Page 1: FY 2016 Annual Listing of Obligated Projects · Annual Listing of Obligated Projects (ALOP) The ALOP is a requirement of metropolitan planning areas, per § 450.332: (a) In metropolitan

FY 2016 Annual Listing of

Obligated Projects

Page 2: FY 2016 Annual Listing of Obligated Projects · Annual Listing of Obligated Projects (ALOP) The ALOP is a requirement of metropolitan planning areas, per § 450.332: (a) In metropolitan
Page 3: FY 2016 Annual Listing of Obligated Projects · Annual Listing of Obligated Projects (ALOP) The ALOP is a requirement of metropolitan planning areas, per § 450.332: (a) In metropolitan

FY 2016 Annual Listing of Obligated Projects - Introduction i

Introduction Each year, the Ozarks Transportation Organization develops a list of all funding obligated during the

preceding federal fiscal year, October 1, 2015 through September 30, 2016. This is known as the Annual

Listing of Obligated Projects (ALOP). An obligation is a commitment of the federal government’s

promise to pay for the federal share of a project’s eligible cost. This commitment occurs when the

project is approved and the project agreement is executed. Obligation is a key step in financing and

obligated funds are considered “used” even though no cash is transferred.

Annual Listing of Obligated Projects (ALOP) The ALOP is a requirement of metropolitan planning areas, per § 450.332:

(a) In metropolitan planning areas, on an annual basis, no later than 90 calendar days following the

end of the program year, the State, public transportation operator(s), and the MPO shall

cooperatively develop a listing of projects (including investments in pedestrian walkways and

bicycle transportation facilities) for which funds under 23 U.S.C. or 49 U.S.C. Chapter 53 were

obligated in the preceding program year.

(b) The listing shall be prepared in accordance with § 450.314(a) and shall include all federally

funded projects authorized or revised to increase obligations in the preceding program year, and

shall at a minimum include the TIP information under § 450.324(e)(1) and (4) and identify, for

each project, the amount of Federal funds requested in the TIP, the Federal funding that was

obligated during the preceding year, and the Federal funding remaining and available for

subsequent years.

(c) The listing shall be published or otherwise made available in accordance with the MPO’s public

participation criteria for the TIP.

TIP (Transportation Improvement Program) The TIP is a financially constrained four-year program outlining the most immediate implementation

priorities for area transportation projects, carrying out the goals and vision of Transportation 2040, the

OTO’s long range transportation plan. It serves to allocate limited financial resources among the various

transportation needs of the community and to program the expenditure of federal, state, and local

transportation funds. In order to receive federal highway or transit funds, a project must be included in

the TIP. The TIP is developed through a collaborative process in which each jurisdiction or federal

recipient of transportation funds is given the opportunity to submit projects to be considered for

placement in the TIP. No project can receive federal funds unless it appears in the TIP.

Ozarks Transportation Organization (OTO) The Ozarks Transportation Organization (OTO) is the designated Metropolitan Planning Organization for

the Springfield, Missouri Urbanized Area. Metropolitan planning organizations serve to conduct and

lead a continuing, cooperative, and comprehensive transportation planning process. In an effort to

make the transportation planning process cooperative and collaborative, elected officials from

jurisdictions within the urban area and major transportation providers are members of the Ozarks

Transportation Organization. The mission of the OTO is to provide a forum for cooperative decision-

making in support of an excellent regional transportation system.

Page 4: FY 2016 Annual Listing of Obligated Projects · Annual Listing of Obligated Projects (ALOP) The ALOP is a requirement of metropolitan planning areas, per § 450.332: (a) In metropolitan

FY 2016 Annual Listing of Obligated Projects - Introduction ii

The Report As stated in federal law, the ALOP has a number of required elements. Below is an explanation of each

column included in the report.

PROJECT NO This is the Federal Number assigned to a project when it is entered into the federal financial

management system.

JOB NO This is an ID assigned by MoDOT (Missouri Department of Transportation) for tracking of projects at the

state level.

PROJECT DESCRIPTION Contains a brief description of the project.

COUNTY County where project is to take place.

DISTRICT This references the MoDOT District where the project is taking place. In this case, “SW” stands for the

MoDOT Southwest District.

TIP NUMBER The OTO assigns each project a unique identifier to track it through the local process. This number is

often assigned before the state and federal IDs are known.

TIP YEARS The TIP is developed annually with a four-year time horizon. This column indicates each edition of the

TIP where the project appears. An additional qualifier, like “A1” or “AM2,” indicates if the project was

part of an amendment or administrative modification to the TIP.

PROGRAMMED YEAR This lists the actual years when funding was planned to be obligated for the project. The (AC) appearing

after certain years indicates the expected year of advance construction conversion. MoDOT uses a

federal funding tool called advance construction to maximize the receipt of federal funds and provide

greater flexibility/efficiency in matching federal-aid categories to individual projects. Advance

Construction (AC) is an innovative finance funding technique, which allows states to initiate a project

using non-federal funds, while preserving eligibility for future federal-aid. AC does not provide

additional federal funding, but simply changes the timing of receipts by allowing states to construct

projects with state or local money and then later seek federal-aid reimbursement.

PREVIOUSLY PROGRAMMED FEDERAL FUNDS These are the funds that were scheduled to be obligated during or prior to federal fiscal year 2016.

FUTURE PROGRAMMED FEDERAL FUNDS These are funds that are estimated to be obligated after federal fiscal year 2016.

Page 5: FY 2016 Annual Listing of Obligated Projects · Annual Listing of Obligated Projects (ALOP) The ALOP is a requirement of metropolitan planning areas, per § 450.332: (a) In metropolitan

FY 2016 Annual Listing of Obligated Projects - Introduction iii

PROGRAM CODE The program code is associated with the category of federal funding that was obligated for the project.

The program code changes with each surface transportation bill and extension. A search of this

document (http://www.fhwa.dot.gov/federalaid/projects.cfm) will provide information on the source of

funding for each program code. As a quick reference, the first letter in the code is related to a particular

surface transportation bill. Funding from the FAST Act, the most recent bill, starts with the letter “Z,”

MAP-21, starts with the letter “M,” while funding that starts with the letter “L” is from SAFETEA-LU.

Some funding is still shown for some older projects as having come from TEA-21 (Q) and from an

extension of TEA-21 (H). To learn more about the current surface transportation bill, the FAST Act, click

here - http://www.fhwa.dot.gov/fastact/. The U.S. DOT website is a good source of information on

federal funding programs.

TRANSACTION DATE This is the date that funding was obligated during the 2016 federal fiscal year.

FEDERAL FUNDING CHANGE This is the amount of money either obligated or de-obligated during the 2016 federal fiscal year. Values

shown in the positive are obligations and values shown in the (negative) are de-obligations. Funding is

often de-obligated at the end of a project if costs were less than expected.

PREVIOUS ALOP(S) FUNDING CHANGE This shows all obligations prior to the 2016 federal fiscal year. Current and past funding changes are

shown by Program Code.

REMAINING FUTURE FEDERAL FUNDS This shows how much money is left to obligate based on the amount of funding programmed in the OTO

Transportation Improvement Program. If the project is complete, the amount is left at $0.00, which is

also the case when the obligated amount has maxed the available programmed funding. Generally, this

number is determined by subtracting all obligated funding from all programmed funds, regardless of the

year in which funding was programmed.

Page 6: FY 2016 Annual Listing of Obligated Projects · Annual Listing of Obligated Projects (ALOP) The ALOP is a requirement of metropolitan planning areas, per § 450.332: (a) In metropolitan
Page 7: FY 2016 Annual Listing of Obligated Projects · Annual Listing of Obligated Projects (ALOP) The ALOP is a requirement of metropolitan planning areas, per § 450.332: (a) In metropolitan

FY 2016 Annual Listing of Obligated Projects

PROJECT NO JOB NO PROJECT DESCRIPTION COUNTY DISTRICT TIP NUMBER TIP YEARSPROGRAMMED

YEAR*

PREVIOUSLY

PROGRAMMED

FEDERAL FUNDS

FUTURE

PROGRAMMED

FEDERAL FUNDS

PROGRAM

CODE TRANS DATE FED FUND CHANGE

PREVIOUS ALOP(S)

FUNDING CHANGE

REMAINING FEDERAL

FUNDS

000S124 N/ABNSF RAIL/GRADE CROSSING IMPROVEMENT FOR

PROTECTIVE DEVICES (DOT #664 097H, LE COMPTE)GREENE SW VARIOUS N/A N/A N/A N/A LS4E 7/12/2016 $26,600.00 $187,929.00 N/A

LS5E 5/2/2016 ($133,132.26) $581,852.88

LS50 5/2/2016 ($41,326.24) $197,353.26

LS5R 5/2/2016 ($18,542.62) $54,351.00

LS50 -- $0.00 $123,648.64

LS5E -- $0.00 $101,892.53

MS5E -- $0.00 $1,455,607.47

M24E 1/15/2016 $489,905.44 $0.00

LS50 12/30/2015 ($6.42) $4,550.00

Q270 12/30/2015 ($87.58) $17,180.10

000S446 N/A

RAIL/GRADE CROSSING IMPROVEMENT FOR

PROTECTIVE DEVICES (DOT #446 117B, BOB BARKER

BLVD)

GREENE SW VARIOUS N/A N/A N/A N/A MS40 7/6/2016 $0.00 $7,000.20 N/A

000S452 N/ABNSF RAIL/GRADE CROSSING IMPROVEMENT FOR

PROTECTIVE DEVICES (DOT #664 180J JEFFERSON)GREENE SW VARIOUS N/A N/A N/A N/A LS5E 11/20/2015 $19,075.05 $0.00 N/A

000S453 N/ABNSF RAIL/GRADE CROSSING IMPROVEMENT FOR

PROTECTIVE DEVICES (DOT #664 181R BRICK CITY)GREENE SW VARIOUS N/A N/A N/A N/A MS40 12/18/2015 $14,870.25 $0.00 N/A

LS40 1/4/2016 $1,647.85 $0.00

LS50 1/4/2016 $15,938.75 $0.00

MS50 1/4/2016 $41,178.19 $0.00

LS5E 1/4/2016 $113,589.84 $0.00

LS4E 1/4/2016 $271,146.65 $0.00

MS5E 11/20/2015 $281,032.17 $0.00

LS5E 11/20/2015 $344,294.13 $0.00

000S463 N/ABNSF RAIL/GRADE CROSSING IMPROVEMENT FOR

PROTECTIVE DEVICES (DOT #945 679P BRICK CITY)GREENE SW VARIOUS N/A N/A N/A N/A Q260 12/18/2015 $2,625.30 $0.00 N/A

000S464 N/A

BNSF RAIL/GRADE CROSSING IMPROVEMENT FOR

PROTECTIVE DEVICES (DOT #664 198U METEOR/FR

123)

GREENE SW VARIOUS N/A N/A N/A N/A MS40 12/18/2015 $218,645.28 $0.00 N/A

000S465 N/ABNSF RAIL/GRADE CROSSING IMPROVEMENT FOR

PROTECTIVE DEVICES (DOT #664 199B FR 123)GREENE SW VARIOUS N/A N/A N/A N/A MS4E 12/14/2015 $252,670.32 $0.00 N/A

000S466 N/ABNSF RAIL/GRADE CROSSING IMPROVEMENT FOR

PROTECTIVE DEVICES (DOT #929 153Y JUNCTION)GREENE SW VARIOUS N/A N/A N/A N/A H260 12/18/2015 $2,500.65 $0.00 N/A

000S467 N/ACHRISTIAN CO, BNSF RAIL/GRADE CROSSING

IMPROVEMENT FOR PROTECTIVE DEVICESCHRISTIAN SW VARIOUS N/A N/A N/A N/A ZS50 3/8/2016 $412,226.01 $0.00 N/A

M0E1 12/15/2015 $0.00 $102,540.27

M001 12/15/2015 $0.00 $2,355,138.67

L23E -- $0.00 $799,517.00

MS4E -- $0.00 $203,138.95

M0E1 5/30/2016 $111,906.04 $1,231,912.80

0132079 J8P3039MO 13 GREENE CO; BRIDGE IMPROVEMENTS OVER

RADIO LANE NORTH OF SPRINGFIELD; 0.0 MIGREENE SW GR1408

2014-2017 A3, 2015-

2018 A5

2014, 2014 (AC),

2015, 2015 (AC),

2016, 2016 (AC)

$1,214,400.00 $0.00 M0E1 6/12/2015 $0.00 $0.00 $1,214,400.00

0132080 J8P3035MO 13 GREENE CO; PAVEMENT IMPROVEMENTS

FROM NORTON RD TO EVERGREEN STREET; 0.25 MIGREENE SW MO1404 2015-2018 A5

2014, 2015, 2015

(AC), 2016, 2017$1,600.00 $220,000.00 M0E1 5/17/2016 $184,589.95 $0.00 $37,010.05

0132083 J8S3063MO 13, GREENE CO; SAFETY IMPROVEMENTS ON THE

SB LANES N/O DIVISION STREET IN SPRINGFIELDGREENE SW GR1603 2017-2020 2016, 2017 $1,800.00 $51,300.00 ZS31 9/12/2016 $40,074.17 $0.00 $13,025.83

0141018 J8S2414

RTE 14, CHRISTIAN COUNTY, SAFETY IMPROVEMENTS

ON VARIOUS CURVES 0.75 MILES WEST OF NIXA, 1.02

MI

CHRISTIAN SW CC1401 2014-2017 2013, 2014 $282,600.00 $0.00 LS3E 4/5/2016 $14,449.34 $0.00 COMPLETE - $0.00

0132078 J8P3042

RT 13, GREENE CO, PAVEMENT IMPROVEMENTS ON

VARIOUS SECTIONS OF KANSAS EXPRESSWAY FROM I-

44 TO MT VERNON ST IN SPRINGFIELD, 3.16 MI

0132072 J8P2263B

$799,517.00

GREENE SW

N/AN/A

$0.00

000S418 J7S3041MO 125 GREENE CO; RAILROAD CROSSING GRADE

SEPARATON 0.1 MILE SOUTH OF RTE D; 0.80 MIGREENE SW

RAIL/GRADE CROSSING IMPROVEMENT FOR

PROTECTIVE DEVICES (DOT #664 176U CENTRAL)N/A000S456 N/AN/AN/AVARIOUSSWGREENE

GR13052013-2016,

2014-20172013, 2014, 2015 (AC) $2,228,000.00

GR1402 2015-2018 AM2 2014, 2015 $1,466,267.00

MO 13, GREENE COUNTY, PAVEMENT

IMPROVEMENTS ON VARIOUS SECTIONS FROM RTE

WW TO I-44 IN SPRINGFIELD, 6.17 MI

000S455 N/A

GREENE CO, BNSF RAIL/GRADE CROSSING

IMPROVEMENTS FOR PROTECTIVE DEVICES (DOT #673

263W FARM ROAD 199 NEAR OO)

GREENE SW VARIOUS N/A N/A N/A N/A N/A

SW $400,000.00 ST1204 2013-2016 2013000S431 N/A

000S364 N/A

BNSF RAIL/HWY CROSSING IMPROVEMENT FOR

PROTECTIVE DEVICES (DOT #664 106E, CHERRY OVER

THAYER NEAR US 65; DOT #664 116K NATIONAL; DOT

#664 182X, CAMPBELL; DOT #664 246G, GLENSTONE;

DOT #070 158D, HOLT COUNTY)

HOLT

GREENESW

VARIOUS, INC.

SP1115, SP13092013-2016 N/A N/A N/A COMPLETE - $0.00

2014-2017 A1 2014SP1417GREENE SW $0.00

$0.00 COMPLETE - $0.00

$0.00 COMPLETE - $0.00

$0.00 $0.00

RAIL/GRADE CROSSING IMPROVEMENT FOR

PROTECTIVE DEVICES (DOT #673 257T ON 125 NEAR

STRAFFORD)

GREENE

Page 1 of 7

Page 8: FY 2016 Annual Listing of Obligated Projects · Annual Listing of Obligated Projects (ALOP) The ALOP is a requirement of metropolitan planning areas, per § 450.332: (a) In metropolitan

PROJECT NO JOB NO PROJECT DESCRIPTION COUNTY DISTRICT TIP NUMBER TIP YEARSPROGRAMMED

YEAR*

PREVIOUSLY

PROGRAMMED

FEDERAL FUNDS

FUTURE

PROGRAMMED

FEDERAL FUNDS

PROGRAM

CODE TRANS DATE FED FUND CHANGE

PREVIOUS ALOP(S)

FUNDING CHANGE

REMAINING FEDERAL

FUNDS

M2E1 12/15/2105 ($36,990.95) $59,314.21

L20E -- $0.00 $19,200.00

M301 -- $0.00 $165,587.00

0141022 J8S2443

MO 14 CHRISTIAN CO; PAVEMENT IMPROVEMENTS

ON VARIOUS SECTIONS FROM 1.6 MI W/O RT M TO

0.2 MI W/O RT M IN NIXA; 2.62 MI

CHRISTIAN SW CC13012013-2016, 2014-

20172013, 2014, 2015 (AC) $196,700.00 $0.00 M001 4/20/2016 $0.00 $118,007.62 COMPLETE - $0.00

M230 5/30/2016 $933,056.71 $0.00

M0E1 5/30/2016 $1,065,487.89 $0.00

0141024 J8P2383

MO 14 CHRISTAIN CO; HIGH FRICTION SURFACE

TREATMENT ON CURVES NEAR RICHWOOD ROAD;

0.097 MI

CHRISTIAN SW MO12012013-2016, 2015-

2018 A5

2013, 2014, 2015,

2016$73,900.00 $0.00 MS30 11/10/2015 ($504.27) $55,170.89 $19,233.38

1/4/2016 $195,629.38

3/17/2016 $12,268.12

0442257 J8P3023

LP 44, GREENE CO, SAFETY IMPROVE ON VARIOUS

SECTIONS OF GLENSTONE AVE FROM I-44 TO

BATTLEFIELD RD. 6.419 MI

GREENE SW MO1604 2015-2018 A5 2015, 2016 $766,800.00 $0.00 ZS31 5/17/2016 $602,825.63 $0.00 $163,974.37

MS30 12/14/2015 ($2,140,446.04) $6,867,264.18

ZS31 5/30/2016 $207,685.35 $0.00

1/4/2016 $0.00

3/17/2016 $0.00

0442286 J8I3047

IS 44, GREENE CO; PVMT IMPROVEMENTS ON

DISCONECTED SECTIONS FROM 0.5 MI E/O RTE 125 IN

STRAFFORD TO THE WEBSTER CO LINE

GREENE SW GR16022015-2018 A5, 2017-

20202016, 2017 $4,500.00 $342,900.00 Z001 9/12/2016 $351,198.91 $0.00 $0.00

0442287 J8S3062LP 44, GREENE CO; SAFETY IMPROVEMENTS ON THE

WB LANES E/O COLLEGE RD IN SPRINGFIELDGREENE SW SP1604

2015-2018 A9, 2017-

20202016, 2017 $1,800.00 $57,600.00 ZS31 9/12/2016 $60,711.83 $0.00 $0.00

MS30 9/14/2016 $23,650.00 $0.00

Z001 9/14/2016 $1,400,377.58 $0.00

L05E 4/6/2016 $4,280.91 $9,894.98

H170 -- $0.00 $45,968.10

H660 -- $0.00 $2,886,847.24

3AA0 -- $0.00 $152,719.58

L050 -- $0.00 $1,382,180.68

MS31 -- $0.00 $908,250.29

M001 1/14/2016 $5,979.05 $1,456,355.71

MS30 -- $0.00 $3,605,798.95

MS30 -- $0.00 ($299,012.93)

MS31 -- $0.00 ($272,373.10)

MSE1 -- $0.00 $197,298.95

M001 -- $0.00 $1,118,582.22

M001 -- $0.00 $31,848.40

M0E1 -- $0.00 $3,634,254.97

0602085 J8P3004

US 60, GREENE CO. PAVEMENT IMPROVEMENTS ON

VARIOUS SECTIONS FROM RTE. 174 TO RTE 360/60.

4.20 MI

GREENE SW RP13012013-2016, 2014-

20172013, 2014, 2015 (AC) $1,346,400.00 $0.00 M001 12/15/2015 ($2,474.38) $1,196,132.56 COMPLETE - $0.00

0602089 J8P3049

US60, GREENE CO; PVMT IMPROVEMENTS FROM RT

13 (KANSAS EXP) TO 0.7 MI W/O RT 65 IN

SPRINGFIELD

GREENE SW SP1601 2015-2018 A5 2016 $281,600.00 $0.00 Z001 7/6/2016 $428,127.48 $0.00 $0.00

0602090 J8P3031

US 60 GREENE CO; PAVEMENT IMPROVEMENTS

FROM COUNTY RD 194 TO 0.3 MI W/O ILLINOIS ST IN

REPUBLIC; 1.19 MI

GREENE SW RP14012014-2017,

2015-2018 A52014, 2015, 2016 $180,000.00 $0.00 M0E1 6/1/2016 $127,949.60 $0.00 $52,050.40

M0E1 $0.00

0442288 J8S3060

LP 44, GREENE CO; PVMT IMPROVEMENTS ON

CHESTNUT EXP FROM LULLWOOD ST TO COLLEGE ST

& FROM RT 13 (KANSAS EXP) TO 0.1 MI E.O

DELAWARE AVE IN SPRINGFIELD

GREENE SW MO1612

EN1601

0442280 J0I3002OIS 44, GREENE CO; JOC FOR PVMT REPAIR IN THE OTO

AREAGREENE SW MO1606

0442263 J8I3000IS 44 GREENE CO; PAVEMENT IMPROVEMENTS FROM

W/O RT 266 (CHESTNUT EXP) TO E/O RT 125; 17.80 MI

$1,460,800.00 $42,372.422015-2018 A8 2016, 2017 $5,600.00

$7,580,700.00

0141023 $2,727,001.00J8P2219

2014 $198,387.00

0141025 J0P3011I

MO 14 CHRISTIAN; ADA IMPROVE AT VARI LOCATIONS

FROM ELLEN ST TO MAIN ST IN NIXA & CHURCH ST TO

WALNUT ST IN OZARK; 0.84 MI

CHRISTIAN SW $800.00M240

$0.00

$0.00

COMPLETE - $0.00$0.00

$0.00 $2,646,196.51

$728,456.40

COMPLETE - $0.00

RT 60/65 INTERCHANGE, GREENE CO--PE

2010-2013

(GR1010), 2011-

2014 (GR1010),

2012-2015

(GR1010), 2013-

2016

(GR0909/GR1010),

2014-2017

(GR1010), 2015-

2018 (GR1010)

2010, 2011, 2012,

2013, 2014, 2015,

2015 (AC)

GREENE SW SP14092014-2017, 2015-

2018 A5

2013, 2014, 2015

(AC), 2016

2014, 2015, 2015

(AC), 2016 (AC)

2014-2017, 2015-

2018 AM5NX0906SW

MO 14 CHRISTIAN CO, INTERSECTION

IMPROVEMENTS AT THE RT 160 (MASSEY BLVD) & RT

14 (MOUNT VERNON ST) INTERSECTION IN NIXA. .649

MI

CHRISTIAN

2014-2017

J8P0683B,0

602(061),J8

P0683

0602062

SW

0141021 J8P3021

MO 14, CHRISTIAN CO. ADA ACCOMMODATIONS AT

VARIOUS LOCATIONS FROM RTE. M IN NIXA TO RTE W

IN OZARK. 10.45 MI

CHRISTIAN SW EN1304

GR0909, GR1010

$3,430,000.0020082008-2011SP0626SWGREENE

2015-2018 A5 2016 $223,200.00 $0.00 $14,502.50

$0.00 $0.00

2015-2018 A5 2016 $194,400.00 $0.00 $194,400.00

US 60, GREENE CO. INTERCHANGE IMPROVEMENTS

AT RTES NN AND J. 3.50 MIGREENE $10,302,000.000602084 J8P0683D

Page 2 of 7

Page 9: FY 2016 Annual Listing of Obligated Projects · Annual Listing of Obligated Projects (ALOP) The ALOP is a requirement of metropolitan planning areas, per § 450.332: (a) In metropolitan

PROJECT NO JOB NO PROJECT DESCRIPTION COUNTY DISTRICT TIP NUMBER TIP YEARSPROGRAMMED

YEAR*

PREVIOUSLY

PROGRAMMED

FEDERAL FUNDS

FUTURE

PROGRAMMED

FEDERAL FUNDS

PROGRAM

CODE TRANS DATE FED FUND CHANGE

PREVIOUS ALOP(S)

FUNDING CHANGE

REMAINING FEDERAL

FUNDS

M230 4/28/2016 $0.00 $2,072,000.00

M0E1 4/28/2016 $0.00 $3,944,746.27

L23E 4/28/2016 $0.00 $228,000.00

L1C0 -- $0.00 $9,766.53

L1CE -- $0.00 $77,964.79

M240 2/23/2016 ($136,801.41) $2,500,058.58

M240 10/30/2015 $0.00 $488,968.96

M24E 10/30/2015 $0.00 $32,443.94

L23E -- $0.00 $2,667,568.92

M0E1 -- $0.00 $1,716,471.98

L20E 4/20/2016 ($213,882.31) $629,360.80

L230 -- $0.00 $1,244,239.20

M001 4/20/2016 ($177,655.58) $1,893,600.00

M001 11/20/2015 $0.00 $999,238.47

L230 11/20/2015 $0.00 $1,450,562.09

0652078 J8P3001

BU 65, GREENE CO. PAVEMENT IMPROVEMENTS ON

VARIOUS SECTIONS OF GLENSTONE FROM WALNUT

ST. TO BATTLEFIELD RD. 7.71 MI

GREENE SW SP1314 2014-2017 2014, 2015 (AC) $1,012,800.00 $0.00 M001 12/14/2015 ($1,386.00) $1,164,836.82 COMPLETE - $0.00

0652080 J8P2263C

US 65, GREENE CO. PAVEMENT IMPROVEMENT ON

VARIOUS SECTIONS OF THE SOUTHBOUND LANES

FROM RTE 60 TO 1.0 MI S OF RTE F. 2.48 MI

CHRISTIAN SW SP1312 2014-2017 2014, 2015 (AC) $1,849,600.00 $0.00 M001 10/29/2015 $37,587.62 $2,072,730.74 COMPLETE - $0.00

1/4/2016 $320,000.00 $0.00

6/1/2016 $8,531,858.39 $0.00

1/4/2016 $1,223,674.87 $0.00

4/12/2016 ($134,482.61) $0.00

M0E1 8/11/2016 ($217,335.97) $1,796,796.53

M001 -- $0.00 $0.00

M0E1 -- $0.00 $120,452.30

M001 10/30/2015 $14,446.52 $501,477.22

L23R 2/23/2016 ($264,800.00) $452,800.00

M0E1 2/23/2016 $4,132,608.11 $0.00

L23E 2/23/2016 $137,632.04 $4,707,969.24

M240 -- $0.00 $1,189,657.00

Z001 9/12/2016 $572,896.54 $0.00

L23R 4/15/2016 $175,035.18 $0.00

M23E 8/8/2016 $478,187.86 $0.00

ZS40 8/8/2016 $2,250,000.00 $0.00

Z001 8/8/2016 $3,128,871.81 $0.00

M0E1 4/15/2016 $353,624.14 $1,626,800.00

L23E 4/15/2016 $178,588.96 $1,626,800.00

0652094 J8P2158

US 65, GREENE CO, BRIDGE IMPROVEMENTS ON

NORTHBOUND BRIDGE OVER LAKE SPRINGFIELD .6 MI

S OF RT 60. .16 MI

GREENE SW SP1018

2011-2014,

2012-2015,

2013-2016,

2014-2017

2011, 2012, 2013,

2014, 2015, 2016$5,134,400.00 $0.00 M0E1 6/1/2016 $4,786,227.58 $0.00 $348,172.42

0652096 J8P3046US 65 GREENE CO; PVMT IMPROVEMENTS @ RT D

(SUNSHINE ST) INTERCHANGE; 0.437 MIGREENE SW SP1502 2015-2018 2015, 2016 $54,400.00 $0.00 M0E1 5/21/2016 $49,521.33 $0.00 $4,878.67

2/23/2016 $1,059,663.24 $0.00

6/1/2016 $54,925.76 $0.00

Z001 6/1/2016 $1,373,464.22 $0.00

0652099 J8P2196B GREENE SWSP1603 (SPLIT

FROM SP1109)

$0.00 COMPLETE - $0.00

2015-2018 AM6 2016 $2,316,510.00 $0.00

MS30

$0.00 COMPLETE - $0.00

$1,549,600.00 $0.00 COMPLETE - $0.00

2014-2017

M0E1

SP1017, SP1109SWGREENEJ8P2196

2014, 2015 (AC) $328,800.00

0652087

$10,598,400.00 $0.00 $0.000652086 J8U0500US 65, GREENE CO. BRIDGE AND INTERCHANGE

IMPROVEMENTS AT BATTLEFIELD RD. 1.20 MIGREENE SW SP1108

2013-2016 A3,

2014-2017 A4

2012, 2013, 2014,

2014 (AC), 2015 (AC)

$0.00$5,659,310.00$2,087,800.00

BUS 65 GREENE CO; RAILROAD CROSSING GRADE SEP

AT CHESTNUT EXPRESSWAY & BNSF 0.2 MI W/O RTE

65; 0.23 MI

<2012, 2012, 2013,

2014, 2015, 2015

(AC), 2016, 2017

2010-2013

(SP1017),

2012-2015

(SP1109),

2013-2016

(SP1109),

2014-2017

(SP1109),

2015-2018 AM4

(SP1109),

2017-2020 (SP1109)

0652084 J8S3024

BU 65, GREENE CO. ADA ACCOMMODATIONS AT

VARIOUS LOCATIONS OF GLENSTONE AVE AND ON

SUNSHINE ST. 5.97 MI

GREENE SW SP1413 2014-2017 A1

GREENE SW SP14100652081 J8P0605G

US 65, GREENE COUNTY. VARIOUS ROADWAY

IMPROVEMENTS FROM RTE. 60 TO 0.7 MI S. OF

EVANS RD. 2.79 MI

SW GR13042013-2016, 2014-

2017 AM2

US 65, GREENE CO. PAVEMENT IMPROVEMENTS ON

VARIOUS SECTIONS OF NORTHBOUND LANES FROM

RTE. KK TO I-44. 6.71 MI

GREENE 2013, 2014, 2014 (AC)

SP1205, SP1313

2012-2015

(SP1205), 2013-

2016 (SP1313)

2012, 2013, 2014,

2015 (AC)

0652083 J8P3006

0651056 J8P2356US65, CHRISTIAN CO; INTERCHANGE IMPROVEMENTS

AT RTES, CC & J IN OZARK; 1.97 MICHRISTIAN SW CC1110

2011-2014,

2012-2015,

2013-2016,

2014-2017,

2015-2018

0652074J8P2424,

J8P3013

RTE 65, GREENE CO, SB TURN LANE IMPROVEMENTS

AT GLENSTONE AVE AND PEELE ST IN SPRINGFIELD,

0.10 MI

GREENE SW

2011, 2012, 2013,

2014, 2015, 2015 (AC)$6,193,356.00 $0.00 $0.00

0651066 J8S2266

0651064 J8P2156RT 65 CHRISTIAN CO; BRIDGE IMPROVE FOR NB BR

OVER FARMER'S BRANCH, 1.5 MI N/O RT J; 0.2 MICHRISTIAN SW OK1004 2013-2016 2013 $2,433,600.00

$0.00 COMPLETE - $0.00

0652076 J8P0850

RT 65, GREENE CO., COST SHARE PROJECT WITH

SPRINGFIELD AND GREENE CO FOR INTRCHNG

IMPVMTS AT RTE 65/BUS 65(CHESTNUT EXPWY),

0.406

GREENE SW $0.00 COMPLETE - $0.002011, 2012, 2015

(AC)$3,632,200.00

BU 65, CHRISTIAN CO. PAVEMENT IMPROVEMENTS

ON VARIOUS SECTIONS OF SOUTH ST IN OZARK FROM

RTE 65 TO RTE 14 AND ON RTE. F. 4.297 MI

CHRISTIAN SW MO1206, MO1407

2013-2016

(MO1206/

MO1407), 2014-

2017 (MO1407)

2013, 2014, 2015 (AC) $528,000.00

$8,866,942.00 $0.00 COMPLETE - $0.00

SP10162011-2014,

2012-2015

2014, 2015, 2016

(AC), 2017 (AC)$7,693,600.00 $0.00 $0.00

M230BU 65, GREENE CO; UTILITY RELOCATE & ACCESS

IMPROVES FOR RR CROSSING GRADE SEPERATION AT

CHESTNUT EXPWY & BNSF RR 0.2 MI W/O RT 65

$0.00

Page 3 of 7

Page 10: FY 2016 Annual Listing of Obligated Projects · Annual Listing of Obligated Projects (ALOP) The ALOP is a requirement of metropolitan planning areas, per § 450.332: (a) In metropolitan

PROJECT NO JOB NO PROJECT DESCRIPTION COUNTY DISTRICT TIP NUMBER TIP YEARSPROGRAMMED

YEAR*

PREVIOUSLY

PROGRAMMED

FEDERAL FUNDS

FUTURE

PROGRAMMED

FEDERAL FUNDS

PROGRAM

CODE TRANS DATE FED FUND CHANGE

PREVIOUS ALOP(S)

FUNDING CHANGE

REMAINING FEDERAL

FUNDS

MS30 3/9/2016 $50,395.20 $1,646,287.66

LS3E -- $0.00 $263,700.00

LS3E 6/28/2016 ($37,050.11) $450,000.00

MS30 -- $0.00 $950,253.32

1601055 J8P3011

RT 160, GREENE CO, PAVE IMPROVE ON VARIOUS

SECTIONS OF WEST BYPASS FROM I-44 TO RTE 413

(SUNSHINE ST). 4.26 MI

GREENE SW MO1306, MO1409

2013-2016

(MO1306),

2014-2017

(MO1409),

2015-2018

(MO1409)

2013, 2014, 2015 $1,323,200.00 $0.00 M0E1 8/19/2016 ($146,435.85) $1,226,014.06 COMPLETE - $0.00

1601056 J8P2264D

US160 GREENE CO; PVMT IMPROVE ON VARI SECS OF

WEST BYPASS FROM RTE 413 (SUNSHINE) TO RT 60

(JAMES RIVER) IN SPRINGFIELD; 2.473 MI

GREENE SW SP13172013-2016,

2014-2017 AM1

2013, 2014, 2015,

2015 (AC), 2016 (AC)$688,000.00 $0.00 M0E1 4/27/2016 ($15,630.02) $659,383.70 COMPLETE - $0.00

3/31/2016 $247,061.44 $0.00

6/16/2016 ($48,701.44) $0.00

M0E1 -- $0.00 $33,560.18

M001 12/14/2015 ($2,244.80) $1,192,229.04

5900845 N/AGREENE COUNTY, SPRINGFIELD/GREENE COUNTY

BICYCLE DESTINATION PLAN - PHASE I.GREENE SW EN1002 2010-2013 2010 $50,000.00 $0.00 L23R 11/4/2015 ($15,041.57) $40,033.84 COMPLETE - $0.00

5901805 N/A

GREENE CO, CITY OF SPRINGFIELD, MAIN AVE

SIDEWALKS AND BICYCLE TRACK, FROM COLLEGE ST

TO OLIVE ST

GREENE SW EN1509 2015-2018 A3 2015 $250,000.00 $0.00 M301 11/20/2015 $250,000.00 $0.00 $0.00

5901806 N/A

SPRINGFIELD-GREENE COUNTY PARK BOARD

COMMISSION, MISSING CONNECTIONS ON SOUTH

DRY SAC TRAIL BETWEEN FULBRIGHT & DAVID C

MURRAY PARK

GREENE SW EN1507

2015-2018 A3, 2015-

2018 AM6, 2017-

2020

2017 $0.00 $192,680.00 M301 2/15/2016 $12,007.42 $0.00 $180,672.58

5901807 N/A

CITY OF SPRINGFIELD, REPLACE THE EXISTING MT

VERNON ST BRIDGE OVER JORDAN CREEK, BRIDGE

#4075041

GREENE SW SP1605

2015-2018 A9, 2015-

2018 A11, 2017-

2020

2017 $0.00 $982,905.00 Z240 8/5/2016 $37,936.80 $0.00 $944,968.20

2/4/2016 $220,413.00 $0.00

2/15/2016 ($220,413.00) $0.00

3/17/2016 $220,413.00 $0.00

2/4/2016 $360,000.00 $0.00

2/15/2016 ($360,000.00) $0.00

3/17/2016 $459,587.00 $0.00

M230 11/20/2015 ($1,439,840.00) $2,159,912.50

HY10 11/20/2015 $273,751.00 $0.00

LY10 11/20/2015 $1,166,089.00 $0.00

5911803 N/A

CITY OF SPRINGFIELD, IMPROVE TO COLLEGE ST

CROSS SECTION - PED PLAZA AT BROADWAY &

COLLEGE & BICYCLE/SIDEWALK IMPROVEMENTS

GREENE SW EN15152015-2018 A4, 2015-

2018 AM62016 $240,000.00 $0.00 M3E1 6/21/2016 $240,000.00 $0.00 $0.00

5921801 N/A

CITY OF SPRINGFIELD, STREETSCAPE INCLUDING

SIDEWALK, LIGHTING, & LANDSCAPING

IMPROVEMENTS BETWEEN PEHLPS & WATER

GREENE SW EN1306 2015-2018 AM6 2016 $320,000.00 $0.00 L22R 3/29/2016 $320,000.00 $0.00 $0.00

5927804 N/A

MISSOURI STATE UNIVERSITY, ACCELERATION LANE

ON KANSAS EXPY (HWY 13) @ BROADMOOR

INTERSECTION.

GREENE SW SP11222014-2017 AM3,

2017-20202014, 2017 $238,000.00 $115,000.00 LY90 4/20/2016 ($6,108.93) $152,018.77 COMPLETE - $0.00

11/10/2015 $12,617.66

8/25/2016 ($3,839.99)

5938805 N/A

CITY OF SPRINGFIELD, FUND SALARIES OF ENGINEERS

& OTHER EMPLOYEES THAT OPERATE & MANAGE

TRANS MANAGE CENTER FOR CITY OF SPRINGFIELD

GREENE SW MO1503 2015-2018 2015, 2015 (AC) $814,400.00 $0.00 L230 3/22/2016 ($88,217.90) $276,000.00 COMPLETE - $0.00

5938806 N/A

CITY OF SPRINGFIELD, OPERATION & MANAGEMENT

OF OZARKS TRAFFIC INTELLIGENT TRANSPORTATION

SYSTEM IN OTO AREA

GREENE SW MO1603 2015-2018 2016 $838,400.00 $0.00 M23E 8/2/2016 $240,000.00 $0.00 $598,400.00

5938802 N/A

MISSOURI STATE UNIVERSITY. TRANSIT RELATED

IMPROVEMENTS FOR NATIONAL AVENUE, MONROE

STREET, BRICK CITY, & JOHN Q. HAMMONS PARKWAY

GREENE SW SP1209

$0.00

5909802 N/A

GREENE CO; FINAL DESIGN & ENVIRONMENTAL WORK

FOR THE EXTENSION OF KANSAS EXP FROM REPUBLIC

RD TO THE FUTURE E/W ARTERIAL.

GREENE SW GR1501 2015-2018 A1 2016, 2017 $720,073.00 $1,679,927.00 $240,087.50

$487,297.34$499,915.00 $0.00 1 COMPLETE - $0.00

L22E

L23E

5903802 N/A

CITY OF SPRINGFIELD, STREETSCAPE INCLUDING

SIDEWALKS, LIGHTING, & LANDSCAPING IMPROVE

BETWEEN WASHINGTON & BENTON

GREENE SW EN1305 2015-2018 A7 2016 $680,000.00 $0.00

L23R3301486 N/A

CITY OF SPRINGFIELD, IMPROVEMENTS AT

INTERSECTIONS OF CAMPBELL AVE/US 160 &

PLAINVIEW RD

GREENE SW GR13092013-2016 A2, 2015-

2018 A92013, 2014, 2016 $343,700.00 $0.00 $145,340.00

COMPLETE - $0.001145005 SW CC13022013-2016,

2014-20172013, 2014 $1,395,000.00 $0.00

1145004 J8S0736CRTE CC, CHRISTIAN CO, ROADWAY REALIGNMENT

FROM CHEYENNE RD TO FREMONT HILLS, 0.579 MICHRISTIAN SW CC1201

2012-2015,

2013-2016,

2014-2017

2012, 2013, 2014 $2,185,200.00 COMPLETE - $0.00

J8S0736BRTE CC, CHRISTIAN COUNTY, INTERSECTION

IMPROVEMENTS T CHEYENNE ROAD, .2 MICHRISTIAN

4131005 J8S3003

MO 413, GREENE CO. PAVEMENT IMPROVEMENT ON

SUNSHINE ST. FROM RTE. 360 TO RTE. 13 IN

SRPINGFIELD. 4.08 MI

GREENE SW $1,470,400.00 $0.00 COMPLETE - $0.00GR13062013-2016,

2014-20172013, 2104, 2015 (AC)

$0.00

2015-2018,

2015-2018 AM62015, 2016

Page 4 of 7

Page 11: FY 2016 Annual Listing of Obligated Projects · Annual Listing of Obligated Projects (ALOP) The ALOP is a requirement of metropolitan planning areas, per § 450.332: (a) In metropolitan

PROJECT NO JOB NO PROJECT DESCRIPTION COUNTY DISTRICT TIP NUMBER TIP YEARSPROGRAMMED

YEAR*

PREVIOUSLY

PROGRAMMED

FEDERAL FUNDS

FUTURE

PROGRAMMED

FEDERAL FUNDS

PROGRAM

CODE TRANS DATE FED FUND CHANGE

PREVIOUS ALOP(S)

FUNDING CHANGE

REMAINING FEDERAL

FUNDS

H230 -- $0.00 $12,465.81

L230 5/1/2016 $35,834.19 $0.00

L23E 1/28/2016 $191,571.10 $0.00

M2E1 8/11/2016 $64,190.76 $0.00

M23E 8/11/2016 $89,290.44 $0.00

7441006 J8S2449

RTE 744, GREENE CO, SAFETY IMPROVEMENTS ON

KEARNEY ST AT MUSTARD WAY & MULROY RD IN

SPRINGFIELD, 0.30 MI

GREENE SW SP12062012-2015, 2013-

2016, 2014-2017

2012, 2013, 2014,

2014 (AC), 2015 (AC)$651,133.00 $0.00 MS30 3/8/2016 ($4,284.91) $607,328.10 COMPLETE - $0.00

M0E1 8/11/2015 ($32,151.66) $252,064.69

M001 8/11/2015 ($77,088.46) $620,317.04

M230 1/13/2016 $681,341.00 $0.00

M0E1 5/21/2016 $1,148,382.45 $0.00

L20E -- $0.00 $47,380.00

M231 11/4/2015 ($0.25) $49,233.29

H230 -- $0.00 $14,751.58

9900843 N/ACITY OF STRAFFORD, GREENE CO,

MADISON/JEFFERSON/PINEGREENE SW EN1510

2015-2018 A3,

2015-2018 AM6,

2017-2020

2015, 2017 $27,131.00 $222,869.00 M303 8/9/2016 $221,783.28 $27,131.02 $1,085.70

9900845 N/ASTRAFFORD R-IV SCHOOLS, STRAFFORD, MO GREENE

CO, PINE ST SIDEWALKSGREENE SW EN1511

2015-2018 A3,

2015-2018 AM6,

2017-2020

2015, 2017 $26,139.00 $133,861.00 L220 8/26/216 $133,861.06 $26,138.94 $0.00

11/10/2015 $10,646.13

11/20/2015 ($10,646.13)

11/20/2015 $4,434.00

7/15/2016 $92,243.98

9/8/2016 ($15,097.60)

M301 11/20/2015 $6,212.13 $0.00

9900884 N/A

05/CITY OF REPUBLIC, SIDEWALKS ON THE NORTH

SIDE OF ELM STREET FROM MAIN STREET TO

SHERMAN AVENUE.

GREENE SW EN1108 2011-2014 A1 2011 $147,232.00 $0.00 L22E 11/20/2015 ($20,838.20) $147,232.00 COMPLETE - $0.00

12/14/2015 $944,866.78

3/31/2016 ($153,848.07)

9901806 N/A

CITY OF WILLARD, FARMER RD. CNST SIDEWALKS ON

FARMER RD. (JACKSON ST TO WILLEY ST) AND ON

MILLER RD (GREENWAY TRAIL TO JACKSON ST)

GREENE SW EN13032013-2016 A3,

2013-2016 AM62013 $200,000.00 $0.00 L22R 11/4/2015 ($1,120.01) $141,519.34 COMPLETE - $0.00

1/4/2016 $2,968.80

6/16/2016 ($2,024.24)

Q220 6/16/2016 ($0.01) $19,205.41

9901810 N/A

CITY OF BATTLEFIELD, GREENE CO, WIDENING

WEAVER RD (FARM RD 178) PROVIDING NEW

DITCHES & FINISHED ROADWAY.

GREENE SW BA1401 2014-2017 A1 2014 $264,699.00 $0.00 L230 11/4/2015 ($6,868.38) $203,565.60 COMPLETE - $0.00

B039030 N/AGREENE CO. REPLACE BRIDGE #1860096 & #1860098

ON FARM RD 186 OVER WILSON CREEK.GREENE SW GR1105, GR1212 2013-2016 2013 $960,000.00 $0.00 M2E3 9/11/2015 $107,445.29 $671,974.99 COMPLETE - $0.00

9/11/2015 $0.00

10/15/2014 $0.00

12/15/2014 $0.00

B039032 N/A

GREENE CO, REPLACE BRIDGE #1410151 ON RD 141

OVER LITTLE SAC RIVER & BRIDGE #1410155 OVER

SOUTH DRY SAC RIVER

GREENE SW GR1213 2015-2018 2015 $1,133,600.00 $0.00 M233 1/4/2016 $142,600.00 $1,446,625.00 $0.00

11/4/2015 $511,070.00

1/4/2016 $68,405.00

6/20/2016 $10,198.28

9/16/2016 $5,177.05

M2E3 8/25/2016 $105,921.55 $0.00

Z233 8/25/2016 $430,820.00 $0.00

6900811 N/A

CITY OF REPUBLIC, CAPACITY & GEOMETRIC IMPROVE

TO MEET CURRENT DESIGN STANDARDS FOR

CLASSIFICATION OF SECONDARY ARTERIAL,

INCLUDING FACILITIES

GREENE SW RP15012015-2018 A3, 2015-

2018 A8 (REMOVED)2015 $40,000.00 $0.00

COMPLETE - $0.00

5944802 N/A

CITY OF WILLARD, GREENE CO, DESIGN & CONSTRUCT

APPROX 315' ADA COMPLIANT SIDEWALK ALONG

JACKSON & MAIN ST

GREENE SW EN14012015-2018 AM5,

2015-2018 AM62015, 2016 $48,000.00 $0.00 $0.00

7441010 J8P3010

MO 744, GREENE CO, PAVE IMPROVE ON VARIOUS

SECTIONS OF KEARNEY ST FROM SPRINGFIELD-

BRANSON NATIONAL AIRPORT TO W/O RT 13, 3.74 MI

GREENE SW MO1306, MO1408

2013-2016

(MO1306),

2014-2017

(MO1408)

2013, 2014, 2015,

2015 (AC)

$0.00

9901804 N/A NX06012015-2018 A3,

2015-2018 AM6

CITY OF NIXA, WIDEN STREET AND CONSTRUCT

SIGNALIZED INTERSECTION AT TRACKER RD. AND

MAIN ST.

GREENE SW $0.002015, 2016 $949,612.00 $0.00

B039031 N/ACO OF GREENE, REPLACE BRIDGE #0660212 OVER

BRANCH OF LITTLE SAC RIVER.GREENE

COMPLETE - $0.009901807 N/ACITY OF STRAFFORD. CONSTRUCT SIDEWALKS ALONG

MADISON ST., BUMGARNER ST., AND PINE ST.

$784,000.00 $0.00

$1,486,040.00

GREENE SW

$0.00 $0.00

2013 $240,000.00 $0.00EN1301 2013-2016 A3

SW GR1311 2014-2017 2014 $168,000.00 $0.00 M233 COMPLETE - $0.00$442,643.90

$320,000.00 M2E3 $0.00

$473,600.00

B039034 N/A

GREENE CO, REPLACE EXISTING BRIDGE & A LIMITED

AMOUNT OF APPROACH ROADWAY, BRDIGE

#1670015 ON FARM RD 167 OVER NORTH DRY SAC

RIVER

GREENE SW GR16012015-2018 A2,

2017-2020

9900077 N/A

GREENE CO, CITY OF REPUBLIC - TRANS MAST PLAN -

REGIONAL TRAFFIC IMPACT STUDY, TRANS CAPITAL

IMPROVE PLANNING, BIKE/PED PLANNING

GREENE SW RP1303 2014-2017 2014 $64,000.00 $0.00 COMPLETE - $0.00

7441012 J8S3019RT MO 744, GREENE CO, INTERSECTIONS IMPROVE AT

RT 744 (KEARNEY ST) & PACKER RD, .02 MIGREENE SW SP1323

2014-2017,

2015-2018 A5

2013, 2014, 2015,

2016

$0.00

$0.00

M301 $189,725.98

9900856 N/AGREENE COUNTY, WILLARD SCHOOLS, KIME ST

SIDEWALKSGREENE SW EN1512

2015-2018 A3,

2015-2018 AM6,

2017-2020

2016, 2017 $10,646.00 $122,434.00 $45,287.49

M302

M3E2

L23R

2017 $0.00 $0.00

B039035 GREENE SW GR1312 2015-2018 2015 $371,200.00 $0.00 $0.00N/A

GREENE COUNTY, BRIDGE REPLACEMENT &

APPROACHES, FARM RD 102 BRIDGE #10201641 OVER

PEA RIDGE CREEK

Page 5 of 7

Page 12: FY 2016 Annual Listing of Obligated Projects · Annual Listing of Obligated Projects (ALOP) The ALOP is a requirement of metropolitan planning areas, per § 450.332: (a) In metropolitan

PROJECT NO JOB NO PROJECT DESCRIPTION COUNTY DISTRICT TIP NUMBER TIP YEARSPROGRAMMED

YEAR*

PREVIOUSLY

PROGRAMMED

FEDERAL FUNDS

FUTURE

PROGRAMMED

FEDERAL FUNDS

PROGRAM

CODE TRANS DATE FED FUND CHANGE

PREVIOUS ALOP(S)

FUNDING CHANGE

REMAINING FEDERAL

FUNDS

HU10 -- $0.00 $728.82

HU30 9/12/2016 ($222.17) $6,616.67

LU10 9/12/2016 ($1,349.26) $16,334.11

LU30 9/12/2016 ($1,392.27) $116,445.63

L11E 8/3/2016 ($3,244.76) $21,052.00

M233 8/3/2016 ($1,401.83) $8,673.14

Q110 8/3/2016 ($666.68) $11,616.80

NBIS816 GREENE CO; 2016 NATIONAL BRIDGE INSPECTIONS -

OFF SYSTEMGREENE SW N/A N/A N/A -- -- M233 1/27/2016 $20,000.00 $0.00 --

M040 4/5/2016 $38,753.95 $552,270.68

Z240 4/5/2016 $101,539.54 $0.00

M24E -- $0.00 $17,103.04

M240 -- $0.00 $299,412.39

M240 4/5/2016 $5,304.40 $217,401.97

L240 -- $0.00 $311.54

L24E 4/5/2016 $7,494.26 $5,399.13

M240 2/15/2016 ($5,475.12) $247,951.98

MS30 -- $0.00 $207,000.00

2/23/2016 $38,058.88

6/6/2016 $4,725.00

8/4/2016 $18,000.00

8/28/2016 $9,012.16

S600073 J8S0556RT H, GREENE CO, BRIDGE IMPROVEMENTS OVER

SOUTH DRY SAC REEK, .400 MIGREENE SW MO1619

2015-2018 A8,

2017-20202016, 2017 $8,000.00 $797,600.00 M0E1 7/26/2016 $0.00 $0.00 $805,600.00

ZS31 8/10/2015 $235,816.29 $0.00

Z231 8/10/2015 $330,291.34 $0.00

MS30 9/15/2016 $328,698.44 $0.00

Z240 9/15/2016 $450,809.62 $0.00

MS30 9/15/2016 $267,055.66 $0.00

Z240 9/15/2016 $474,573.10 $0.00

S944008 J8P2263

RT D. GREENE CO. PAVEMENT IMPROVEMENTS FROM

GLADSTONE AVE TO BLACKMAN ROAD IN

SPRINGFIELD. ADA ON JOINT SPLIT JOB. 4.6 MI

GREENE SW SP13192013-2016,

2014-20172013, 2014, 2015 (AC) $799,200.00 $0.00 M001 12/14/2015 ($630.00) $866,228.41 COMPLETE - $0.00

1180 3/11/2016 $80.75 $0.00

Q100 3/11/2016 $447.82 $0.00

M240 3/11/2016 $4,182.39 $1,872,324.17

L1CE 3/11/2016 $142,172.91 $0.00

LS2E 2/10/2016 $10,753.51 $0.00

LS20 -- $0.00 $26,062.15

LS2R 2/10/2016 $11,128.88 $0.00

S965011 J8S2426RTE 125, GREENE CO, TURN LANE IMPROVEMENTS AT

WASHINGTON ST IN STRAFFORD, 0.30 MIGREENE SW ST1201

2012-2015,

2013-2016,

2014-2017

2012, 2013, 2014,

2015 (AC)$467,200.00 $0.00 MS30 11/2/2015 $2,217.30 $652,305.77 COMPLETE - $0.00

S965012 J8P2265RTE OO, GREENE CO, THIN PAVEMENT TREATMENT

FROM RTE 744 TO WEBSTER CO LINE, 6.464 MIGREENE SW ST1101

2012-2015,

2014-20172012, 2014, 2015 $733,700.00 $0.00 M240 2/15/2016 ($10,409.61) $461,612.91 COMPLETE - $0.00

SWGREENE

VARIOUS RT VARIOUS CO; ON CALL WORK ZONE

ENFORCEMENT AT VARIOUS LOCATIONS IN THE

URBAN SW DISTRICT; 0.00 MI

J8P2279S600050

$576,800.00

$32,000.00

S600037 J8S3028

MO125 GREENE CO; PAVEMENT & SAFETY

IMPROVEMENTS ON VARIOUS SECTIONS FROM RT 60

TO SMYRNA RD; 5.02 MI

GREENE SW GR1406

$0.00

$896,000.00 $118,091.94

$0.00 COMPLETE - $0.00

MS30 $47,250.00 $0.0020152015-2017MO1501

$15,811.47

$8,000.00

2012, 2013, 2014,

2015, 2015 (AC), 2016

(AC)

2012-2015

(MO1206),

2013-2016

(MO1206),

2014-2017 AM1

(MO1406)

MO1206, MO1406SWCHRISTIANRTE. NN, CHRISTIAN CO. PAVEMENT IMPROVEMENTS

FROM RTE. J TO RTE. 14. IN OZARK. 0.00 MIJ8S2267

CHRISTIAN SW 20142014-2017 $152,973.00EN1309

COMPLETE - $0.00

$0.00

$637,600.00

MO1206, GR1401

2012-2015

(MO1206),

2013-2016

(MO1206),

2014-2017 (GR1401)

2012, 2013, 2014,

2015 (AC)$251,200.00

COMPLETE - $0.00

$0.00 COMPLETE - $0.002014-2017 2014, 2015

$0.00S600032 J8S1300

RT M GREENE CO; PAVEMENT IMPROVEMENTS ON

VARIOUS SECTIONS FROM RT 60 TO E/O RT FF; 2.83

MI

GREENE SW

$0.00 COMPLETE - $0.00

H32G101 N/ACITY OF OZARK, SRTS SIDEWALK PROJECT ALONG E.

SAMUEL J. STREET TO EAST ELEMENTARY SCHOOL.

SW MO1411 2014-2017 2014 $16,000.00

S600033 J8S1300B

RT ZZ GREENE CO; PAVEMENT IMPROVEMENTS ON

VARIOUS SECTIONS FROM S/O RT M TO COUNTY RD

194; 2.83 MI

GREENE SW GR1405 2014-2017 2014, 2015 $298,200.00 $0.00 COMPLETE - $0.00

NBI9768 N/A

LINCOLN CO & GREENE CO, BRIDGE INSPECTION FOR

LINCOLN COUNTY, GREENE COUNTY AND CITY OF

SPRINGFIELD

GREENE

S600020

MO16142015-2018 A8,

2017-20202016, 2017 $1,600.00

S600095 J8P3057MO 14, CHRISTIAN CO, PAVEMENT & SAFETY

IMPROVEMENTS FROM RT W TO RT OO. 2.959 MICHRISTIAN SW MO1613

2015-2018 A8,

2017-20202016, 2017 $1,600.00 $489,600.00 $0.00

2012-2015,

2013-2016,

2014-2017

2012, 2013, 2014 $2,124,000.00

S601035 J8S3059RT AB, GREENE CO; PAVEMENT & SAFETY

IMPROVEMENTS FROM RTE 160 TO RTE 266GREENE SW MO1615

2015-2018 A8,

2017-20202016, 2017 $3,200.00 $728,800.00 $0.00

S601034 J8S3058RT EE, GREENE CO; PAVEMENT & SAFETY

IMPROVEMENTS FROM RTE AB TO RTE 160GREENE SW

S965008 J8P2292RTE 125, CHRISTIAN CO, SAFETY IMPROVEMENTS

BETWEEN SMYRNA RD AND RTE JJ, 2.00 MIGREENE SW CC1202

2012-2015,

2013-2016,

2014-2017

2012, 2013, 2014 $211,200.00 $0.00 COMPLETE - $0.00

S957007 J8S2396RTE B, GREENE CO, BRIDGE IMPROVEMENTS OVER I-

44 W/O SPRINGFIELD, 3.952 MIGREENE SW GR1206

Page 6 of 7

Page 13: FY 2016 Annual Listing of Obligated Projects · Annual Listing of Obligated Projects (ALOP) The ALOP is a requirement of metropolitan planning areas, per § 450.332: (a) In metropolitan

PROJECT NO JOB NO PROJECT DESCRIPTION COUNTY DISTRICT TIP NUMBER TIP YEARSPROGRAMMED

YEAR*

PREVIOUSLY

PROGRAMMED

FEDERAL FUNDS

FUTURE

PROGRAMMED

FEDERAL FUNDS

PROGRAM

CODE TRANS DATE FED FUND CHANGE

PREVIOUS ALOP(S)

FUNDING CHANGE

REMAINING FEDERAL

FUNDS

CU1600 2015-2018 A10 2016 $1,700,000.00 $0.00 OPERATING 7/20/2016 $1,700,000.00 $0.00

CU1601 2015-2018 A10 2016 $402,541.00 $0.00 MAINT. $0.00

CU1602 2015-2018 A10 2016 $254,218.00 $0.00 OPERATING $0.00

CU1604 2015-2018 A10 2016 $160,000.00 $0.00 PLANNING 7/20/2016 $160,000.00 $0.00

CU1605 2015-2018 A10 2016 $25,422.00 $0.00 CAPITAL 7/20/2016 $25,422.00 $0.00

MO340006 N/A FY 2016 5339 FUNDING FOR 2 PARATRANSIT BUSES GREENE SW CU1607 2015-2018 A8 2016 $240,336.00 $0.00 CAPITAL 4/20/2016 $240,336.00 $0.00 $0.00

MO16X053 N/A FTA 5310 NEW FREEDOM-TYPE PROJECTS GREENE SW CU1514/1517 2015-2018 A6 2015 $296,596.00 $0.00 CAPITAL 11/13/2015 $99,548.00 $0.00 $197,048.00

$61,971.00

$156,432.00

FY 2013 AND FY 2014 5310 STATE ADMINISTRATION VARIOUS SW MO15072015-2018 A2,

2015-2018 A62015 $46,608.00 $0.00 CAPITAL $24,268.00 $22,340.00

7/20/2016 $656,759.00

*Note: (AC) indicates Advanced Construction, which means MoDOT funds the project during the initial completion and then requests reimbursement with federal funds at a projected later date.

$0.00MO90X312

FY 2016 5307 OPERATING, PLANNING, PREVENTATIVE

MAINTENTANCE, ADA, SECURITY, AND ASSOCIATED

TRANSIT IMPROVEMENTS

N/A

MO16X049 N/A

FY2013 AND FY 2014 5310 FUNDING FOR HUMAN

SERVICE VEHICLESMO1506

2015-2018 A2,

2015-2018 A6$0.00

GREENE SW

VARIOUS SW 2015 $419,470.00 $0.00 CAPITAL $201,067.00

Page 7 of 7

Page 14: FY 2016 Annual Listing of Obligated Projects · Annual Listing of Obligated Projects (ALOP) The ALOP is a requirement of metropolitan planning areas, per § 450.332: (a) In metropolitan

This report was prepared in cooperation with the USDOT,

including FHWA and FTA, as well as the Missouri

Department of Transportation. The opinions, findings, and

conclusions expressed in this publication are those of the

authors and not necessarily those of the Missouri

Highways and Transportation Commission, the Federal

Highway Administration or the Federal Transit

Administration.

Ozarks Transportation Organization 2208 W. Chesterfield Boulevard, Suite 101

Springfield, Missouri 65807

(417) 865-3042

(417) 862-6013 Fax

www.OzarksTransportation.org