FY 2015 APL
Transcript of FY 2015 APL
FY 2015 Annual Project Listing09/01/2014 – 08/31/2015
The preparation of this report has been fi nanced in part through the Federal Highway Administration and Federal Transit Administration, United States Department of Transportation,
under the Metropolitan Planning Program, Section 104 (f) of Title 23, United State Code. The contents of this report have been generated by the Capital Area Metropolitan Planning Organization and do not necessarily refl ect the offi cial views or policies of the United States
Department of Transportation.
Table of ContentsPage
Introduction: Obligation and Reimbursement of Federal Funds Summary of Obligated Funds for FY 2005 – FY 2015Federal Highway Administration (FHWA) Highway Projects Programs and Studies Grouped ProjectsFederal Transit Authority (FTA) Transit
12
356
51
2015 Annual Project Listing1
INTRODUCTION: Obligation and Reimbursement of Federal Funds
Funding for projects is programmed or reserved for a project until they are obligated. Obligation is a way of ensuring that actual cash is available to pay for project expenditures. Obligation of funds occurs on a project phase basis (i.e. design, right of way or construction). Key activities under each phase will trigger obligation of funds. Typically these are critical points at which commitments are made, but expenditures have yet to start. Such items as advertisement of consultant or construction contracts and preparing offers for property acquisition are actions which will obligate funds.
Before an agency can obligate funds, it must have approval to do so. In the case of highway and streets projects, the authority to approve the obligation of funds is passed from the Federal Highway Administration (FHWA) on to the Texas Department of Transportation (TxDOT). The TxDOT has specifi c processes that must be followed for an agency to get to a point in which funds can be obligated. These vary depending on the program, but generally include submitting a "project authorization request" and/or entering into an Agreement with TxDOT. For transit related projects, the lead agency for the project must transmit specifi c information directly to the Federal Transit Authority (FTA).
Once an agency has authorization to proceed with a project, it can obligate funds. Every federal program will have specifi c time limits in which funds must be obligated. Typically these are by the end of a federal or state fi scal year, September 30th and August 30th, respectively. If funds are not obligated by those deadlines, those funds are withdrawn from the project. FTA projects have a longer window of opportunity, typically three years from the time the grant is approved.
Federal funding is typically transferred to an agency on a reimbursement basis. Therefore, the agency must ensure it has adequate cash fl ows to cover planned project expenditures. Typically once expenditures are incurred, the agency can request reimbursement for those costs. If the agency is required to provide matching monies to the federal funds, those must also be expended. Once the project is complete, the lead agency may have to conduct an audit to ensure funds were spent in accordance with the grant or funding program guidelines.
This document was developed by the Capital Area Metropolitan Planning Organization (CAMPO) for informational purposes and is not warranted for any other use. The information contained in the document was provided to CAMPO by transportation providers in the CAMPO region. No warranty is made by CAMPO regarding the accuracy or completeness of the information provide.
2015 Annual Project Listing2
Fund Summary
FY 2015 Federal Funds ObligatedCapital Area Metropolitan Planning Organization
Summary of Obligated Funds 2005 through 2015
Year Reported
Federal Highway Administration (FHWA)
Federal Transit Authority (FTA)
Number of Projects
Total Funds Obligated
Number of Projects Funds Obligated
Number of Projects Funds Obligated
2005 46 $56,054,284 9 $8,179,771 55 $64,234,055 2006 61 $373,373,817 9 $10,801,110 70 $384,174,927 2007 54 $147,673,448 4 $1,689,539 58 $149,362,987 2008 38 $38,518,055 33 $45,512,014 71 $84,030,069 2009 68 $104,820,661 11 $18,980,694 79 $123,801,355 2010 83 $143,040,434 22 $41,467,279 105 $184,507,713 2011 117 $202,334,668 32 $40,398,219 149 $242,732,887 2012 89 $82,868,660 42 $101,330,657 131 $184,199,317 2013 66 $141,949,177 41 $41,513,461 107 $183,462,638 2014 91 $207,032,066 18 $83,838,522 109 $290,870,588 2015 94 $102,498,523 1 $542,024 95 $103,040,547
Totals $1,600,163,793 $394,253,290 $1,891,376,536
Highway Projects
Transit Projects
Bicycle and Pedestrian Projects
Grouped Projects
Programs and Studies
FY 2015 Federal Funds Obligated by Type
2015 Annual Project Listing3
Highway ProjectsProject ID: STP 1502(521)MM Federal Cost ($): 17,876,611.20
CSJ Number: 0015-13-379 State Cost ($): 4,469,152.80
Project Name: IH 35 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: NORTH OF STASSNEY LANE Total ($): 22,345,764.00
Let Date: 11/2015
Funding Category: 7To: SOUTH OF WILLIAM CANNON DRIVE
Estimated Completion Date:
Summer 2018
Work Type: OPERATIONAL IMPROVEMENTS
Highway ProjectsProject ID: STP 1502(599)MM Federal Cost ($): 4,400,000.00
CSJ Number: 2102-01-061 State Cost ($): 1,100,000.00
Project Name: RM 2244 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: 1000 FT. WEST OF BUCKEYE TRAIL Total ($): 5,500,000.00
Let Date: 11/2015
Funding Category: 7To: WALSH TARLTON
Estimated Completion Date:
Fall 2018
Work Type: CONST. 4 LN URBAN RDWY W CONT. LTL
Highway ProjectsFY 2015 Federal Funds Obligated
2015 Annual Project Listing4
Highway ProjectsProject ID: STP 1502(599)MM Federal Cost ($): 1,040,000.00
CSJ Number: 2102-01-061 State Cost ($): 260,000.00
Project Name: RM 2244 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: 1000 FT. WEST OF BUCKEYE TRAIL Total ($): 1,300,000.00
Let Date: 11/2015
Funding Category: 1To: WALSH TARLTON
Estimated Completion Date:
Fall 2018
Work Type: CONST. 4 LN URBAN RDWY W CONT. LTL
2015 Annual Project Listing5
Programs and StudiesProject ID: STP 2015(769)MM Federal Cost ($): 1,000,000.00
CSJ Number: 0914-00-383 State Cost ($):
Project Name: VA Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: VARIOUS LOCATIONS IN THE CAMPO AREA
Total ($): 1,000,000.00
Let Date: 01/2015
Funding Category: 7To: TRAV, WILL, HAYS, BSTP, CALD &
BRNT Estimated Completion Date:
Summer 2018
Work Type: DTA MODELING
Programs and StudiesProject ID: NH 2016(110) Federal Cost ($): 200,000.00
CSJ Number: 0914-00-389 State Cost ($): 50,000.00
Project Name: IH 35 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: VARIOUS LOCATIONS ALONG IH 35 IN
Total ($): 250,000.00
Let Date: 08/2015
Funding Category: 10To: TRAVIS COUNTY.
Estimated Completion Date:
Summer 2017
Work Type: ICM STUDY
Programs and StudiesFY 2015 Federal Funds Obligated
2015 Annual Project Listing6
Grouped ProjectsProject ID: STP 2016(173) Federal Cost ($): 815,000.80
CSJ Number: 0265-04-060 State Cost ($): 203,750.20
Project Name: SH 21 Local Cost ($):
County Name: BASTROP Local Contribution ($):
From: 2.535 MI. WEST OF FM 20 Total ($): 1,018,751.00
Let Date: 10/2015
Funding Category: 1To: SH 304
Estimated Completion Date:
Summer 2016
Work Type: MILL, SEAL & INLAY MAINLANES
Grouped ProjectsProject ID: STP 2015(882) Federal Cost ($): 3,438,480.00
CSJ Number: 1378-06-011 State Cost ($): 859,620.00
Project Name: FM 3406 Local Cost ($):
County Name: WILLIAMSON Local Contribution ($):
From: 0.13 MI. EAST OF WYOMING SPRINGS DR
Total ($): 4,298,100.00
Let Date: 04/2015
Funding Category: 1To: 0.05 MI. WEST OF GTRR
Estimated Completion Date:
Summer 2016
Work Type: WIDEN TO 5-LANE WITH CENTER LTL
Grouped ProjectsFY 2015 Federal Funds Obligated
2015 Annual Project Listing7
Grouped ProjectsProject ID: STP 2016(173) Federal Cost ($): 1,113,833.60
CSJ Number: 0265-04-061 State Cost ($): 278,458.40
Project Name: SH 21 Local Cost ($):
County Name: BASTROP Local Contribution ($):
From: 0.521 MI. WEST OF SH 304 Total ($): 1,392,292.00
Let Date: 10/2015
Funding Category: 1To: COLORADO RIVER
Estimated Completion Date:
Summer 2016
Work Type: MILL, SEAL & INLAY FRT RDS & RAMPS
Grouped ProjectsProject ID: STP 1502(386)HES Federal Cost ($): 583,709.40
CSJ Number: 0471-05-039 State Cost ($): 64,856.60
Project Name: SH 21 Local Cost ($):
County Name: BASTROP Local Contribution ($):
From: 0.363 MI W OF MARTINS CROSSING Total ($): 648,566.00
Let Date: 07/2015
Funding Category: 8To: 0.223 MI E OF MARTINS CROSSING
Estimated Completion Date:
Spring 2016
Work Type: INSTALL CONTINUOUS TURN LANE
2015 Annual Project Listing8
Grouped ProjectsProject ID: STP 2015(736) Federal Cost ($): 345,360.00
CSJ Number: 0807-05-020 State Cost ($):
Project Name: FM 535 Local Cost ($):
County Name: BASTROP Local Contribution ($):
From: 0.052 MI E OF TRAVIS C/L Total ($): 345,360.00
Let Date: 03/2015
Funding Category: 1To: 1.252 MI E OF TRAVIS C/L
Estimated Completion Date:
August-15
Work Type: FULL DEPTH REPAIR & SEAL COAT
Grouped ProjectsProject ID: BR 2014(690) Federal Cost ($): 369,024.00
CSJ Number: 0914-18-092 State Cost ($): 92,256.00
Project Name: CR Local Cost ($):
County Name: BASTROP Local Contribution ($):
From: ON PAINT CRK RD AT PAINT CRK Total ($): 461,280.00
Let Date: 04/2015
Funding Category: 6To: AA01-62-001
Estimated Completion Date:
January-16
Work Type: REPLACE BRIDGE & APPROACHES
2015 Annual Project Listing9
Grouped ProjectsProject ID: STP 2015(552)FRS Federal Cost ($): 277,177.50
CSJ Number: 0914-18-106 State Cost ($): 30,797.50
Project Name: CR Local Cost ($):
County Name: BASTROP Local Contribution ($):
From: ON CR 265_(BATEMAN ROAD) Total ($): 307,975.00
Let Date: 03/2015
Funding Category: 8To: AT UPRR X-ING (DOT NO. 415733T)
Estimated Completion Date:
Winter 2019
Work Type: INSTALL RAILROAD GRADE X-ING SGNLS
Grouped ProjectsProject ID: BR 1502(072) Federal Cost ($): 1,905,127.00
CSJ Number: 1073-01-020 State Cost ($): 0.00
Project Name: FM 696 Local Cost ($):
County Name: BASTROP Local Contribution ($):
From: 1.165 MI N OF US 290 Total ($): 1,905,127.00
Let Date: 06/2015
Funding Category: 6To: 1.296 MI N OF US 290
Estimated Completion Date:
Fall 2016
Work Type: REPLACE BRIDGE AND APPROACHES
2015 Annual Project Listing10
Grouped ProjectsProject ID: BR 1502(072) Federal Cost ($): 300,000.00
CSJ Number: 1073-01-020 State Cost ($): 0.00
Project Name: FM 696 Local Cost ($):
County Name: BASTROP Local Contribution ($):
From: 1.165 MI N OF US 290 Total ($): 300,000.00
Let Date: 06/2015
Funding Category: 1To: 1.296 MI N OF US 290
Estimated Completion Date:
Fall 2016
Work Type: REPLACE BRIDGE AND APPROACHES
Grouped ProjectsProject ID: BR 1502(031) Federal Cost ($): 960,000.00
CSJ Number: 2686-01-011 State Cost ($): 240,000.00
Project Name: FM 2571 Local Cost ($):
County Name: BASTROP Local Contribution ($):
From: 3.586 MI EAST OF SH 304 Total ($): 1,200,000.00
Let Date: 06/2015
Funding Category: 6To: 3.768 MI EAST OF SH 304
Estimated Completion Date:
Spring 2016
Work Type: REPLACE BRIDGE AND APPROACHES
2015 Annual Project Listing11
Grouped ProjectsProject ID: STP 2016(174) Federal Cost ($): 896,720.00
CSJ Number: 3115-01-010 State Cost ($): 224,180.00
Project Name: FM 3000 Local Cost ($):
County Name: BASTROP Local Contribution ($):
From: 0.007 MI. EAST OF LOOP 109 Total ($): 1,120,900.00
Let Date: 10/2015
Funding Category: 1To: 3.658 MI. EAST OF LOOP 109
Estimated Completion Date:
Fall 2016
Work Type: ACP, LVL-UP, FULL DEPTH REPAIR & SC
Grouped ProjectsProject ID: BR 1502(384) Federal Cost ($): 203,180.00
CSJ Number: 0273-02-023 State Cost ($): 50,795.00
Project Name: US 183 Local Cost ($):
County Name: BURNET Local Contribution ($):
From: AT NORTH ROCKY CREEK Total ($): 253,975.00
Let Date: 09/2015
Funding Category: 1To: .
Estimated Completion Date:
Summer 2017
Work Type: REPLACE BRIDGE AND APPROACHES
2015 Annual Project Listing12
Grouped ProjectsProject ID: BR 1502(384) Federal Cost ($): 1,318,640.00
CSJ Number: 0273-02-023 State Cost ($): 329,660.00
Project Name: US 183 Local Cost ($):
County Name: BURNET Local Contribution ($):
From: AT NORTH ROCKY CREEK Total ($): 1,648,300.00
Let Date: 09/2015
Funding Category: 6To: .
Estimated Completion Date:
Summer 2017
Work Type: REPLACE BRIDGE AND APPROACHES
Grouped ProjectsProject ID: BR 1502(389) Federal Cost ($): 602,400.00
CSJ Number: 0700-05-007 State Cost ($): 150,600.00
Project Name: SS 191 Local Cost ($):
County Name: BURNET Local Contribution ($):
From: AT CYPRESS CREEK Total ($): 753,000.00
Let Date: 07/2015
Funding Category: 6To: STR 0700-05-030
Estimated Completion Date:
Late 2016
Work Type: REPLACE BRIDGE AND APPROACHES
2015 Annual Project Listing13
Grouped ProjectsProject ID: STP 1502(390)HES Federal Cost ($): 2,413,890.00
CSJ Number: 2206-01-015 State Cost ($): 268,210.00
Project Name: RM 2341 Local Cost ($):
County Name: BURNET Local Contribution ($):
From: 0.85 MI N OF CR 114 Total ($): 2,682,100.00
Let Date: 07/2015
Funding Category: 8To: SH 29
Estimated Completion Date:
Spring 2017
Work Type: SAFETY TREATMENTS, ADD PAVE WIDTH
Grouped ProjectsProject ID: BR 1502(520) Federal Cost ($): 2,640,000.00
CSJ Number: 0152-03-056 State Cost ($): 660,000.00
Project Name: US 183 Local Cost ($):
County Name: CALDWELL Local Contribution ($):
From: AT CLEAR FORK PLUM CREEK Total ($): 3,300,000.00
Let Date: 09/2015
Funding Category: 6To: (STR 152-3-9)
Estimated Completion Date:
Summer 2017
Work Type: REPLACE BRIDGE AND APPROACHES
2015 Annual Project Listing14
Grouped ProjectsProject ID: STP 1502(308)HES Federal Cost ($): 906,300.00
CSJ Number: 0286-02-031 State Cost ($): 100,700.00
Project Name: SH 80 Local Cost ($):
County Name: CALDWELL Local Contribution ($):
From: 0.336 MI W OF FM 1984 Total ($): 1,007,000.00
Let Date: 06/2015
Funding Category: 8To: 0.246 MI E OF FM 1979
Estimated Completion Date:
November-15
Work Type: INSTALL CONTINUOUS TURN LANE
Grouped ProjectsProject ID: STP 2016(173) Federal Cost ($): 111,200.00
CSJ Number: 0286-03-016 State Cost ($): 27,800.00
Project Name: SH 80 Local Cost ($):
County Name: CALDWELL Local Contribution ($):
From: 0.36 MI. WEST OF US 183 Total ($): 139,000.00
Let Date: 10/2015
Funding Category: 1To: US 183
Estimated Completion Date:
Summer 2016
Work Type: MILL, SEAL & INLAY
2015 Annual Project Listing15
Grouped ProjectsProject ID: STP 2016(173) Federal Cost ($): 355,920.00
CSJ Number: 0287-01-015 State Cost ($): 88,980.00
Project Name: SH 80 Local Cost ($):
County Name: CALDWELL Local Contribution ($):
From: US 90 Total ($): 444,900.00
Let Date: 10/2015
Funding Category: 1To: 0.999 MI. SOUTH OF US 90
Estimated Completion Date:
Summer 2016
Work Type: MILL, SEAL & INLAY
Grouped ProjectsProject ID: STP 2015(571)HES Federal Cost ($): 47,900.00
CSJ Number: 0384-01-022 State Cost ($):
Project Name: SH 142 Local Cost ($):
County Name: CALDWELL Local Contribution ($):
From: AT FM 1966 Total ($): 47,900.00
Let Date: 02/2015
Funding Category: 8To: .
Estimated Completion Date:
Late 2016
Work Type: ADD FLASHING BEACON & SFTY LGHTNG
2015 Annual Project Listing16
Grouped ProjectsProject ID: BR 2014(691) Federal Cost ($): 246,576.80
CSJ Number: 0914-22-057 State Cost ($): 61,644.20
Project Name: CS Local Cost ($):
County Name: CALDWELL Local Contribution ($):
From: ON N WALNUT AVE AT SALT BRANCH CRK
Total ($): 308,221.00
Let Date: 06/2015
Funding Category: 6To: (STR C004-71-001)
Estimated Completion Date:
January-16
Work Type: REPLACE BRIDGE & APPROACHES
Grouped ProjectsProject ID: STP 2016(336)FRS3 Federal Cost ($): 281,947.50
CSJ Number: 0914-22-069 State Cost ($): 31,327.50
Project Name: CR Local Cost ($):
County Name: CALDWELL Local Contribution ($):
From: UPRR X-ING ON CR 295 [EASY STREET]
Total ($): 313,275.00
Let Date: 08/2015
Funding Category: 8To: DOT NO. 415722F__[DALE, TX]
Estimated Completion Date:
Winter 2019
Work Type: REPLACE RAILROAD CROSSING
2015 Annual Project Listing17
Grouped ProjectsProject ID: STP 2016(174) Federal Cost ($): 245,840.00
CSJ Number: 1375-01-010 State Cost ($): 61,460.00
Project Name: FM 1322 Local Cost ($):
County Name: CALDWELL Local Contribution ($):
From: 4.914 MI. NORTH OF FM 86 Total ($): 307,300.00
Let Date: 10/2015
Funding Category: 1To: FM 86
Estimated Completion Date:
Summer 2016
Work Type: ACP, LVL-UP, FULL DEPTH REPAIR & SC
Grouped ProjectsProject ID: STP 2016(174) Federal Cost ($): 456,560.00
CSJ Number: 1375-02-017 State Cost ($): 114,140.00
Project Name: FM 1322 Local Cost ($):
County Name: CALDWELL Local Contribution ($):
From: FM 86 Total ($): 570,700.00
Let Date: 10/2015
Funding Category: 1To: 9.068 MI. SOUTH OF FM 86
Estimated Completion Date:
Summer 2016
Work Type: LEVEL-UP & SEAL COAT
2015 Annual Project Listing18
Grouped ProjectsProject ID: STP 2016(174) Federal Cost ($): 986,392.00
CSJ Number: 1776-03-010 State Cost ($): 246,598.00
Project Name: FM 2001 Local Cost ($):
County Name: CALDWELL Local Contribution ($):
From: SH 21 Total ($): 1,232,990.00
Let Date: 10/2015
Funding Category: 1To: US 183
Estimated Completion Date:
Summer 2016
Work Type: LVL-UP, FULL DEPTH REPAIR & SL COAT
Grouped ProjectsProject ID: STP 2016(174) Federal Cost ($): 157,440.00
CSJ Number: 1850-01-014 State Cost ($): 39,360.00
Project Name: FM 1966 Local Cost ($):
County Name: CALDWELL Local Contribution ($):
From: HAYS COUNTY LINE Total ($): 196,800.00
Let Date: 10/2015
Funding Category: 1To: SH 142
Estimated Completion Date:
Fall 2016
Work Type: SEAL COAT
2015 Annual Project Listing19
Grouped ProjectsProject ID: NH 2015(568) Federal Cost ($): 2,749,936.50
CSJ Number: 0016-02-136 State Cost ($): 305,548.50
Project Name: IH 35 Local Cost ($):
County Name: HAYS Local Contribution ($):
From: SL 82 Total ($): 3,055,485.00
Let Date: 02/2015
Funding Category: 1To: YARRINGTON ROAD
Estimated Completion Date:
Fall 2015
Work Type: MILL, SEAL & OVERLAY NB/SB MAINLANE
Grouped ProjectsProject ID: STP 1502(144)HES Federal Cost ($): 668,500.00
CSJ Number: 0016-02-138 State Cost ($):
Project Name: IH 35 Local Cost ($):
County Name: HAYS Local Contribution ($):
From: TRAVIS COUNTY LINE Total ($): 668,500.00
Let Date: 05/2015
Funding Category: 8To: LP 82 NORTH IN SAN MARCOS
Estimated Completion Date:
Fall 2016
Work Type: IMPROVE GUARDRAIL TO STANDARDS
2015 Annual Project Listing20
Grouped ProjectsProject ID: NH 2015(352) Federal Cost ($): 4,819,500.00
CSJ Number: 0016-02-140 State Cost ($): 535,500.00
Project Name: IH 35 Local Cost ($):
County Name: HAYS Local Contribution ($):
From: AQUARENA SPRINGS DRIVE (LP 82) Total ($): 5,355,000.00
Let Date: 12/2014
Funding Category: 1To: IH 35-BL (SOUTH OLD HWY 81)
Estimated Completion Date:
Fall 2016
Work Type: BASE REPAIR & OVERLAY (IH 35 SBFR)
Grouped ProjectsProject ID: STP 1502(145)HES Federal Cost ($): 391,900.00
CSJ Number: 0016-03-099 State Cost ($):
Project Name: IH 35 Local Cost ($):
County Name: HAYS Local Contribution ($):
From: LP 82 NORTH IN SAN MARCOS Total ($): 391,900.00
Let Date: 05/2015
Funding Category: 8To: COMAL COUNTY LINE
Estimated Completion Date:
Early 2016
Work Type: IMPROVE GUARDRAIL TO STANDARDS
2015 Annual Project Listing21
Grouped ProjectsProject ID: NH 2015(568) Federal Cost ($): 733,500.00
CSJ Number: 0016-03-105 State Cost ($): 81,500.00
Project Name: IH 35 Local Cost ($):
County Name: HAYS Local Contribution ($):
From: SH 80 Total ($): 815,000.00
Let Date: 02/2015
Funding Category: 1To: SL 82
Estimated Completion Date:
Fall 2015
Work Type: OVERLAY IH 35 MAINLANES
Grouped ProjectsProject ID: NH 2015(352) Federal Cost ($): 18,360.00
CSJ Number: 0016-03-106 State Cost ($): 2,040.00
Project Name: IH 35 Local Cost ($):
County Name: HAYS Local Contribution ($):
From: 350 FT. NORTH OF SL 82 Total ($): 20,400.00
Let Date: 12/2014
Funding Category: 1To: 740 FT. NORTH OF SL 82
Estimated Completion Date:
Fall 2015
Work Type: BASE REPAIR & OVERLAY
2015 Annual Project Listing22
Grouped ProjectsProject ID: STP 2015(880) Federal Cost ($): 1,952,320.00
CSJ Number: 0285-03-057 State Cost ($): 488,080.00
Project Name: RM 12 Local Cost ($): 0.00
County Name: HAYS Local Contribution ($):
From: SADDLERIDGE DR Total ($): 2,440,400.00
Let Date: 04/2015
Funding Category: 1To: HUGO RD
Estimated Completion Date:
Spring 2016
Work Type: ADD CENTER TURN LANE AND SHOULDERS
Grouped ProjectsProject ID: NH 2015(492) Federal Cost ($): 200,000.00
CSJ Number: 0286-01-055 State Cost ($): 50,000.00
Project Name: SH 80 Local Cost ($):
County Name: HAYS Local Contribution ($):
From: AT IH 35 Total ($): 250,000.00
Let Date: 01/2015
Funding Category: 10To: .
Estimated Completion Date:
Late 2017
Work Type: LANDSCAPING AND IRRIGATION
2015 Annual Project Listing23
Grouped ProjectsProject ID: STP 1502(388) Federal Cost ($): 184,679.20
CSJ Number: 0683-05-011 State Cost ($): 46,169.80
Project Name: RM 12 Local Cost ($):
County Name: HAYS Local Contribution ($):
From: AT OLD FITZHUGH RD. Total ($): 230,849.00
Let Date: 07/2015
Funding Category: 1To: .
Estimated Completion Date:
Winter 2016
Work Type: INSTALL FLASH BEACON/REALIGN INTER.
Grouped ProjectsProject ID: STP 1502(387)HES Federal Cost ($): 666,450.00
CSJ Number: 0683-05-012 State Cost ($): 74,050.00
Project Name: RM 12 Local Cost ($):
County Name: HAYS Local Contribution ($):
From: 0.25 MI N OF OLD FITZHUGH RD. Total ($): 740,500.00
Let Date: 07/2015
Funding Category: 8To: 0.25 MI S OF OLD FITZHUGH RD.
Estimated Completion Date:
Winter 2016
Work Type: ADD CENTER TURN LANE AND SHOULDERS
2015 Annual Project Listing24
Grouped ProjectsProject ID: BR 2016(249) Federal Cost ($): 2,000,000.00
CSJ Number: 0914-33-071 State Cost ($): 500,000.00
Project Name: CR Local Cost ($):
County Name: HAYS Local Contribution ($):
From: FISCHER STORE ROAD AT BLANCO RIVER
Total ($): 2,500,000.00
Let Date: 09/2015
Funding Category: 6To: .(STR NO. AA01-80-001)
Estimated Completion Date:
Spring 2016
Work Type: REPLACE BRIDGE AND APPROACHES
Grouped ProjectsProject ID: STP 2016(304) Federal Cost ($): 242,960.00
CSJ Number: 2293-01-027 State Cost ($): 60,740.00
Project Name: FM 2439 Local Cost ($):
County Name: HAYS Local Contribution ($):
From: MOORE ST Total ($): 303,700.00
Let Date: 11/2015
Funding Category: 1To: NORTH OF BISHOP ST.
Estimated Completion Date:
Fall 2016
Work Type: MILL, SEAL & OVERLAY
2015 Annual Project Listing25
Grouped ProjectsProject ID: STP 2016(175) Federal Cost ($): 847,040.00
CSJ Number: 3210-01-013 State Cost ($): 211,760.00
Project Name: FM 2770 Local Cost ($):
County Name: HAYS Local Contribution ($):
From: FM 1626 Total ($): 1,058,800.00
Let Date: 10/2015
Funding Category: 1To: RM 150
Estimated Completion Date:
Summer 2016
Work Type: MILL & THIN OVERLAY
Grouped ProjectsProject ID: STP 1502(300)HES Federal Cost ($): 161,354.00
CSJ Number: 0015-11-061 State Cost ($):
Project Name: SL 275 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: AT RUNDBERG LN Total ($): 161,354.00
Let Date: 06/2015
Funding Category: 8To: .
Estimated Completion Date:
Late 2016
Work Type: IMPROVE TRAFFIC SIGNAL
2015 Annual Project Listing26
Grouped ProjectsProject ID: NH 2015(567) Federal Cost ($): 2,340,000.00
CSJ Number: 0015-13-352 State Cost ($): 260,000.00
Project Name: IH 35 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: BEN WHITE BLVD. Total ($): 2,600,000.00
Let Date: 02/2015
Funding Category: 1To: HOLLY STREET
Estimated Completion Date:
Spring 2016
Work Type: REPAIR, MILL, SEAL & OVERLAY MAINLANES
Grouped ProjectsProject ID: STP 1502(632)HES Federal Cost ($): 1,434,940.20
CSJ Number: 0015-13-384 State Cost ($): 159,437.80
Project Name: IH 35 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: SLAUGHTER LANE <SL 275> Total ($): 1,594,378.00
Let Date: 11/2015
Funding Category: 8To: 0.705 MI NORTH OF STASSNEY LANE
Estimated Completion Date:
Summer 2018
Work Type: SAFETY LIGHTING
2015 Annual Project Listing27
Grouped ProjectsProject ID: NH 1502(381) Federal Cost ($): 576,000.00
CSJ Number: 0016-01-114 State Cost ($): 64,000.00
Project Name: IH 35 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: IH 35 AT SLAUGHTER LANE Total ($): 640,000.00
Let Date: 07/2015
Funding Category: 10To: .
Estimated Completion Date:
Summer 2018
Work Type: LANDSCAPING AND IRRIGATION
Grouped ProjectsProject ID: STP 2015(877) Federal Cost ($): 493,400.00
CSJ Number: 0113-09-071 State Cost ($):
Project Name: SL 343 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: 1500 FEET SOUTH OF PANTHER TRAIL
Total ($): 493,400.00
Let Date: 04/2015
Funding Category: 1To: PANTHER TRL
Estimated Completion Date:
Fall 2015
Work Type: MILL, SEAL AND INLAY
2015 Annual Project Listing28
Grouped ProjectsProject ID: NH 2015(569) Federal Cost ($): 2,447,300.00
CSJ Number: 0113-13-154 State Cost ($):
Project Name: SL 360 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: US 183 Total ($): 2,447,300.00
Let Date: 02/2015
Funding Category: 1To: WALSH TARLETON LANE
Estimated Completion Date:
Fall 2015
Work Type: PAVEMENT REPAIR, SEAL & OVERLAY
Grouped ProjectsProject ID: NH 2016(063) Federal Cost ($): 1,200,000.00
CSJ Number: 0113-13-157 State Cost ($): 300,000.00
Project Name: SL 360 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: NORTH OF WALSH TARLTON Total ($): 1,500,000.00
Let Date: 09/2015
Funding Category: 11To: SOUTH OF SL 1
Estimated Completion Date:
Spring 2017
Work Type: WDN RDWY, OVRLY, SGLS, MBGF & PVMKS
2015 Annual Project Listing29
Grouped ProjectsProject ID: NH 2016(063) Federal Cost ($): 2,667,200.00
CSJ Number: 0113-13-157 State Cost ($): 666,800.00
Project Name: SL 360 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: NORTH OF WALSH TARLTON Total ($): 3,334,000.00
Let Date: 09/2015
Funding Category: 1To: SOUTH OF SL 1
Estimated Completion Date:
Spring 2017
Work Type: WDN RDWY, OVRLY, SGLS, MBGF & PVMKS
Grouped ProjectsProject ID: NH 1502(588) Federal Cost ($): 15,497.60
CSJ Number: 0113-13-161 State Cost ($): 3,874.40
Project Name: SL 360 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: COURTYARD DR. Total ($): 19,372.00
Let Date: 08/2015
Funding Category: 1To: WESTBANK DRIVE
Estimated Completion Date:
Summer 2016
Work Type: GRADING, BASE, ACP & PVMNT MARKINGS
2015 Annual Project Listing30
Grouped ProjectsProject ID: STP 1502(589)HES Federal Cost ($): 266,760.00
CSJ Number: 0114-01-058 State Cost ($): 29,640.00
Project Name: US 290 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: IH 35 Total ($): 296,400.00
Let Date: 08/2015
Funding Category: 8To: 0.04 MI W OF CAMERON RD
Estimated Completion Date:
Summer 2016
Work Type: INSTALL MEDIAN BARRIER
Grouped ProjectsProject ID: STP 1502(590)HES Federal Cost ($): 225,927.00
CSJ Number: 0114-01-059 State Cost ($): 25,103.00
Project Name: SS 69 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: 0.571 MI W OF IH 35 Total ($): 251,030.00
Let Date: 08/2015
Funding Category: 8To: IH 35
Estimated Completion Date:
Summer 2016
Work Type: INSTALL MEDIAN BARRIERS
2015 Annual Project Listing31
Grouped ProjectsProject ID: NH 1502(382) Federal Cost ($): 720,000.00
CSJ Number: 0114-02-100 State Cost ($): 180,000.00
Project Name: US 290 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: US 183 Total ($): 900,000.00
Let Date: 07/2015
Funding Category: 10To: FM 734
Estimated Completion Date:
Summer 2018
Work Type: LANDSCAPING AND IRRIGATION
Grouped ProjectsProject ID: BR 2015(878) Federal Cost ($): 1,063,000.00
CSJ Number: 0114-03-025 State Cost ($):
Project Name: US 290 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: 0.091 MI. WEST OF WILLOW CREEK Total ($): 1,063,000.00
Let Date: 04/2015
Funding Category: 6To: 0.083 MI. EAST OF WILLOW CREEK
Estimated Completion Date:
Spring 2016
Work Type: REPLACE BRIDGE
2015 Annual Project Listing32
Grouped ProjectsProject ID: STP 1502(302)HES Federal Cost ($): 85,438.00
CSJ Number: 0151-06-140 State Cost ($):
Project Name: US 183 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: AT OAK KNOLL Total ($): 85,438.00
Let Date: 06/2015
Funding Category: 8To: .
Estimated Completion Date:
Late 2016
Work Type: IMPROVE TRAFFIC SIGNAL
Grouped ProjectsProject ID: NH 2016(302) Federal Cost ($): 781,274.40
CSJ Number: 0152-01-076 State Cost ($): 195,318.60
Project Name: US 183 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: 0.4 MI NORTH OF FM 973 Total ($): 976,593.00
Let Date: 11/2015
Funding Category: 1To: VON QUINTUS RD
Estimated Completion Date:
Fall 2016
Work Type: OVERLAY
2015 Annual Project Listing33
Grouped ProjectsProject ID: NH 1502(385) Federal Cost ($): 520,000.00
CSJ Number: 0440-06-014 State Cost ($): 130,000.00
Project Name: SH 130 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: SH 130 @ FM 812 Total ($): 650,000.00
Let Date: 07/2015
Funding Category: 10To: .
Estimated Completion Date:
Summer 2018
Work Type: LANDSCAPING AND IRRIGATION
Grouped ProjectsProject ID: STP 1502(596) Federal Cost ($): 800,000.00
CSJ Number: 0683-02-063 State Cost ($): 200,000.00
Project Name: RM 620 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: 500 FT N OF LOHMANS CROSSING RD
Total ($): 1,000,000.00
Let Date: 09/2015
Funding Category: 11To: LADERA BLVD.
Estimated Completion Date:
Spring 2018
Work Type: OPERATIONAL IMPROVEMENTS
2015 Annual Project Listing34
Grouped ProjectsProject ID: STP 2015(574) Federal Cost ($): 720,000.00
CSJ Number: 0683-04-018 State Cost ($): 180,000.00
Project Name: RM 3238 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: 0.31 MI W OF SH 71 Total ($): 900,000.00
Let Date: 02/2015
Funding Category: 1To: RM 12
Estimated Completion Date:
Spring 2016
Work Type: ADD SHOULDERS AND LEFT TURN LANE
Grouped ProjectsProject ID: STP 2015(572)HES Federal Cost ($): 150,640.00
CSJ Number: 0757-02-016 State Cost ($):
Project Name: FM 685 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: AT FM 1825 Total ($): 150,640.00
Let Date: 02/2015
Funding Category: 8To: .
Estimated Completion Date:
Late 2016
Work Type: IMPROVE TRAFFIC SIGNAL
2015 Annual Project Listing35
Grouped ProjectsProject ID: STP 1502(213) Federal Cost ($): 853,818.40
CSJ Number: 0914-00-310 State Cost ($): 213,454.60
Project Name: VA Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: VARIOUS_ON SYSTEM LOCATIONS Total ($): 1,067,273.00
Let Date: 03/2015
Funding Category: 1To: .
Estimated Completion Date:
Fall 2016
Work Type: NON-SITE SPECIFIC ITS MAINT
Grouped ProjectsProject ID: STP 1502(147) Federal Cost ($): 900,000.00
CSJ Number: 0914-00-343 State Cost ($):
Project Name: VA Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: AT VARIOUS LOCATIONS DISTRICTWIDE
Total ($): 900,000.00
Let Date: 05/2015
Funding Category: 1To: .
Estimated Completion Date:
Late 2016
Work Type: FY 2015 SITE-SPECIFIC SIGNALS
2015 Annual Project Listing36
Grouped ProjectsProject ID: NH 2015(575) Federal Cost ($): 1,306,090.40
CSJ Number: 0914-00-344 State Cost ($): 326,522.60
Project Name: VA Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: AT VARIOUS LOCATIONS DISTRICTWIDE
Total ($): 1,632,613.00
Let Date: 02/2015
Funding Category: 1To: .
Estimated Completion Date:
Late 2016
Work Type: FY 2015 NON-SITE SPECIFIC SIGNALS
Grouped ProjectsProject ID: NH 2016(104) Federal Cost ($): 296,000.00
CSJ Number: 0914-00-367 State Cost ($): 74,000.00
Project Name: VA Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: AT VARIOUS LOCATIONS DISTRICTWIDE
Total ($): 370,000.00
Let Date: 09/2015
Funding Category: 1To: INCLUDE IH 35, SH 71, SL 360, ETC
Estimated Completion Date:
Summer 2016
Work Type: FY 2016 SIGNING
2015 Annual Project Listing37
Grouped ProjectsProject ID: STP 1502(148) Federal Cost ($): 24,000.00
CSJ Number: 0914-00-381 State Cost ($): 6,000.00
Project Name: VA Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: VARIOUS LOCATIONS IN Total ($): 30,000.00
Let Date: 05/2015
Funding Category: 10To: BASTROP, LEE & CALDWELL
COUNTIES Estimated Completion Date:
Spring 2016
Work Type: CONSTRUCT ADA CURB RAMPS
Grouped ProjectsProject ID: STP 1502(148) Federal Cost ($): 771,929.60
CSJ Number: 0914-00-381 State Cost ($): 192,982.40
Project Name: VA Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: VARIOUS LOCATIONS IN Total ($): 964,912.00
Let Date: 05/2015
Funding Category: 10To: BASTROP, LEE & CALDWELL
COUNTIES Estimated Completion Date:
Spring 2016
Work Type: CONSTRUCT ADA CURB RAMPS
2015 Annual Project Listing38
Grouped ProjectsProject ID: STP 2015(604)HES Federal Cost ($): 113,193.00
CSJ Number: 0914-04-292 State Cost ($):
Project Name: CS Local Cost ($): 12,577.00
County Name: TRAVIS Local Contribution ($):
From: 1.2 MI. EAST OF OLD HWY 20 Total ($): 125,770.00
Let Date: 05/2015
Funding Category: 8To: 0.2 MI. WEST OF BITTING SCHOOL
RD. Estimated Completion Date:
Spring 2016
Work Type: HIGH FRICTION SURFACE TREATMENT
Grouped ProjectsProject ID: STP 2015(605)HES Federal Cost ($): 181,378.80
CSJ Number: 0914-04-293 State Cost ($):
Project Name: CS Local Cost ($): 20,153.20
County Name: TRAVIS Local Contribution ($):
From: OLD HWY 20 Total ($): 201,532.00
Let Date: 05/2015
Funding Category: 8To: KIMBRO ROAD
Estimated Completion Date:
Spring 2016
Work Type: HIGH FRICTION SURFACE TREATMENT
2015 Annual Project Listing39
Grouped ProjectsProject ID: NH 2016(065) Federal Cost ($): 12,800.00
CSJ Number: 1200-06-011 State Cost ($): 3,200.00
Project Name: SH 45 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: SL 1 Total ($): 16,000.00
Let Date: 09/2015
Funding Category: 1To: KENDRICK BLVD
Estimated Completion Date:
Spring 2016
Work Type: REPAIR BRIDGE JOINTS
Grouped ProjectsProject ID: STP 2015(738) Federal Cost ($): 316,422.40
CSJ Number: 1902-01-027 State Cost ($): 79,105.60
Project Name: FM 1825 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: 10TH STREET IN PFLUGERVILLE Total ($): 395,528.00
Let Date: 03/2015
Funding Category: 1To: FM 685
Estimated Completion Date:
Summer 2016
Work Type: FULL DEPTH REPAIR, SEAL & OVERLAY
2015 Annual Project Listing40
Grouped ProjectsProject ID: NH 2015(739) Federal Cost ($): 1,017,000.00
CSJ Number: 2100-01-056 State Cost ($):
Project Name: RM 2222 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: LP 1 Total ($): 1,017,000.00
Let Date: 03/2015
Funding Category: 1To: LAMAR BLVD
Estimated Completion Date:
Early 2016
Work Type: MILL, SEAL & OVERLAY
Grouped ProjectsProject ID: NH 2016(065) Federal Cost ($): 812,080.00
CSJ Number: 3136-01-161 State Cost ($): 203,020.00
Project Name: SL 1 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: US 290 Total ($): 1,015,100.00
Let Date: 09/2015
Funding Category: 1To: SH 45
Estimated Completion Date:
Spring 2016
Work Type: SEAL & THIN OVERLAY
2015 Annual Project Listing41
Grouped ProjectsProject ID: NH 2016(064) Federal Cost ($): 100,000.00
CSJ Number: 3136-01-182 State Cost ($): 25,000.00
Project Name: SL 1 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: SL 360 Total ($): 125,000.00
Let Date: 09/2015
Funding Category: 1To: 700 FEET SOUTH OF SL 360
Estimated Completion Date:
Spring 2017
Work Type: WIDEN BRDG & ADJUST PVMT MARKINGS
Grouped ProjectsProject ID: STP 1502(303)HES Federal Cost ($): 64,263.00
CSJ Number: 3417-01-025 State Cost ($):
Project Name: FM 734 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: AT SL 275 (N. LAMAR BLVD) Total ($): 64,263.00
Let Date: 06/2015
Funding Category: 8To: .
Estimated Completion Date:
Late 2016
Work Type: IMPROVE TRAFFIC SIGNAL
2015 Annual Project Listing42
Grouped ProjectsProject ID: STP 1502(304)HES Federal Cost ($): 85,438.00
CSJ Number: 3417-01-026 State Cost ($):
Project Name: FM 734 Local Cost ($):
County Name: TRAVIS Local Contribution ($):
From: AT SL 1 Total ($): 85,438.00
Let Date: 06/2015
Funding Category: 8To: .
Estimated Completion Date:
Late 2016
Work Type: IMPROVE TRAFFIC SIGNAL
Grouped ProjectsProject ID: STP 1502(301)HES Federal Cost ($): 204,072.00
CSJ Number: 0151-05-099 State Cost ($):
Project Name: US 183 Local Cost ($):
County Name: WILLIAMSON Local Contribution ($):
From: AT ANDERSON MILL Total ($): 204,072.00
Let Date: 06/2015
Funding Category: 8To: .
Estimated Completion Date:
Late 2016
Work Type: IMPROVE TRAFFIC SIGNAL
2015 Annual Project Listing43
Grouped ProjectsProject ID: STP 2015(570)HES Federal Cost ($): 135,460.00
CSJ Number: 0204-01-061 State Cost ($):
Project Name: US 79 Local Cost ($):
County Name: WILLIAMSON Local Contribution ($):
From: AT FM 1460 Total ($): 135,460.00
Let Date: 02/2015
Funding Category: 8To: .
Estimated Completion Date:
Late 2016
Work Type: IMPROVE TRAFFIC SIGNAL
Grouped ProjectsProject ID: STP 2015(570)HES Federal Cost ($): 198,017.60
CSJ Number: 0204-01-061 State Cost ($): 49,504.40
Project Name: US 79 Local Cost ($):
County Name: WILLIAMSON Local Contribution ($):
From: AT FM 1460 Total ($): 247,522.00
Let Date: 02/2015
Funding Category: 1To: .
Estimated Completion Date:
Late 2016
Work Type: IMPROVE TRAFFIC SIGNAL
2015 Annual Project Listing44
Grouped ProjectsProject ID: NH 2015(632) Federal Cost ($): 2,432,900.00
CSJ Number: 0204-01-062 State Cost ($):
Project Name: US 79 Local Cost ($):
County Name: WILLIAMSON Local Contribution ($):
From: 0.42 MILES W. OF FM 1460 Total ($): 2,432,900.00
Let Date: 02/2015
Funding Category: 1To: CR 110
Estimated Completion Date:
Summer 2015
Work Type: MILL, SEAL & THIN OVERLAY
Grouped ProjectsProject ID: BR 2015(573) Federal Cost ($): 149,760.00
CSJ Number: 0273-04-033 State Cost ($):
Project Name: US 183 Local Cost ($):
County Name: WILLIAMSON Local Contribution ($):
From: 0.28 MI S OF RM 1869 Total ($): 149,760.00
Let Date: 02/2015
Funding Category: 6To: 0.22 MI N OF RM 1869
Estimated Completion Date:
Early 2016
Work Type: ADD TURN LANES AND SIGNAL
2015 Annual Project Listing45
Grouped ProjectsProject ID: STP 2015(879)HES Federal Cost ($): 874,400.00
CSJ Number: 0273-04-035 State Cost ($):
Project Name: US 183 Local Cost ($):
County Name: WILLIAMSON Local Contribution ($):
From: 0.156 MI S OF CR 213/258 Total ($): 874,400.00
Let Date: 04/2015
Funding Category: 8To: 0.483 MI S OF CR 213/258
Estimated Completion Date:
Spring 2016
Work Type: CONSTRUCT LEFT TURN LANE
Grouped ProjectsProject ID: BR 1502(592) Federal Cost ($): 1,800,000.00
CSJ Number: 0320-03-083 State Cost ($): 450,000.00
Project Name: SH 95 Local Cost ($):
County Name: WILLIAMSON Local Contribution ($):
From: AT WILLIS CREEK Total ($): 2,250,000.00
Let Date: 08/2015
Funding Category: 6To: (STR 0320-03-032)
Estimated Completion Date:
Fall 2016
Work Type: REPLACE BRIDGE AND APPROACHES
2015 Annual Project Listing46
Grouped ProjectsProject ID: BR 1502(594) Federal Cost ($): 240,000.00
CSJ Number: 0334-01-043 State Cost ($): 60,000.00
Project Name: FM 112 Local Cost ($):
County Name: WILLIAMSON Local Contribution ($):
From: AT DRAW 1.0 MI E OF US 79 Total ($): 300,000.00
Let Date: 08/2015
Funding Category: 6To: STR 0334-01-003
Estimated Completion Date:
Summer 2016
Work Type: REPLACE BRIDGE AND APPROACHES
Grouped ProjectsProject ID: BR 1502(594) Federal Cost ($): 560,000.00
CSJ Number: 0334-01-043 State Cost ($): 140,000.00
Project Name: FM 112 Local Cost ($):
County Name: WILLIAMSON Local Contribution ($):
From: AT DRAW 1.0 MI E OF US 79 Total ($): 700,000.00
Let Date: 08/2015
Funding Category: 1To: STR 0334-01-003
Estimated Completion Date:
Summer 2016
Work Type: REPLACE BRIDGE AND APPROACHES
2015 Annual Project Listing47
Grouped ProjectsProject ID: BR 2014(427) Federal Cost ($): 372,000.00
CSJ Number: 0914-05-173 State Cost ($): 93,000.00
Project Name: CS Local Cost ($):
County Name: WILLIAMSON Local Contribution ($):
From: COLORADO ST @ WILLIS CREEK BRANCH
Total ($): 465,000.00
Let Date: 03/2015
Funding Category: 6To: STR# 246-J001-15-001
Estimated Completion Date:
Fall 2015
Work Type: REPLACE BRIDGE & APPROACHES
Grouped ProjectsProject ID: BR 1502(149) Federal Cost ($): 1,206,864.00
CSJ Number: 0986-01-042 State Cost ($): 0.00
Project Name: FM 619 Local Cost ($):
County Name: WILLIAMSON Local Contribution ($):
From: 0.089 MI. NORTH OF BRUSHY CREEK Total ($): 1,206,864.00
Let Date: 05/2015
Funding Category: 6To: 0.100 MI. SOUTH OF BRUSHY CREEK
Estimated Completion Date:
Fall 2016
Work Type: REPLACE BRIDGE
2015 Annual Project Listing48
Grouped ProjectsProject ID: BR 1502(353) Federal Cost ($): 535,532.80
CSJ Number: 1200-04-011 State Cost ($): 133,883.20
Project Name: FM 1466 Local Cost ($):
County Name: WILLIAMSON Local Contribution ($):
From: AT DRAW Total ($): 669,416.00
Let Date: 06/2015
Funding Category: 6To: (STR 1200-4-6)
Estimated Completion Date:
Early 2016
Work Type: REPLACE BRIDGE AND APPROACHES
Grouped ProjectsProject ID: STP 2015(737) Federal Cost ($): 4,574,048.00
CSJ Number: 1201-02-018 State Cost ($): 1,143,512.00
Project Name: FM 487 Local Cost ($):
County Name: WILLIAMSON Local Contribution ($):
From: IH35 Total ($): 5,717,560.00
Let Date: 03/2015
Funding Category: 1To: BELL COUNTY LINE
Estimated Completion Date:
Early 2016
Work Type: REHAB RDWY
2015 Annual Project Listing49
Grouped ProjectsProject ID: STP 1502(073) Federal Cost ($): 3,080,000.00
CSJ Number: 1202-01-017 State Cost ($): 770,000.00
Project Name: FM 972 Local Cost ($):
County Name: WILLIAMSON Local Contribution ($):
From: IH 35 Total ($): 3,850,000.00
Let Date: 09/2015
Funding Category: 1To: 0.128 MILES WEST OF CR 150
Estimated Completion Date:
Summer 2017
Work Type: REHAB PVMT, ADD SHLDR & SAFTY TREAT
Grouped ProjectsProject ID: BR 2015(881) Federal Cost ($): 491,308.80
CSJ Number: 1202-03-015 State Cost ($): 122,827.20
Project Name: FM 1063 Local Cost ($):
County Name: WILLIAMSON Local Contribution ($):
From: 0.046 MI N OF SPRING BRANCH Total ($): 614,136.00
Let Date: 04/2015
Funding Category: 6To: 0.019 MI S OF SPRING BRANCH
Estimated Completion Date:
Spring 2016
Work Type: REPLACE BRIDGE
2015 Annual Project Listing50
Grouped ProjectsProject ID: STP 2015(882) Federal Cost ($): 3,438,480.00
CSJ Number: 1378-06-011 State Cost ($): 859,620.00
Project Name: FM 3406 Local Cost ($):
County Name: WILLIAMSON Local Contribution ($):
From: 0.13 MI. EAST OF WYOMING SPRINGS DR
Total ($): 4,298,100.00
Let Date: 04/2015
Funding Category: 1To: 0.05 MI. WEST OF GTRR
Estimated Completion Date:
Summer 2016
Work Type: WIDEN TO 5-LANE WITH CENTER LTL
2014 Annual Project Listing51
Transit Projects - Round Rock Transit DistrictProject ID: TX-90-Y131-00 Federal Cost: $542,024
CSJ Number: Transportation Development Credits:
Project Name: Round Rock Transit District Local Cost: $766,286
County Name: Williamson Local Contribution:
From: City of Round Rock and ETJ Total: $1,308,310
To: Let Date: 5/13/2015
Work Type: Transit Capital Funding Category: 5307Estimated Completion Date:
8/30/2017
Transit Projects - UrbanFY 2015 Federal Funds Obligated
Transit Projects - Capital Metro Transportation AuthorityProject ID: NOTE: Capital Metro Transportation
Authority did not obligate any federal funds during the period of 10/1/2014 through 9/30/2015.
Three (3) federal formula grants programmed under FY 2015 were executed in November 2015.
Federal Cost:
CSJ Number: Transportation Development Credits:
Project Name: Local Cost:
County Name: Local Contribution:
From: Total:
To: Let Date:
Work Type: Funding Category:Estimated Completion Date:
2014 Annual Project Listing52
Transit Projects - RuralFY 2015 Federal Funds Obligated
NOTE: TxDOT-PTN has not yet provided information on rural transit lettings for FY 2015.