Freyssinet nuclear Nuclear_En v02_BD.pdf2 Freyssinet nuclear Freyssinet offers integrated technical...

12

Transcript of Freyssinet nuclear Nuclear_En v02_BD.pdf2 Freyssinet nuclear Freyssinet offers integrated technical...

Page 1: Freyssinet nuclear Nuclear_En v02_BD.pdf2 Freyssinet nuclear Freyssinet offers integrated technical solutions in construction and repair in the world. The company is the world leader
Page 2: Freyssinet nuclear Nuclear_En v02_BD.pdf2 Freyssinet nuclear Freyssinet offers integrated technical solutions in construction and repair in the world. The company is the world leader

2

Freyssinet nuclearFreyssinet offers integrated technical solutions in construction and repair in the world. The company is the world leader in its specialist areas, among which post-tensioning, seismic protection and construction methods. Since its creation, Freyssinet has been involved in numerous nuclear power plant projects across five continents.Our teams support you throughout the design, manufacturing and procurement of related specific equipment.Freyssinet is currently providing post-tensioning systems for various designs: a French EPR (Olkiluoto, Taishan, Flamanville), a Russian VVER-1200 (Rostov, Belarussia), a Chinese Hualong (Fuqing, FangChengGang).Cover photograph: Flamanville, France

FreyssinetFreyssinet offers integrated technical solutions in two major fields: construction and structural repair, under the Foreva® label.

Freyssinet is involved in numerous projects across five continents, making it the world leader in its specialist areas of:

· prestressing, · cable-stayed structures, · construction methods, · structural accessories, · structural repair and reinforcement, and · structural maintenance.

These activities are performed on a wide range of structures, including civil engineering structures, buildings, skyscrapers, industrial installations, power production plants, offshore platforms, transport and sporting infrastructure, and more.

For more information, visit: www.freyssinet.com

Page 3: Freyssinet nuclear Nuclear_En v02_BD.pdf2 Freyssinet nuclear Freyssinet offers integrated technical solutions in construction and repair in the world. The company is the world leader

3

Nuclear reactor Jules HorowitzFrance

Page 4: Freyssinet nuclear Nuclear_En v02_BD.pdf2 Freyssinet nuclear Freyssinet offers integrated technical solutions in construction and repair in the world. The company is the world leader

Taishan 1China

Ling Ao 2China

Page 5: Freyssinet nuclear Nuclear_En v02_BD.pdf2 Freyssinet nuclear Freyssinet offers integrated technical solutions in construction and repair in the world. The company is the world leader

5

Taishan 2China

Page 6: Freyssinet nuclear Nuclear_En v02_BD.pdf2 Freyssinet nuclear Freyssinet offers integrated technical solutions in construction and repair in the world. The company is the world leader

6

Tian WanChina

BalakovoRussia

Page 7: Freyssinet nuclear Nuclear_En v02_BD.pdf2 Freyssinet nuclear Freyssinet offers integrated technical solutions in construction and repair in the world. The company is the world leader

7

Kalinin 4Russia

OlkiluotoFinland

Page 8: Freyssinet nuclear Nuclear_En v02_BD.pdf2 Freyssinet nuclear Freyssinet offers integrated technical solutions in construction and repair in the world. The company is the world leader

8

Rostov 3Russia

Page 9: Freyssinet nuclear Nuclear_En v02_BD.pdf2 Freyssinet nuclear Freyssinet offers integrated technical solutions in construction and repair in the world. The company is the world leader

9COUNTRY AND STATION NAME OWNER YEAR OF

COMMISSIONNING REACTOR TYPE POWER OUTPUT (MW)

ANCHORAGE TYPE

TYPE OF PRESTRESSING

FRANCEEPR Flamanville EDF Under construction EPR 1600 55 C 16 Bonded

Civaux 2 EDF 1998 PWR 1300 37 K 16 & 55 C 15 BondedCivaux 1 EDF 1996 PWR 1300 37 K 16 BondedChooz 2 EDF 1989 PWR 1300 37 K 16 BondedPenly 2 EDF 1989 PWR 1300 37 K 16 Bonded

Cattenom 4 EDF 1988 PWR 1300 37 K 16 BondedChooz 1 EDF 1988 PWR 1300 37 K 16 Bonded

Golfech 2 EDF 1988 PWR 1300 37 K 16 BondedPenly 1 EDF 1988 PWR 1300 37 K 16 Bonded

Belleville 2 EDF 1987 PWR 1300 37 K 16 BondedCattenom 3 EDF 1987 PWR 1300 37 K 16 BondedGolfech 1 EDF 1987 PWR 1300 37 K 16 BondedNogent 2 EDF 1987 PWR 1300 37 K 16 Bonded

Belleville 1 EDF 1986 PWR 1300 37 K 16 BondedNogent 1 EDF 1986 PWR 1300 37 K 16 Bonded

Cattenom 1 EDF 1985 PWR 1300 37 K 15 BondedCattenom 2 EDF 1985 PWR 1300 37 K 15 Bonded

Chinon 3 EDF 1985 PWR 900 19 K 15 BondedChinon 4 EDF 1985 PWR 900 19 K 15 Bonded

Flamanville 2 EDF 1985 PWR 1300 37 K 15 BondedGravelines 5 EDF 1985 PWR 900 19 K 15 BondedGravelines 6 EDF 1985 PWR 900 19 K 15 Bonded

Paluel 4 EDF 1985 PWR 1300 37 K 15 BondedSaint Alban 2 EDF 1985 PWR 1300 37 K 15 Bonded

Cruas 3 EDF 1984 PWR 900 37 K 15 BondedCruas 4 EDF 1984 PWR 900 37 K 15 Bonded

Flamanville 1 EDF 1984 PWR 1300 37 K 15 BondedPaluel 3 EDF 1984 PWR 1300 37 K 15 Bonded

Saint Alban 1 EDF 1984 PWR 1300 37 K 15 BondedCruas 1 EDF 1983 PWR 900 37 K 15 BondedCruas 2 EDF 1983 PWR 900 37 K 15 BondedPaluel 1 EDF 1983 PWR 1300 37 K 15 BondedPaluel 2 EDF 1983 PWR 1300 37 K 15 BondedBlayais 3 EDF 1982 PWR 900 19 K 15 Bonded

FRANCE 60

1 unit 70 MW34 units 900 MW24 units 1300 MW1 units 1600MW

CHINE 35

2 units 600 MW4 units 700 MW

26 units 900 MW4 units 1000Mw2 units 1600MW

BIELORUSSIA 2 2 units 1200 MW

BELGIUM 5 5 units 900 MW

SPAIN 31 unit 500 MW2 units 900 MW

SOUTH AFRICA 2 2 units 900 MW

PAKISTAN 51 unit 125 MW2 units 300 MW2 units 1000 MW

USA 14 14 units725 MW

à 1250 MW

U.K. 52 units 530 MW

2 units 850 MW

1 unit 1300 MW

TAIWAN 2 2 units 950 MW

INDIA 86 units 220 MW

2 units 1000 MW

SOUTH KOREA 2 2 units 900 MW

IRAN 22 units 900 MW

(stopped under construction)

RUSSIA 107 units 1000MW

3 units 1200MW

FINLAND 1 1 units 1600MW

Prestressed Concrete in Nuclear Power StationsList of references

Total = 150 Pressured Vessels

Page 10: Freyssinet nuclear Nuclear_En v02_BD.pdf2 Freyssinet nuclear Freyssinet offers integrated technical solutions in construction and repair in the world. The company is the world leader

10

COUNTRY AND STATION NAME OWNER YEAR OF

COMMISSIONNING REACTOR TYPE POWER OUTPUT (MW)

ANCHORAGE TYPE

TYPE OF PRESTRESSING

Blayais 4 EDF 1982 PWR 900 19 K 15 BondedChinon 1 EDF 1982 PWR 900 19 K 15 BondedChinon 2 EDF 1982 PWR 900 19 K 15 BondedBlayais 1 EDF 1981 PWR 900 19 K 15 BondedBlayais 2 EDF 1981 PWR 900 19 K 15 Bonded

Dampierre 3 EDF 1981 PWR 900 19 K 15 BondedDampierre 4 EDF 1981 PWR 900 19 K 15 BondedGravelines 3 EDF 1981 PWR 900 19 K 15 BondedGravelines 4 EDF 1981 PWR 900 19 K 15 Bonded

Saint Laurent 1 EDF 1981 PWR 900 19 K 15 BondedSaint Laurent 2 EDF 1981 PWR 900 19 K 15 Bonded

Tricastin 3 EDF 1981 PWR 900 19 K 15 BondedTricastin 4 EDF 1981 PWR 900 19 K 15 Bonded

Dampiere 2 EDF 1980 PWR 900 19 K 15 BondedDampierre 1 EDF 1980 PWR 900 19 K 15 BondedGravelines 1 EDF 1980 PWR 900 19 K 15 BondedGravelines 2 EDF 1980 PWR 900 19 K 15 BondedTricastin 1 EDF 1980 PWR 900 19 K 15 BondedTricastin 2 EDF 1980 PWR 900 19 K 15 BondedBugey 4 EDF 1978 PWR 900 12 T 15 BondedBugey 5 EDF 1978 PWR 900 12 T 15 Bonded

Fessenheim 2 EDF 1978 PWR 890 12 T 15 BondedBugey 2 EDF 1977 PWR 900 12 T 15 BondedBugey 3 EDF 1977 PWR 900 12 T 15 Bonded

Fessenheim 1 EDF 1977 PWR 890 12 T 15 BondedMont d'Arrée CEA/EDF 1967 GCHWR 70 12 T 13 BondedBELGIUM

Doel 4 INDIV. DOEL 1984 PWR 900 37 K 15 BondedTihange 3 SEMO 1984 PWR 900 12 et 37 K 15 Bonded

Doel 3 INDIV. DOEL 1982 PWR 900 37 K 15 BondedTihange 2 SEMO 1981 PWR 900 12 T 15 BondedTihange 1 SEMO 1975 PWR 870 12 T 15 Bonded

CHINAFang Cheng Gang 3 GNEC Under construction (Hualong) PWR 900 55 C 15 BondedFang Cheng Gang 4 GNEC Under construction (Hualong) PWR 900 55 C 15 Bonded

Fuqing 5 CNNC/CGNPC Under construction (Hualong) PWR 1000 55 C 15 BondedFuqing 6 CNNC/CGNPC Under construction (Hualong) PWR 1000 55 C 15 Bonded

Hongyanhe 5 CNEC Under construction PWR 900 19/38 K 15 BondedHongyanhe 6 CNEC Under construction PWR 900 19/38 K 15 BondedTaïshan 1 EPR CGNEC Under construction EPR PWR 1600 55 C 15 BondedTaishan 2 EPR CGNEC Under construction EPR PWR 1600 55 C 15 BondedYangjiang 5 GNEC Under construction PWR 900 19/37 K 15 BondedYangjiang 6 GNEC Under construction PWR 900 19/37 K 15 BondedYangjiang 4 GNEC 2017 PWR 900 19/37 K 15 Bonded

Fang Cheng Gang 1 GNEC 2016 PWR 900 19/37 K 15 BondedFang Cheng Gang 2 GNEC 2016 PWR 900 19/37 K 15 Bonded

Hongyanhe 4 GNEC 2016 PWR 900 19/37 K 15 BondedNingde 4 GNEC 2016 PWR 900 19/37 K 15 Bonded

Hongyanhe 3 GNEC 2015 PWR 900 19/37 K 15 BondedNingde 3 GNEC 2015 PWR 900 19/37 K 15 Bonded

Yangjiang 2 GNEC 2015 PWR 900 19/37 K 15 BondedYangjiang 3 GNEC 2015 PWR 900 19/37 K 15 Bonded

Hongyanhe 2 GNEC 2014 PWR 900 19/37 K 15 BondedNingde 2 GNEC 2014 PWR 900 19/37 K 15 Bonded

Yangjiang 1 GNEC 2014 PWR 900 19/37 K 15 BondedHongyanhe 1 GNEC 2013 PWR 900 19/37 K 15 Bonded

Ningde 1 GNEC 2013 PWR 900 19/37 K 15 BondedLing Ao 4 GNEC 2011 PWR 900 19/37 K 15 BondedLing Ao 3 GNEC 2010 PWR 900 19/37 K 15 BondedTianwan 2 JNPC 2008 VVER 1000 55 C 16 BondedTianwan 1 JNPC 2006 VVER 1000 55 C 16 Bonded

Quinshan II extension 2 NPQJVC 2004 PWR 600 19/37 K 15 BondedLing Ao 2 LANPC 2002 PWR 900 19/37 K 15 Bonded

Quinshan II extension 1 NPQJVC 2002 PWR 600 19/37 K 15 BondedQuinshan III unit 2 TQNPC 2002 PHWR 700 25/37 C 15 Bonded

Ling-Ao 1 LANPC 2001 PWR 900 19/37 K 15 BondedQuinshan III unit 1 TQNPC 2001 PHWR 700 25/37 C 15 Bonded

BIELORUSSIABielorusskaya 1 / Ostrovets 1 Atomstroyexport Under construction VVER 1200 55 C 15 UnbondedBielorusskaya 2 / Ostrovets 2 Atomstroyexport Under construction VVER 1200 55 C 15 Unbonded

Page 11: Freyssinet nuclear Nuclear_En v02_BD.pdf2 Freyssinet nuclear Freyssinet offers integrated technical solutions in construction and repair in the world. The company is the world leader

11

FINLANDOlkiluoto 3 TVO / AREVA Under construction EPR 1600 55 C 15 Bonded

COUNTRY AND STATION NAME OWNER YEAR OF

COMMISSIONNING REACTOR TYPE POWER OUTPUT (MW)

ANCHORAGE TYPE

TYPE OF PRESTRESSING

Quinshan II unit 1 NPQJVC 1999 PWR 600 19/37 K 15 BondedQuinshan II unit 2 NPQJVC 1999 PWR 600 19/37 K 15 Bonded

Day Bay 2 GNPJVC 1993 PWR 900 19/37 K 16 BondedDay Bay 1 GNPJVC 1992 PWR 900 19/37 K 16 Bonded

INDIAKudankulam 2 NPCIL 2016 VVER 1000 55 C 15 UnbondedKudankulam 1 NPCIL 2014 VVER 1000 55 C 15 Unbonded

Narora 2 Dept. AE 1983 PHWR 220 12 V 13 BondedNarora 1 Dept. AE 1982 PHWR 220 12 V 13 Bonded

Madras Mapp 2 Dept. AE 1980 PHWR 220 12.8 BondedMadras Mapp 1 Dept. AE 1978 PHWR 220 12.8 Bonded

Rajasthan 2 Dept. AE 1978 PHWR 202 12.7 BondedRajasthan 1 Dept. AE 1973 PHWR 202 12.7 Bonded

IRANKarun 1 AEOI Not completed PWR 900 19 K 15 BondedKarun 2 AEOI Not completed PWR 900 19 K 15 Bonded

PAKISTANKarachi 2 CZEC Under construction (Hualong) PWR 1000 55 C 15 BondedKarachi 3 CZEC Under construction (Hualong) PWR 1000 55 C 15 BondedChasma 2 CZEC 2011 PWR 300 19 K 15 BondedChasma 1 CZEC 1999 PWR 300 19 K 15 BondedKanupp PAEC 1972 PHWR 125 12 T 15 Bonded

RUSSIARostov 4 Rosenenergoatom Under construction VVER 1000 46 C 15 Unbonded

Kaliningrad 1 Rosenenergoatom Stand-by VVER 1200 55 C 15 UnbondedBalakovo 2 Rosenenergoatom Replacement of cables VVER 1000 46 C 15 UnbondedKalinine 1 Rosenenergoatom Replacement of cables VVER 1000 46 C 15 UnbondedKalinine 2 Rosenenergoatom Replacement of cables VVER 1000 46 C 15 Unbonded

Novovoronej 5 Rosenenergoatom Replacement of cables VVER 1000 37 C 15 UnbondedNovovoronezh 7 Rosenenergoatom 2017 VVER 1200 55 C 15 UnbondedNovovoronezh 6 Rosenenergoatom 2016 VVER 1200 55 C 15 Unbonded

Rostov 3 Rosenenergoatom 2015 VVER 1000 46 C 15 UnbondedKalinine 4 Rosenenergoatom 2012 VVER 1000 46 C 15 Unbonded

SOUTH AFRICAKoeberg 1 ESCOM 1983 PWR 900 19 K 15 BondedKoeberg 2 ESCOM 1983 PWR 900 19 K 15 Bonded

SOUTH KOREAUljin Knu 10 KEPCO 1987 PWR 900 19/37 K 15 BondedUljin Knu 9 KEPCO 1986 PWR 900 19/37 K 15 BondedSPAIN

Asco 2 FECSA 1984 PWR 900 37 K 15 UnbondedAsco 1 FECSA 1983 PWR 900 37 K 15 Unbonded

Vandellos 1 HIFRENSA 1972 GCR 480 12 T 15 UnbondedTAIWANMaanshan 6 TPC 1984 PWR 950 37 K 15 UnbondedMaanshan 5 TPC 1983 PWR 950 37 K 15 Unbonded

UNITED KINGDOMSizewell B NEPLC 1996 PWR 1300 37 K 15 DS Unbonded

Wylfa 2 CEGB 1972 MAGNOX 850 12 T 15 UnbondedWylfa 1 CEGB 1971 MAGNOX 850 12 T 15 Unbonded

Oldbury 2 CEGB 1968 MAGNOX 530 12 T 15 UnbondedOldbury 1 CEGB 1967 MAGNOX 530 12 T 15 Unbonded

UNITED STATESSouth Texas 2 HLP/CenPL/SAn 1982 PWR 1250 186.1/4" UnbondedSouth Texas 1 HLP/CenPL/SAn 1980 PWR 1250 186.1/4" Unbonded

Arkansas 2 APL 1977 PWR 915 90.1/4" UnbondedChrystal River FPC 1977 PWR 825 163.7 UnbondedClavert Cliffs 2 BGE 1977 PWR 845 90.1/4" Unbonded

Trojan Port GE/PacPL 1976 PWR 1130 186.1/4" UnbondedClavert Cliffs 1 BGE 1975 PWR 845 90.1/4" Unbonded

Millstone 1 CPL/HEL/WME 1975 PWR 830 186.1/4" UnbondedArkansas 1 APL 1974 PWR 850 90.1/4" UnbondedOconee 2 DUKE 1974 PWR 890 90.1/4" UnbondedOconee 3 DUKE 1974 PWR 890 90.1/4" UnbondedOconee 1 DUKE 1973 PWR 890 90.1/4" Unbonded

Turkey Point 4 FPL 1973 PWR 725 90.1/4" UnbondedTurkey Point 3 FPL 1972 PWR 725 90.1/4" Unbonded

Page 12: Freyssinet nuclear Nuclear_En v02_BD.pdf2 Freyssinet nuclear Freyssinet offers integrated technical solutions in construction and repair in the world. The company is the world leader

© 2017 Soletanche Freyssinet - The text, photos and other information contained in this catalogue are the property of the Soletanche Freyssinet Group.All reproduction, display or other use without the prior consent of Soletanche Freyssinet is prohibited. Soletanche Freyssinet promotes the use of paper pulp from sustainably managed forests. The paper used in this catalogue is certified in accordance with the stringent rules of the PEFC (Program for the Endorsement of Forest Certification).

Publication: 06/2017 - Printed in France

www.freyssinet.com

Find us on: