FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett,...

119
FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH PRIORITY Funding Conference Application Due Dates HP – Commercial Motor Vehicle (CMV) April 16, 2019 5:00pm Eastern Time HP – Innovative Technology Development (ITD) April 26, 2019 5:00pm Eastern Time

Transcript of FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett,...

Page 1: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

FMCSAFY 2019 HIGH PRIORITY

Funding ConferenceApplication Due Dates

HP – Commercial Motor Vehicle (CMV)April 16, 2019 5:00pm Eastern Time

HP – Innovative Technology Development (ITD) April 26, 2019 5:00pm Eastern Time

Page 2: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

PresentersBettina Conroy & Jacob York

High Priority Grant & Service Center State Programs Representatives

Thomas Kelly, Program ManagerInnovative Technology Deployment

Camille White, Program OfficerPerformance and Registration Information Systems Management

Scott Valentine, Program OfficerSafety Data Quality

Lester Finkle, National Title VI Program ManagerOffice of Civil Rights

Rikita Jarrett, Lisa Ensley, and James Ross Grants Management Specialist

Grants Management Office (GMO)

2

Page 3: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Agenda

• FY 2019 High Priority • Programmatic Requirements

• Grants Management Office Overview• Financial and Application requirements

• Attachment A - ITD/PRISM/SDQ Narrative Samples• Attachment B - SF-424A Categories Budget Narrative Sample

3

Page 4: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

FY 2019 High Priority Grant

4

HP- ITD $20M

Anticipated number of applications 35

HP - CMV $23M

Anticipated number of applications 65

Authorized funds $43M

Anticipated number of applications 100

Page 5: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

424a –Complete Instructions found on Grants.gov

5

Page 6: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Participation by Local Law Enforcement Agencies and Other Applicants

Any local law enforcement agency applying directly to FMCSA for HP funding must provide a statement within the application certifying the applicant meets the nine conditions listed in 49 C.F.R. § 350.203.

6

Page 7: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Application Structure• If applying for both HP-ITD and HP-CMV funding, the applicant must

submit separate applications for each program.

• If an application for HP-ITD or HP- CMV contains more than one project, you must include for each project:

• project narrative • budget narrative• comprehensive budget matching the 424a line item budget.

• What is a project?

7

Page 8: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Project Narrative Development (see NOFO for full description) • Introduction: Include a description of the goal(s)

• Problem Statement: A quantifiable description of the identified problem with data source.

• Performance Objective: measurable goal(s).

• Program Activity Plan: number and frequency of activities.

• Performance Measurement Plan: measure progress towards the goal, such as measurable outputs (hours, carrier contacts, inspections, etc.) and in terms of performance outcomes.

• Monitoring Plan: who will conduct the monitoring, the frequency with which it will be carried out.

8

Page 9: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Budget Narrative Development(see NOFO for full description)

•Description by 424a object class categories•Do not combine categories•Justification of the expense is allowable, allocable, reasonable and necessary

•Assumption will be 85/15 unless the narrative includes a breakout of Federal and match totals.

•Confirm calculations are correct

9

Page 10: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Grant Development

10

1. Read each NOFO carefully

2. Proof read your application

3. Additional resources:

• Motor Carrier Safety Grant Comprehensive Policy (MCP)• 2 CFR part 200 Uniform Administrative Requirements, Cost

Principles, and Audit Requirements for Federal Awards

4 . Submit the application sooner rather than later.

5. High Priority Grant Program is an extremely competitive program

Page 11: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

11

Page 12: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

High Priority INNOVATIVE TECHNOLOGY DEVELOPMENT

Overview

• Thomas Kelly, Program Manager• Innovative Technology Deployment

12

Page 13: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

ITD Eligibility FAST Act• States, DC, and U.S. Territories • Have an approved program plan (PP/TLD) (*prior to

application)• Certify to ITS architecture (by acceptance)• Promote interoperability (by acceptance)• Testing with FMCSA (by acceptance)

Additional Requirements• Applicant is Lead ITD Agency noted in PP/TLD or has

MOU with the Lead.• MOU agency has coordinated with Lead Agency.

13

Page 14: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

ITD HP vs. ITD MCSAPThe FAST Act provided flexibility for the States to utilize a portion of their MCSAP funding toward ITD operation and maintenance*

•Any MCSAP lead agency needing ITD O&M funding should utilize MCSAP funding for this purpose.

•MCSAP Lead Agencies applying for ITD O&M via a separate ITD grant application will be considered only after all other HP-ITD projects have been considered.

•Any eligible non-MCSAP lead agency needing ITD O&M funding should apply as part of any HP-ITD application.

•Hasn’t been an issue last 2 years.*(49 U.S.C. § 31102)

14

Page 15: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

FY 2019 HP ITD Priorities• States needing to achieve Core certification

• 100% for CVIEW

• PP/TLD funding cap at $150,000

• Improve Data Quality

• CVIEW data exchange in real-time (or near real-time)

• Ensure data accuracy & quality

15

Page 16: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

FY 2019 HP ITD Priorities, continued

• Innovative Technologies

• Work-Zone & Incident Notification

• CMV Truck Parking availability technologies

• E-screening technologies that detect OOS

• O&M for systems or capabilities needed to remain Core

• Other typical projects

16

Page 17: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

17

Page 18: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

High Priority

PERFORMANCE REGISTRATION INFORMATION SYSTEMS MANAGEMENT (PRISM) Overview

• Camille White • PRISM Program Manager

18

Page 19: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Old PRISM Implementation Structure

19

2017

Page 20: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

New PRISM Implementation Structure

20

*New Map*

2019

Page 21: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

MCSAP Lead Agency Non-Lead AgencyHigh Priority

PRISM Projects

1. Reach Full Participation by Oct. 1, 2020

2. Once full PRISM participation is reached, projects that exceed full participation ONLY

1. All PRISM participation projects

2. O&M

MCSAP Grant

PRISM Projects

1. Reach or exceed full PRISM participation

2. O&M

1. Receive sub award fromMCSAP Lead Agency for all projects to reach or exceed full PRISM participation

FY 2019 Grants: PRISM Eligibility

Page 22: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

States that never participated in PRISM must have an approved implementation plan

US + DC – subject to PRISM US Territories - NOT subject to PRISMFY 2018 Grants: PRISM Eligibility

Page 23: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

FY 2019 HP PRISM EligibilityApplication must indicate

Current PRISM level• Partial, Full, Enhanced, Expanded

Project goal• elevate, maintain or enhance a State’s

participation levelPRISM requirements implemented/improved

*Projects must deploy/maintain mechanisms linking FMCSA info systems to States’ CMV registration systems to identify/immobilize carriers under a Federal OOS

23

Page 24: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

FY 2019 HP PRISM Priorities

24

Priority 1

Priority 2

(Mandatory)

Page 25: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

FY 2019 HP PRISM PrioritiesPriority 3 • Operation & Maintenance (non lead agencies only)

Priority 4 • Implement PRISM web service, real-time data• Implement process to retrieve license plates• Update PRISM outreach/education materials

*Not a Priority Law Enforcement Technology Projects prioritized under HP-CMV Safety and ITD

25

Page 26: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

PRISM Resources

• MCSAP Comprehensive Policy - Sections 4.3.1 and 5.8• -MCSAP and HP Grant funding and eligibility • -Restructuring of PRISM• -Full and Enhanced Participation definition• -PRISM Requirements• https://www.fmcsa.dot.gov/sites/fmcsa.dot.gov/files/docs/mission/grants/7

3001/motor-carrier-grant-comprehensive-policy-v31.pdf•• FMCSA Website – About Us - PRISM Section• -PRISM Map & Implementation Summary• -PRISM Training Workbook and Program Manual• -Guidance materials• https://www.fmcsa.dot.gov/information-systems/prism/performance-and-

registration-information-systems-management-prism

26

Page 27: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

27

Page 28: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

High Priority STATE SAFETY DATA QUALITY

(SSDQ)Overview

Scott Valentine, Program OfficerState Safety Data Quality

28

Page 29: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

HP SSDQ Priorities

29

(1) Data projects that improve CMV data collected on PARs through increased implementation of the MMUCC.

(2) Training projects for state and local law enforcement to improve the collection of CMV data on PARs.

(3) Technology projects which add to crash and/or inspection data collection that automates the verification of driver, vehicle and motor carrier information.

Page 30: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

HP SSDQ Priorities Continued:

30

(4) Innovative projects for resolving Requests for Data Review (RDRs) entered through DataQs to improve timeliness, consistency, and/or accountability.

(5) Innovative projects for improving the state’s performance in the SSDQ results.

Page 31: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

HP SSDQ EligibilityFor projects seeking to improve SSDQ results, there are additional constraints and priorities depending on which agency is submitting the application

• Agencies responsible for submitting the CVSP • Agencies not responsible for submitting the CVSP

31

Page 32: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

HP SSDQ EligibilityAgencies responsible for submitting the CVSP • Projects that exceed MCSAP Requirements:

• Development and implementation of policies and/or procedures directly related to the improvement of timeliness, accuracy and completeness of safety data.

• Establishing and maintaining a DataQs Review Council.• Implementation of procedures to ensure that at least 85 percent of Requests for Data

Reviews are closed out within 14 days of receipt.

32

Page 33: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

HP SSDQ Eligibility Continued:Agencies not responsible for submitting the CVSP Projects that:

• Allow the state to complete the MCSAP requirements for safety data collection and participation in information reporting.

• Allow the state to exceed these MCSAP requirements.

Note: Agencies not responsible for submitting the state’s CVSP that apply for HP funding for safety data related projects must confirm and document coordination in the application (i.e., to include in the application which agency was contacted, date contact was made, and who was contacted) with the Agency responsible for submitting the CVSP.

33

Page 34: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

SSDQ Performance MeasuresComplete MCSAP Requirement

• Completing requirements is achieved when the State’s overall rating is Green.

34

Page 35: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

SSDQ Performance MeasuresExceed MCSAP Requirement

• Exceeding requirements or “beyond Green” is when a project makes incremental changes (technology, process, level of effort) to improve performance in one or more measures.

35

Page 36: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

HP SSDQ Requirements• Improvements to how the State uses the DataQ System to meet the

• Complete Requirements:• Each State will identify at least one point of contact for resolving inspection

and crash Requests for Data Review (RDR) thought FMCSA’s DataQs system.• Minimum period of consideration (inspections – 3 years, crashes – 5 years).• Follow the Adjudicated Citations Policy.

• Exceeds Requirements are:• Anything beyond the completion requirements.• Improvements to timeliness or consistency of responses.• Additional processes that address protection of privacy-related data.• Additional independent review processes or boards.

36

Page 37: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

37

Page 38: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

High Priority CMV SAFETY PROJECTS

OverviewJacob York , Program Officer

High Priority Grant & Southern Service CenterState Programs Representative

38

Page 39: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

HP CMV Safety Eligible PrioritiesComplete eligibility info in NOFO

1. Targeting unsafe driving of CMVs and non-CMVs in areas identified as high-risk crash corridors

2. Improvements for the Safe Transportation of Goods and Persons in Foreign Commerce

3. Improve CMV Safety and Compliance with CMV Safety Regulations

39

Page 40: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

HP CMV Safety Eligible Priorities Continued:Complete eligibility info in NOFO

4. Motorcoach safety initiativesa. Distracted driving by CMV drivers and others

operating around CMVs;b. CMV safety in work zones; andc. Innovative efforts that have a demonstrable

potential for nationwide implementation.

40

Page 41: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

HP CMV Safety Eligible PrioritiesComplete eligibility info in NOFO

5. Technologies to improve CMV safety6. CMV safety on Rural Roads7. Public Awareness and Education

Page 42: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Additional 2019 HP ProjectComplete eligibility info in NOFO

Temporary Project at FMCSA Headquarters

FMCSA’s Integrated Inspection Management System (IIMS) and related inspection modernization efforts.

• Period of performance – 1 fiscal year• approx. 10/1/2019 thru 9/30/2020

42

Page 43: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

43

Page 44: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Title VI Program RequirementsNote: Both the Plan & Assurance must be submitted each Fiscal Year in which Applicant submits a Grant Application to FMCSA. Please do not submit in Grants.gov with application. Both Plan and Assurances should be submitted directly to the Title VI Program Manager.

For more information and/or answers to questions, please contact:

Lester G. FinkleFMCSA National Title VI Program Manager

[email protected]

44

Page 45: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Title VI Program Requirements For FY 2019

FMCSA Title VI Program Compliance Plan Checklist: This is the format for the Title VI Program Compliance Plan. The Plan will include a Chief Executive Officer signed/dated FMCSA Title VI Program Assurance. The following is applicable:

45

Page 46: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Title VI Program Requirements For FY 2019 (Cont’d)

•FY 2018 Grantees: The FY 2018 approved Plan will be updated to identify any procedural changes (if any) and to update the status regarding any to-be-completed items (if any). The Policy Statement and Assurance will need to be re-signed/re-dated. The approval letter for the FY 2019 Plan will be provided upon receipt of the updated Plan;

46

Page 47: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Title VI Program Requirements For FY 2019 (Cont’d)

• FY 2019 Applicants that did not submit an application in FY 2018: Develop a FMCSA Title VI Program Compliance Plan using the Checklist or update the FMCSA-approved FY 2017 Plan using the FY 2019 Checklist. The FMCSA National Title VI Program Manager is providing technical assistance to each Applicant. The FY 2019 approval letter will be provided upon receipt of the final/updated Title VI Program Compliance Plan.

Page 48: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Title VI Program Compliance Plan Checklist

•Policy Statement;•FMCSA Title VI Program Assurance;•Description of Federal-Aid Programs;•Notification to Beneficiaries/Participants;•Sub-Recipient Compliance Reports;•Training;

48

Page 49: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Title VI Program Compliance Plan Checklist (Cont’d)

•Access to Records;•Complaint Disposition Process;•Status of Corrective Actions Implemented by Applicant to Address Deficiencies Identified During a Title VI Program Compliance Review;

•Community Participation Process.

49

Page 50: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Questions

Are there any questions?

Contact InformationLester Finkle

National Title VI Program [email protected]

202-366-4474

50

Page 51: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

High Priority GRANTS MANAGEMENT

OFFICEOverview

• Rikita Jarrett, Lisa Ensley, James Ross • Grants Management Specialist

• Grants Management Office

51

Page 52: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Application Submission• STEP #1: To apply, the applicant must complete the Grants.gov registration

process. Note that the new registration process can take as long as four weeks.

• STEP #2: Every applicant must be: 1) registered in the System for Award Management; 2) provide a valid Data Universal Numbering System (DUNS) number; and 3) continue to maintain an active SAM registration with current information at all times during which it has an active Federal award or an application under consideration by FMCSA. Failure to maintain DUNS and registration could jeopardize the successful submission of your application.

• STEP #3: Download the application package from Grants.gov, complete it, and submit the package with required attachments through Grants.gov on or before the deadline of 5pm (EST) o, 2019.

52

Page 53: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Required Application Document Checklist1. SF-424 Application for Federal Assistance2. SF-424A Budget Information for Non-Construction Programs3. SF-424B Assurances for Non-Construction Programs4. Grants.Gov Lobbying Form5. SF-LLL Disclosure of Lobbying Activities (if applicable)6. Key Contacts Form7. Project Narratives8. Budget Narratives9. Indirect Cost Rate Agreement (if applicable)10. ITD Program Plan approval letter (if applicable)

53

Page 54: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

SF-424

• FMCSA uses Boxes 8f and 21 as the appropriate point of contact (POC) for all pre-award and awarding activities, such as matters involving the application and accepting NGAs.

• The associated user account role in GrantSolutions (GS) for Box 8f is the Principal Investigator/Program Director (PI/PD) and for Box 21 is the Grantee Authorized Representative (ADO).

• The SF-424 establishes the POC for pre-award and awarding activities, it does not necessarily establish the POCs for all post-award activities throughout the grant’s lifecycle.

54

Page 55: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Key Contact Form

• The Key Contact Form (KCF) requests contact information for: 1.) Authorized Designated Official (authorized signer) 2.) Principal Investigator or Program Director (program/project manager); and 3) Financial Official (grants Manager).

• This form should also be used when establishing additional personnel for all award activities throughout the grant’s lifecycle; such as shared responsibilities for ADO and/or PI/PD roles.

55

Page 56: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Title VI Program RequirementsNote: Both the Plan & Assurance must be submitted each Fiscal Year in which Applicant submits a Grant Application to FMCSA. Please do not submit in Grants.gov with application. Both Plan and Assurances should be submitted directly to the Title VI Program Manager.

For more information and/or answers to questions, please contact:

Lester G. FinkleFMCSA National Title VI Program Manager

[email protected]

56

Page 57: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Indirect Cost Guidance• Before FMCSA will pay any reimbursements for indirect

costs, a current and approved indirect cost rate agreement must be in force.

• If the budget includes indirect costs, attach a copy of the fully executed, negotiated agreement with your application in Grants.gov (www.grants.gov)

• If the rate will not be approved by the application due date, attach the letter of renewal or letter of request that you sent to your cognizant agency to your application.

57

Page 58: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

How do I know that my application has been received by Grants.gov?

• Once Grants.gov has received your submission, they will send email messages to advise you of the progress of your application through the system.

• Over the next two business days, you should receive two emails: 1) confirms application receipt by the Grants.gov system; and 2) indicates that the application has either been successfully validated by Grants.gov prior to transmission to FMCSA or has been rejected due to errors.

58

Page 59: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

How do I know that my application has been received by Grants.gov? (cont.)

59

• IMPORTANT: Attachment file names must be limited to the following characters:• A-Z, a-z, 0-9, underscore (_), hyphen (-), space, and period.

• Using any other characters will cause the application to be rejected by Grants.gov!

• Please note that late application submissions will not be accepted.

Page 60: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

If you do not receive these emails contact Grants.Gov at:

• Phone: 1-800-518-4726 (toll-free) or 606-545-5035 • Business Hours: 24 hours a day, 7 days a week. Closed on Federal

holidays• Email: [email protected]

60

Page 61: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

What to Expect After the Application is Submitted

61

• Intake Review• Technical Merit Review• Budget Review/Cost Analysis• Federal Awarding Agency Review of Risk Posed by

Applicants• Applicant Past Performance w/ FMCSA• Consideration of Program-Specific Aspects

Applications undergo a series of reviews

Page 62: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Technical Merit ReviewTRP reviewers evaluate applications to determine how:• the proposal describes an enforcement program that will meet the stated

objectives of the notice of funding availability• the proposed work is based on sound principles of CMV safety enforcement and

will likely result in project success.• staffing resource allocation is sufficient to achieve the program objectives.

62

Page 63: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Technical Merit Review (cont.)• All equipment, training, and travel components are clearly linked to

the project goal and are necessary to adequately equip, train, and enable personnel;

• Proposed expenditures are reasonable in amount and clearly necessary to conduct the activities; these expenditures do not include unallowable expenses; proposed expenditures are eligible per the MCSAP Comprehensive Policy.

• Includes clearly-identified performance goals and measurements; and

• Includes a self-monitoring and evaluation component that indicates how the recipient will ensure project success

63

Page 64: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Applicant Performance and Budget ReviewReviewers evaluate applications to determine that:

• The application is reasonable in scope, adequate to address existing and emerging commercial vehicle safety issues, and likely to succeed;

• The proposed expenditures are reasonable based on personnel and budgetary practices; and

• The applicant successfully performs/manages current or past projects. • The proposed application includes a plan, milestones, measurable outcomes

• Budget costs identified in a particular category are properly identified as allowable, with the necessary detail for its use, and not duplicative to the other budget line items.

64

Page 65: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Federal Awarding Agency Review of Applicant Risk

Includes: • A debarment and suspension review, and a review of

the applicant’s administrative capability and SAM records;

• A review of the applicant’s history with other Federal agencies including Single Audit Clearinghouse Database; and

• An evaluation of the applicant’s Single Audit in accordance with the Single Audit Act.

65

Page 66: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Additional Considerations• FMCSA may conduct inquiries to obtain clarification (if necessary). • The FMCSA will consider the results of the reviews, applicant responses (if

applicable) and recommend that the application:• be approved for award from currently available funds

(in its entirety or in part), or• be declined due to limited funds or unfavorable review.

66

Page 67: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Award Administration Information • Once the FMCSA Administrator approves the recommendations, they may

be presented to the United States Secretary of Transportation for final approval.

• The FMCSA may not award grants or release information concerning application recommendations until Secretarial approval is obtained.

• FMCSA may not award grants until the enactment of authorizing legislation, an appropriations act, budget authority, and apportionment from the Office of Management and Budget.

67

Page 68: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

What are the expectations after approval?• After approval, the GMO issues the Notice of Grant Award

(NGA) to the recommended applicant via GrantSolutions, the FMCSA grant management system.

• Attached to the NGA is the FMCSA Financial Assistance Agreement General Provisions, Terms and Conditions of Award and Assurances.

• Applicants must agree fully to the terms and conditions, by accepting the award, before grant funds are made available.

68

Page 69: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Developing a Successful Budget NarrativeWhat is a Budget Narrative?• A budget narrative explains the “who, what, when, where, how and why”

of a line item cost to carry out grant project goals and objectives. (helps the reviewer understand the legitimacy of the cost proposed)

• The budget narrative:• Is clear, specific, detailed and mathematically correct• Shows how costs are allowable, allocable, reasonable and necessary• Is a description, by budget category (object class) that details the costs

necessary to complete the proposed projects• Provides a sufficient level of detail to justify the funding requested.

69

Page 70: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Eligible Expenses

Guidance available in:

• Motor Carrier Safety Grant Comprehensive Policy (MCP)

• 2 CFR part 200 Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards

70

Page 71: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

GMO Contact Information

•By E-mail: [email protected]•By Telephone: (202) 366-0621•Office hours are from 9 a.m. to 5 p.m., Eastern Standard Time, Monday through Friday, except Federal holidays.

71

Page 72: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

NOFO Point of Contact Rikita Jarrett, Grants Management

SpecialistGrants Management Office

(202) [email protected]

72

Page 73: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

73

Page 74: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Attachment A

ITD/PRISM/SaDIP samples of the sections below:• Problem Statement• Performance Objective • Program Activity Plan• Performance Measurement Plan • Monitoring and Oversight Plan

74

Page 75: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

ITD Problem Statement Example Commercial vehicle braking system violations are discovered in a large percentage of our State’s roadside inspections. The electronic screening systems currently deployed are unable to identify brake issues without having to do a manual inspection.

75

Page 76: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

ITD Performance Objective Example

The State will procure, install and test a thermal imaging system for incorporation into the existing e-screening system at the Interstate Port-of-Entry on I-42 westbound.

76

Page 77: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

ITD Program Activity Plan Example• Develop a Request for Proposal (RFP) which outlines the State’s needs at

the Port of Entry.• Evaluate proposals and make an award.• Schedule installation.• Conduct acceptance testing.• Train personnel on the use of new system.

77

Page 78: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

TD Performance Measurement Example•Project will commence on October 1, 2019 with ITD stakeholders meeting to develop requirements and statement of work to be performed.

•RFP will be published December 1, 2019.•Vendor conference conducted January 15, 2020.•Vendor selected March 1, 2020.•Vendor coordinates installation with State Project Manager May 1, 2020.

• Installation completed August 30, 2020.•Acceptance testing completed October 1, 2020•Training completed November 1, 2020.

78

Page 79: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

ITD Monitoring and Oversite Example

79

• Project progress will be reported quarterly to FMCSA and monitored utilizing the Performance Plan and Milestones outlined in the overall project plan.

• Inspection out-of-service and violation rates will be analyzed quarterly after full implementation to determine effectiveness of thermal imaging within the existing e-screening system.

• Crashes, injuries and fatalities will be analyzed annually to determine reduction progress.

Page 80: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

PRISM Problem Statement Example

80

The State’s Commercial Motor Vehicle CMV registration agency does not have the technical framework within their current registration system to suspend or revoke and deny registration, if the motor carrier responsible for the safety of the vehicle is under any Federal Out-of-Service order.

These activities are required to “fully participate” in the PRISM program by the mandatory date of Oct. 1, 2020.

Page 81: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

PRISM Performance Objective Example

81

The State’s CMV registrationagency will upgrade their technicalframework to ensure theirregistration system can facilitatethe required activities to “fullyparticipate” in the PRISMprogram.

Page 82: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

PRISM Program Activity Plan ExampleDevelop Request for Proposal (RFP) outlining State’s needs to upgrade

their registration system to perform registration activities to achieve full

participation.

Evaluate proposals and

make an award

Develop capabilities

Conduct testing

Train personnel on the use of

upgraded system

82

Page 83: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

PRISM Performance Measurement Plan Example

83

Dates Milestone Plan Description

10.01.18 Project starts PRISM stakeholders meet to develop requirements and SOW to be performed

12.01.18 RFP published Outline State’s need to upgrade their registration system and why

03.01.18 Vendor selected Evaluate proposal, make award

05.01.19 Systems upgrade begins Vendor coordinates upgrade with State Project Manager

08.30.19 Systems upgrade completed

State verifies upgrade with State Project Manager

10.01.18 Testing Systems tested to verify the requirements and SOW have been met

11.01.19 Training Develop and/or implement training plan

Page 84: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

PRISM Monitoring and Oversite Plan Example

Grant Quarterly ReportsReport progress quarterly to FMCSA utilizing the Performance Plan

and Milestones outlined in the overall project plan

PRISM Quarterly ReportsReport progress quarterly to FMCSA on the number of registration

suspensions and denials

84

Page 85: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

SSDQ Problem Statement ExampleThe State is unable to evaluate safety risks of commercial motor vehicles (CMV) based on outdated information collection techniques. This affects the State’s ability to recognize high crash corridors involving CMVs, being able to properly link crash data with other State systems (driver licensing, vehicle registrations, citations, etc.), and impacts the completeness, timeliness and accuracy of crash records sent to FMCSA.

85

Page 86: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

SSDQ Performance Objective ExampleThe State will update the eCrash systems that capture and store crash data to include all CMV-related elements from the Model Minimum Uniform Crash Criteria, creating additional data quality checks, and will create additional analytical capabilities in order to implement roadway data and targeted enforcement strike operations.

86

Page 87: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

SSDQ Program Activity Plan Example• Develop a Statement of Work (SOW) which outlines the State’s needs to

needs to improve CMV-related crash data.• Evaluate proposals and make an award.• Schedule installation.• Conduct testing.• Train personnel on the use of new/updated system.

87

Page 88: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

SSDQ Performance Measurement Plan Example

• Project begins October 2018 with eCrash stakeholders meeting to develop requirements and statement of work to be performed.

• Modifications to SOW agreed by all parties December 2018

• Vendor development Phase 1 completed August 2019• Phase 1 testing completed October 2019• Vendor development Phase 2 completed April 2020• Phase 2 testing completed June 2020• Training completed September 2020

88

Page 89: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

SSDQ Monitoring and Oversite Plan Example

89

• Project progress will be reported quarterly to FMCSA and monitored utilizing the Performance Plan and Milestones outlined in the overall project plan.

• State Safety Data Quality measures will be analyzed monthly and annually to determine effectiveness in overall program progress and specific grant impact.

Page 90: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Attachment B Budget Narrative Sample and Tips / SF-424A Categories:

• Personnel• Fringe• Travel• Equipment• Supplies• Contractual• Other

90

Page 91: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Sample Personnel Budget NarrativePersonnel Budget Narrative (SF-424A, Line 6a)

Position(s) # of Staff % of Time Work Year Hours Hourly Salary/Wage Total CostSupervisor 1 100 2,080 $21.63 $45,000Trooper 1 100 2,080 $19.00 $39,520Trooper 10 50 2,080 $19.00 $197,600

Total Cost for Personnel: $282,120The Supervisor supervises activities of the project. She/he spends 100% time implementing the project, supervising staff, and conducting activities to meet the objectives. Activities include: supervising daily operation of projects and staff, providing staff training/technical assistance, coordinating staff work schedule/assignments, ensuring data entry, tracking and following-up on procedures to meet quality assurance, and tracking policy to ensure compliance. There are 11 Troopers (1 FT, 10 PT). Officers conduct roadside inspections to fulfill reporting requirements. Each officer is paid an hourly wage of $19 and the part-time officers average 50% on activities. The FT Trooper wages equate to $39,520 annually, with the PT (10) Troopers averaging 1,040 hours or 50% on activities @ $19,760 per year.

91

Page 92: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Personnel Budget Tips

• FMCSA evaluates personnel costs to determine that:• Proposed number of personnel is appropriate

and that there is sufficient staffing• Salary ranges are reasonable

• The labor mix should be consistent with the caliber of effort (professional, nonprofessional and clerical) required by the grant

92

Page 93: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Sample Fringe Budget NarrativeFringe Benefits Budget Narrative (SF-424A, Line 6b)

Position Benefits Rate Base Amount Total Cost

1 Trooper Fringe 16.72 100 $6,60810 Troopers (Part-Time) Fringe 16.72 50 $33,040

Total Cost for Fringe: $39,648Fringe benefits include cost of health insurance, retirement, workers’ compensation and unemployment benefit plans. It is calculated at the average fringe rate of 16.72 as recognized by the cognizant agency. This fringe rate is applied to the average hourly rate of $19 per trooper, with a projected annual hours worked at 2,080 hours. The full-time trooper would have an annual wages of $39,520 x 16.72% or $6,608 total fringe cost for the one full-time trooper. The 10 part-time troopers average 1,040 hours or $19,760 per year, and an average (per part-time Trooper) fringe cost of $3,304 (Totaling $33,040 fringe costs for the 10 part-time Troopers).

93

Page 94: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Fringe Budget Tips• Include how you calculated the benefit amount

• E.g., actual fringe benefits, rate approved by the Health and Human Services State Wide Cost Allocation Plan or cognizant agency

• Explain what is included in the benefit package• Fringe percentages are averages—the SF-270 will provide specific

fringe costs of employees when you seek reimbursement

94

Page 95: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Fringe Budget Tips, cont.• Do not combine the fringe benefit costs with direct salaries

and wages in the personnel category. • An agency who is on a cash basis shall not accrue leave

expenses per 2 CFR 200.431(b)(3)(i-ii).

95

Page 96: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Sample Travel Budget NarrativeTravel Cost Budget Narrative (SF-424A, Line 6c)

Purpose # of Staff Method of Travel # of Days Total CostRoutine Travel 10 Car 10 $4,600San Diego Conference 15 Air 5 $28,410

Total Cost for Travel: $33,010Costs represent necessary travel funds for law enforcement officers to provide adequate coverage within the state. Travel is necessary to perform compliance reviews, patrols, and team operations in high crash corridors within the State. Reimbursement is based upon the current state per diem rates and rules. The per diem rate for each day is $46.00.Certification Training in San Diego for 15 officers with an average cost (per officer) of

$600 – Airfare or $9,000; $204 Per State Approved Diem or $3,060; $290 – Hotel Accommodations or $4,350; and $800 – Registration Fees or $12,000 for a total of $28,410.

96

Page 97: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Travel Budget Tips

• Travel costs include field work activities or professional meetings• FMCSA evaluates:

• Out-of-state to ensure the trips planned are necessary to complete the scope of work

• The number of travelers is consistent with the trip purpose

97

Page 98: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Travel Budget Tips, cont.

Some more helpful tips• Place unexpected conferences/trips into the budget – no need to

breakout daily cost• Include estimates for unforeseen travel with and estimated costs• Explain the reason for travel expenses for project personnel

98

Page 99: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Sample Equipment Budget NarrativeEquipment Cost Budget Narrative (SF-424A, Line 6d)

Item Name # of Items Cost per Item Total CostVehicles 12 $36,000 $432,000

Total Cost for Equipment: $432,000The state requests 12 new vehicles to complete motor carrier safety inspections that will replace vehicles that have reached their useful life by the state’s vehicle replacement policy. These vehicles will only be used for grant eligible purposes and are needed to fulfill activities proposed in the application. The cost for the vehicles is approximately $36,000 each based on the state’s procurement contract.

99

Page 100: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Equipment Budget Tips

• Tangible, nonexpendable, personal property items that have a useful life of more than one year and an acquisition cost of $5,000 or more per unit

• FMCSA evaluates the need for the equipment (e.g., ratio of employees to equipment) in the budget narrative and how it supports project activities

100

Page 101: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Equipment Budget Tips, cont.

Some more helpful tips

• Indicate if your equipment threshold is below $5,000• Explain the purpose and use of each item of equipment

• Prorate, if applicable• Common purchases like a computer system are considered

equipment if the total cost exceeds the threshold

101

Page 102: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Sample Supplies Budget Narrative

Supplies Cost Budget Narrative (SF-424A, Line 6e)Item Name # of Units Cost per Unit Total Cost

General Office Supplies 12 $39 $4,680

Mobile Printers 7 $250 $1,750

Laptop Computers 12 $2,000 $24,000Total Cost for Supplies: $30,430

General office supplies include paper, printer ink, etc. for 26 officers in the program. These 26 officers require supplies that are estimated at $39 for 12 months. Ten part-time troopers require laptops and shall be utilized only to fulfill planned activities. Mobile printers are also needed for 5 new full-time officers. The total number of officers is 26, including the 5 new officers and 10 part-time troopers. The extra printers and laptops are requested for replacement purposes. These officers conduct roadside inspections to fulfill reporting requirements.

102

Page 103: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Supplies Budget Tips

• Supplies are tangible personal property other than equipment

• FMCSA evaluates supplies costs to ensure a sufficient level of detail that would allow an informed reader to understand that the standard office supplies are reasonable

103

Page 104: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Supplies Budget Tips

Some more helpful tips• Document supplies by indicating the approximate expenditure of the unit

as a whole• Remember to include a quantity and unit cost for larger cost supply items

such as computers and printers

104

Page 105: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Sample Contractual Budget NarrativeContractual Cost Budget Narrative (SF-424A, Line 6f)Description of Services Total Cost

Local Police Department - Subgrantee $8,000Contract services for crash timeliness $200,000

Total Cost for Contractual: $208,000Subgrant costs include $8,000 in travel for 12 officers to conduct grant activities. Costs represent necessary funds for officers to provide adequate coverage within the state. Travel is necessary to perform inspections, patrols, and team operations in high crash corridors within the State. Reimbursement is based upon the current state per diem rates and rules. The per diem rate for each day is $46.00.Contract services include an assessment of the timeliness and quality of our data systems. The contractor will oversee development plans to implement system improvements to support the state’s highway safety programs. The contractor will conduct analyses of crash, ticket, and inspection data used in the planning and development of the CVSP, evaluating program and legislative initiatives, and monitoring the performance of the program.

105

Page 106: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Contractual Budget Tips

FMCSA reviews the contractual narrative to ensure it contains:• Descriptive information about what specific costs (products and/or

services) would be charged to the grant• A rationale for how those costs were derived, and the applicability

and necessity of each to the grant

106

Page 107: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Contractual Budget Tips, cont.A contractor:• Provides goods and services within normal business operations• Provides similar goods or services to different purchasers• Operates in a competitive environment• Provides goods or services that are ancillary to the operation of the

Federal program

107

Page 108: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Contractual Budget Tips, cont.

A subgrantee:• Has performance measured in relation to whether objectives of a

Federal program were met; • Has a programmatic decision-making role; • Is responsible for adhering to applicable Federal program

requirements• Uses Federal funds to carry out a program for a public purpose

108

Page 109: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Contractual Budget Tips, cont.Some more helpful tips• Include the name of the vendor/subgrantee, if known

• If not, indicate that the selection is pending and an estimated timeframe when the vendor/subgranteewill be selected

• Explain the purpose of the contract/subgrant and how the cost was estimated

109

Page 110: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Sample Other Budget Narrative

Other Cost Budget Narrative (SF-424A, Line 6h)Item Name # of Units Cost per Unit Total Cost

Copy machine rental 12 $50 $600Total Cost for Other: $600

The rental of the copy machine is shared with the administration. The machine is used on a daily basis to print inspection reports. A code is punched in whenever it is used for grant purposes. Based on the average usage of the machine for grant activities: $50.00 per month times 12 months.

110

Page 111: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Other Budget Tips• Other costs are costs that do not fit within any of the

other object class categories• Typical costs in this category include printing and

advertising costs

111

Page 112: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Other Budget Tips, cont.FMCSA reviews other costs to determine costs are:• Consistent with the proposed work plan• Necessary to complete the approved work plan• Allowable• Reasonable

112

Page 113: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Other Budget Tips, cont.If planning to lease:

• A lease is considered “other” when you are not the prime on the agreement—i.e., you are partnering with or using a shared utility, facility or other service

• A lease is considered a contractual cost when you directly engage, and form a contract with, a vendor

113

Page 114: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Other Budget Tips, cont.

Ensure other costs such as professional services, audit, postage, printing, facilities expenses are not already in your indirect cost rate agreement/cost allocation plan

114

Page 115: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Sample Indirect Cost Budget Narrative

Indirect Cost Budget Narrative (SF-424A, Line 6j)

IndirectCost Rate

Rate Period

Rate Period End

Cost BaseIndirect Cost

Expense35% 7/1/2016 6/30/2017 108,750.00 38,062.50

In this example, there is a current approved indirect rate of 35% which applies to salaries/wages and fringe benefits. The total salary amount included in the budget is $70,200, and the associated fringe costs are $38,550. The total eligible indirect expense is $108,750 to which the rate of 35% may be applied. The resulting indirect expense is $38,062.50.

115

Page 116: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Indirect Cost Tips, cont.

• Remember to include your indirect cost rate agreement with your application in Grants.gov (www.grants.gov)• If your rate will not be approved by the due date,

attach the letter of renewal or letter of request you sent to your cognizant agency

• This will be a placeholder until the rate is approved

• Grantees may not receive reimbursement for indirect costs until the rate is approved

116

Page 117: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Indirect Cost Tips, cont.

• Grantees can request a one time extension of their indirect rate for up to 4 years. See 2CFR.200.414 (g) Restrictions apply:

• Request should be approved by the Federal Cognizant Agency.• If extension is granted, the rate will not be reduced or renegotiated

until the extension period is over.• Grantees can request another one time extension of a current rate,

as long as there’s another negotiated rate between the 4 year extension.

117

Page 118: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Indirect Cost Tips, cont. (de minimis)

• The de minimis rate is allowable at 10% and the following restrictions apply:

• Grantee has never had a Federally approved indirect rate• Rate is applied to modified total direct cost only• State or local gov’t agencies that receive more than $35Min federal

funds can’t use de minimis rate• A grantee must use the de minimis rate for all their Federal awards (if

indirect is allowable). Grantee’s can’t use a negotiated rate for one Federal agency and the de minimis rate for a different Federal agency.

118

Page 119: FY2019 High Priority Funding Conference FMCSA FY 2019 HIGH … · 2019-12-13 · Rikita Jarrett, Lisa Ensley, and James Ross . Grants Management Specialist. Grants Management Office

FY2019 High Priority Funding Conference

Indirect Cost Tips (de minimis)

• Grantee can use this rate for as long as they choose or until they get a negotiated rate

• 2 CFR 200.414 (f)In an effort to relieve administrative burden, Office of Management and Budget (OMB) specified that non-federal entities that have never received a negotiated indirect cost rate many elect to charge a de minimis rate of 10% of modified total direct costs, which may be used indefinitely.

119