FT_INT002

download FT_INT002

of 15

Transcript of FT_INT002

  • 7/28/2019 FT_INT002

    1/15

    TESTSCRIPT

    TESTSCRIPTID : FT_INT002

    Test Title Sales to Domestic Industrial Customers fromRDCs-(MTO)

    Date 03.09.2007

    SAP Modules PP/MM/FI/SD Prepared By Shantanu Shankar Ray, Samir G Karwade, PayalDutta, Madhurima Bhattacharya and Ruchika Havelia

    Business Scenario Description

    PIL sells Industrial batteries to Domestic Customers from the RDC. This test script captures end to end business process for the same.

    Sales will receive an order from the customer and create a sales order at the RDC.

    Receive a down payment from the customer for the order.

    MRP Run at the RDC will create a Purchase requisition for stock transfer against the sales order on the supplying manufacturing plant in the

    system.

    Based on the purchase requisition for stock transfer from the RDC the system will create a planned order against the purchase requisition for

    stock transfer after the MRP Run at the manufacturing plant and Purchase Requisitions will be created for raw materials.

    These include Purchase Requisition for local, imported and BOP items.

    The procurement cycle takes place independently of the production cycle. The procurement takes place based on previous procurement

    elements and can run simultaneously along with the production.

    The Planned Orders are converted to Production Order and released to Shop Floor for production.

    The materials are issued to Production and production will manufacture the finished goods.

    After manufacturing the Finished Batteries are kept in customer stocks in the outbound storage location.

    From the manufacturing plant the Finished batteries are then dispatched to the RDC through stock transfer order and subsequently delivered

    to the customer and billing document will be generated followed by payment processing.

    The down Payment received will be processed and the customer account will be subsequently cleared.

    _____________________________________________________________________________________________________________

    FASTTRAK Integration Test Page 1 of 15 Version1.0

  • 7/28/2019 FT_INT002

    2/15

    TESTSCRIPT

    TESTSCRIPTID : FT_INT002

    This process also includes invoice verification of all vendors. After invoice verification, the vendors are paid through automatic payment run

    wherein all the open items of the vendors are processed and consequently automatic cheque printing is done.

    The following master data is created:

    Material Master for Finished GoodsBills of materialWork centerRoutingsVendor Master

    Purchasing Info for the componentsSource List for the componentsCustomer MasterPricing Condition Records

    [For the above process i.e. MTO for Industrial Customers the raw materials viz. Lead, PP-CP, Separators and ORMs are procured from Importvendors as well as Local vendors .

    The detailed Material Vendor combination is enclosed herewith and this will be followed for Local and Import Raw Material Procurement.The detailed BOM is also enclosed herewith.

    The Data Used for the TestFinished Good (Battery) 100007Manufacturing plant NASHRDC RDIMCustomer Number 5Selling Price of the Battery INR 2500.00Discount 10%Tax 17.50%

    _____________________________________________________________________________________________________________

    FASTTRAK Integration Test Page 2 of 15 Version1.0

  • 7/28/2019 FT_INT002

    3/15

    TESTSCRIPT

    TESTSCRIPTID : FT_INT002

    Step#

    TransactionCode

    StepDetails

    Data Requirement Expected Results Actual Results Success?Y/N

    1 F-37 Create a down paymentrequest on the customer for aspecified amount

    Customer Account noAmount

    Creation of a down paymentrequest (Noted Item)

    Doc No.1500010

    Y

    2 F-29 Enter the amount which isreceived as down payment.Choose the 'Requests' pushbutton to clear the requestagainst which down paymentis received. Select the request

    and choose the "Create DownPayments" button. Post thedocument.

    Customer Account no.,Amount, Bank A/C no.,Profit Centre

    A payment is received and adocument will be generated.

    Doc No.1500011

    Y

    3 VA01 Create sales Order (can be done with reference toa quotation also)

    Sales document type - ZOR

    - Sales document type- Sales Area( comprising of thesales organization,distribution channeland division)

    Sales order will be createdwhich will include the salesarea through which thematerial will be deliveredand will automatically takethe pricing procedure

    Sales Ordercreated.

    Doc No. 3

    Y

    _____________________________________________________________________________________________________________

    FASTTRAK Integration Test Page 3 of 15 Version1.0

  • 7/28/2019 FT_INT002

    4/15

    TESTSCRIPT

    TESTSCRIPTID : FT_INT002

    Step#

    TransactionCode

    StepDetails

    Data Requirement Expected Results Actual Results Success?Y/N

    - Sold to party(customer no.)

    - Purchase OrderNumber

    - Material Number- QuantityItem Category ( Shouldpopulate automatically)

    Save it & note the ordernumber.

    depending on that particularsales area, documentpricing procedure andcustomer pricingprocedure.Condition records for basicprice, sales tax, discountsetc are to be maintained.

    MD01 MRP at scope - at RDC PlantProcessing key NETCH (Net changeplanning)Creation indicator 2(Purchase Requisitionin opening period)Delivery schedule 3(schedule lines)MRP List 1 (CreateMRP List)Planning mode 1(Adapt planning data(Normal mode))Scheduling 1 (Basicdates for plannedorders)

    Planning date Current

    Creation of purchaserequisition for stock transferat RDC for finished goods onthe manufacturing plant.

    PurchaseRequisitionNo. 10000256

    Y

    _____________________________________________________________________________________________________________

    FASTTRAK Integration Test Page 4 of 15 Version1.0

  • 7/28/2019 FT_INT002

    5/15

    TESTSCRIPT

    TESTSCRIPTID : FT_INT002

    Step#

    TransactionCode

    StepDetails

    Data Requirement Expected Results Actual Results Success?Y/N

    date

    Parallel Processing Checked

    Display material list Checked

    ME21N

    Documenttype

    UB

    Create Stock Transport Order Purchase RequisitionNumber

    Creation of Stock TransferOrder from RDC tomanufacturing plant.

    STO created.STO No.4500000029

    Y

    MD01 MRP at Scope at themanufacturing plant

    PlantProcessing key NETCH (Net changeplanning)Creation indicator 1(Purchase Requisition)Delivery schedule 3

    (schedule lines)MRP List 1 (CreateMRP List)Planning mode 1(Adapt planning data(Normal mode))Scheduling 1 (Basicdates for plannedorders)

    Creation of Planned ordersfor finished goods againstthe Purchase Order for stocktransfer at the manufacturingplant.

    Simultaneous planning forall the BOM components ofthe finished goods.

    Planned OrderNo. 497 forFinished Goodcreated.

    Planned Orderand PurchaseRequisition

    generated forin houseproducedcomponentsand rawmaterialsrespectively

    Y

    _____________________________________________________________________________________________________________

    FASTTRAK Integration Test Page 5 of 15 Version1.0

  • 7/28/2019 FT_INT002

    6/15

    TESTSCRIPT

    TESTSCRIPTID : FT_INT002

    Step#

    TransactionCode

    StepDetails

    Data Requirement Expected Results Actual Results Success?Y/N

    Planning date Currentdate

    Display material list Checked

    CO41 Collective conversion of planned orders

    Planning PlantMRP controllerProduction plantProduction schedulerOrder type

    Collective conversion ofplanned order of the finishedgood to production order.

    ProductionOrder No.300096 for theFinished Good

    Y

    MD04 Stock requirement overviewlist.

    Material numberPlant

    Requirement to be displayedin stock requirement list.

    Analysis of stock situationfor various components.

    Therequirement ofall thecomponentsdisplayed.

    Y

    ME21N-P.O. Creationfor RawMaterials

    Create PO with the followingvariables

    1. Material2. Plant3. Pur.Org.4. Material Group5. Pur. Group6. Vendor

    1)The PRs aregenerated as a result ofMRP run with assignedsource i.e. a PIR has tobe maintained prior toprocurement

    2) Plant specific POswill be raised.

    4) POs containing all the

    P.O is generated with all theline items and relevantfields populated in line withthe PRs.These P.Os and the P.R.swill have no releasestrategy.

    {The condition types likeFreight, Insurance ,Excise

    P.O. No.4500000030 33.

    Y

    _____________________________________________________________________________________________________________

    FASTTRAK Integration Test Page 6 of 15 Version1.0

  • 7/28/2019 FT_INT002

    7/15

    TESTSCRIPT

    TESTSCRIPTID : FT_INT002

    Step#

    TransactionCode

    StepDetails

    Data Requirement Expected Results Actual Results Success?Y/N

    PRs from differentplant will be raised forthe single vendor

    duty to be entered manuallyIf the Freight and Insuranceare to be paid to any otherVendor (Not the mainvendor) then in the POcondition line item thosevendor codes need to beentered. }

    MIGO-GR 1)Use movt. type 1012) For all local Raw Materialposting to Unrestricted-usestock

    1)Released POs as perthe previous step

    1)Material documentgenerated as per GR-entry

    2)Accounting Documentgenerated with accountpostings as per a/cassignment document

    GR of RawMaterialsdone. MaterialDoc No.500000000028,500000000029,500000000030&500000000032.

    Y

    Import Procurement of Materials

    ME21N-P.O. Forimportedmaterials

    1.Create PO for the1. Material2. Plant3. Pur.Org.4. Material Group5. Pur. Group6. Vendor

    PO raised for importedmaterials. Theconsolidated quantitywill be combined of allthe manufacturingplants

    Automatic P.O is generatedwith all the line items andrelevant fields populated inline with the PRs.The POs will have releasestrategy.

    The condition types likeFreight, Insurance ,Exciseduty to be entered manually

    P.O. created.P.O. No.4500000031

    Y

    _____________________________________________________________________________________________________________

    FASTTRAK Integration Test Page 7 of 15 Version1.0

  • 7/28/2019 FT_INT002

    8/15

    TESTSCRIPT

    TESTSCRIPTID : FT_INT002

    Step#

    TransactionCode

    StepDetails

    Data Requirement Expected Results Actual Results Success?Y/N

    ME21N STOfor importedmaterials

    1.Create variant with thefollowing variables

    1. Supplying Plant2. Pur.Org. CTPO3. Pur. Group CPG1. Vendor is IMPO

    1)Convert the PRs intoSTO

    2)For all importprocurment POscontaining all the PRsfrom different plant willbe raised for the singlevendor IMPO

    POs ar generated with theline items adopted from thePRs

    The relevant fields populatedin line with the PRs.The POs will have releasestrategy.

    The condition types like

    Freight, Insurance ,Exciseduty to be entered manually

    STO created.STO No.4500000037

    Y

    ME28-ReleasePO

    1.Use Rel. Codes PM,MD.2. Select the PRs for releaseand execute3.For PO valuation>500000 theRel code MD is reqd.

    1)POs generated by theprevious process

    2)POs under Release forPurchasing groupsCPG

    The POs will get ReleasedStatus .

    Use ME23N to view the POsfor Release status

    P.O. released Y

    MIGO GR(For importprocurement)

    1. Use MOvt type 101 forimport materials at the IMPOplant

    Released PO GR of importmaterialsdone. Doc No.500000000032

    Y

    VL10B Listing of open PurchaseOrders

    Shipping PointDelivery Date

    Delivery Document iscreated

    Deliverycreated. DocNo. 8000020

    Y

    VL02 Change outbound delivery(Picking and PGI)

    Outbound DeliveryNumber

    The Goods Issue happened.The quantity is shown in thestock in transit of thereceiving plant if we runtransaction MMBE.

    Goods issuedand stocks areshown as intransit.Material Doc :

    Y

    _____________________________________________________________________________________________________________

    FASTTRAK Integration Test Page 8 of 15 Version1.0

  • 7/28/2019 FT_INT002

    9/15

    TESTSCRIPT

    TESTSCRIPTID : FT_INT002

    Step#

    TransactionCode

    StepDetails

    Data Requirement Expected Results Actual Results Success?Y/N

    4900000107

    MIGO-GR (forimportedmaterials)

    1)Use movt. type 1012) For all local Raw Materialposting to Unrestricted-usestock

    1)Released POs as perthe previous step

    1)Material documentgenerated as per GR-entry

    2)Accounting Documentgenerated with account

    postings as per a/cassignment document

    GR of importmaterialsdone. Doc No.500000000032

    Y

    Procurement of BOP item : Sub contracting Activity

    ME21N-P.O. For Sub-contractingActivity

    1.Create PO for the7. Material8. Plant9. Pur.Org.10. Material Group11. Pur. Group12. Vendor

    PO raised for sub-contracting materials.The consolidatedquantity will becombined of all themanufacturing plants

    P.O is generated with all theline items and relevantfields populated in line withthe PRs.The POs will have releasestrategy.

    The condition types like

    Freight, Insurance ,Exciseduty to be entered manually

    P.O. created.Doc No.4500000034

    Y

    MB11 Here the input material needsto be issued to the vendor. Usemovement type 541. EnterPlant and storage location.Click on the button ToPurchase Order and enter thePO number and enter.Again enter the PO number in

    Purchase order number Material document will becreated.

    No Accounting documentwill be created.

    MaterialDocumentcreated. DocNo.5000000027

    Y

    _____________________________________________________________________________________________________________

    FASTTRAK Integration Test Page 9 of 15 Version1.0

  • 7/28/2019 FT_INT002

    10/15

    TESTSCRIPT

    TESTSCRIPTID : FT_INT002

    Step#

    TransactionCode

    StepDetails

    Data Requirement Expected Results Actual Results Success?Y/N

    the field Goods recipient.Check the material andquantity and save thedocument

    MMBE Go to Stock overview andcheck the stock of the inputmaterial.In Stock overview this willappear as Stock provided tovendor

    PlantMaterial

    Stock issued to vendorshould appear in the stockoverview

    Stock shown invendorpossession

    Y

    MIGO Select Goods receipt againstPurchase order and execute.Enter the received quantityand save the document

    Purchase orderPlant

    Material document iscreated.

    Material document number isdisplayed.

    Accounting document isgenerated.

    GR of Subcontracteditems done.

    Doc No.500000000032

    Y

    Invoice Verification andpayment processing for Local

    Procurement and subContracting

    MIRO Invoice posting andverification for vendor

    PO Number. Accounting entry will be asfollows:

    GR/IR A/C DrVendor Cr

    Invoice created.Invoicenumber5105600110,5105600112 114

    Y

    _____________________________________________________________________________________________________________

    FASTTRAK Integration Test Page 10 of 15 Version1.0

  • 7/28/2019 FT_INT002

    11/15

    TESTSCRIPT

    TESTSCRIPTID : FT_INT002

    Step#

    TransactionCode

    StepDetails

    Data Requirement Expected Results Actual Results Success?Y/N

    Invoice verification andpayment processing for

    Import Procurement

    MIRO Invoice posting andverification for vendor

    1. PO Number2. Choose

    goods/serviceitems

    3. Payment to bemade in foreigncurrency

    Accounting entry will be asfollows:

    GR/IR A/C DrVendor Cr

    Invoice created.Invoicenumber

    5105600111

    Y

    F110 Payment to vendors(Automatic Payment Run)

    2. Company code3. Payment Method4. Vendor Account

    No.Assigning variant toprinting programRFFOUS_C

    Accounting entry will be asfollows

    Vendor A/C DrBank A/C Cr

    Automatic check printing willhappen through SAPprinter.

    Payment tovendors Titan,Zenith, GGKand Pichemdone. DocNos. 2100005,2100007,2100004 and2100006

    Y

    MF 60 Material staging for plannedorders

    Production ordernumber

    Plant

    A Reservation Number isgenerated against thereservation for transferposting.

    ReservationNumber isgenerated. No.710-715

    Y

    MF 65 Picking / collective processing MaterialPlantReservation number

    Transfer posting of thedeficit component to aparticular storage locationwith respect to theReservation Number as

    MaterialTransportdone.

    Y

    _____________________________________________________________________________________________________________

    FASTTRAK Integration Test Page 11 of 15 Version1.0

  • 7/28/2019 FT_INT002

    12/15

    TESTSCRIPT

    TESTSCRIPTID : FT_INT002

    Step#

    TransactionCode

    StepDetails

    Data Requirement Expected Results Actual Results Success?Y/N

    mentioned in the earlierstep.

    CO11N Enter time ticket for production order

    Production ordernumber thecorrespondingoperations

    Confirmation of productionorder for the Finished Good.

    Goods issue of components

    from particular storagelocation.

    Goods receipt of the finishedproduct at the prescribedstorage location.

    Cancellation of confirmationin case of deficit ofcomponents.

    Confirmationand GR ofFinishedGoods carried

    out at thestoragelocation of themanufacturingplant.

    Y

    VL10B Listing of open PurchaseOrders

    Shipping PointDelivery Date

    Delivery Document iscreated

    Outbounddelivery

    created. DocNo. 80000025

    Y

    VL02 Change outbound delivery(Picking and PGI)

    Outbound DeliveryNumber

    The Goods Issue happened.The quantity is shown in thestock in transit of thereceiving plant if we runtransaction MMBE.

    The FG ispicked andposted forgoods issuefrommanufacturingplant to RDC.Doc.

    Y

    _____________________________________________________________________________________________________________

    FASTTRAK Integration Test Page 12 of 15 Version1.0

  • 7/28/2019 FT_INT002

    13/15

    TESTSCRIPT

    TESTSCRIPTID : FT_INT002

    Step#

    TransactionCode

    StepDetails

    Data Requirement Expected Results Actual Results Success?Y/N

    4900000136

    MIGO Goods Receipt against theSTO at RDC

    STO number. The stock of the FinishedGoods gets updated.

    GR of finishedgoods at theRDC. Doc No.5000000042

    Y

    VL01N Create Delivery Order ( thistakes the reference of theparticular sales order whichwill be populatedautomatically)

    - Shipping Point- Selection Date- Order Number- Select the Picking tab,

    - Select storage location- Picking Quantity

    Save the document &Note the delivery ordernumber.

    Delivery order number isgenerated

    Outbounddeliverycreated. DocNo. 80000026

    Y

    VL02N Post goods issue for delivery Input delivery ordernumber

    Click on Post goodsissue.

    Stock is updated withcreation of materialdocument

    The FG ispicked andposted forgoods issuefrom RDC tothe customer.

    DeliveryNumber4900000137

    Y

    _____________________________________________________________________________________________________________

    FASTTRAK Integration Test Page 13 of 15 Version1.0

  • 7/28/2019 FT_INT002

    14/15

    TESTSCRIPT

    TESTSCRIPTID : FT_INT002

    Step#

    TransactionCode

    StepDetails

    Data Requirement Expected Results Actual Results Success?Y/N

    VF01 Create Billing Input delivery order no.Press Enter & Save it

    Note the invoiceNumber

    Invoice Number is generated& accounting document iscreated.

    Invoice created.Invoice No.90000015

    Billing done.Billing Doc No.90000015

    Y

    F-39 Clear the customer DownPayment

    Customer account no.,Invoice reference.

    Down Payment is cleared. Aclearing doc is created.

    D.P. cleared.DP clearing

    doc no.1700002

    Y

    F-32 Clear the customer Account Customer no. Customer is cleared and adocument is generated.

    Customerclearing doneand docgenerated.Doc No.1500012

    Y

    Comments (Reason for new version, issues encountered during testing, etc.)

    Success

    _____________________________________________________________________________________________________________

    FASTTRAK Integration Test Page 14 of 15 Version1.0

  • 7/28/2019 FT_INT002

    15/15

    TESTSCRIPT

    TESTSCRIPTID : FT_INT002

    Test Status: [ X ] PASS [ ] FAIL (Check One)

    Review After Execution

    Technical: ReviewedDate:

    06.09.2007

    FI/CO: ACCEPTED ReviewedDate:

    06.09.2007

    UserAcceptance AcceptedDate: 06.09.2007

    _____________________________________________________________________________________________________________

    FASTTRAK Integration Test Page 15 of 15 Version1.0