From Here to There - Mississippi State University...Storage may not be practical in some areas...

25
Robert W. Cummings NERC Senior Director of Engineering and Reliability Initiatives i-PCGRID 27 March 2019 From Here to There Grid Reliability in the Grid of the Future

Transcript of From Here to There - Mississippi State University...Storage may not be practical in some areas...

Page 1: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

Robert W. CummingsNERC Senior Director of Engineering and Reliability Initiativesi-PCGRID27 March 2019

From Here to ThereGrid Reliability in the Grid of the Future

Page 2: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY2

Page 3: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY3

Smart Grid Defined (2009 version)

Defined from a Reliability Perspective Two-way flow of energy and communications enabling

new technologies to supply, deliver and consume electricity.

Functions • Enhanced flexibility and control• Balancing variable demand & resources• Demand Response• Large deployment of sensor & automation technologies • etc.

Caution of the time – Smart Grid Integration must be Done Intelligently!

Page 4: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY4

Questions• What will it look like?• Will we have 100% renewable resources?• Will all resources be connected through power electronics?• What will the load look like?• Will we still a grid and transmission lines?• How will micro grids interact?Transition issues• Transition to higher penetrations of inverter‐coupled renewables may be painful…not without surprises

• Reductions in inertia and synchronizing torque will make the 

Grid of the Future

Page 5: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY5

• Transition to higher penetrations of inverter‐coupled renewables may be painful…not without surprises Higher levels of inverter‐based resources could be more stable Reductions in inertia and synchronizing torque will make the grid more brittle

Behavior of inverters has to be understood

• Reduced levels of fault current provided by inverters How do you melt steel in an arc furnace? System protection redesigns will be necessary in some areas

• Transportation of renewables from source to consumption Wind and solar resources are abundant in areas far from demand centers

o Not all areas can locally support their loads from renewables – NYC

Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional system connections

Grid of the Future – Transition Issues

Page 6: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY6

• Load composition changing Electric vehicle charging LED lighting Variable speed drive motors

• Distributed Energy Resources Inverter‐based resources

o Roof‐top solar panelso Micro turbineso Small wind turbines

Inverter‐based resources on sub‐transmission systems

• Micro‐Grids• Load becoming schizophrenic Load models no longer adequate for simulations

Changing Load

Page 7: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY7

Changing Dispatch Mix• Higher penetration of renewables – variability of resources• Minimum generation levels on conventional units• Ramping needs increase for load followingRetirement of large fossil‐fired generation plants• Loss of dynamic reactive support for voltage control• Possible reduced system inertia• Lower levels of synchronizing torqueChanging System Inertia• Lower inertia impacts on Primary Frequency Response• Inertia‐les system?Behavior of Inverter‐Based Resources

Changing Resources

Page 8: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY8

Brayton Point Power Plant – 1,535 MW

Built between 1960 and 1972 Units 1 & 2 – Early cross‐compound coal‐fired@ 245 MW Unit 3 – 612 MW coal‐fired Unit 4 – 435 MW Grade C bunker residual oil Closed in May 2017

Page 9: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY9

Brayton Point Demolition

Page 10: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY10

Page 11: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY11

Where Were You?

5:16:11 pm 9:29 pm 3:48 pm 3:05:41 pm 12:32:44 pm 5:14:54 am 1:09:08 pm 11:45:06 am

1965 Northeast Blackout 1977 New York Blackout 1996 Western Blackout 2003 Northeast Blackout 2005 Los Angeles Blackout 2007 Saskatchewan Blackout 2008 South Florida Blackout 2016 Blue Cut Fire Disturbance

Page 12: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY12

Page 13: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY13

System Frequency during Disturbances

Page 14: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY14

Inverter-Based Disturbances –Identified by RoCoF

• Typical Western Interconnection• RoCoF ranges from 25 to 50 mHz/Sec• Nadir reached in about 9 seconds

• Inverter‐based events• RoCoF is above 120 mHz/Sec• Nadir reached in about 4 seconds

• NERC Bulk Power Situational Awareness detects using FNet• Event size typically determined using SCADA (4 second scan rate)• Momentary loss determined from Interconnection inertia

Page 15: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY15

• Continuous Operation – Actively injecting current into the grid • Momentary Cessation – Momentarily cease injecting active current into the grid, but remain electrically connected Triggered by abnormal system voltages (< 0.9 or > 1.1 per unit) 

• Trip Mode (Cease to Energize) – Ceased injecting current and will delay returning to service. (typically 5 minute delay)  May also mechanically disconnect from the grid 

• Modeling is a real issue – Little of this is modeled in conventional powerflow and dynamics simulations

PV Inverter Operating Modes

Page 16: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY16

Full Analyses of Four IBR-Related Events

Page 17: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY17

August 16, 2016 Faults

Blue Cut fire caused• Thirteen 500 kV line faults• Two 287 kV line faults11:45:06 PDT Fault• 500 kV line‐to‐line fault• Cleared normally in 2.5 cycles (41.7 milliseconds)• PV resources impacted – 1,178 MW

• 26 different solar developments• All utility scale – connected at 500kV or 230kV• 10 different inverter manufacturers• No PV site system protection relays/breakers operated• All action was by on‐board inverter controls

Page 18: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY18

Blue Cut and Canyon 2 Disturbances

Blue Cut Fire Disturbance – August 16, 2016 Line‐to‐Line 500 kV fault normally cleared in 2.5 cycles 1,200 MW loss back‐calculated to ~2,500 MW from interconnection inertia Published disturbance report in June 2017 

• Key Findings: Use of momentary cessation Frequency‐related tripping

Canyon 2 Fire Disturbance – October 9, 2017 Normally cleared 220 kV phase‐to‐phase fault followed by a normally cleared 500 kV phase‐to‐phase fault 

900 MW loss back‐calculated to ~1,500 MW from interconnection inertia Published disturbance report in February 2018 

• Key Findings: No frequency‐related tripping but continued use of momentary cessation Transient overvoltage‐related tripping 

Page 19: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY19

Angeles Forest and Palmdale Roost Disturbances

Angeles Forest Disturbance – 10 April 2018 • 500 kV “bolted” line‐to‐line fault – cleared in 2.6 cycles

– Line is mixed 500 kV underground/overhead

• Lopsided RLC line parameters – unbalanced line shunt reactors used to compensate.

• Involved ~1,100 MW of BPS‐connected PV• 200 MW gas turbine loss/associated steam reduction• Evidence of jump in CAISO Net Load – DER lossPalmdale Roost Disturbance – 11 May 2018 • Fault on short 500 kV line – cleared in 3.6 cycles• Involved ~900 MW of BPS‐connected PV

Page 20: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY20

CAISO BPS-Connected Solar and Net Load

Page 21: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY21

Palmdale Roost Disturbance – CAISO BPS-Connected Solar and Net Load

Page 22: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY22

Modeling Notification: Momentary Cessation

• Existing models largely DO NOT accurately represent installed resource performance Identified issue that must be addressed for models in planning and operations studies

Developed notification to help industry in modeling efforts

Guidance provided as part of second NERC Alert 

Page 23: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY23

Joint NERC-IEEE Paper on Impacts

• How do we deal with lower short circuit current?

• What are the dynamics issues?

• Several Working Groups and Task Teams of IEEE PSRC are working on the System Protection issues

• Other IEEE Committees are 

Page 24: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY24

Inverter-Based ResourceReliability Guideline

• BPS‐connected inverter‐based resource performance

• Guideline based on findings and recommendations of NERC disturbance reports

• Intended as cornerstone document for industry moving forward

• Approved by NERC Operating Committeehttps://www.nerc.com/comm/Pages/Reliability‐and‐Security‐Guidelines.aspx

• Basis for IEEE P2800 Inverter‐Based Resources – Connected above Distribution

Page 25: From Here to There - Mississippi State University...Storage may not be practical in some areas Co‐locating renewables and storage is essential to minimize additional ... Unit 4 –435

RELIABILITY | ACCOUNTABILITY25