FSchoefs-WG2 [Modo de Compatibilidade]durati.lnec.pt/pdf/workshop/DURATINET Workshop/FS... ·...
Transcript of FSchoefs-WG2 [Modo de Compatibilidade]durati.lnec.pt/pdf/workshop/DURATINET Workshop/FS... ·...
Insert Your logo
Investing in our common future
7th Trans-national WorkshopLisboa LNEC 30th May 2012
Project nr 2008-1/049Project nr 2008-1/049
Franck Schoefs, LUNAM Université, U. of Nantes, France and all the partners of WG2 (TCD, U. Bordeaux, EP)
duratiNet 7th Trans-national WorkshopLisboa LNEC 30th May 2012
InsertYourlogo
Investing in our common future
Problem Definition
For a given structure how do we decide upon the optimal maintenance strategy as a function of age, condition, importance, required remaining life etc. in a robust/repeatable manner, avoiding generalisation/excessive conservatism such that our maintenance budget is optimised???
e.g. Storstroem 1937, 3.2km
7th TRANS-NATIONAL DURATINET Workshop LNEC • Lisbon • Portugal • 30 May 2012
Durati
Net
duratiNet 7th Trans-national WorkshopLisboa LNEC 30th May 2012
InsertYourlogo
Investing in our common future
Load Rating @ t
Problem Definition
Extensive repair
Cathodic Protection
Do Nothing
Load Rating @ t
duratiNet 7th Trans-national WorkshopLisboa LNEC 30th May 2012
InsertYourlogo
Investing in our common future
A Complex Problem
7th TRANS-NATIONAL DURATINET Workshop LNEC • Lisbon • Portugal • 30 May 2012
Durati
Net
duratiNet 7th Trans-national WorkshopLisboa LNEC 30th May 2012
InsertYourlogo
Investing in our common future
Hierarchical Methodology
duratiNet 7th Trans-national WorkshopLisboa LNEC 30th May 2012
InsertYourlogo
Investing in our common future
Adaptation to the practice
7th TRANS-NATIONAL DURATINET Workshop LNEC • Lisbon • Portugal • 30 May 2012
Durati
Net
duratiNet 7th Trans-national WorkshopLisboa LNEC 30th May 2012
InsertYourlogo
Investing in our common future
Statistical Modelling of:LoadsResistancesUncertainties Updating based upon results of tests/inspections
Purpose:Cut strengthening or rehabilitation costs without compromising the safety level
Essentially a Bridge specific “code” is obtained
Some technical aspects
duratiNet 7th Trans-national WorkshopLisboa LNEC 30th May 2012
InsertYourlogo
Investing in our common future
Legal Basis – Eurocode 1 Basis of Design
Safety Level NEVER Compromised – Rather Optimised
Probability Based Maintenance Optimisation
7th TRANS-NATIONAL DURATINET Workshop LNEC • Lisbon • Portugal • 30 May 2012
Durati
Net
duratiNet 7th Trans-national WorkshopLisboa LNEC 30th May 2012
InsertYourlogo
Investing in our common future
Few Examples
from
Portugal,
Ireland,
France
duratiNet 7th Trans-national WorkshopLisboa LNEC 30th May 2012
InsertYourlogo
Investing in our common future
Ferrycarrig Bridge, IrelandAlternative Repair Options
Crossshead 1,7: Cem 1 OPC, 50mm coverCrosshead 2: Cem 1 OPC, 70mm coverCrosshead 3: Cem 1 OPC, silanesurface treatmentCrosshead 4,6: Cem 1 OPC, 60% GGBSCrosshead 5: Cem 1 OPC, mixed in corrosion inhibitors
Probabilistic Assessment
Torsional Capacity of Crosshead Beams
•Failed in Deterministic Assessment
•Passed in Probabilistic Assessment
7th TRANS-NATIONAL DURATINET Workshop LNEC • Lisbon • Portugal • 30 May 2012
Durati
Net
duratiNet 7th Trans-national WorkshopLisboa LNEC 30th May 2012
InsertYourlogo
Investing in our common future
Barra Bridge, Portugal
Resistance capacity before repair
(kN.m)
Resistance capacity after
repair(kN.m)
Pier 8 -319730 -364150
Mid-Span
20 460 22100
duratiNet 7th Trans-national WorkshopLisboa LNEC 30th May 2012
InsertYourlogo
Investing in our common future
Steel Wharf, France
7th TRANS-NATIONAL DURATINET Workshop LNEC • Lisbon • Portugal • 30 May 2012
Durati
Net
duratiNet 7th Trans-national WorkshopLisboa LNEC 30th May 2012
InsertYourlogo
Investing in our common future
Economic Implications
duratiNet 7th Trans-national WorkshopLisboa LNEC 30th May 2012
InsertYourlogo
Investing in our common future
Thank you for your attention
7th TRANS-NATIONAL DURATINET Workshop LNEC • Lisbon • Portugal • 30 May 2012
Durati
Net