NEWSLETTERMARCH 2015
solutions generating value
Insanity: doing the same thing over and over again expecting different results Albert Einstein
// Tenaz Solutions Newsletter
INAUGURAL CELEBRATION
>$2.5bProven Record Securing
>$3.3bSuccess Delivered
CONTENTS
CONTACT
Berry Freshney
Managing Director
M: +61 413 483 267
W: tenazsolutions.com.au
FROM THE MANAGING DIRECTOR - 1
OUR EXPERTISE - 2Senior Management
Construction Management
Owner, Success & Management
BERESFORD FRESHNEY OVER 22 YEARS - 3-6
TRACK RECORD - 7-9Project Scoping & Design
Bulk Earthworks
SMP Construction
Mining & Mine Infrastructure
Road & Bridge Construction
Regional Work Logistics
Rail
Tunneling
Pipeline & Water Infrastructure
In-situ Material Utilisation
LNG Infrastructure
Soft Soil Construction
Wharf Construction
AWARDS - 9
‘Tenaz’ - tenacious, determined, tireless, indefatigable, resolute, purposeful
// Tenaz Solutions Newsletter
FROM THE MANAGING DIRECTOR
I would like to welcome you to a very special inaugural newsletter
edition celebrating Tenaz Solutions launch and reflect on the
journey of the last 22 yrs in the construction industry.
This reflection has determined that there is a third certainty in life,
that being Change. The Construction industry being reliant on all
levels of the economy – whether you call it micro/macro or local/
national/international, businesses need to be innovative, flexible and
nimble to survive. The boom and bust (4yrs) is an ever increasing
cyclic, and operating models must resist the temptation to become
less efficient during the boom times to minimise risk and loss in a
changing environment.
Nimble; recognising early opportunities, Innovation; gaining
competitive advantage, Solutions; focused on results, are attributes
that industry reward and Tenaz Solutions can support your
businesses to deliver both opportunistic and sustainable solutions.
My sincerest thanks to all in the industry for their support over the
last 22 yrs and I look forward to working with you in the future and
assure you the best of our service.
APLNG Water Treatment Facility (2014) Ipswich Motorway/Logan Motorway Upgrade (2010)
1 // Tenaz Solutions Newsletter
OWNER
• Project Brief
• Budget Reviews
• Contract Models
• Construction Methodology
• Tender Documentation &
Evaluation
• Project Delivery Team
• Commercial Negotiation
• Contract Adjudication
SUCCESS
• Opportunity Identification
• Bid Strategy
• Design Optimisation
• Tender Reviews
• Estimating Reviews
• Program Critique
• JV Partners
• Contract Risk Solutions
CONSTRUCTION
• Startup Teams
• Opportunity Conversion
• Project Audits
• Traffic Management
• Temporary Staging
• Safety + Production
• Methodology
• RPEQ (pending)
OUR EXPERTISE
Senior Management
• Strategy, Execution & Leadership
• Contract Management & Negotiations
• Corporate and Project Risk Management
• Cost Analysis, Reduction and Control
• Opportunity Cost of Capital
• Profitability Improvement
• Development of High Performing Teams
• Joint Ventures & Strategic Business
Partnerships
• Organisational Change Management
Construction Management
• Project Scoping and Design
• Road and Bridge Construction
• Rail
• LNG Infrastructure
• Pipeline Construction
• SMP Construction
• Mining and Mine Infrastructure
• Water Infrastructure
• Tunneling
• Wharf Construction
• Regional Work Logistics
CoalConnect Rail Link (2012) South East Transit Project (2001)
2 // Tenaz Solutions Newsletter
2014
APLNG Water Treatment
Facility $840m+Tender and Construction of two
number 20 megalitre RO CSG water
treatment facilities and associated 100
hectare of lined ponds in the Miles
and Roma region.
Construct competitive Lump Sum
Solutions
Modularisation offsite of piping
and GR piping to minimise
expensive on-site manufacture
2013 Broadmeadow Sustainable
Operations $300m+Tender and Construction of the
Broadmeadow Sustainable Operations
is the rehabilitation of the existing
open cut pit for underground
operations, including 9 million m3 of
cut to fill, 1.2 million m3 of high quality
levee construction, in-situ concrete
works and the portal construction.
EPCM Schedule of Rates competitive
tender
BERESFORD FRESHNEY OVER 22 YEARS
2012
CoalConnect Rail Link
$370m+Design & Construction of the
Northern Missing Link, a 69km
rail link between North Goonyella
and Newlands rail system, and the
upgrading works along the 140km rail
line between Buckley to Newlands.
Design & Construction Alliance
Solutions
Traditional design & standard
specifications were challenged
and performance criteria
established to achieve alternatives
such as the replacement of the
1m wide outer verge protection
with an improved vegetation
establishment resulted in
significant savings through the
reduction of processed quarry
materials
Experiencing two cyclones,
one which being Yasi caused a
significant risk to the completion
date and final budget of the
project, subsequently achieved
through revised staging
and additional resourcing
methodology
Cyclone Yasi damaged a
significant section of the Hail
Creek railway and the Alliance
was requested to affect
immediate design and repair
over a 6-week period. Innovative
design & construct solutions such
as containers backfill with quarry
materials or concrete to facilitate
rapid bridge abutment repair.
Eastern Busway – Buranda to
Main Avenue $278mDesign & Construction of a 1km
dedicated, two-way busway with full
grade separation from existing local
network including a elevated busway
station, two cut & cover tunnels, 12-
span viaduct bridge and significant
service relocations.
Design and Construction Alliance
Solutions
Three key design innovations
delivered included the elimination
of the tunnel extension, raising
of the Langlands Park busway
station and adjusting alignment
of the Logan Tunnel resulted in
both capital & operating cost
reductions and time savings
2011NDRRA Regional Project Offices Mackay & Bundaberg
$100m+Tender & Startup of the NDRRA
Regional Offices for the Scoping,
Design & Delivery for the Contract
Management of the Flood Recovery in
the regions of Fitzroy ($530m+) and
Bundaberg ($320m+)
Project Scoping, Design and
Construction Management
3 // Tenaz Solutions Newsletter
2010
Townsville Super V8 Precinct
$22m+Tender, Design & Construction of
the Reid Park Multi-Event Precinct in
partnership with Department of Sport
& Recreation, Townsville City Council
and V8 Supercars, primarily to stage
the first Dunlop Townsville V8 festival.
Managing Contract GMP competitive
tender
Solutions
Tight schedule was further
challenged as North Queensland
experienced its heaviest wet
season in recorded history, with
1.7m of rain, resulting in a site
closure for 6 weeks
Existing ground conditions were
extremely unpredictable with very
poor strength qualities as site
was previously used as landfill,
required dynamic compaction
and continual evaluation to
optimise pavement design
Ipswich Motorway Logan
Motorway Upgrade $275m+Tender, Design & Construction of
the upgrade of the interchange
connecting Ipswich and Logan
Motorways, and the construction
2.2km of the Ipswich Motorway
corridor catering for 100,000+ traffic
movements per day.
Design and Construction Lump Sum
Solutions
Design innovation leading to
original interchange design
being turn ‘upside down’ from
overpasses to underpasses
Constructed during ‘Boom’ and
to minimise resources risk, design
was undertaken in Hong Kong
facilitated by local established
core team
2009
Northern Access Road Project
$206m+Tender, Design & Construction of a
new vital high speed access to the
Brisbane Airport Precinct. The project
included 6km of multi-lane highway,
9 bridges, new interchanges and
roundabouts over significant soft soils.
Design and Construct competitive
Lump Sum
Solutions
Innovative drainage design to
allow recolonisation of affected
mangroves
Pre-cast headstock design and
construction improving staging &
program
Hybrid pile design combining
octagonal and square segments
Best practice design input &
reliable modeling to achieve
superior embankment and
pavement over deep soft clays
2008Bruce Highway Upgrade Ulhmann to Caboolture ECI
$109m+Tender & Construction of 6km of
widening of the Bruce Highway
from four to six lanes, including the
widening of two bridges.
Schedule of Rates competitive tender
South West Transport Corridor
Package B $120m+Tender & Construction of 9km new
highway between Springfield and
Ripley, including five bridges, 2.5
million cubic metres of embankment
and 110,000 tons of asphalt. Schedule
of Rates competitive tender
Solutions
Constructed in the driest
period in SEQ and during water
restrictions, a construction
water piping system was
utilised accessing water from
abandon underground coal mine
BERESFORD FRESHNEY OVER 22 YEARS
4 // Tenaz Solutions Newsletter
2006Bruce Highway Upgrade
Boundary to Ulhmann $53m+Tender & Construction of 9.8km of
widening the Bruce Highway from
four lanes to six lanes between
Boundary Rd and Uhlmann Rd
interchanges. Schedule of Rates
competitive tender
2005
Bruce Highway Upgrade D’Aguilar Highway
(Caboolture Bypass) $37.5m+Tender & Construction of the grade
separation interchange and 4km
Caboolture Bypass over low lying
areas, including bridge widenings
on the Bruce Highway, drainage
structures and new service road.
Schedule of Rates competitive tender
Walter Hay Drive project
Noosa $23m+Tender & Construction of a 4.5km
two lane road providing a new route
from Eenie Creek to the Sunshine
Motorway, including a 220m bridge
and a fauna underpass. Schedule of
Rates competitive tender
BERESFORD FRESHNEY OVER 22 YEARS
Successful relocation of 82no rare
wattle species ‘Acacia Attenuata’,
previously not achieved.
2004Wimbrel Car Precinct $16m+Tender & Construction of a 27 hectare
storage facility for new cars arriving
on the wharf from Asia, requiring
180,000m3 earthworks, 5km of
drainage, 55,000m3 of pavements,
20 hectare hail protection system
and associated services. Lump Sum
competitive tender
River Links Canal Estate
$64m+Tender, Design and Construction
of a 90-hectare canal estate, being
developed by a consortium party
including Gay Group of Companies,
Macquarie Bank and Urban Pacific.
Design & Construct Lump Sum
2003AMCI Infrastructure Works
$30m+Tender, Design & Construction
of facilities for three new mines,
including two rail loops, two bridges,
coal loadout facilities, coal haulage
and associated access roads.
Selected Design & Construct,
Contractor Involvement
Design & construction of a lime
stabilised ub-base material
allowing the optimisation of the
top 600 material to a revised
425mm thickness, a significant
savings in expensive processed
materials
2002Bruce Hwy Upgrade Yandina
to Cooroy $54mTender & Construction an 11.4km
split dual carriageway of heavy-
duty pavement and associated
interchanges. Schedule of Rates
competitive tender
Utilisation of a 1m wide painted
noise lines to further separate
flowing traffic during construction
to minimize traditional ‘Black
Spot’ risk – a feature still used in
the region
In-situ materials were an highly
expansive clays, which were
incorporated into the project
using ‘wet earthworks’ principles
for equilibrium and lime
stabilisation for rigidity
2001South East Transit Project 1B
$38+Tender & Construction of a 1km
section of the South East Transit
project, including a 400m driven
tunnel, two bridges and an elevated
busway station platform. Schedule of
Rates competitive tender
Canopy tubes to protect South
Brisbane railway line at portal
entry
Design & construction of a 36m
span Y-Junction facility for
proposed BLR
5 // Tenaz Solutions Newsletter
Design & construction of an
alternative continuous piled
wall to underpinning an existing
building achieving a 3month
program saving
1999Gunpowder Solvent Extraction
$25m+Construction of the Solvent Extraction
facility for the Gunpowder Copper
mine. Schedule of Rates competitive
tender
Highly specialised supply &
installation of 5mm HDPE liner to
concrete walls
Utilisation of refrigerated in-situ
concrete cooling system for the
construction of the 2.8m thick
roof to the reclaim tunnel
1998Esperenza Mining Operations
$75+Establishment and commencement
of a open cut mining operation at the
Gunpowder Copper mine site.
Schedule of Rates competitive tender
1997Eungella to Moranbah Water
Pipeline $25+Construction of a 123km of 711mm
dia MSCL pipeline, 2no clay core earth
dams, 2no concrete balance tanks and
associated infrastructure.
Schedule of Rates competitive tender
Construction methodology
achieving high production with
the utilisation of vacuum pipe
lifters and sand immersion
vibrators
Design & construction of a
sand bedding box to eliminate a
bedding production constraint
and achieve the installation of
2100m of pipe per day
1996Port Waratah Second Receival
$30m+Design & Construction of the Second
Receival dump station, coal sampling
and associated conveyor system for
the Kooragang Coal Terminal Design
& Construct Lump Sum tender
High product standard required
for the design & construction of
1.8m wide, 60m deep diaphragm
walls in sand
1995 Esso Berth 6 $25m+Construction of a 600m long
petroleum product berth on the Esso
refinery island in Singapore. Lump
Sum
Barge installed with concrete
batch plant & pumping system
able to deliver high quality
concrete at 250m3 per day
Construction planning using 2
piling barges, 2 concrete barges &
associated support
Onsite fabrication of piles utilising
submerged arc welding
Precast of 6no 320ton platform
decks on a barge and installation
by Hercules crane barge
1994Skyrail Project $35m+Design and Construction of a 7.5km
cable car and stations through
the Daintree World listed Heritage
Rainforest. Design & Construct Lump
Sum
‘Lean’ construction in a sensitive
ecological rainforest
Innovative helicopter
construction methodology
Robust environmental solutions
utilised in limited 10m square
work site
QR Mainline Upgrade $23m+Construction & Upgrade of a 32km
section of the QR main line between
Inkerman to Gumlu, requiring the
replacement of existing timber
bridges, substandard culverts and
embankment. Schedule of Rates
competitive tender
1993Logan Truck Main Amplification
$12m+Construction of 2no 60m deep
vertical caissons & 310m long Drill
& Blast tunnel for the installation
of twin 1860mm dia water MSCL
pipe. Schedule of Rates, Lump Sum
competitive tender
BERESFORD FRESHNEY OVER 22 YEARS
6 // Tenaz Solutions Newsletter
TRACK RECORD
Project Scoping & Design $1.5bnPort Waratah Second Receival $30m+
River Links Canal Estate $64m+
AMCI Infrastructure Works $30m+
Northern Access Road Project $206m+
Ipswich Motorway Logan Motorway Upgrade $275m+
Bruce Highway Upgrade Ulhmann to Caboolature ECI $109m+
Townsville Super V8 Precinct $22m+
NDRRA Regional Project Offices Mackay & Bundaberg $100m+
Eastern Busway – Buranda to Main Avenue $278m
CoalConnect Rail Link $370m+
SMP Construction - $1.2bnPort Waratah Second Receival $30m+
South East Transit Project 1B $38m+
Eastern Busway – Buranda to Main Avenue $278m
APLNG Water Treatment Facility $840m+
Bulk Earthworks - 21.6 million m3
Bruce Hwy Upgrade Yandina to Cooroy – 0.5 million m3
AMCI Infrastructure Works - 2.2 million m3
South West Transport Corridor Package B - 2.5 million m3
South West Transport Corridor Package C – 0.5 million m3
CoalConnect Rail Link – 3.2 million m3
Broadmeadow Sustainable Operations – 10.2 million m3
APLNG Water Treatment Facility - 2.5 million m3
Mining & Mine Infrastructure - $430m+Esperenza Mining Operations $75m+
Gunpowder Solvent Extraction $25m+
AMCI Infrastructure Works $30m+
Broadmeadow Sustainable Operations $300m+
7 // Tenaz Solutions Newsletter
Road & Bridge Construction - 86km road, 40 bridges
South East Transit Project 1B – 1km busway, 2 bridges
Bruce Hwy Upgrade Yandina to Cooroy – 11.4km highway
AMCI Infrastructure Works – 22km road, 2 bridges
Walter Hay Drive project – 4.5km road, 2 bridges
Bruce Highway Upgrade D’Aguilar Highway – 4km highway, 2 bridges
Bruce Highway Upgrade Boundary to Ulhmann – 9.8km motorway
South West Transport Corridor Package B – 9km highway, 5 bridges
South West Transport Corridor Package C – 4.5km highway, 1 bridge
Northern Access Road Project – 6km highway, 9 bridges
Ipswich Logan Motorway Upgrade – 2.2km motorway, 12 bridges
Bruce Highway Upgrade Ulhmann to Caboolature – 6km motorway, 2
bridges
Townsville Super V8 Precinct 5km road, 2 bridges
NDRRA Regional Project Offices Mackay & Bundaberg
Eastern Busway – Buranda to Main Avenue 1km busway, 1 bridge
Tunneling - $50m+Logan Truck Main Amplification $12m+
South East Transit Project 1B $38m+
Rail - 118kmQR Mainline Upgrade - 23km
AMCI Infrastructure Works - 12km
CoalConnect Rail Link - 83km
Regional Work Logistics - 2,400 team membersembersEungella to Moranbah Water pipeline - 110 team
Esperenza Mining Operations - 150 team
Gunpowder Solvent Extraction - 75 team
AMCI Infrastructure Works - 95 team
CoalConnect Rail Link - 520 team
Broadmeadow Sustainable Operations - 450 team
APLNG Water Treatment Facility - 1000 team
Track Record8 // Tenaz Solutions Newsletter
TRACK RECORD
In-situ Material UtilisationBruce Hwy Upgrade Yandina to Cooroy $54m
AMCI Infrastructure Works $30m+
South West Transport Corridor Package B $120m+
CoalConnect Rail Link $370m+
Wharf ConstructionEsso Berth 6 $25m+
Soft Soil ConstructionRiver Links Canal Estate $64m+
Northern Access Road Project $206m+
LNG InfrastructureAPLNG Water Treatment Facility $840m+
AWARDSConstruction Industry Training Council 2000 Winner
Sunshine Coast Environment Council Awards
Engineers Australia Queensland 2004 High Commendation
Sunshine Coast Council Frog Award
National Safety Council Award 2009 Winner
Queensland Major Contractors Association Safety Excellence 2012 Finalist
Civil Contractors Federation 2011 Trainee of the Year
Premier’s ClimateSmart Sustainability 2011 Finalist
Master Plumbers Association 2011 Safety Award
Consult Australia 2012 Award for Excellence
Queensland Major Contractors Association Safety Excellence 2013 Winner
Pipeline & Water Infrastructure - $879mLogan Truck Main Amplification $12m+
Eungella to Moranbah Water pipeline $25m+
Millmerran Water pipeline $1.9m+
APLNG Water Treatment Facility $840m+
9 // Tenaz Solutions Newsletter
There are no win-win solutions after the act, only compromise. Beresford Freshney