Full Depth Reclamation ALDOT FDR...
Transcript of Full Depth Reclamation ALDOT FDR...
![Page 1: Full Depth Reclamation ALDOT FDR Requirementssecement.org/wp-content/uploads/2016/11/AL-2015-FDR-Wrap...Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department](https://reader034.fdocuments.us/reader034/viewer/2022050607/5faeab5661879e2169483541/html5/thumbnails/1.jpg)
Full Depth ReclamationALDOT FDR Requirements
Lyndi D. Blackburn, PE
Assistant Materials and Tests EngineerAlabama Department of TransportationBureau of Materials and Tests
![Page 2: Full Depth Reclamation ALDOT FDR Requirementssecement.org/wp-content/uploads/2016/11/AL-2015-FDR-Wrap...Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department](https://reader034.fdocuments.us/reader034/viewer/2022050607/5faeab5661879e2169483541/html5/thumbnails/2.jpg)
110+ MILES
ALDOT FDR TOTALSJANUARY 2014 - PRESENT
![Page 3: Full Depth Reclamation ALDOT FDR Requirementssecement.org/wp-content/uploads/2016/11/AL-2015-FDR-Wrap...Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department](https://reader034.fdocuments.us/reader034/viewer/2022050607/5faeab5661879e2169483541/html5/thumbnails/3.jpg)
FULL DEPTH RECLAMATION WITH PORTLAND CEMENTSECTION 302
Job Special Provision – Project Specific
![Page 4: Full Depth Reclamation ALDOT FDR Requirementssecement.org/wp-content/uploads/2016/11/AL-2015-FDR-Wrap...Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department](https://reader034.fdocuments.us/reader034/viewer/2022050607/5faeab5661879e2169483541/html5/thumbnails/4.jpg)
CONTRACTOR REQUIREMENTS
• Pulverizing, Mixing, Compaction
• Roadbed Sampling
• Job Mix Design
• Quality Control Plan
• Other Construction Requirements
![Page 5: Full Depth Reclamation ALDOT FDR Requirementssecement.org/wp-content/uploads/2016/11/AL-2015-FDR-Wrap...Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department](https://reader034.fdocuments.us/reader034/viewer/2022050607/5faeab5661879e2169483541/html5/thumbnails/5.jpg)
PULVERIZING, MIXING, AND COMPACTING• Length of pulverization limits• 100% by weight passes a 3 inch sieve
• A minimum of 95% passes a 2 inch sieve and• A minimum of 50% passes a Number 4 Sieve
• Portland cement shall not vary more than5% of approved mix design
• Dust Control• Addition of water and mixing to be
completed in a continuous pass• The moisture content shall be within ± 2%
of the theoretical optimum moisture• The pulverizing, mixing, and compacting
shall be a continuous operation• Compaction shall be to 96% of Theoretical
maximum density
![Page 6: Full Depth Reclamation ALDOT FDR Requirementssecement.org/wp-content/uploads/2016/11/AL-2015-FDR-Wrap...Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department](https://reader034.fdocuments.us/reader034/viewer/2022050607/5faeab5661879e2169483541/html5/thumbnails/6.jpg)
CONTRACTOR REQUIREMENTS
CONT.• Pulverizing
• Mixing
• Compaction
• Roadbed Sampling
• Job Mix Design
• Quality Control Plan
• Other Construction Requirements
![Page 7: Full Depth Reclamation ALDOT FDR Requirementssecement.org/wp-content/uploads/2016/11/AL-2015-FDR-Wrap...Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department](https://reader034.fdocuments.us/reader034/viewer/2022050607/5faeab5661879e2169483541/html5/thumbnails/7.jpg)
SAMPLING EXISTING ROAD
• Sample existing roadbedMaterials at least every1,000 feet along roadbed
• Submit 75 pounds of compositeroadbed material to M&TSoils Laboratory
• Submit 5 pounds of cementfor each proposed job mixdesign to M&T Soils laboratory
![Page 8: Full Depth Reclamation ALDOT FDR Requirementssecement.org/wp-content/uploads/2016/11/AL-2015-FDR-Wrap...Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department](https://reader034.fdocuments.us/reader034/viewer/2022050607/5faeab5661879e2169483541/html5/thumbnails/8.jpg)
CONTRACTOR REQUIREMENTS
CONT.• Pulverizing
• Mixing
• Compaction
• Roadbed Sampling
• Job Mix Design
• Quality Control Plan
• Other Construction Requirements
![Page 9: Full Depth Reclamation ALDOT FDR Requirementssecement.org/wp-content/uploads/2016/11/AL-2015-FDR-Wrap...Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department](https://reader034.fdocuments.us/reader034/viewer/2022050607/5faeab5661879e2169483541/html5/thumbnails/9.jpg)
JOB MIX DESIGN• Design as per ALDOT-416, “Laboratory
Design of Soil-Cement andFull-Depth Reclamation Mixes
• Approved materials only(cement, water)
• If not shown in the plans, Contractor isresponsible for the design and approval
request of the job mix design
• More than one job mix design may be required
• Changes on the approved job mix designwould require a new mix design submittal
• Five copies no less than 21 calendar daysprior to beginning the FDR
![Page 10: Full Depth Reclamation ALDOT FDR Requirementssecement.org/wp-content/uploads/2016/11/AL-2015-FDR-Wrap...Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department](https://reader034.fdocuments.us/reader034/viewer/2022050607/5faeab5661879e2169483541/html5/thumbnails/10.jpg)
CONTRACTOR REQUIREMENTS
CONT.
• Pulverizing
• Mixing
• Compaction
• Roadbed Sampling
• Job Mix Design
• Quality Control Plan
• Other Construction Requirements
![Page 11: Full Depth Reclamation ALDOT FDR Requirementssecement.org/wp-content/uploads/2016/11/AL-2015-FDR-Wrap...Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department](https://reader034.fdocuments.us/reader034/viewer/2022050607/5faeab5661879e2169483541/html5/thumbnails/11.jpg)
QUALITY CONTROL PLAN• Provide a “Quality Control Plan” to include
• Procedure, equipment, and frequency for monitoring• Cement placement• Amount of water utilized• Reclaimed material moisture requirements• Density and moisture content of in-place FDR• Materials characteristics of reclaimed materials
• Provide six copies of plan
• Provide weekly documentation showingthat work is performed according to the plan
• Quality Control Plan will be reviewby ALDOT for completeness
![Page 12: Full Depth Reclamation ALDOT FDR Requirementssecement.org/wp-content/uploads/2016/11/AL-2015-FDR-Wrap...Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department](https://reader034.fdocuments.us/reader034/viewer/2022050607/5faeab5661879e2169483541/html5/thumbnails/12.jpg)
CONTRACTOR REQUIREMENTS
CONT.• Pulverizing
• Mixing
• Compaction
• Roadbed Sampling
• Job Mix Design
• Quality Control Plan
• Other Construction Requirements
![Page 13: Full Depth Reclamation ALDOT FDR Requirementssecement.org/wp-content/uploads/2016/11/AL-2015-FDR-Wrap...Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department](https://reader034.fdocuments.us/reader034/viewer/2022050607/5faeab5661879e2169483541/html5/thumbnails/13.jpg)
OTHER CONSTRUCTION REQUIREMENTS
• Description of all equipment that willbe used during the construction of FDR
• Daily check of spread rate of cement• At beginning of production• Each 2,000 linear feet
• Surface finish• Responsible for roadbed grade controls• ¼ of an inch from a 16 foot straightedge• Cross slope shall not vary more than 50%
• Curing: Finished surface shall be covered witha Type A bituminous treatment until a pavementlayer or additional surface treatment is applied.
• Quality Control During Production• Moisture requirements • Density requirements• Compressive Strength• Thickness
![Page 14: Full Depth Reclamation ALDOT FDR Requirementssecement.org/wp-content/uploads/2016/11/AL-2015-FDR-Wrap...Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department](https://reader034.fdocuments.us/reader034/viewer/2022050607/5faeab5661879e2169483541/html5/thumbnails/14.jpg)
ALDOT REQUIREMENTS
• ALDOT = OWNER or OWNER’s REPRESENTATIVE
• Laboratory Responsibilities
• Field Responsibilities
![Page 15: Full Depth Reclamation ALDOT FDR Requirementssecement.org/wp-content/uploads/2016/11/AL-2015-FDR-Wrap...Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department](https://reader034.fdocuments.us/reader034/viewer/2022050607/5faeab5661879e2169483541/html5/thumbnails/15.jpg)
ALDOT LABORATORY RESPONSIBILITIES
• Mix design verification or design of FDR mixesfor inclusion in contract plans
• Determination of Moisture-Density relationship
• Compressive strength
• Review of Contractor’s Quality ControlPlan for completeness
• Approve final mix design
![Page 16: Full Depth Reclamation ALDOT FDR Requirementssecement.org/wp-content/uploads/2016/11/AL-2015-FDR-Wrap...Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department](https://reader034.fdocuments.us/reader034/viewer/2022050607/5faeab5661879e2169483541/html5/thumbnails/16.jpg)
ALDOT REQUIREMENTS
• ALDOT = OWNER or OWNER’s REPRESENTATIVE
• Laboratory Responsibilities
• Field Responsibilities
![Page 17: Full Depth Reclamation ALDOT FDR Requirementssecement.org/wp-content/uploads/2016/11/AL-2015-FDR-Wrap...Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department](https://reader034.fdocuments.us/reader034/viewer/2022050607/5faeab5661879e2169483541/html5/thumbnails/17.jpg)
ALDOT FIELD RESPONSIBILITIES
• Verify that field theoretical optimum moistureis maintained within ± 2%
• Check gradation at least once for each 2,000linear feet of FDR placed
• Verify that the cement spread rate does not varymore than 5% by weigh from approved mix
• Determine the in-place density using AASHTO T 310at least once for each 1,000 linearfeet of FDR placed
• Verify that the work performed is in compliancewith the QC Plan
![Page 18: Full Depth Reclamation ALDOT FDR Requirementssecement.org/wp-content/uploads/2016/11/AL-2015-FDR-Wrap...Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department](https://reader034.fdocuments.us/reader034/viewer/2022050607/5faeab5661879e2169483541/html5/thumbnails/18.jpg)
ALDOT FIELD RESPONSIBILITIES
CONT.
• Check the surface finish at intervals of 100 feet• Verify that cross slope does not vary by more than
0.50% from required slope• Verify that finished surface does not vary more than
¼ of an inch from a 16 foot straightedge placedparallel to the centerline of roadbed
• Check the thickness of the FDR at least once per200 linear feet of roadbed
![Page 19: Full Depth Reclamation ALDOT FDR Requirementssecement.org/wp-content/uploads/2016/11/AL-2015-FDR-Wrap...Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department](https://reader034.fdocuments.us/reader034/viewer/2022050607/5faeab5661879e2169483541/html5/thumbnails/19.jpg)
Special Thanks to Sergio Rodriguez