time Allocation and Breakdown of Personnel Costs
roject Name
ate
2011 2012 2013 2014 TOTAL
2011-03-10; revised 2011-04-04
No. Personnel Name Institution Days per YearType of
Institution
Brief Description of Contribution
to Project, as described in G1
Contacts (Project Workbook)
Productive, profitable, and resilient agriculture and aquaculture systems
1.2 PI (Reg'l) Benoy Kumar Barman WFC CGIAR M&E; coordinator of
aquaculture activities
0
1.3 PI (Nat'l) Rafiqul Islam BRRI NARES germplasm validation and seed
distribution network, BGD
0
Alamgir Alam BFRI NARES Aquaculture technologies and
systems, BGD
0
Bimal K. Bandyopadhyay CSSRI NARES Germ plasm and Rice based
cropping systems, IND
0
Jitendra Kumar Sundary CIBA NARES aquaculture systems, IND 0
1.4 Consultants To Phuc Tuong 8 11 11 3 33
Under "lump sum" contract
under "lump sum contract" with WFC
WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Page 3
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
37/60
taff Time Allocation and Breakdown of Personnel Costs
roject Name
ate
2011 2012 2013 2014 TOTAL
2011-03-10; revised 2011-04-04
No. Personnel Name Institution Days per YearType of
Institution
Brief Description of Contribution
to Project, as described in G1
Contacts (Project Workbook)
Productive, profitable, and resilient agriculture and aquaculture systems
.1.5 Support
Staff
Rexie Jane Parreo IRRI CGIAR involved in facilitating supply of
seeds for objective 1, purchase
of supplies and equipments,
arrangement of travel for
meetings and site visits for IRRI
partners and in compiling of
reports and in other
communication activities
49 65 65 16 195
Romeo Cabangon IRRI CGIAR directly involved in planning,
execution and monitoring of
research activities of most ofG2, specially objectives 2, 3 and
5. He will regularly visit the
project sites for monitoring
with local staff
49 65 65 16 195
Research Technician(TBD) in
Bangladesh
IRRI CGIAR assist PL and PI in project
monitoring and field visit
163 217 217 54 651
WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Page 3
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
38/60
taff Time Allocation and Breakdown of Personnel Costs
roject Name
ate
2011 2012 2013 2014 TOTAL
2011-03-10; revised 2011-04-04
No. Personnel Name Institution Days per YearType of
Institution
Brief Description of Contribution
to Project, as described in G1
Contacts (Project Workbook)
Productive, profitable, and resilient agriculture and aquaculture systems
1.6 Other
Project
Participants
Tao Li IRRI CGIAR Crop modeling 16 22 6 44
Postdoc (TBD) IRRI CGIAR Based in BGD; day to day
management of the project,
contribute to rice-based
cropping systems
98 130 130 32 390
WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Page 3
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
39/60
taff Time Allocation and Breakdown of
roject Name
ate
1.1 PL To Phuc Tuong (Liz Humphreys
in year 2 and 3)
1.2 PI (Int'l) Abdelbagi Ismail
Elizabeth Humphreys
Manjurul Karim
Michael John Phillips
2011-03-10; revised 2011-04-04
No. Personnel Name
Productive, profitable, and resili
2011 2012 2013 2014
730 for TPT
and 648 for
EH; annual
increase 3%
13,125 14,319 14,749 3,714 45,907
764 ;
annual
increase 3%
12,235 16,680 17,180 4,326 50,421
648 ;annual
increase 3%
5,835 - 5,835
-
-
18,070 16,680 17,180 4,326 56,256
Total (US$)Personnel CostsDaily
Charge Out
(US$)
WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Page 39
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
40/60
taff Time Allocation and Breakdown of
roject Name
ate 2011-03-10; revised 2011-04-04
No. Personnel Name
Productive, profitable, and resili
1.2 PI (Reg'l) Benoy Kumar Barman
1.3 PI (Nat'l) Rafiqul Islam
Alamgir Alam
Bimal K. Bandyopadhyay
Jitendra Kumar Sundary
1.4 Consultants To Phuc Tuong
2011 2012 2013 2014
Total (US$)Personnel CostsDaily
Charge Out
(US$)
-
- - - - -
-
-
-
-
- - - -
4,649 6,199 6,199 1,550 18,597
4,649 6,199 6,199 1,550 18,597
WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Page 40
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
41/60
taff Time Allocation and Breakdown of
roject Name
ate 2011-03-10; revised 2011-04-04
No. Personnel Name
Productive, profitable, and resili
1.5 Support
Staff
Rexie Jane Parreo
Romeo Cabangon
Research Technician(TBD) in
Bangladesh
2011 2012 2013 2014
Total (US$)Personnel CostsDaily
Charge Out
(US$)
54 ; annual
increase 5%
2,475 3,423 3,595 910 10,403
87.5 ;
annual
increase 5%
4,055 5,609 5,889 1,490 17,043
45 ; annual
increase 5%
6,993 9,673 10,158 2,570 29,394
13,523 18,705 19,642 4,970 56,840
WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Page 41
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
42/60
taff Time Allocation and Breakdown of
roject Name
ate 2011-03-10; revised 2011-04-04
No. Personnel Name
Productive, profitable, and resili
1.6 Other
Project
Participants
Tao Li
Postdoc (TBD)
2011 2012 2013 2014
Total (US$)Personnel CostsDaily
Charge Out
(US$)
610 ;
annual
increase 3%
9,919 13,522 3,406 26,847
288 ;
annual
increase 3%
27,308 37,228 38,346 9,657 112,539
27,308 47,147 51,868 13,063 139,386
TOTAL 76,675 103,050 109,638 27,623 316,986
WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Page 42
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
43/60
taff Time Allocation and Breakdown of
roject Name
ate
1.1 PL To Phuc Tuong (Liz Humphreys
in year 2 and 3)
1.2 PI (Int'l) Abdelbagi Ismail
Elizabeth Humphreys
Manjurul Karim
Michael John Phillips
2011-03-10; revised 2011-04-04
No. Personnel Name
Productive, profitable, and resili
1 2 3 4 5 6
1 1 1 1 1 5
1 1 1 1 4
1 1 1 1 4
1 1 1 3
1 1 1 3
Outputs
Entries from Column S are added for reviewers'
comments and to note items for clarification. There
should be a clear assignment of outputs. Mark (with
1) lead and contributed outputs in columns (S) to (X)
Total
WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Pag
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
44/60
taff Time Allocation and Breakdown of
roject Name
ate 2011-03-10; revised 2011-04-04
No. Personnel Name
Productive, profitable, and resili
.1.2 PI (Reg'l) Benoy Kumar Barman
1.3 PI (Nat'l) Rafiqul Islam
Alamgir Alam
Bimal K. Bandyopadhyay
Jitendra Kumar Sundary
.1.4 Consultants To Phuc Tuong
1 2 3 4 5 6
Outputs
Entries from Column S are added for reviewers'
comments and to note items for clarification. There
should be a clear assignment of outputs. Mark (with
1) lead and contributed outputs in columns (S) to (X)
Total
1 1 1 3
1 1 1 3
1 1 1 3
1 1 1 1 4
1 1 1 1 4
1 1 1 1 1 5
WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Pag
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
45/60
taff Time Allocation and Breakdown of
roject Name
ate 2011-03-10; revised 2011-04-04
No. Personnel Name
Productive, profitable, and resili
.1.5 Support
Staff
Rexie Jane Parreo
Romeo Cabangon
Research Technician(TBD) in
Bangladesh
1 2 3 4 5 6
Outputs
Entries from Column S are added for reviewers'
comments and to note items for clarification. There
should be a clear assignment of outputs. Mark (with
1) lead and contributed outputs in columns (S) to (X)
Total
1 1 1 1 1 5
1 1 2
1 1 1 1 4
WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Pag
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
46/60
taff Time Allocation and Breakdown of
roject Name
ate 2011-03-10; revised 2011-04-04
No. Personnel Name
Productive, profitable, and resili
1.6 Other
Project
Participants
Tao Li
Postdoc (TBD)
1 2 3 4 5 6
Outputs
Entries from Column S are added for reviewers'
comments and to note items for clarification. There
should be a clear assignment of outputs. Mark (with
1) lead and contributed outputs in columns (S) to (X)
Total
1 1
1 1 1 1 1 5
10 11 13 9 12 0 55
WF Project Workbook Staff Time Allocation and Breakdown of Personnel Costs Pag
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
47/60
Indicative Breakdown of Budget by OutputBudget does not include overhead costs
Project Name
Date
Output Institution $ value of the budget % share of the budget
IRRI 160,865 13%
WFC - 0%
BRRI 61,818 5%
BRAC 16,275 1%
BFRI - 0%
CSSRI 31,659 2%
CIBA - 0%
Other BD 11,254 1%
Total for Output 1 281,871 22%
IRRI 182,643 14%
WFC 21,459 2%
BRRI 37,083 3%
BRAC 27,347 2%
BFRI 12,274 1%
CSSRI 25,450 2%
CIBA 12,139 1%
Other BD 5,810 0%
Total for Output 2 324,206 25%
IRRI 119,023 9%
WFC 44,816 4%
BRRI 22,924 2%
BRAC - 0%BFRI 17,384 1%
CSSRI 13,111 1%
CIBA 16,682 1%
Other BD 26,557 2%
Total for Output 3 260,496 20%
IRRI 51,749 4%
WFC 117,447 9%
BRRI - 0%
BRAC - 0%
BFRI 49,960 4%
CSSRI - 0%CIBA 41,826 3%
Other BD - 0%
Total for Output 4 260,982 20%
IRRI 81,720 6%
WFC 27,818 2%
BRRI 14,622 1%
BRAC - 0%
BFRI 7,165 1%
2011-02-26; revised 2011-04-04
Productive, profitable, and resilient agriculture and aquaculture systems
Output No. 5: Technology and policy
recommendations
Output No. 1: new germplasm
validated and seed distribution
network established)
Output No. 2: 2. More productive,profitable, resilient & diversified rice-
based cropping systems
Output No. 3: 3. Improved homestead
production systems
Output No. 4: Brackish water aquatic
production systems
CPWF Project Workbook Indicative Breakdown of Budget by Output Page 47 of 60
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
48/60
Project Name
Date
Output Institution $ value of the budget % share of the budget
2011-02-26; revised 2011-04-04
Productive, profitable, and resilient agriculture and aquaculture systems
CSSRI 8,522 1%CIBA 7,596 1%
Other BD - 0%
Total for Output 5 147,444 12%
TOTAL 1,275,000
CPWF Project Workbook Indicative Breakdown of Budget by Output Page 48 of 60
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
49/60
Indicative Breakdown of Budget by Institution
Project Name
Date
Institution Total $ value Total % share Comments
IRRI 596,000 47% Includes institutional cost and
management fee
WFC 211,540 17% This include $20,000 funds for BFRIand CIBA to attend reflection
workshop and Water Forum
BRRI 136,446 11% This include $3,500 to be kept at IRRI
but used by NARES to attend the
Reflection workshops and Water
Forum
BRAC 43,622 3%
BFRI (sub contract
with WFC)
86,784 7%
CSSRI (india) 78,743 6% This includes $3,500 to be kept at IRRI
for the use of NARES to attend the
Reflection workshops and WaterForum
CIBA (India - sub
contract with
WFC)
78,243 6%
Others in BGD
(including
students)
43,622 3%
TOTAL 1,275,000 1
Productive, profitable, and resilient agriculture and aquaculture systems
2011-02-26; revised 2011-04-04
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
50/60
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
51/60
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
52/60
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
53/60
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
54/60
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
55/60
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
56/60
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
57/60
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
58/60
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
59/60
by institute by output Adjustments to be made
IRRI 596,000 596,000 (0)
WFC 211,540 211,540 (0)
BRRI 136,446 136,446 (0)
BRAC 43,622 43,622 (0)
BFRI 86,784 86,784 (0)CSSRI (india) 78,743 78,743 0
CIBA (India) 78,243 78,243 (0)
Others in BGD (including students) 43,622 43,622 0
TOTAL 1,275,000 1,275,000 (0)
-
7/31/2019 G2 Annex 2 Project Workbook 2012-04-2 Update
60/60
(0)
(0)
(0)
(0)
(0)0
(0)
0