Functional Requirements Status and Plans Christopher Neyman & Erik Johansson W. M. Keck Observatory...
-
date post
22-Dec-2015 -
Category
Documents
-
view
217 -
download
1
Embed Size (px)
Transcript of Functional Requirements Status and Plans Christopher Neyman & Erik Johansson W. M. Keck Observatory...

Functional Requirements Status and Plans
Christopher Neyman & Erik Johansson W. M. Keck Observatory
Viswa Velur California Institute of Technology
Keck NGAO Team Meeting #11
November 5, 2007
Videoconference

2
Outline
• Status of AO and laser FRD draft 0.3• Requirements management database tests• Discussion

3
FRD AO section status
• Converted from Word document to Excel template for easier input into database
• Required functionality well documented• Specification about 75% complete• Traceability about 75% complete
• Text field references KAON, error budget, SRD, and/or ScRD sections.
• Version on Twiki and imported into database

4
FRD Laser section status
• Converted from Word to Excel database template• Laser status
– 27 pages of requirement, ~ 200 requirements
– Laser requirements, LTA, diagnostics & Laser service enclosure well done.
• Required functionality well documented• Traceability 90% (by Nov. 5th)• Rational 90% (by Nov. 5th)• Version on TWiki and database (By Tuesday Nov. 6 CRN)

5
Selecting requirements database software• Erik Johansson made a brief evaluation of a number of
requirements management tools for use in the NGAO project (details in KAON)– DOORS (Telelogic)
– Cross-Tie (Teledyne Brown Engineering)
– CaliberRM (Borland)
– OSRMT (open source)
– Rational Requisite Pro (IBM)
– RMTrak (RBC Product Development)
– ARTS (Goda SW)
– Contour (JAMA)

6
Selecting requirements database software• Selected Contour by Jama Software, Inc.,
– web-based
– multi-user tool
– no client software required
– easy to use and configurable to meet our needs
– reasonably affordable
– user community includes Intel, Amgen, and Lockheed-Martin, as well as smaller companies and startups

7
Testing requirements database software
• Received a 30 day trial multiple-user version of Contour– Expires Nov. 23
• Installed at Keck – AO requirements imported from Excel template
– Laser requirements imported from Excel template
– See following screen shots on slides
• Global access through Keck fire wall – Make accounts and distribute passwords

8
Contour project explorer
Organized by SEMP WBS
Short name for easier searching
Requirements document section: easier to organize final documents
Rationale and traceability (just text field for now)

9
Contour requirements editor
Rich text editor

10
Contour links and change history
Attach documents or web links
Link to other database elements
Add notes and email change notices
Compare versions

11
Contour issues
• Need to decide on what to put into database or link to outside URL• Automatic report generation
– Issues with formatting
• Outside user testing– Access should be global (any IP) but requires two passwords (Contour
and Keck internet)
• Make decision on Contour by November 23.

12
Requirements issues
• Forward and backward trace requires putting contents of ScRD, SRD into database
• Make decision on Contour by November 23• Gather input for AO & laser requirements version 2.0
– Release as design work completes at start of calendar 2008