Funding Infrastructure Projects
JICA India
November 20th,2019
1
Contents
1. India - Japan Relations
2. JICA’s Policy and Activities
3. Projects in Transport Sector
-Metro Projects
-Western Dedicated Freight Corridor (WDFC)
-Mumbai Ahmadabad High Speed Rail (MAHSR)
-Road Projects
2
India - Japan Relations
● Both established Special Strategic and Global Partnership.
● For India, Japan is the largest bilateral development partner.● For Japan, India is the oldest recipient of ODA.
• Apr. 1952 Established official diplomatic relations
• 1958 Japan's first ODA Loan in the world extended to India.
• Aug. 2000 "Japan-India Global Partnership in the 21st Century"
• Apr. 2005 Japanese PM Koizumi visited India. Annual based PMs mutual visits started.
• Dec. 2006 "Joint Statement Towards Japan-India Strategic and Global Partnership"
• Sept. 2014 Indian PM Modi visited Japan. "Tokyo Declaration for Japan-India Special Strategic
and Global Partnership"
a) Doubling Japan’s foreign direct investment in India within five years.
b) Doubling the number of Japanese companies in India within five years.
c) JPY 3.5 trillion (Rs. 2 trillion) of public and private investment and financing to India from Japan,
including ODA, within five years.
• Sept. 2017 Japanese PM Abe visited India (Commencement ceremony of HSR in Ahmedabad)
• Oct. 2018 Indian PM Modi visited Japan (Tokyo and Yamanashi).3
* Part of grant aid is provided by the Ministry of Foreign Affairs.
bilateral assistance
international authority
Grant
ODA Loan / PSIF (Private Sector Investment Finance)
ODA(Official
DevelopmentAssistance)
multilateral assistance
Grant Aid*
✓ JICA is a governmental agency of Japan that coordinates official development assistance (ODA).
✓ JICA, the world’s largest bilateral aid agency, works in over 150 countries and regions and has some 100 overseas offices.
Technical Cooperation
What is “JICA”?
4
JICA at a glance
Japan International Cooperation Agency• President: Shinichi Kitaoka• Establishment: August 1974 Reorganized 2008 • Staff: 1,827 (Full time)• Recipient Countries: 150• Overseas Offices: 92• Offices in Japan: HQ (Tokyo) and 17 sites
JICA’s Vision
Inclusive and Dynamic Development
Addressing Global Agenda Reducing Povertythrough Equitable Growth
Improving Governance Achieving Human Security
Mission 3
Mission 1 Mission 2
Mission 4
5
6
Assistance Policy
Development Agenda
Inclusive Rural Growth
Enhancing Connectivity
Industrial Development
Urbanization Sustainable and Inclusive
Growth
Strengthening Industrial
Competitive-ness
Railway utilizing Japanese Technologies (High Speed Rail, etc.)
North East Region, Special Category States, Island Areas
Urban Development(Water Supply and Sewage)
Rural, Environmental Issues (Forestry, Agriculture)
Private Sector Development(Economic Corridor, Skill Development,
Infrastructure for Industrial Development, Power and Energy)
Regional Cooperation
(Asia/Africa)
Technical Assistance, etc.
Other Agenda
Regional Cooperation
Priority Areas and Sectors(Support through ODA Loans)
SDGs
Comprehensive Support for SDGs(Policy Program Loans, etc.)
Possible Contribution by JICA
JICA’s Contribution to Development Agenda of India
JICA Country Analysis Paper (JCAP) FY 2017
Grant Aid Technical CooperationCitizen Partnership /
Public-Private Partnership
・Results in FY 2016/17JPY 16.0 billion (about Rs. 850 crore)
About 1100 Japanese experts to IndiaAbout 250 Trainee from India to Japan
Two on-going projects in
Varanasi & Bengaluru
• Japanese Volunteers• Japanese NGO activities• Partnerships with
Private-Sector Activities
Accumulated Commitment by FY2017/18:- JPY 5.3 trillion in total
(equivalent to over Rs. 3 lakh crore)
Operational Results in FY2017/18:Commitment: JPY 398.4 billion
(equivalent to about Rs. 25,000 crore) Disbursement: JPY 264.3billion
(equivalent to over Rs. 16,000 crore)
Terms and conditions: (as of Jan. 2018)- General terms: Interest rate 1.5%, repayment period 30 years (including 10 years grace period)- STEP: Interest rate 0.1%, repayment period 40 years (including 12 years grace period)
Soft Loan
India is JICA’s Largest Development Partner in the World
7
Water 12%
Energy9%
Agri & Forest6%
Others9%
Metro33% DFC
17%
Others14%
Transport64%
Major Sector (FY2008/09-2017/18)
8
1,250 1,345
1,555 1,849
2,251 2,360
2,182
480
2,669
3,493
3,115
1,210
3,773
3,088
3,984
-
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Increasing trend of ODA loan to India
-
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
India
Vietnam
Bangladesh
Thailand
Myanmar
Indonesia
Sri Lanka
thePhilippines
JICA is supporting metro projects in 6 major cities in India
⚫ Total Length: 351km⚫ Project Cost: JPY 1,274 Billion
(about Rs. 80,000 crore: Phase 1-3)⚫ Completion Year: 2020 (Phase-3)⚫ Phase 4 plan is coming up
Delhi Metro
⚫ Total Length: 34 km⚫ Project Cost: JPY 621 Billion
(about Rs. 39,000 crore)⚫ Completion Year: 2021⚫ Under Construction. New plan
for Line 2 and 4 is coming up.
Mumbai Metro
⚫ Total Length: 16 km⚫ Project Cost: JPY 140 Billion
(about Rs. 9,000 crore)⚫ Completion Year: 2021⚫ Under construction
Kolkata Metro
⚫ Total Length: 42 km⚫ Project Cost: JPY 307 Billion
(about Rs. 19,000 crore)⚫ Completion Year: 2017⚫ Phase-2 is under construction
Bangalore Metro⚫ Total Length: 53 km⚫ Project Cost: JPY 386 Billion
(about Rs. 24,000 crore)⚫ Completion Year: 2020 (Phase-1)⚫ Phase-1 under construction
Chennai Metro
Cooperation on Metro Projects
9
⚫ Total Length: 38 km⚫ Project Cost: JPY 246 Billion
(about Rs. 15,000 crore)⚫ Completion Year: 2020⚫ Under Construction
Ahmedabad Metro
Safe, Timely, Comfortable Move for Better Life
10
➢ Safe operation➢ Timely & Stable (with reliability, efficiency and comfort) ➢ Considerations for environmental harmonization, operation
and maintenance, managerial/financial sustainability➢ Coordination with various stakeholders for better operation
/service
“Quality Infrastructure”
10
Sustainable Development Goals (SDGs) (draft)
Goal 9
Build resilient infrastructure, promote inclusive and sustainable industrialization and foster innovation
Target 9.1
Develop quality, reliable, sustainable and resilient infrastructure, including regional and trans border infrastructure, to support economic development and human well-being, with a focus on affordable and equitable access for all
11
Key Elements of Quality Infrastructure Investment
1. Aligning to country/regional development strategy
2. Attach importance to Life-Cycle cost rather than adopting lower initial cost
3. Duly addressing potential social and environmental impacts in accordance with relevant international practices and standards
4. Safety and resilience5. Benefits to society and people: Job creation and
human resource development
12
1. Delhi Mass Rapid Transport System Project (India)
13
Distance Full operation Project Cost
Phase 1 65km 2006 US$2.3 bil (ODA Loan:US$1.4bil)
Phase 2 125km 2011 US$3.2 bil (ODA Loan:US$1.8bil)
Phase 3 106km Under construction US$6.0 bil (ODA Loan:US$2.9bil)
1. Delhi Mass Rapid Transport System Project (India)
(1) Inclusiveness➢ Attention for the disabled, elderly, and women
14
Women-only train car
Wheelchair users
1. Delhi Mass Rapid Transport System Project(India)
(2) Environmental Sustainability➢ First railway project registered with the UN under the Clean
Development Mechanism (CDM)
➢ 22 mil ton CO² reduction (2002~2032) by regenerative braking system
15
Industrial Corridors under Development (DMIC & CBIC)
DMIC and CBIC are being supported by GoI and GoJ.
Delhi-Mumbai Industrial Corridor
Bengaluru-Mumbai
Economic Corridor
Chennai-Bengaluru Industrial Corridor
Amritsar Kolkata Industrial Corridor
• ~15% y-o-y growth in manufacturing sector to achieve 25% contribution to GDP by 2022
• 100 million jobs by 2022
• Skill development for inclusive growth
• Improved technology orientation & value addition
• Global Competitiveness
• Environmental sustainability
National Manufacturing Plan Targets
16
WDFC
➢ The backbone of DMIC (Delhi-Mumbai Industrial Corridor)
➢ WDFC (Delhi–Mumbai: 1,500 km) will focus on:
(1) construction of new dedicated freight lines
(2) installation of automated signal & telecommunication
(3) introduction of electric locomotives with high-speed & high-capacity transportation
➢ Construction is underway (Almost all tendering are completed)
WW-
W-
Kolkata
Eastern
Western (Phase 1)
Ludiana
Rewari
Dadri
Vadodara
Delhi
Mumbai
427 km
922 km
127 km
Delhi~Mumbai
DFC Western
1,500 km
Corridor
Western (Phase 2)
17
<Completion image>
Electric Traction System Double Stack Container Wagon
Maximum speed
Transport time(Delhi – Mumbai)
30 - 40 km / h(approximately)
48 - 72 hours
NOWDFC
100 km / h
20 hours(approximately)
Western Dedicated Freight Corridor (DFC) Project
18
MAHSR
➢ Joint Feasibility Study (F/S) conducted by JICA and Ministry of Railway from Dec. 2013 to July. 2015.
➢ Both sides confirmed the use of Japanese high speed rail technologies (i.e. the SHINKANSEN system) and experiences, in line with the result of the joint F/S at the Japan-India Summit Meeting (December 2015).
➢ Follow-Up Study conducted by JICA from Mar. 2016 to Feb.2018
➢ In the latest Japan-India Summit Meeting (September 2017), the two Prime Minister welcomed:(1) Steady progress, including the project commencement at the Sabarmati Station, witnessing the
construction commencement of training institute in Vadodara(2) Provision for a soft ODA loan amounting to JPY 100 billion(3) Business matching efforts to establish Japan-India cooperation for advancing “Make in India” and
technology transfer HSR projects
➢ JICA has been providing with utmost technical support (for CD);✓ Formulation of technical standards,✓ Safety certification measures,✓ Strengthening the institutional capacity of NHSRCL✓ Urban development planning of stations and surrounding areas for enhancement of the connectivity
and non-fare revenue, etc.
19
◼ The impact of HSR on development of India
Safe, comfortable and punctual HSR
• Boost economic development• Stimulate regional development
✓mitigate excessive concentration on large cities✓lead to balanced economy
• Promote “social innovation” by introducing Japan’s;✓Technology✓Discipline✓Perfection✓Teamwork Concept
20
MAHSR
Station Area Development (SAD) for MAHSR Project
Area 2The area to be developed
approximately within 10
years after HSR opening
Area 1The area to be
secured before
opening of HSR
【JICA Invitation Program in Japan】【Image of Area Classification】
• The Experts Committee for SAD was formed between India and Japan
and have been discussing on SAD issues.
• Phased development based on Area Classification is considered for
station area of HSR
• JICA invited Indian officials, MOR, MOHUA, NHSRCL, Gujarat and
Maharashtra state governments to Japan from Jan 27 to Feb 5, 2019.
Basement of Tokyo Station
Tokyo Station
Osaka Station
Area 3The area surrounding the
station to be developed /
redeveloped in the mid/long
term
Training in Japan for Officials of MOR and NHSRCL
• At Prime Ministers’ Summit Meeting held in December 2015, it was agreed
that Japan would cooperate with India for MOR’s Human Resource
Development.
• Based on this, JICA has been providing MOR and NHSRCL with
comprehensive training program in Japan for Railway system and
technology.
• JICA have conducted 19 times of training in Japan since February 2017.
• In total, 683 officials of MOR/NHSRCL have participated as of August 2019.
• In this FY 2019, 8 times for this training program in Japan are scheduled.
Comprehensive Training Program in Japan Tohoku SHINKANSEN (E5/H5)
Capacity Development on Railway Safety in India
• JICA’s Technical Cooperation on Improvement of Existing Railway Safety.
• Project period : November 2018 to October 2020
• Technical knowledge and experience are shared by Japanese experts to
Indian experts through site survey in India and training in Japan to improve
technical capacity in the fields of (1) Rail welding, (2) Track maintenance,
(3) Rolling stock maintenance, (4) Accident investigation and (5) Safety
management.
Discussion for accident Investigation
in February 2019
Training in Japan for accident
Investigation in July 2019
Site Survey for Rolling Stock
Maintenance in July 2019
上下水道セクター 日本の知見を活かして重要な都市を包括的に支援
Project for Installation of Chennai
Metropolitan Area Intelligent Transport
System
-L/A amount : INR 537 crore
-L/A signing : March 2018
Bihar National Highway Improvement Project
(Phase 1 and Phase 2)
L/A amount (Phase 1) : INR 1,524 crore
L/A Signing(Phase 1) : February 2013
L/A amount (Phase 2) : INR 1,426 crore
L/A Signing(Phase 2) : January 2014
Hyderabad Outer Ring Road Project (Phase 1,2)
-L/A amount (Phase 1) : INR 2,785 crore
-L/A signing (Phase 1) : March 2008
-L/A amount (Phase 2) : INR 2,797 crore
-L/A signing (Phase 2) : November 2008
Capacity Development Project
Highways Mountainous Regions
(Technical Cooperation)
Period: April 2016- March 2021
Japanese ODA for Road Sector (on-going)
24
Project for Advanced Traffic Information
and Management System in parts of Core
Bengaluru (Grant)
-G/A amount : INR 84 crore
-G/A signing : January 2018
Project for Upgradation of Environmental
Management for Ship Recycling in Alang and
Sosiya in Gujarat
-L/A amount : INR 567 crore
-L/A signing : September 2017
Delhi Eastern Peripheral Express Intelligent
Transport System Installation Project
-L/A amount :INR 457 crore
-L/A signing : March 2017
Project for the Construction of Chennai
Peripheral Ring Road (Phase 1)
-L/A amount : INR 2,667 crore
-L/A signing : January 2019
North East Connectivity
Improvement Project (Phase 3)
-L/A amount: INR 1,696 crore
-L/A signing: January 2018
Mumbai Trans-Harbour Link
Project (I)
-L/A amount : INR 9,636 crore
-L/A signing : March 2017
North East Connectivity
Improvement Project (Phase 1)
-L/A amount : INR 4,470 crore
-L/A signing : March 2017
North East Connectivity
Improvement Project (Phase 2)
-L/A amount: INR 2,573 crore
-L/A signing :March 2018
The Project for Smart Cities for
emerging countries based on Sensing
Network and Big Data analysis of
Multimodal Regional Transport System
(SATREPS) Period: June 2017- June
2022
Mumbai Trans Harbour Link Project (I)
Total Project cost: JPY 326,531 million / Loan amount: JPY 144,795 million
Project period: 2016-2023
Project: 22 km road construction (3 lanes on each side) including (i) 18km on the sea (Sewri to Shivaji Nagar), (ii) 4 km on land (Shivaji Nagar to Chirle) and (iii) Intelligent Transport Systems (ITS)
25
The project is to increase connectivity by constructing an ocean road
connecting the Mumbai city center to Navi Mumbai, thereby contributing to
further economic growth in Mumbai metropolitan region.
Mumbai Trans Harbour Link Project
Mumbai Bay
Mumbai Port
SEZ Development
JNPT
Mumbai Int. Airport
Mumbai
Navi MumbaiSEZ Development
Navi Mumbai New Airport
SEZ Development
Sewri
Shivaji Nagar
Chirle
Bihar National Highway Improvement Project (Phase I)
Total Project cost: JPY 41,760 million / Loan amount: JPY 22,903 million
Project period: 2013-2020
Project : Involving 4 laning of NH83 (Patna-Dobhi)
Road construction 127 m (Including bypass 56km, service road and bridge)
26
The project is to improve accessibility in the state of Bihar , thereby
contributing to mitigation of traffic jam and promoting economic development
including tourist traffic
Bihar National Highway Improvement Project (Phase 1,2)
Bihar National Highway Improvement Project (Phase II)
Total Project cost: JPY 29,363 million / Loan amount: JPY 21,426 million
Project period: 2014-2022
Project : Involving 4 laning of NH82 (Gaya- Biharsharif)
Road construction 92 m (Including bypass 11km, 27 crossroads)
MizoramNorth East Connectivity Phase 1Aizawl–Tuipang 350.7km (NH-54) (2016-)
MeghalayaNorth East Connectivity Phase 1Tura-Dalu (NH-51) (2016-)
Mizoram North East Connectivity Phase 2Aizawl–Tuipang (NH-54) (2017-)
MeghalayaNorth East Connectivity Phase 2Shillong – Dawki (NH-40) (2017-)
Assam North East Connectivity Phase 3Dhubri/Phulbari (New Bridge) (2018-)
27
North East Road Network Connectivity Project Map
28
• Intelligent Transport System (ITS) is integrated system consisted of efficient tall collectionsystem, real-time traffic information system, traffic signal control system, etc. ITS is aiming tooptimize the traffic and minimize risks of congestion and accident by IT technology.
• ITS is awaited technology for Metropolitan city to mitigate issues along with urbanization suchas heavy traffic.
• JICA is supporting GoI with a) Development of ITS Masterplan, b) Finance to establish facilities,and c) Technical Cooperation for capacity development of Operation and Maintenance.
Delhi Eastern Peripheral Expressway ITS Installation Project
• Loan Amount: JPY 6,870 million
• Introducing ITS on Delhi Eastern PeripJheral Expressway (EPE)
Hyderabad Outer Ring Road Project (Phase 1, 2)
• Loan Amount: JPY 83,706 million
• Construct an expressway and install ITS.
• Technical Assistance to enhance O&M Capacity
(GRANT) The Project for Implementation of Advanced Traffic Information and
Management System in Core Bengaluru
• Grant Amount: JPY 1,276 million
• Signal control systems at 29 intersections and a traffic control centre.
Project for Installation of Chennai Metropolitan Area Intelligent Transport Systems
• Loan Amount: JPY 8,082 million
• Chennai Smart City Limited is introducing ITS
Intelligent Transport System (ITS)
Chennai Peripheral Ring Road ProjectProject (Phase I)
Total Project Cost : JPY 74,497 million
Loan amount: JPY 40,074 million
Project period: 2019-2024
Project scope:
(i) 24.52km road construction (Section 1 of
Chennai Peripheral Ring Road consists of
the Northern Port Access Road (Ennore Port
to Thatchur), which is the northern part of
the planned Chennai Peripheral Ring Road)
(ii) Installation of Toll Management System
and Highway Traffic Management System
29
Mitigating traffic congestion and promoting regional economic development by constructing Chennai Peripheral Ring Road
Chennai Peripheral Ring Road Project (Phase 1)
THIRUVELLAVOYALPUDUVOYAL
MINJUR
CHENGALPATTU
THIRUKAZHIKUNDRAM
MAMALLAPURAM
MANAMATHI
SINGAPERUMA
LKOIL
Chennai Port
Ennore Port
POONJERI
地図出典:Open Street Mapに加筆
SRIPERUM
BUDUR
THIRUVALLUR
PALAVAKKAM
⑳
⑲
⑰
⑪⑩
⑯ ⑫
⑮
⑬
⑧
⑨
⑱
③②
④
⑤
①⑨
⑥
⑦
⑭
REPUBLIC OF INDIA
①
②
③
④
⑤⑥
⑦
• This India- Japan joint research project has been designed collaboratively as a scheme
of “Science Technology Partnership for Sustainable Development (SATREPS)”.
• It has been jointly undertaken by Indian Institute of Technology, Hyderabad (IIT-H),
Nagoya Electric works Co. Ltd., Nihon University and Tokyo Institute of Technology.
• The aim of this joint research project is to establish a reliable and common approach for
grasping the traffic situation in cities by building a system that effectively utilizes
mobile devices, traffic sensing, big-data analysis and network technology.
• The team has launched the field test bed system in IIT-H campus, Hyderabad and also
Ahmedabad city. This field test bed system comprises of several key components of
traffic management system such as real time traffic flow monitoring cameras, speed
detection safety system, traffic signal lights and remote environment gas sensing.
30
SATREPS: Multi Modal Smart Transportation (M2Smart) project
India- Japan Joint Research Program to create innovative solution for severe traffic
congestion and to realize a modal shift of urban transportation towards a low carbon
society through scientific traffic analysis
31
The technical cooperation project is to strengthen institutional capacity of
organization concerned for development of sustainable mountainous highways
TC: Capacity Development Project on Highways in Mountainous Regions
• Project Outline : To develop technical guidelines for highways in mountainous regions, and to provide technical training programs in order to enhance capacity of the planning, the construction and management of mountainous highways consisting of tunnels, bridges and earthworks etc.
• Project Period: April 2016- March 2021
• Project Cost : JPY 491million
• Project Site: Whole India
• Implementing Agencies: MORTH, NHAI, NHIDCL
• Beneficiaries (Direct): Technical Officials in MoRTH, NHAI, NHIDCL and PWD.
• (Indirect): Road Users
Thank you!
धन्यवादc.f. http://www.jica.go.jp/india/english/office/about/message.html
http://www.jica.go.jp/india/english/office/others/brochures.htmlhttp://www.jica.go.jp/india/english/office/others/presentations.html
DisclaimerWhile every effort is made to provide accurate information, JICA does not guarantee that there will be no errors in the contentsof this presentation document, nor does JICA disclaims any liability for errors accruing from the use of the contents.The presentation document also includes contents, other information, and translated material provided by third-parties for which JICA claims no responsibility.
32