*It’s all about the numbers
Can we do it, can we afford it, and what compromises do each of us, and our society have to make in each scenario?
![Page 3: FSEM 180 The numbers](https://reader035.fdocuments.us/reader035/viewer/2022062517/56813950550346895da0ee64/html5/thumbnails/3.jpg)
![Page 4: FSEM 180 The numbers](https://reader035.fdocuments.us/reader035/viewer/2022062517/56813950550346895da0ee64/html5/thumbnails/4.jpg)
200 billion kWh/yr for entire US population:
= 1.8 kWh/d per person
![Page 5: FSEM 180 The numbers](https://reader035.fdocuments.us/reader035/viewer/2022062517/56813950550346895da0ee64/html5/thumbnails/5.jpg)
MacKay“Without the hot air”conclusion of Ch. 3
![Page 6: FSEM 180 The numbers](https://reader035.fdocuments.us/reader035/viewer/2022062517/56813950550346895da0ee64/html5/thumbnails/6.jpg)
![Page 7: FSEM 180 The numbers](https://reader035.fdocuments.us/reader035/viewer/2022062517/56813950550346895da0ee64/html5/thumbnails/7.jpg)
*SCE, along with other west coast utilities, was one of the earliest to use Hydroelectric Power for the rapidly growing population in the 1920s onward
*Big Creek Project (SCE)1 GW peak total power to SCE
14 million homes
¼ kW each home = 1.5 kWh/d
![Page 8: FSEM 180 The numbers](https://reader035.fdocuments.us/reader035/viewer/2022062517/56813950550346895da0ee64/html5/thumbnails/8.jpg)
SEGS project in Mojave Desert (350 MW) – 0.5 kWh/d peak
Solar Millenium AG received contract for new 1GW solar farm at Blythe in Sonoran Desert in 2010 but filed for bankruptcy at the end of 2011.
![Page 9: FSEM 180 The numbers](https://reader035.fdocuments.us/reader035/viewer/2022062517/56813950550346895da0ee64/html5/thumbnails/9.jpg)
195 180 kWh/d
![Page 10: FSEM 180 The numbers](https://reader035.fdocuments.us/reader035/viewer/2022062517/56813950550346895da0ee64/html5/thumbnails/10.jpg)
![Page 11: FSEM 180 The numbers](https://reader035.fdocuments.us/reader035/viewer/2022062517/56813950550346895da0ee64/html5/thumbnails/11.jpg)
Cos
t of p
rodu
cing
ele
ctric
ity (
cent
s / k
Wh) 12
10
8
6
4
2
0
![Page 12: FSEM 180 The numbers](https://reader035.fdocuments.us/reader035/viewer/2022062517/56813950550346895da0ee64/html5/thumbnails/12.jpg)
*How many people are regularly on the USC campus?
Numbers from USC web site:
Students: 37,000Faculty 3,300Staff 11,500Outpatients/in patients at USC hospitals?
![Page 13: FSEM 180 The numbers](https://reader035.fdocuments.us/reader035/viewer/2022062517/56813950550346895da0ee64/html5/thumbnails/13.jpg)
The art of estimation
![Page 14: FSEM 180 The numbers](https://reader035.fdocuments.us/reader035/viewer/2022062517/56813950550346895da0ee64/html5/thumbnails/14.jpg)
![Page 15: FSEM 180 The numbers](https://reader035.fdocuments.us/reader035/viewer/2022062517/56813950550346895da0ee64/html5/thumbnails/15.jpg)
![Page 16: FSEM 180 The numbers](https://reader035.fdocuments.us/reader035/viewer/2022062517/56813950550346895da0ee64/html5/thumbnails/16.jpg)
Solar
*Goal - to increase the electricity generated from solar power to 100%. Is it possible (enough land)? Can the campus (i.e. the student tuition) afford it?