Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon...
Transcript of Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon...
![Page 1: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/1.jpg)
Funding a Multi-Objective Flood Control Project in a Climate of Drought ($$$):
A Re-examination of the Federal/Local Funding Model
Albert Martinez, Senior Civil EngineerMark Wills, Chief of Planning
September 10, 2015
![Page 2: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/2.jpg)
Project Background
Authorization vs. Appropriation
NED vs. LPP
Doing Business in Post-Earmark Era
Outline
![Page 3: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/3.jpg)
7,308 Square Miles
Riverside County Data
![Page 4: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/4.jpg)
![Page 5: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/5.jpg)
Riverside County Data
7,308 Square Miles
Population – 2.3 million
Valleys, Mountains and Deserts
Annual Rainfall of 6” – 12”
![Page 6: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/6.jpg)
![Page 7: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/7.jpg)
Location
![Page 8: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/8.jpg)
Watershed Factoids
Watershed Area: 220mi2 Major Tributaries: Warm Springs Creek, Santa
Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek
Peak Flow Rate at Downstream End: 33,000 cfs Drains to Pacific Ocean
![Page 9: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/9.jpg)
Flooding History
Late 1800s Floods of Record Major Events in 1938, 1969 and 1993 Creation of Master Drainage Plan in 1986 Presidential Disaster Declarations in 1980, 1993,
1995 and 1998 1993 Storm Damages: $12 Million to Temecula and Murrieta$88 Million to Camp Pendleton
![Page 10: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/10.jpg)
Flooding History Old Town Temecula
![Page 11: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/11.jpg)
Flooding History Old Town Temecula
![Page 12: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/12.jpg)
Flooding History Rancho California Road Bridge
![Page 13: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/13.jpg)
Project Factoids
Project broken up into four phases 7 miles of channel improvements 270-acre flood control basin160 acres of environmental restoration50-acre recreation park
7 miles of habitat corridor within channel 14 miles of equestrian, pedestrian and bike trails Total cost $90M (2000 price level)$167M (2013 price level)
Federal/Local Split 65/35
![Page 14: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/14.jpg)
Authorization vs. Appropriation
AuthorizationAuthorizes the appropriation of federal funds to
implement the projectDoes not give Corps permission to award a
construction contract
AppropriationLegislation the Corps needs before it can award
a construction contractDictated by Congressional Appropriations
Committee
![Page 15: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/15.jpg)
Project History
Army Corps of Engineers contacted in 1995Developed Reconnaissance StudyDeveloped Feasibility Report
Congressional Authorization granted in 2000 Funds Appropriated for design and construction
begin trickling in Phase I gets built
![Page 16: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/16.jpg)
Phase I Completed in 2005
![Page 17: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/17.jpg)
Project History
Appropriated Federal funds continue to trickle in and local sponsor continues to pay their share
![Page 18: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/18.jpg)
Year Federal Contributions Sponsor Contributions
2005 $1,702,000 $02006 $3,674,000 $125,0002007 $1,760,000 $110,0002008 $1,813,000 $62,5332009 $3,349,000 $217,0002010 $1,890,000 $02011 $2,000 $0
![Page 19: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/19.jpg)
Project History
Local Sponsor continues to keep pressure on Congress and the Corps
Result: No appropriated construction funding and nothing to show for the money received
Now it’s 2012 Locals are ready to ditch the CorpsCorps agree to come up with a plan but first….
![Page 20: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/20.jpg)
NED vs. LPP
National Economic Development (NED)Corps Preferred PlanBenefit Cost Ratio 1.1Above and beyond the LPP (flood damage/environmental
restoration benefits)Did not cover entire community
Locally Preferred Plan (LPP)Local’s Preferred PlanBenefit Cost Ratio 0.37
Role of Limited Reevaluation Report (LRR)
![Page 21: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/21.jpg)
Limited Reevaluation Report (LRR) Developed through Post-Authorization Change
Report“Defers” Phase IA and IV
![Page 22: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/22.jpg)
Location
![Page 23: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/23.jpg)
LRR Develop Post-Authorization Change ReportDefers Phase IA and IVIncreases benefit-cost ratio to 1.23 Revises project cost to $115 MillionReduces local obligation from $58.5 Million to
$40 MillionWarning: LRR not for everyone
![Page 24: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/24.jpg)
NED vs. LPP
NED and LPP plans Role of Limited Reevaluation Report (LRR) Role of the Independent External Peer Review
(IEPR)Must be 100% Federally fundedWaiver possible but difficult to obtain
Difficulty of Monetizing Project Environmental Benefits
![Page 25: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/25.jpg)
Doing Business in Post-Earmark Era
Accelerated (Local) FundingAllows for locals to “accelerate” cost-share
(<=35%)
Advanced (Local) FundingAllows for locals to “advance” beyond cost-
share (>35%)
![Page 26: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/26.jpg)
To be classified as an “earmark spending”, one or more of the following characteristics may apply: The requested funding is not specifically authorized as
necessary for the basic operations of the government in the annual budget.
The funding is requested by only one chamber of Congress.
The funding was not included in the president's budget request.
The funding results in a substantial increase over the amounts projected in the president's budget.
The funding is for a project that will benefit a small population or a narrow special interest.
Regarding Earmarks
![Page 27: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/27.jpg)
Congress’s View
“… provisions associated with legislation (appropriations or general legislation) that specify certain congressional spending priorities or in revenue bills that apply to a very limited number of individuals or entities.”
- Congressional Research Service
![Page 28: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/28.jpg)
Administration’s View
“…funds provided by the Congress for projects, programs, or grants where the purported congressional direction … circumvents or otherwise curtails the ability of the executive branch to manage its statutory and constitutional responsibilities pertaining to the funds allocation process.”
- Office of Management and Budget
![Page 29: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/29.jpg)
Earmark Reform
“Bridge To Nowhere” (2005)$223 million earmark to fund the construction of a
bridge from Ketchikan, AK [Pop. 8,900], to the tiny island of Gravina, AK
Inserted in a bill to provide funding for reconstruction efforts after Hurricane Katrina
In 2007, Congress stripped the earmark
![Page 30: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/30.jpg)
Earmark Reform
Provide Increase Transparency / Disclosure / Accountability Identify Sponsor Identify Beneficiary Identify Funding LevelPublic Disclosure (internet)
![Page 31: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/31.jpg)
Earmark Reform
Honest Leadership and Open Government Act of 2007 (Pub.L. 110–81, 121 Stat. 735, enacted September 14, 2007)
Effectively superseded by November 2010 House of Representatives “moratorium” on Congressional Earmarks (and supported by the Administration)
![Page 32: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/32.jpg)
Cost-Share Agreement Process
ACOEDistrict Office (LA)
ACOESouth Pacific Division
(SF)
ACOE HQ
(DC)
Assistant Secretary
of the Army (Pentagon)
Congressional Committee
(DC)
Total time from original request to execution:
Over 2 years
![Page 33: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/33.jpg)
Year Federal Contributions Sponsor Contributions
2005 $1,702,000 $02006 $3,674,000 $125,0002007 $1,760,000 $110,0002008 $1,813,000 $62,5332009 $3,349,000 $217,0002010 $1,890,000 $02011 $2,000 $02012 $500,000 $1,615,0002013 $79,840 $87,0002014 $1 $2,000,0002015 $0 $17,100,000
Show Me The Money
![Page 34: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/34.jpg)
Key Takeaways
Authorized projects
Consider re-scoping the project if BCR is lowRequires an approved LRRRevising agreement is a long processExpect surprises along the way
Be patient, if you can afford it
Project Delivery
![Page 35: Funding a Multi-Objective Flood Control Project in a ... · Gertrudis Creek, Slaughterhouse Canyon Creek, Cole Canyon Creek, Long Canyon Creek, Empire Creek Peak Flow Rate at Downstream](https://reader034.fdocuments.us/reader034/viewer/2022043016/5f386bfb9f5e3f08145a49d5/html5/thumbnails/35.jpg)
Questions?