Friday, December 16, 2016 - Californiadocs.cpuc.ca.gov/PublishedDocs/Published/G000/M167/…  ·...

25

Click here to load reader

Transcript of Friday, December 16, 2016 - Californiadocs.cpuc.ca.gov/PublishedDocs/Published/G000/M167/…  ·...

Page 1: Friday, December 16, 2016 - Californiadocs.cpuc.ca.gov/PublishedDocs/Published/G000/M167/…  · Web view... Practice and Procedure Rule 8.1(c) such that no ex parte communication

Public Utilities Commission of the State of CaliforniaTimothy J. Sullivan, Executive Director

Headquarters Southern California Office505 Van Ness Avenue 320 West 4th Street, Suite 500

San Francisco, CA 94102 Los Angeles, CA 90013(415) 703-2782 (213) 576-7000

Website: http://www.cpuc.ca.govCalendar Archive: prior to year 2000 http://www.cpuc.ca.gov/daily_calendar_archive/

Search calendars published since July 2000

Daily Calendar

Friday, December 16, 2016

Commission Meetings Notices Public Meetings and Workshops Notice of Draft Resolutions (PU Code § 311(g)) New Filings Petitions for Modification and Applications for Rehearing Proposed Decisions/Alternates/Presiding Officer’s Decisions/Arbitrator’s Reports Advice Letter Filings Miscellaneous Transportation Items Miscellaneous Communications Matters Table of Submission Dates for the Preceding Two Weeks Changes to Hearing Calendar Hearings Notice of All-Party Meetings (PU Code §1701.3(c))

Resolution ALJ 176-3390 regarding ratification of preliminary determinations of category and notice of

assignment is included in this calendar.

The Commission’s policy is to schedule hearings (meetings, workshops, etc.) in locations that are accessible to people with disabilities.

The CPUC encourages all Californians to participate in its meetings, hearings, workshops, and proceedings. We try to hold our public meetings only in places that are wheelchair accessible and which can accommodate specialized equipment and other services useful to people with disabilities. Please see the notice of the meeting you wish to attend for more specifics.

If you plan to attend and need specialized accommodations for a particular meeting that are not listed in the notice, request them from the Public Advisor’s Office at least three business days in advance of the meeting. Contact the Public Advisor’s Office by any one of the following: Email: [email protected] toll-free: 1-866-849-8390 Voice: 415-703-2074

FAX: 415-355-5404 (Attn.: Public Advisor)TTY: 1-866-836-7825 (toll-free) 1-415-703-5282

Page 2: Friday, December 16, 2016 - Californiadocs.cpuc.ca.gov/PublishedDocs/Published/G000/M167/…  · Web view... Practice and Procedure Rule 8.1(c) such that no ex parte communication

California Public Utilities Commission Daily Calendar Friday, December 16, 2016

REGULAR COMMISSION BUSINESS MEETINGS

December 15, 2016 9:30 am San FranciscoJanuary 19, 2017 9:30 am San FranciscoFebruary 9, 2017 9:30 am San Francisco

COMMISSION RATESETTING DELIBERATIVE MEETINGS(Not Open to the Public)

Ratesetting Deliberative Meeting dates are reserved as noted but will only be held if there are ratesetting matters to be considered.

January 13, 2017 10:00 am San Francisco, Room 5305February 6, 2017 10:00 am San Francisco, Room 5305February 27, 2017 10:00 am San Francisco, Room 5305

OTHER COMMISSION MEETINGSMore information on the Committee meeting is available at http://www.cpuc.ca.gov/commissionercommittees/

Notice of Public Participation Hearing: A.16-07-002 - Application of California-American Water Company (U210W) for Authorization to Increase its Revenues for Water Service by $34,559,200 or 16.29% in the year 2018, by $8,478,500 or 3.43% in the year 2019, and by $7,742,600 or 3.03% in the year 2020,

January 17, 20176 pm

Palm Garden Hotel – Palm I495 North Ventu Park RoadThousand Oaks, CA 91320

The Public Participation Hearing in the above entitled matter will be held at the date, time and location above. Assigned Commissioner Michael Picker and/or Administrative Law Judge Sophia J. Park will preside. There may be a quorum of Commissioners present, however, no voting will occur.

Questions about the hearing date, time or place, call the Calendar Clerk at (415) 703-1203 or [email protected].

If special arrangements are needed for attendees, such as sign and/or foreign language interpreters, please contact the CPUC Public Advisor’s Office at 1-866-849-8391 or 1-415-703-2074 or email: [email protected] at least three days prior to the hearing.

Notice of Public Participation Hearing: A.16-07-002 - Application of California-American Water Company (U210W) for Authorization to Increase its Revenues for Water Service by $34,559,200 or 16.29% in the year 2018, by $8,478,500 or 3.43% in the year 2019, and by $7,742,600 or 3.03% in the year 2020,

January 18, 20176 pm

Courtyard Marriott Hotel – Salon B700 W. Huntington DriveMonrovia, CA 91016

The Public Participation Hearing in the above entitled matter will be held at the date, time and location above. Assigned Commissioner Michael Picker and/or Administrative Law Judge Sophia J. Park will preside. There may be a quorum of Commissioners present, however, no voting will occur.

Questions about the hearing date, time or place, call the Calendar Clerk at (415) 703-1203 or [email protected].

If special arrangements are needed for attendees, such as sign and/or foreign language interpreters, please contact the CPUC Public Advisor’s Office at 1-866-849-8391 or 1-415-703-2074 or email: [email protected] at least three days prior to the hearing.

Page 2

Page 3: Friday, December 16, 2016 - Californiadocs.cpuc.ca.gov/PublishedDocs/Published/G000/M167/…  · Web view... Practice and Procedure Rule 8.1(c) such that no ex parte communication

California Public Utilities Commission Daily Calendar Friday, December 16, 2016

Notice of Public Participation Hearing: A.16-07-002 - Application of California-American Water Company (U210W) for Authorization to Increase its Revenues for Water Service by $34,559,200 or 16.29% in the year 2018, by $8,478,500 or 3.43% in the year 2019, and by $7,742,600 or 3.03% in the year 2020,

January 24, 20171:30 pm

and

6 pm

Oldemeyer Center – Laguna Grande Hall986 Hilby AvenueSeaside, CA 93955

The Public Participation Hearing in the above entitled matter will be held at the date, time and location above. Assigned Commissioner Michael Picker and/or Administrative Law Judge Sophia J. Park will preside. There may be a quorum of Commissioners present, however, no voting will occur.

Questions about the hearing date, time or place, call the Calendar Clerk at (415) 703-1203 or [email protected].

If special arrangements are needed for attendees, such as sign and/or foreign language interpreters, please contact the CPUC Public Advisor’s Office at 1-866-849-8391 or 1-415-703-2074 or email: [email protected] at least three days prior to the hearing.

Notice of Public Participation Hearing: A.16-07-002 - Application of California-American Water Company (U210W) for Authorization to Increase its Revenues for Water Service by $34,559,200 or 16.29% in the year 2018, by $8,478,500 or 3.43% in the year 2019, and by $7,742,600 or 3.03% in the year 2020,

January 25, 20176 pm

Chualar Union Elementary School – Board Room24285 Lincoln StreetChualar, CA 93925

The Public Participation Hearing in the above entitled matter will be held at the date, time and location above. Assigned Commissioner Michael Picker and/or Administrative Law Judge Sophia J. Park will preside. There may be a quorum of Commissioners present, however, no voting will occur.

Questions about the hearing date, time or place, call the Calendar Clerk at (415) 703-1203 or [email protected].

If special arrangements are needed for attendees, such as sign and/or foreign language interpreters, please contact the CPUC Public Advisor’s Office at 1-866-849-8391 or 1-415-703-2074 or email: [email protected] at least three days prior to the hearing.

Notice of Public Participation Hearing: A.16-07-002 - Application of California-American Water Company (U210W) for Authorization to Increase its Revenues for Water Service by $34,559,200 or 16.29% in the year 2018, by $8,478,500 or 3.43% in the year 2019, and by $7,742,600 or 3.03% in the year 2020,

February 9, 20176 pm

City of Imperial Beach – Community Room825 Imperial Beach Blvd.Imperial Beach, CA 91932

The Public Participation Hearing in the above entitled matter will be held at the date, time and location above. Assigned Commissioner Michael Picker and/or Administrative Law Judge Sophia J. Park will preside. There may be a quorum of Commissioners present, however, no voting will occur.

Questions about the hearing date, time or place, call the Calendar Clerk at (415) 703-1203 or [email protected].

If special arrangements are needed for attendees, such as sign and/or foreign language interpreters, please contact the CPUC Public Advisor’s Office at 1-866-849-8391 or 1-415-703-2074 or email: [email protected] at least three days prior to the hearing.

Page 3

Page 4: Friday, December 16, 2016 - Californiadocs.cpuc.ca.gov/PublishedDocs/Published/G000/M167/…  · Web view... Practice and Procedure Rule 8.1(c) such that no ex parte communication

California Public Utilities Commission Daily Calendar Friday, December 16, 2016

NOTICES

Charge for Commission DocumentsTo purchase Commission documents, there is a charge of 20 cents a printed page (postage prepaid) with a minimum purchase of $2.00.

Commission Resources Available for RentalThe auditorium, hearing rooms, and training room at the headquarters of the California Public Utilities Commission, located at 505 Van Ness Avenue, San Francisco, California, are available for rent. Further information about requirements and fees can be obtained by contacting Scott Finger (415) 703-1641.

PUBLIC MEETINGS & WORKSHOP NOTICES

“The below notices having been duly noticed in the Daily Calendar and along with the requisite ruling, scoping memo or other order issued in the specific proceedings satisfy the requirements of the Commission’s Rules of Practice and Procedure Rule 8.1(c) such that no ex parte communication shall be considered to occur should a decisionmaker or an advisor be present at the meeting or workshop.”

(UPDATED) Public Workshop Notice:   Workshop on Integrated Resource Planning Scenario Development and GHG Planning Targets (REVISED AS OF 12/8/16)

December 16, 20169 am – 12 noon

Air Resources Board1001 “I” Street, Sierra Hearing RoomSacramento, CA  95812

Remote Access To Join by Phone:Teleconference number: 866-830-2902Participant code: 2453758

To join by WebEx: https://van.webex.com/van/j.php?MTID=ma4573ab09dee175b1d4f0fcc78e38d05

Meeting number: 747 982 183Meeting password: !Energy1

PurposeThis workshop will be used to explore in more detail the options for Integrated Resource Planning (IRP) Scenario Development within IRP. A quorum of Commissioners may attend the workshop, but no votes will be taken.

BackgroundIRP Scenarios and Modeling:  In October and November 2016, Energy Division staff initiated two different series of public webinars to foster transparency and facilitate the ability of Energy Division staff to develop a proposal for implementing the IRP process in 2017.

Modeling Advisory Group:  One series of webinars focused specifically on the technical, modeling-related aspects of IRP.

Scenario Development:  The second series of webinars focused on higher level planning concepts and issues involved in developing and selecting scenarios and portfolios of future resources.

This workshop will be used to discuss party feedback on this item.  This December 16th workshop will be posted to the Commission’s Daily Calendar.  An agenda and other workshop materials will be emailed to the service list in advance of

Page 4

Page 5: Friday, December 16, 2016 - Californiadocs.cpuc.ca.gov/PublishedDocs/Published/G000/M167/…  · Web view... Practice and Procedure Rule 8.1(c) such that no ex parte communication

California Public Utilities Commission Daily Calendar Friday, December 16, 2016

the workshop. For more information, please contact:  Jason Ortego at [email protected] or Nathan Barcic at [email protected].

Public Workshop Notice: Energy Division, Energy Efficiency Branch Workshop on Strategic Energy Management, R.13-11-005

December 16, 201610 am – 1:30 pm

California Public Utilities Commission505 Van Ness Avenue. Golden Gate Room(Corner of Van Ness Avenue and McAllister Street)San Francisco, CA 94102

Conference Phone Line: 866-633-5564Participant Code: 8705907

WebEx information:Meeting Number: 747335161Meeting Password: !Energy1

To start or join the online meeting:Go to: https://van.webex.com/van/j.php?MTID=m18ca30d47cb7beef01fd99f8f0a02d97

AGENDAThis workshop is to provide information and to facilitate discussion on the design of the Strategic Energy Management energy efficiency program addressed in Decision 16-08-019 as well as the evaluation of savings from the program. Issuance of RFPs for implementers of the Strategic Energy Management program will also be discussed. The agenda is available at http://www.energydataweb.com/cpuc/search.aspx by typing Strategic Energy Management into the search text box. Contact: Kay Hardy, (415) 703-2322, [email protected].

Public Workshop Notice: Energy Data Access Committee Q4 meetingDecember 16, 20161:00 pm – 4:30 pm

San Diego Gas & Electric – Century Park8326 Century ParkSan Diego, CA 92123

Conference Phone Line: (877) 601-3542Participant Code: 1232

To start or join the online meeting:Go to: https://sempramtg.sempra.com

AGENDASDG&E hosts the Q1.2016 quarterly meeting of the Energy Data Access Committee. California Public Utilities Commission Decision (D.14-05-016) establishes the Data Request and Response Process for investor owned utilities to follow when providing customer usage data to eligible third party requesters. The EDAC is non-adjudicatory and serves as a forum to discuss issues that arise from the data request process. For more information, contact [email protected].

Public Workshop Notice (Continuation) – Best Practices Technical Workshop for SB 1371 Methane Leak Abatement Proceeding (R.15-01-008)

December 21, 201610:00 am – 5:00 pm

California Public Utilities Commission505 Van Ness Avenue, Courtyard Room(Corner of Van Ness Avenue and McAllister Streets)San Francisco, CA 94102

Conference Call Line: (866) 859-2737Passcode: 1682922#

Page 5

Page 6: Friday, December 16, 2016 - Californiadocs.cpuc.ca.gov/PublishedDocs/Published/G000/M167/…  · Web view... Practice and Procedure Rule 8.1(c) such that no ex parte communication

California Public Utilities Commission Daily Calendar Friday, December 16, 2016

This workshop is a continuation of the December 12, 2016, Technical Best Practices Workshop (noticed in ALJ Kersten’s Ruling of November 21, 2016) to clarify requirements for 26 methane emissions reduction best practices (Attachment A of ALJ November 21st Ruling) and discuss realistic deadlines. Participants at the December 12th workshop had no objections to continuing on December 21, 2016. The CPUC’s Safety and Enforcement Division, in cooperation with the California Air Resources Board (CARB) will again facilitate this Workshop. For questions about this workshop, including a copy of the refined agenda and workshop materials, please contact Ms. Wendy al-Mukdad at [email protected] or (415) 703-2311 and cc: Winardi Setiawan at [email protected].

Public Workshop Notice:   Presentation of “Click-Through" Advice Letters(UPDATED 12/7/16) January 9, 201710 am – 3:30 pm

Pacific Energy Center851 Howard Street, (Between 4th and 5th StreetsSan Francisco, CA 94103

Conference Phone Line: 866-652-7690Participant Code: 301 915 7722#

WebEx information:Meeting Number: 745 787 299https://pge.webex.com/pge/j.php?MTID=m9d866998b2255087eb3a61d4adfcf82e

AGENDACommission Decision 16-06-008 (“the Decision”) resolves issues related to customer authorization for the utility to share data with third party Demand Response providers.  This includes completing the Customer Information Service Request Demand Response Provider Form (CISR-DRP Form) in paper form or through a “Click-Through” process.

Pursuant to the Decision, the utilities held working group meetings to “develop a consensus proposal to streamline and simplify the direct participation enrollment process, including adding more automation, mitigating enrollment fatigue, and resolving any remaining electronic signature issues.”  (See Ordering Paragraph 9, D.16-06-008).

The consensus proposals detailing plans to implement the “Click-Through” solution will be filed by the utilities as Advice Letters by January 3, 2017. During this workshop, the utilities will present these Advice Letters. For questions about this workshop, please contact Katherine Stockton at [email protected].

NOTICE OF DRAFT RESOLUTIONS(Pursuant to PU Code § 311(g))

The ALJ Division has prepared Resolution ALJ-335 for the January 19, 2017, Commission Meeting. This resolution resolves the appeal of Citation No. CPED FC-834 issued to J&I Transportation LLC, doing business as (dba) Apollo Shuttle VIP Transportation Services (Apollo) by the California Public Utilities Commission’s Consumer Protection and Enforcement Division Citation No. CPED FC-834 issues a fine of $4,000 for five violations (15 counts) of the Public Utilities Code and the Commission’s General Orders 157-D and 158-A during the period of January 1, 2016 through May 9, 2016. The citation is sustained. Recovery of $2,000 is suspended provided that Apollo does not receive any future violations in the next 36 months. The amount that is now due and payable is $2,000. The citation is affirmed. Any comments should be directed to ALJ Kelly via email: [email protected] or phone 1-415-703-5506.

The web link is http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=170284458.

The Energy Division has prepared Draft Resolution E-4817 for the January 19, 2017, Commission Meeting.  This Draft Resolution approves, with modifications, the proposal of SCE, SDG&E, and PG&E, to create an auction mechanism for demand response capacity, called the Demand Response Auction Mechanism.  Notice of this Draft has been sent to parties in the service lists. Any questions or comments should be directed to Cathleen Fogel at [email protected] and Bruce Kaneshiro at [email protected]

The web link is http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M171/K259/171259043.PDF

Page 6

Page 7: Friday, December 16, 2016 - Californiadocs.cpuc.ca.gov/PublishedDocs/Published/G000/M167/…  · Web view... Practice and Procedure Rule 8.1(c) such that no ex parte communication

California Public Utilities Commission Daily Calendar Friday, December 16, 2016

The Energy Division has prepared Draft Resolution G-3520 for the January 19, 2017, Commission Meeting.  This Draft Resolution approves Pacific Gas and Electric Company’s Corrected and Restated Amendment to the Co-Ownership Agreement which was originally approved by the Commission in Decision 97-04-087 on April 23, 1997.  Notice of this Draft has been sent to parties in the service lists. Any questions or comments should be directed to Amardeep Assar at [email protected] and Franz Cheng at [email protected].

The web link is http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M171/K198/171198276.PDF

The Safety and Enforcement Division (SED) has prepared Resolution ST-182 for the January 19, 2017, Commission meeting. This resolution grants approval of the final report, titled “2015 Triennial Security Review of North County Transit District (NCTD),” dated October 14, 2016. The report compiles the results of the Commission Staff’s review of the NCTD’s security programs. Background information, review procedures, security review checklists, findings, and recommendations are included in the report. Any questions or comments should be directed to Michael Warren at [email protected] .

The web link is http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=171242581

The Safety and Enforcement Division (SED) has prepared Resolution ST-183 for the January 19, 2017, Commission meeting. This resolution grants approval of the final report, titled “2015 Triennial Safety Review of the North County Transit District (NCTD),” dated October 14, 2016. The report compiles the results of the Commission staff’s review of the NCTD’s safety programs. Background information, review procedures, safety review checklists, findings, and recommendations are included in the report. Any questions or comments should be directed to Michael Warren at [email protected] .

The web link is http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=171195227

The Safety and Enforcement Division has prepared Resolution ST-192 for the January 19, 2017, Commission meeting. This resolution grants approval of the final report, titled “2016 Triennial Safety Review of Sacramento County Department of Airports [SCDOA] Automated People Mover System,” dated November 23, 2016. The report compiles the results of the Commission Staff’s review of the SCDOA’s safety programs. Background information, review procedures, safety review checklists, findings, and recommendations are included in the report. Any questions or comments should be directed to Raed Dwairi: [email protected]

The web link is http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=171198275

The Safety and Enforcement Division has prepared Resolution ST-193 for the January 19, 2017, Commission meeting. This resolution grants approval of the final report, titled “2016 Triennial Security Review of Sacramento County Department of Airports [SCDOA] Automated People Mover System,” dated November 23, 2016. The report compiles the results of the Commission Staff’s review of the SCDOA’s security programs. Background information, review procedures, safety review checklists, findings, and recommendations are included in the report. Any questions or comments should be directed to Howard Huie: [email protected]

The web link is http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=171181495

The Consumer Protection and Enforcement Division has prepared Draft Resolution TL-19124 for the January 19, 2017 Commission Meeting. The resolution increases the maximum rates in Maximum Rate Tariff 4, containing maximum rates for household goods carriers, by 2.7%. Any comments or questions should be directed to Don Wise, Senior Transportation Representative, Consumer Protection and Enforcement Division, License Section, California Public Utilities Commission, 505 Van Ness Avenue, San Francisco, CA 94102, Telephone: (415) 703-3115.

Page 7

Page 8: Friday, December 16, 2016 - Californiadocs.cpuc.ca.gov/PublishedDocs/Published/G000/M167/…  · Web view... Practice and Procedure Rule 8.1(c) such that no ex parte communication

California Public Utilities Commission Daily Calendar Friday, December 16, 2016

The web link is http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=170775227.

NEW FILINGS

NONE

PETITIONS FOR MODIFICATION AND APPLICATIONS FOR REHEARING

NONE

PROPOSED DECISIONS * ALTERNATES * PRESIDING OFFICER’S DECISIONS * ARBITRATOR’S REPORTS

NONE

ADVICE LETTER FILINGS

To inquire about a filing, call the Energy Division (703-1093), Communications Division (703-3052) or Water Division (703-1133).

To protest a filing, mail the original letter/telegram to the Chief of the appropriate division (i.e., "Chief, [Energy, Communications or Water] Division"), to be received no later than 20 days after the date the Advice Letter was filed.

"Effective TBD" means that the date is to be determined by further Commission action. A date listed as "anticipated effective" may be subject to change. An Advice Letter Supplement is not a new filing, and there is no protest period unless indicated.

12/12/16 Energy 546E Pacificorp, Decision Regarding PacifiCorp's 2016 Energy Cost Adjustment Clause Rates and Greenhouse Gas Costs and Allowance Proceeds, D.16-12-012 - Change PacifiCorp Rates on January 1, 2017. (anticipated effective 01/01/17)

12/12/16 Energy 547E Pacificorp, Update to the PUC Reimbursement Fee Effective January 1, 2017 in Compliance with Resolution M-4830. (anticipated effective 01/01/17)

12/12/16 Energy 3016E/2539G

San Diego Gas & Electric Company, Modification of Energy Savings Assistance Programs Memorandum Account Pursuant to Decision 16-06-018 (anticipated effective 01/01/16)

12/12/16 Energy 3017E San Diego Gas & Electric Company, Modification to Schedule Net Energy Metering for Fuel Cell Customer-Generators (NEM-FC) and Forms Pursuant to Assembly Bill 1637 (anticipated effective 01/11/17)

12/13/16 Energy 68E Liberty Utilities (CalPeco Electric) LLC, Request for Approval of Long-Term Purchase and Sale Agreement for Renewable Energy Credits from Biomass One, L.P. (anticipated effective 01/12/17)

Page 8

Page 9: Friday, December 16, 2016 - Californiadocs.cpuc.ca.gov/PublishedDocs/Published/G000/M167/…  · Web view... Practice and Procedure Rule 8.1(c) such that no ex parte communication

California Public Utilities Commission Daily Calendar Friday, December 16, 2016

12/13/16 Energy 4923E-A Pacific Gas & Electric Company, Supplements A.L.No.4923E, Request for Approval of Agreement between Pacific Gas and Electric Company and Bay Area Rapid Transit District (anticipated effective 01/01/17)

12/13/16 Energy 4977E Pacific Gas & Electric Company, Information-Only Filing Regarding NEM Monthly Transition Reporting. (anticipated effective 12/13/16)

12/13/16 Energy 3530E Southern California Edison Company, 2017 California DWR Power and Bond Charges in Accordance with D.16-12-008. (anticipated effective 01/01/17)

12/13/16 Telecom 1480 Cox California Telcom, LLC, Individual Case Bases Contract (effective TBD)

12/13/16 Water 168 Alisal Water Corporation, Update User Fee in compliance with Res. M-4830 (anticipated effective 01/01/17)

12/13/16 Water 169 Alisal Water Corporation, Establish a surcharge to collect funds for the 2017 Water Conservation Programs (anticipated effective 01/01/17)

12/13/16 Water 66-W Bass Lake Water Company, Recover by Surcharge Power and Water Conservation Filing Fee Cost (anticipated effective 01/26/17)

12/13/16 Water 59 California Utilities Service, Inc., Update User Fee in compliance with Res. M-4830 (anticipated effective 01/01/17)

12/13/16 Water 2 Sierra Park Water Company, Demonstrate asset transfer completion per OP 1 of D16-01-047 (anticipated effective 04/01/16)

12/14/16 Energy 69E Liberty Utilities (CalPeco Electric) LLC, Standard Forms Update (anticipated effective 01/01/17)

12/14/16 Energy 3465E-A Southern California Edison Company, Supplements A.L.No.3465E, Southern California Edison Company's 2017 Annual Energy Efficiency Program and Portfolio Budget Request (anticipated effective 10/01/16)

12/14/16 Energy 3493E-A Southern California Edison Company, Supplements A.L.No.3493E, Modifications to Electric Tariff Rule 21 to Implement an Expedited Interconnection Process for Non-Exporting Storage Facilities Pursuant to Decision 16-06-052 (anticipated effective 11/20/16)

12/14/16 Energy 437G-A West Coast Gas Company, Supplements A.L.No.437G, Change in PPP Rate at Mather Field and Castle (anticipated effective 01/01/17)

12/14/16 Water 469 Del Oro Water Co., Inc., [Metropolitan] Reimbursement of Uncollected Revenues (effective TBD)

12/14/16 Water 103 North Gualala Water Works, Refund over-collection of surcharge rates for repayment of SDWSRF loan maturing on 1/1/17 and terminate surcharge rates authorized by Res. W-4678 (anticipated effective 12/14/16)

ADVICE LETTER SUSPENSIONS (Pursuant to M-4801, 04/19/01)

To inquire about a suspension, call the Energy Division (703-1093), Communications Division (703-3052) or Water Division (703-1133).

Page 9

Page 10: Friday, December 16, 2016 - Californiadocs.cpuc.ca.gov/PublishedDocs/Published/G000/M167/…  · Web view... Practice and Procedure Rule 8.1(c) such that no ex parte communication

California Public Utilities Commission Daily Calendar Friday, December 16, 2016

07/30/16 Telecom 439 Sierra Telephone Company, Inc.. Initial suspension on the following grounds: staff needs additional time to process. Date suspension ends: 11/30/16. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

08/01/16 Telecom 6 Consolidated Communications Enterprise Services, Inc.. Initial suspension on the following grounds: staff needs additional time to process. Date suspension ends: 12/01/16. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

08/01/16 Telecom 2051 Consolidated Communications of California Company. Initial suspension on the following grounds: staff needs additional time to process. Date suspension ends: 12/01/16. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

08/01/16 Telecom 1452 Cox California Telcom, LLC. Initial suspension on the following grounds: staff needs additional time to process. Date suspension ends: 12/01/16. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

08/01/16 Telecom 45740 Pacific Bell. Initial suspension on the following grounds: staff needs additional time to process. Date suspension ends: 12/01/16. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

08/01/16 Telecom 191 Teleport Communications America, LLC. Initial suspension on the following grounds: staff needs additional time to process. Date suspension ends: 12/01/16. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

08/01/16 Telecom 192 Teleport Communications America, LLC. Initial suspension on the following grounds: staff needs additional time to process. Date suspension ends: 12/01/16. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

08/01/16 Telecom 193 Teleport Communications America, LLC. Initial suspension on the following grounds: staff needs additional time to process. Date suspension ends: 12/01/16. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

08/10/16 Telecom 12738 Frontier California Inc.. Initial suspension on the following grounds: staff needs additional time to process. Date suspension ends: 12/01/16. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

Page 10

Page 11: Friday, December 16, 2016 - Californiadocs.cpuc.ca.gov/PublishedDocs/Published/G000/M167/…  · Web view... Practice and Procedure Rule 8.1(c) such that no ex parte communication

California Public Utilities Commission Daily Calendar Friday, December 16, 2016

08/10/16 Telecom 88 Frontier Communications of the Southwest Inc.. Initial suspension on the following grounds: staff needs additional time to process. Date suspension ends: 12/01/16. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

08/17/16 Telecom 18 Blue Rooster Telecom, Inc.. Initial suspension on the following grounds: staff needs additional time to process. Date suspension ends: 12/01/16. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

08/17/16 Telecom 45 Utility Telecom Group, LLC. Initial suspension on the following grounds: staff needs additional time to process. Date suspension ends: 12/01/16. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

08/18/16 Telecom 32 CCT Telecommunications, Inc.. Initial suspension on the following grounds: staff needs additional time to process. Date suspension ends: 12/15/16. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

11/26/16 Telecom 4304 AT&T Corp.. Initial suspension on the following grounds: staff needs additional time to process. Date suspension ends: 03/27/17. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

11/26/16 Telecom 4305 AT&T Corp.. Initial suspension on the following grounds: staff needs additional time to process. Date suspension ends: 03/27/17. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

11/26/16 Telecom 4308 AT&T Corp.. Initial suspension on the following grounds: staff needs additonal time to process. Date suspension ends: 03/27/17. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

11/26/16 Telecom 4309 AT&T Corp.. Initial suspension on the following grounds: staff needs additional time to process. Date suspension ends: 03/27/17. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

11/26/16 Telecom 46053 Pacific Bell. Initial suspension on the following grounds: staff needs additional time to process. Date suspension ends: 03/27/17. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

11/26/16 Telecom 196 Teleport Communications America, LLC. Initial suspension on the following grounds: staff needs additional time to process. Date

Page 11

Page 12: Friday, December 16, 2016 - Californiadocs.cpuc.ca.gov/PublishedDocs/Published/G000/M167/…  · Web view... Practice and Procedure Rule 8.1(c) such that no ex parte communication

California Public Utilities Commission Daily Calendar Friday, December 16, 2016

suspension ends: 03/27/17. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

11/26/16 Telecom 197 Teleport Communications America, LLC. Initial suspension on the following grounds: staff needs additional time to process. Date suspension ends: 03/27/17. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

11/26/16 Telecom 198 Teleport Communications America, LLC. Initial suspension on the following grounds: staff needs additional time to process. Date suspension ends: 03/27/17. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

12/01/16 Telecom 439 Sierra Telephone Company, Inc.. Automatic suspension extension. Date suspension ends: 06/01/17.

12/02/16 Telecom 18 Blue Rooster Telecom, Inc.. Automatic suspension extension. Date suspension ends: 06/01/17.

12/02/16 Telecom 6 Consolidated Communications Enterprise Services, Inc.. Automatic suspension extension. Date suspension ends: 06/01/17.

12/02/16 Telecom 2051 Consolidated Communications of California Company. Automatic suspension extension. Date suspension ends: 06/01/17.

12/02/16 Telecom 1452 Cox California Telcom, LLC. Automatic suspension extension. Date suspension ends: 06/01/17.

12/02/16 Telecom 12738 Frontier California Inc.. Automatic suspension extension. Date suspension ends: 06/01/17.

12/02/16 Telecom 88 Frontier Communications of the Southwest Inc.. Automatic suspension extension. Date suspension ends: 06/01/17.

12/02/16 Telecom 45740 Pacific Bell. Automatic suspension extension. Date suspension ends: 06/01/17.

12/02/16 Telecom 191 Teleport Communications America, LLC. Automatic suspension extension. Date suspension ends: 06/01/17.

12/02/16 Telecom 192 Teleport Communications America, LLC. Automatic suspension extension. Date suspension ends: 06/01/17.

12/02/16 Telecom 193 Teleport Communications America, LLC. Automatic suspension extension. Date suspension ends: 06/01/17.

12/02/16 Telecom 45 Utility Telecom Group, LLC. Automatic suspension extension. Date suspension ends: 06/01/17.

12/15/16 Energy 4954E Pacific Gas & Electric Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 04/13/17. Note: Initial suspensions will be automatically extended for an

Page 12

Page 13: Friday, December 16, 2016 - Californiadocs.cpuc.ca.gov/PublishedDocs/Published/G000/M167/…  · Web view... Practice and Procedure Rule 8.1(c) such that no ex parte communication

California Public Utilities Commission Daily Calendar Friday, December 16, 2016

additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

12/15/16 Water 1674-W Golden State Water Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 04/13/17. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

12/16/16 Telecom 32 CCT Telecommunications, Inc.. Automatic suspension extension. Date suspension ends: 06/01/17.

12/20/16 Energy 3515E Southern California Edison Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 04/18/17. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends.

12/23/16 Energy 2931E San Diego Gas & Electric Company. Automatic suspension extension. Date suspension ends: 06/20/17.

ADVICE LETTER PROTESTS

To inquire about a protest, call the Energy Division (703-1093), Communications Division (703-3052) or Water Division (703-1133). To obtain a copy of the protest, please direct your request to the protestor.

MISCELLANEOUS TRANSPORTATION ITEMSFilings with Safety and Enforcement Division

NONE

MISCELLANEOUS COMMUNICATIONS MATTERS

NONE

A TABLE OF SUBMISSION DATES FOR THE PRECEDING TWO WEEKS

NONE

CHANGES TO HEARING CALENDAR

NEW SETTINGS

Page 13

Page 14: Friday, December 16, 2016 - Californiadocs.cpuc.ca.gov/PublishedDocs/Published/G000/M167/…  · Web view... Practice and Procedure Rule 8.1(c) such that no ex parte communication

California Public Utilities Commission Daily Calendar Friday, December 16, 2016

02/01/179:30 a.m.ALJ AyoadeComr Peterman

C.16-07-012 (EH) - DC Universal, LLC, Complainant vs. California American Water Company (U210W), Defendant,Commission Courtroom, San Francisco

02/02/1710:00 a.m.ALJ KellyComr Picker

R.15-06-009 (PHC) - Order Instituting Rulemaking Regarding Policies, Procedures and Rules for Regulation of Physical Security for the Electric Supply Facilities of Electrical Corporations Consistent with Public Utilities Code Section 364 and to Establish Standards for Disaster and Emergency Preparedness Plans for Electrical Corporations and Regulated Water Companies Pursuant to Public Utilities Code Section 768.6,Commission Courtroom, San Francisco

RESETTINGS - NONE

REMOVALS FROM CALENDAR - NONE

HEARINGS CONTINUED - NONE

HEARINGS CONCLUDED

ALJ Lirag I.16-10-015 - Order Instituting Investigation Into the November 2016 Submission of San Diego Gas & Electric Company's Risk Assessment and Mitigation Phase,And Related Matter:I.16-10-016Prehearing Conference held and concluded

HEARINGS

Dates in parentheses following the word “also” are subject to change without notice. The assigned Commissioner’s name is listed next to the proceedings as matter of record; the assigned Commissioner may not be present at the hearing.

(PHC) = Prehearing Conference (WS) = Workshop (OA) = Oral Argument(PPH) = Public Participation Hearing (STC) = Status Conference (SEC) = Settlement Conference(EH) = Evidentiary Hearing (L&M) = Law & Motion (CA) = Closing Argument

12/16/161:00 p.m.ALJ MilesComr Randolph

A.16-08-015 (PHC) - Application of Chariot Transit Inc., dba Chariot Transit for authority to operate as a scheduled, and on-call passenger stage corporation between points in San Francisco and surrounding counties including Alameda, San Francisco, Marin, Contra Costa, San Mateo, and Santa Clara counties and various locations in downtown San Francisco and surrounding counties including Alameda, San Francisco, Marin, Contra Costa, San Mateo, and Santa Clara counties; and to establish a Zone of Rate Freedom,Commission Courtroom, San Francisco

12/16/162:00 p.m.ALJ MikitaComr Picker

C.16-10-005 (PHC) - Charles Paul Varvayanis, Complainant vs. Odd Fellows Sierra Recreation Association, Defendant,Commission Courtroom, San Francisco

12/19/1610:00 a.m.ALJ YackninComr Peterman

A.16-10-019 (PHC) - Application of Pacific Gas and Electric Company to Recover Costs Recorded in the Catastrophic Event Memorandum Account Pursuant to Public Utilities Code Section 454.9(U39E).Commission Courtroom, San Francisco

Page 14

Page 15: Friday, December 16, 2016 - Californiadocs.cpuc.ca.gov/PublishedDocs/Published/G000/M167/…  · Web view... Practice and Procedure Rule 8.1(c) such that no ex parte communication

California Public Utilities Commission Daily Calendar Friday, December 16, 2016

01/03/1710:00 a.m.ALJ BemesderferALJ HagaComr Peterman

A.16-10-020 (PHC) - Application of San Pablo Bay Pipeline Company LLC (PLC29) for authority, pursuant to Public Utilities Code Section 455.3, to increase its rates for pipeline transportation services within California,Commission Courtroom, San Francisco

01/09/172:00 p.m. & 7:00 p.m.ALJ Pro Tem GoldbergALJ TsenComr Randolph

A.15-09-010 (PPH) - Application of San Diego Gas & Electric Company (U902E) for Authorization to Recover Costs Related to the 2007 Southern California Wildfires Recorded in the Wildfire Expense Memorandum Account (WEMA),California Center for the Art Escondido, Conference Center – Salon 1 Room, 340 North Escondido Blvd., Escondido, CA 92025

01/10/176:00 p.m.ALJ ParkComr Picker

A.16-07-002 (PPH) - Application of California-American Water Company (U210W) for Authorization to Increase its Revenues for Water Service by $34,559,200 or 16.29% in the year 2018, by $8,478,500 or 3.43% in the year 2019, and by $7,742,600 or 3.03% in the year 2020,Mark West Elementary Campus – Multi-Purpose Room, 4600 Lavell Road, Santa Rosa, CA 95403

01/11/1710:00 a.m.ALJ SemcerComr Peterman

R.14-03-003 (PHC) - Order Instituting Rulemaking to Address Natural Gas Distribution Utility Cost and Revenue Issues Associated with Greenhouse Gas Emissions,Commission Courtroom, San Francisco

01/12/1710:00 a.m.ALJ AyoadeComr Randolph

A.16-08-009 (PHC) - Joint Application of Webpass Telecommunications, LLC (U7278C) and Google Fiber Inc. for Approval of a Transfer of Control of Webpass Telecommunications, LLC,Commission Courtroom, San Francisco

01/17/176:00 p.m.ALJ ParkComr Picker

A.16-07-002 (PPH) - Application of California-American Water Company (U210W) for Authorization to Increase its Revenues for Water Service by $34,559,200 or 16.29% in the year 2018, by $8,478,500 or 3.43% in the year 2019, and by $7,742,600 or 3.03% in the year 2020,Palm Garden Hotel – Palm I, 495 North Ventu Park Road, Thousand Oaks, CA 91320

01/18/176:00 p.m.ALJ ParkComr Picker

A.16-07-002 (PPH) - Application of California-American Water Company (U210W) for Authorization to Increase its Revenues for Water Service by $34,559,200 or 16.29% in the year 2018, by $8,478,500 or 3.43% in the year 2019, and by $7,742,600 or 3.03% in the year 2020,Courtyard Marriott Hotel – Salon B, 700 W. Huntington Drive, Monrovia, CA 91016

01/23/1710:00 a.m.ALJ Pro Tem GoldbergALJ TsenComr Randolph

A.15-09-010 (EH) - Application of San Diego Gas & Electric Company (U902E) for Authorization to Recover Costs Related to the 2007 Southern California Wildfires Recorded in the Wildfire Expense Memorandum Account (WEMA),Commission Courtroom, San Francisco(Also January 24 – 27)

01/23/1710:30 a.m.ALJ MilesComr Randolph

C.16-05-005 (EH) - Vivian Goria and George Goria, Complainants vs. San Diego Gas & Electric Company (U902E), Defendant,Commission Courtroom, San Francisco(Also January 24)

01/24/171:30 p.m. & 6:00 p.m.ALJ ParkComr Picker

A.16-07-002 (PPH) - Application of California-American Water Company (U210W) for Authorization to Increase its Revenues for Water Service by $34,559,200 or 16.29% in the year 2018, by $8,478,500 or 3.43% in the year 2019, and by $7,742,600 or 3.03% in the year 2020,Oldemeyer Center – Laguna Grande Hall, 986 Hilby Avenue, Seaside, CA 93955

Page 15

Page 16: Friday, December 16, 2016 - Californiadocs.cpuc.ca.gov/PublishedDocs/Published/G000/M167/…  · Web view... Practice and Procedure Rule 8.1(c) such that no ex parte communication

California Public Utilities Commission Daily Calendar Friday, December 16, 2016

01/25/176:00 p.m.ALJ ParkComr Picker

A.16-07-002 (PPH) - Application of California-American Water Company (U210W) for Authorization to Increase its Revenues for Water Service by $34,559,200 or 16.29% in the year 2018, by $8,478,500 or 3.43% in the year 2019, and by $7,742,600 or 3.03% in the year 2020,Chualar Union Elementary School – Board Room, 24285 Lincoln Street, Chualar, CA 93925

01/26/1710:00 a.m.ALJ KimComr Randolph

A.14-12-003 (PHC) - Application of the City of San Diego for Authority to modify the Park Boulevard At-Grade Crossing of three light rail vehicle tracks of the Metropolitan Transit System and two heavy rail tracks of the BNSF Railway Company in the City of San Diego, County of San Diego, California,Commission Courtroom, San Francisco

02/01/179:30 a.m.ALJ AyoadeComr Peterman

C.16-07-012 (EH) - DC Universal, LLC, Complainant vs. California American Water Company (U210W), Defendant,Commission Courtroom, San Francisco

02/02/1710:00 a.m.ALJ KellyComr Picker

R.15-06-009 (PHC) - Order Instituting Rulemaking Regarding Policies, Procedures and Rules for Regulation of Physical Security for the Electric Supply Facilities of Electrical Corporations Consistent with Public Utilities Code Section 364 and to Establish Standards for Disaster and Emergency Preparedness Plans for Electrical Corporations and Regulated Water Companies Pursuant to Public Utilities Code Section 768.6,Commission Courtroom, San Francisco

02/07/179:30 a.m.ALJ Kim

ECP - C.16-10-017 (EH) - Childrens’ Cardiology of the Bay Area, Inc., Complainant vs. Preferred Long Distance, Inc., dba Telplex (U5502C), Defendant,Commission Courtroom, San Francisco

02/09/176:00 p.m.ALJ ParkComr Picker

A.16-07-002 (PPH) - Application of California-American Water Company (U210W) for Authorization to Increase its Revenues for Water Service by $34,559,200 or 16.29% in the year 2018, by $8,478,500 or 3.43% in the year 2019, and by $7,742,600 or 3.03% in the year 2020,City of Imperial Beach – Community Room, 825 Imperial Beach Blvd., Imperial Beach, CA 91932

03/06/1710:30 a.m.ALJ MilesComr Florio

A.16-03-009 (EH) - In the Matter of the Application of Crimson California Pipeline L.P. (PLC-26) for Authority to Increase Rates for Its Crude Oil Pipeline Services,Commission Courtroom, San Francisco(Also March 7 – 10 at 10:00 a.m.)

03/13/1710:00 a.m.ALJ HagaComr Peterman

A.16-07-017 (EH) - Application of West Coast Gas Company to Revise its Gas Rates and Tariffs. (U910G),Commission Courtroom, San Francisco(Also March 14 - 15)

04/18/1710:00 a.m.ALJ AllenComr Picker

A.16-08-006 (EH) - Application of Pacific Gas and Electric Company for Approval of the Retirement of Diablo Canyon Power Plant, Implementation of the Joint Proposal, And Recovery of Associated Costs Through Proposed Ratemaking Mechanisms (U39E),Commission Courtroom, San Francisco(Also April 19 – 21 and April 24 – 28)

04/24/179:30 a.m.ALJ CookeComr Picker

I.16-07-007 (EH) - Order Instituting investigation on the Commission’s Own Motion into the Operations and Practices of Southern California Edison Company; Notice of Opportunity for Hearing; and Order to Show Cause Why the Commission Should not Impose Fines and Sanctions for Major Power Outages in the City of Long Beach on July 15, 2015 to July 20, 2015, and on July 30 to August 3, 2015,Commission Courtroom, San Francisco(Also April 25 - 28)

Page 16

Page 17: Friday, December 16, 2016 - Californiadocs.cpuc.ca.gov/PublishedDocs/Published/G000/M167/…  · Web view... Practice and Procedure Rule 8.1(c) such that no ex parte communication

California Public Utilities Commission Daily Calendar Friday, December 16, 2016

05/01/1710:00 a.m.ALJ ParkComr Picker

A.16-07-002 (EH) - Application of California-American Water Company (U210W) for Authorization to Increase its Revenues for Water Service by $34,559,200 or 16.29% in the year 2018, by $8,478,500 or 3.43% in the year 2019, and by $7,742,600 or 3.03% in the year 2020,Commission Courtroom, San Francisco(Also May 2 – 5 and May 8 – 12)

NOTICE OF ALL-PARTY MEETINGS (PU Code § 1701.3(c))(A quorum of Commissioners and/or their staff may attend All-Party Meetings noticed on the Daily Calendar.)

NONE

RESOLUTION REGARDING RATIFICATION OF PRELIMINARY DETERMINATIONS OF CATEGORY

For purposes of Rule 9.2(c), notice of the assignment is the day the assignments associated with this preliminary categorization document appear in the Daily Calendar following the Commission business meeting.

(12/15/16) ALJ 176-3390 Ratification of preliminary determinations of category for proceedings initiated by application. The preliminary determinations are pursuant toRule 7.1 of the Commission's Rules of Practice and Procedure.Adopted. The preliminary determination schedule is shown below.

PRELIMINARY DETERMINATION SCHEDULESResolution ALJ 176-3390 (12/15/16) ASSIGNMENTS

NUMBER

TITLEPROPOSED CATEGORY

PRELIM.CATEGORY HEARING COMR ALJ

A16-12-002 San Diego Gas & Electric Company, Southern California Edison Company, Joint Application of Southern California Edison Company (U338E) and San Diego Gas & Electric Company (U902E) For Cost Recovery of the Wheeler North Reef Expansion Project Marine Mitigation Costs.

Ratesetting Ratesetting YES Picker Houck

Page 17