Future development at Future development at INCDTIM computing centerINCDTIM computing center
Dr. Ing. FDr. Ing. Făărcarcaşş Felix Felix
NATIONAL INSTITUTE FOR RESEARCH AND DEVELOPMENT OF ISOTOPICNATIONAL INSTITUTE FOR RESEARCH AND DEVELOPMENT OF ISOTOPIC AND MOLECULAR TECHNOLOGIESAND MOLECULAR TECHNOLOGIES
Donath St. 65-103, 400293, Cluj-Napoca, ROMANIADonath St. 65-103, 400293, Cluj-Napoca, ROMANIA Tel.: +40-264-584037; Fax:Tel.: +40-264-584037; Fax: +40-264-420042; GSM: +40-731-030060+40-264-420042; GSM: +40-731-030060
e-mail: e-mail: [email protected], web: , web: http://www.itim-cj.ro
Achievements in 2011 Achievements in 2011
1.1. A 10 GBps Uplink A 10 GBps Uplink
2.2. Multiple Back up solutionsMultiple Back up solutions
3.3. MPI ClusterMPI Cluster
4.4. A functional Grid site processing ATLAS jobsA functional Grid site processing ATLAS jobs
Grid, MPI and NetworkGrid, MPI and Network
22
INCDTIM
Network abilitiesNetwork abilities
Cisco Catalyst 6509E Layer 3 systemCisco Catalyst 6509E Layer 3 system
ITIM – RoEduNet 10 GB from 1 Mar. 2011ITIM – RoEduNet 10 GB from 1 Mar. 2011
Nexus system through the Grid systemNexus system through the Grid system– ~40 GB between WN and SE, Cream~40 GB between WN and SE, Cream– ~20 GB between Site and Switch~20 GB between Site and Switch
INCDTIM
33
44
NetworkNetworkLinkLink
Network Link 2008Farcas F. - AQTR 2008
Traffic measurement
0
100
200
300
400
500
0 4 8 12 16 20 24 28 32 36 40 44 48
Time [h]
Sp
eed
[M
bp
s]
Network Link 2009
Farcas F. – CISSE 2009
INCDTIM
Testing the speed with MGEN program, March 2011 44
55
Multiple Backup solution Multiple Backup solution
Power generator 275kW
Uninterruptible
Power Source ~
APC Symetra of
max 160 KVA full
redundant
INCDTIM
U
P
S
Power Generator
275 KW, start in
full 8 seconds55
MPI ClusterMPI Cluster
Program installedProgram installed– CASTEP (NMR, CASTEP (NMR,
Forcite, Reflex Plus, Forcite, Reflex Plus, Conformers - Conformers - Moduls) (Moduls) (licenselicense))
– MolPro, SIESTA, MolPro, SIESTA, Quantum Expresso, Quantum Expresso, ProChem, Orca, etcProChem, Orca, etc
Module Environment Module Environment PackagePackage for job for job
MonitoredMonitored by Ganglia by Ganglia
25 processing station25 processing station
INCDTIM
66
RO-14-ITIM RO-14-ITIM Grid Site Grid Site Four Main station (Cream, Apel, SE, UI)Four Main station (Cream, Apel, SE, UI)
Max number of processing core 300 Max number of processing core 300
Storage = 100 TB, online 35 (for the moment) Storage = 100 TB, online 35 (for the moment)
Technology usedTechnology used, next slide…, next slide…
INCDTIM
77
88
Technology usedTechnology used INCDTIM
Blade system and MSA storage
IBM and HP Blade system, total of IBM and HP Blade system, total of 46 46 Blades in only Blades in only 29 U29 UIntel 1U SeverIntel 1U SeverProcessing power: 432Processing power: 432 corecoreManagement -> through web based Management -> through web based interfacesinterfacesMSA Storage capacity: 50 TB, MSA Storage capacity: 50 TB, Less space for 46 PC => Less space for 46 PC => core increase core increase by 56%by 56%Less Less powerpower consume - consume - reduced reduced by by 34%34%
HP & IBM web management interface
Grid Results 2011Grid Results 2011 INCDTIM
CPU EfficiencyCPU Efficiency
~270.000 jobs (1.01 - 1.11.2011) = 6%(RO)~270.000 jobs (1.01 - 1.11.2011) = 6%(RO)
in 2010 ~6000 jobsin 2010 ~6000 jobs
99
1010
Network Configuration Network Configuration and and Logical Schema of the DatacenterLogical Schema of the Datacenter
INCDTIM
Farcas F& all – REV 2011
Future development for 2012Future development for 2012
Grid site DevelopmentGrid site Development
MPI cluster DevelopmentMPI cluster Development
Improving monitoring in the site and Improving monitoring in the site and clustercluster
IPv6 implementationIPv6 implementation
What are the Financial sourcesWhat are the Financial sources??
RO-LCG 2012 symposium/conference RO-LCG 2012 symposium/conference organizingorganizing
1111
INCDTIM
Grid developmentGrid development
Improving Improving MemoryMemory (3 GB/core) (3 GB/core)
Improving Improving StorageStorage capacitycapacity (online 150 (online 150 TB)TB)
Building a Building a virtual virtual Grid site based on Grid site based on EMI (European Middleware Initiative) EMI (European Middleware Initiative) for testingfor testing
If the testing are successful If the testing are successful implementing the Grid site with EMIimplementing the Grid site with EMI
Implementing Implementing IPv6IPv6 in the virtual site in the virtual site
INCDTIM
1212
MPI developmentMPI developmentINCDTIM
1414
Building a strong monitoring system Building a strong monitoring system ((nagios, ganglianagios, ganglia))
Implementing special queues for special Implementing special queues for special processing programprocessing program
Installing new software (Installing new software (Gaussian 2009, Gaussian 2009, CRYSTAL & WIEN2k))
Acquiring Acquiring 80 processor80 processor for MPI for MPI processing, technology unknown !yet! processing, technology unknown !yet!
Fund through National Authority for Science Research Fund through National Authority for Science Research (NASR)(NASR)Continuing the 12 EUContinuing the 12 EU – ConDeGrid / 2009 - 2014 – ConDeGrid / 2009 - 2014Continuing the 15 EUContinuing the 15 EU / 2009-2014 / 2009-2014Cooperation programCooperation program "Hulubei-Meshcheryakov“ together "Hulubei-Meshcheryakov“ together with the Laboratory of Information Technologies at JINR –with the Laboratory of Information Technologies at JINR –Dubna 2010-2013Dubna 2010-2013POS-CCE 192POS-CCE 192, , Improving the capacity and reliability of Improving the capacity and reliability of INCDTIM GRID center for integration in international INCDTIM GRID center for integration in international networks (INGRID)networks (INGRID)POS-CCE 536POS-CCE 536, Axis 2, operation 2.1.2, Axis 2, operation 2.1.2PN-II-RU-TE-2011-3-0124PN-II-RU-TE-2011-3-0124 PN-II-RU-TE-2011-3-0085PN-II-RU-TE-2011-3-0085: : „Modelarea First-Principles a „Modelarea First-Principles a Oxizilor bazati pe SrTiO3 pentru Aplicatii Termoelectrice”Oxizilor bazati pe SrTiO3 pentru Aplicatii Termoelectrice” ..PN-II-KAI2.2- O2.2.1-2PM/2008PN-II-KAI2.2- O2.2.1-2PM/2008 Molecular and Molecular and Biomolecular Physics Department Upgrading – Biomolecular Physics Department Upgrading – MDFMOLBIOMDFMOLBIO
INCDTIMFinancial ResourcesFinancial Resources
1515
POS-CCE 192POS-CCE 192
Improving the capacity and reliability of Improving the capacity and reliability of INCDTIM GRID center for integration in INCDTIM GRID center for integration in
international networksinternational networks
(INGRID)(INGRID)
UNIUNEA EUROPEANA GUVERNUL ROMÂNIEI INCDTIM
Project 192 Project 192 contract no: 42/11.05.2009contract no: 42/11.05.2009
Total valueTotal value: : 2.345.8002.345.800 lei lei ~ ~ 500.000 Euro 500.000 Euro
11.05.200911.05.2009 to to 10.03.201110.03.2011
INCDTIM
Main acquisitionsMain acquisitions
Power generator ( ~Power generator ( ~21.250 21.250 Euro)Euro)
HP Blade system ( ~HP Blade system ( ~193.000193.000 Euro) Euro)
Cisco Catalyst 6509E system ( ~Cisco Catalyst 6509E system ( ~141.000141.000 Euro) Euro)
APC UPS system ( ~APC UPS system ( ~95.00095.000 Euro) Euro)
1717
Research area applied Research area applied for MPI resourcesfor MPI resources
Molecular and Molecular and biomolecular biomolecular physicsphysics– Numerical Numerical
ModelingModeling – Molecular and Molecular and
Biomolecular Biomolecular ModelingModeling
– Structural Analysis Structural Analysis on Solidson Solids
INCDTIM
2020
2012 RO-LCG meeting2012 RO-LCG meeting
We are organizing the RO-LCG meeting We are organizing the RO-LCG meeting next year in next year in Cluj-Napoca at INCDTIMCluj-Napoca at INCDTIM
We are doing it with the support of IEEE We are doing it with the support of IEEE RomaniaRomania
We will publish your contribution in an We will publish your contribution in an IEEE volumeIEEE volume
We are waiting for We are waiting for interestinginteresting reports and reports and contribution in LCG and Parallel contribution in LCG and Parallel computing domain.computing domain.
INCDTIM
2121
Published articles 2011Published articles 2011
1.1. F. Farcas, R. Trusca, S. Albert, Izabella Szabo & G. Popeneciu, F. Farcas, R. Trusca, S. Albert, Izabella Szabo & G. Popeneciu, Application of Green IT for Physics Data Processing at Application of Green IT for Physics Data Processing at INCDTIMINCDTIM, PIM 2011, PIM 2011
2.2. Trusca MRC, Farcas F, Szabo I, Albert S, Floare C.G., Trusca MRC, Farcas F, Szabo I, Albert S, Floare C.G., Techniques for parameters monitoring in datacenterTechniques for parameters monitoring in datacenter , XXIII , XXIII International Symposium on Nuclear Electronuics & Computing, International Symposium on Nuclear Electronuics & Computing, NEC 2011, Varna 2011NEC 2011, Varna 2011
3.3. Felix Farcas, Felix Farcas, Development of INCDTIM Datacenter using „green Development of INCDTIM Datacenter using „green IT”IT”, XXIII International Symposium on Nuclear Electronuics & , XXIII International Symposium on Nuclear Electronuics & Computing, NEC 2011, Book of Abstract, plenary session.Computing, NEC 2011, Book of Abstract, plenary session.
4.4. Felix Farcas, Radu Trusca, Felix Farcas, Radu Trusca, Grid computing Improvment at Grid computing Improvment at INCDTIM ClujINCDTIM Cluj, Proceedins REV-2011, Remote Engineering and , Proceedins REV-2011, Remote Engineering and Virtual Instrumentation, International Association of Online Virtual Instrumentation, International Association of Online Engineering, ISBN 978-3-89958-55-1Engineering, ISBN 978-3-89958-55-1..
INCDTIM