Fusion improvement

20
LTX QRM Sep.2002--1 Fusion's status CS.T u

description

 

Transcript of Fusion improvement

Page 1: Fusion improvement

LTX

QR

M S

ep

.2002--

1

Fusion's status

CS.Tu

Page 2: Fusion improvement

FUSION in PHILIPS 2

• Introduction of Fusion in Philips

• MTBBF V.S DOA/DUW

• Fault rates of PECHF and SMS

• Improvement Actions 2004 & 2005

• Bottle neck on Fusion.

Agenda

Page 3: Fusion improvement

FUSION in PHILIPS 3

Introduction of Fusion in Philips

• Installed base :

Fusion HF x 41 , DH x 31 & DM x10.

• Configurations DH :

VX250(320ch), Baseline 1 , 2 &3, SMS_Hr (2), HS (2) ch,DPS(10) and AP(16).

• Configurations DM :

VX250(256), DPS(10).

Page 4: Fusion improvement

FUSION in PHILIPS 4

MTBBF V.S DOA/DUWFusion MTBBF

0

200

400

600

800

1000

Q1'04 Q2'04 Q3'04 Q4'04 Q1'05

Q1'04 Q2'04 Q3'04 Q4'04 Q1'05

MTBBF 775 684 722 581 443

0

10

20

30

40

50

60

70

2003 2004 Q4'04 Q1'05

• Fusion HF is more sensitive then other plate forms to power cut. (Q4’04 response to Q1’05 + A great impact on LTX )

• 0185-01(PSCM) issue : Wrong action from LTX SG repair house.

• Take too much time to verify parts returned from LTX. (DOA)

DUW : fault before 90 days.DOA : fault before 13

days.2003 2004 Q4'04 Q1'05

DOA 45 22 3 25DUW 22 33 10 24

hrsea

Page 5: Fusion improvement

FUSION in PHILIPS 5

0

50

100

150

200

250

300

350

400

450

500

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

80.00%

90.00%

Total 22 33 29 473

Rates% 3.95% 5.92% 5.21% 84.92%

DOA DUW PRE R&R

• 2005 Jan~May failures status.

• DOA 8.1%; DUW 12.0%

• High usage and failure rates come from application pcf5212/3 & om6384.

• 2004 ‘s failures status.

• 2004’s average planning ~94% < 2003’s

• DOA 3.95%; DUW 5.92%.

0

50

100

150

200

250

300

0.0%

10.0%

20.0%

30.0%

40.0%

50.0%

60.0%

70.0%

80.0%

Total 29 43 12 265Rates% 8.1% 12.0% 3.4% 74.2%

DOA DUW PRE R&R

DOA/DUW Rates

2005 2004

Page 6: Fusion improvement

FUSION in PHILIPS 6

TITL Fusion Board Usage Summary

Y05 MTBBF Goal=1400

Note: MTBBF including DOA parts.

Fusion Board Usage and MTBBF

1440

1275

812

744

0

3

6

9

12

15

18

Jan-05 Feb-05 Mar-05 Apr-05 May-05 Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05

# of

boa

rds

600

900

1200

1500MTBBF

pwr sply pechf tsint farmnt dscm sms opt ctmu opt

others cooler MTBBF

Part Jan-05 Feb-05 Mar-05 Apr-05 May-05 Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05 Summary %

pechf 4 4 3 2 13 40.63

pwr sply 1 1 1 1 4 12.50

tsint 1 1 1 3 9.38

cooler 1 2 3 9.38

farmnt 2 2 6.25

dscm 2 1 3

sms opt 2 2

ctmu opt 1 1 others 1 0 1DOA 0 0 2 0 2 6.25Usage 11 12 3 3 29

Total 11 12 5 4 0 0 0 0 0 0 0 0 32MTBBF 812 744 1275 1440

Page 7: Fusion improvement

FUSION in PHILIPS 7

Fault rates of PECHF and SMS

• SMS digital & SMS Hr become the top faults in PSK.

• 95% of SMS dig , SMS Hr fail are related to OM6384 & PCf5212/3.

0

10

20

30

40

50

60

2002 2003 2004 Q4'05 Q1'05

SMS Faults

Year 2002 2003 2004 Q4'05 Q1'05

SMS Faults 26 48 58 13 26

In Q1 we get 26 ea. DOA x 2DUW x 5

ea

Part NumberDOA DUW PRE R&RGrand Total

Failure Rates/installed base

865-7393-03 5 1 34 40 5.3%

865-2728-03 2 5 1 18 26 21.7%

865-7313-04 3 3 22 28 3.7%

865-1545-01 2 1 10 13 6.5%

865-2749-01 2 1 6 9 15.0%

Page 8: Fusion improvement

FUSION in PHILIPS 8

0

10

20

30

40

50

60

0

20

40

60

80

100

120

140

160

180

board failures'03 49 43 40 48 48 56 31 29 43 37 35 29

board failures'04 37 26 33 29 36 40 45 45 48 30 30 43

Repair Price'03 170 134 141 138 148 143 101 105 121 134 113 95

Repair Price'04 121 74 97 91 110 110 154 141 149 70 107 109

Jan. '03Feb. '03Mar. '03Apr. '03 May '03 Jun. '03 Jul. '03 Aug '03Sep. '03Oct. '03 Nov '03Dec. '03

Failure & Repair Price(KUSD)

(EA)

Page 9: Fusion improvement

FUSION in PHILIPS 9

Improvement Actions Related to Cost

• Evaluation of LTX new PECHF relay

• Looked for local service : Buying LCD instead of CRT, Snubbors, flower sensors. (CRT : Transportation + repair cost = nt 14xxxx + usd $800 )

• Heat-exchanger local solution.

• Look for consumable parts from local vendor.

• Repair PSCM, THBUF.

Page 10: Fusion improvement

FUSION in PHILIPS 10

Evaluation of LTX new PECHF relay

newold

• 60% of PECHF fault causes are related to relay’s reliability.

• The results after the evaluation of LTX new PECHF relay.

Failure rate of PEC’s was slightly higher on the ZTR tester through 3 months.

Replacing all relays during repair does not improve reliability.

LTX have already implemented the above measures in repair.

Page 11: Fusion improvement

FUSION in PHILIPS 11

Heat-exchanger local solution

• Purpose of request : To get stable temperature(17 centigrade ) + Cost saving.

• Real status in use : Same function as origin.

• Getting from LTX is (USD): $5900/ea

• Buying from local vendor is NT 5XXX/ 2ea

Page 12: Fusion improvement

FUSION in PHILIPS 12

Bottle Necks On Fusion

• Hardware and software upgrade frozen.

• NPF (No Problem Found) control.

• DFCP control.

Page 13: Fusion improvement

FUSION in PHILIPS 13

Items PSK TITL

Mix-Signal DH & Pure Dig DM (3:1) Pure Digital Tester.

Baseline3 VX250. Baseline 5 VX250 above.

TC and VME crate. 4 x pattern load.

AXMP + SunBlade 2500.

Solaris 7 Solaris 7

enVission++ R10.8.4.5.2enVission++ R12.x

Service Labor service Buy on site.

MTBBF 650 H/B (DOA 13days, DUW 90 days)1000 H/B (DOA = DUW = 90 days)

Parts 100% parts rent from Vendor. Partial parts rent from Vendor

Improvement Actions D.I.Y & Partial actions from Vendor. 90% control by Vendor.

H/W configuration

Software

PSK V.S.TI

(upgrade frozen)

(upgrade frozen)

(upgrade frozen)

(upgrade frozen)

Page 14: Fusion improvement

FUSION in PHILIPS 14

DFCP in Q1’05

• DFCP: Device Fail Check Pass.

Order quantity (ea)

Failure status 05-01 05-02 05-03 05-04 Grand Total

CFDF 1 1

DFCF 64 38 37 58 197

DFCP 2 3 5 10

DPCF 27 23 12 13 75

DPCP 2 2

Recalibration 3 3

Grand Total 96 62 52 78 288

Month

Page 15: Fusion improvement

FUSION in PHILIPS 15

Page 16: Fusion improvement

FUSION in PHILIPS 16

5622

2633

946

14729

574473

0 100 200 300 400 500 600

DOA

DUW

ECO

PRE

R&R

2004

2003

Failures 2004 V.S 2003

Page 17: Fusion improvement

FUSION in PHILIPS 17

765501

2721

5125

798648

0 100 200 300 400 500 600 700 800

DFCF

DFCP

DPCF

Grand Total

2004

2003

2004 501 21 125 648

2003 765 27 5 798

DFCF DFCP DPCF Grand Total

Failures Status in 2003 & 2004

Page 18: Fusion improvement

FUSION in PHILIPS 18

High Failures Sorting in 2003 & 2004

Sum of Orderquantity

Part number DOA DUW ECO PRE R&R Grand Total865-7393-03 12 8 164 184865-7393-05 1 7 46 8 62865-7313-04 4 47 51865-2728-03 3 2 5 35 45865-2080-00 2 17 19865-2728-02 1 1 11 13

2004 Service CodeSum of Order

quantity

Part number DOA DUW ECO PRE R&R Grand Total

865-7393-03 17 5 19 152 193865-7313-04 6 1 60 67865-2080-00 5 4 57 66865-2728-03 2 2 16 19 39865-1533-01 27 27858-0213-01 2 2 10 9 23

2003 Service Code

Page 19: Fusion improvement

FUSION in PHILIPS 19

Failure Status in 2003 & 2004

5622

2633

946

14729

574473

0 100 200 300 400 500 600

DOA

DUW

ECO

PRE

R&R

2004

2003

Page 20: Fusion improvement

FUSION in PHILIPS 20

Vacuum Pump + Reservoir

• Purpose of request :

Prevent probe card from being damaged.

• Real status in use :

1. Charge the reservoir first. (it need 30 sec)

2. Keep –650 psi in reservoir.

3. It will hold 20 seconds when power cut or air lost.