Fréjus site pre-study and beyond
description
Transcript of Fréjus site pre-study and beyond
NNN07 - Hamamatsu 05.10.2007 M. Russo - Switzerland
Fréjus site pre-study and beyond
NNN07 – HAMAMATSU
Workshop on Next Generation Nucleon Decay and Neutrino Detectors
Hamamatsu 05.10.2007Hamamatsu 05.10.2007 M. RussoM. Russo
Site knowledge of Fréjus area
State of studies for enlargement of undreground lab
Further developements and items to consider for next stage design
NNN07 - Hamamatsu 05.10.2007 M. Russo - Switzerland
TheThe AreaArea
670 km from Paris (F)
240 km from Milan (I)
190 km from Geneva (CH)
70 km from Turin (I)
200 km from Lyon (F)
NNN07 - Hamamatsu 05.10.2007 M. Russo - Switzerland
Fréjus facilities and future projectsFréjus facilities and future projects
IN2P3 (CNRS) and DAPNIA (CEA) run the Modane Underground Laboratory (LSM) The Lab Facilities are composed by:
External LSM buildings (under
construction)
LSM Project for a 60’000 m3 extension to
be constructed according to on-going
projects (safety tunnel)A cavity of about 3’500 m3 at middle of Fréjus Road Tunnel in French Territory
Project for Large scale underground laboratory (1’000’000 m3)
For 3 types of experiments (Glacier, Memphys, Lena)
NNN07 - Hamamatsu 05.10.2007 M. Russo - Switzerland
The Main Underground Projects in AreaThe Main Underground Projects in Area
Historical tunnelling in the area since 1480 (Pertuis di Visio)
…existing Fréjus Railway tunnel (1857-1871) 12.2 km …
…Fréjus Road Tunnel safety tunnel, 12.8 km…
…Lyon-Turin Railway base tunnel, ~57 km
…existing Fréjus Motorway tunnel (1975 -1978) , 12.8 km…
NNN07 - Hamamatsu 05.10.2007 M. Russo - Switzerland
The underground LSM locationThe underground LSM location
Fréjus tunnel entrance
Railw
ay t
un
nel (a
ctu
al)
LSM underground facilities
NNN07 - Hamamatsu 05.10.2007 M. Russo - Switzerland
The On-Going Safety Tunnel ProjectThe On-Going Safety Tunnel Project
Frejus safety tunnel project (safety tunnel to road tunnel):Aims to raise safety level of Fréjus Motorway tunnel by (Governments requirements):
• Adding 34 new shelters (every max 400 m) for auto-rescue of users;• Provide a safe issue for fire brigades for rescue purposes;• Provide an alternative issue to attack and manage fires and accidents in tunnel;• Provide new rooms for technical equipment renewals;• Accede to LSM without interferring with tunnel operation;• Possibility of maintenance of tunnel equipments not affecting Tunnel operation;• Provide fast access in case of accident.
• Internal safety tunnel diameter 8.00 m (clearance profile 6.6x4.0m)• 5 carriage cross-adits (bypass)• Longitudinal ventilation of safety tunnel• 2 underground ventilation plants• Portals energy supply up to 8 MW on each side
Frejus safety tunnel project 2006 (approved by Governments on 11.12.06):
NNN07 - Hamamatsu 05.10.2007 M. Russo - Switzerland
Foreseen new laboratory rooms (60000 m3)Foreseen new laboratory rooms (60000 m3)
OPTION 2
OPTION 1
• 2 New Halls• exc. A=37’500 m3 (opt.1)• exc. A=41’000 m3 (opt.2)• exc. B=15’000 m3
• by-pass tot. exc. 14’415 m3
• Safety Tunnel not modified• No interruptions of LSM activities• Flexibility for future upgrades• Favourable orientation• Excavated volume may be accomodated at the Safety Tunnel Deposit (F side)
NNN07 - Hamamatsu 05.10.2007 M. Russo - Switzerland
Megatonne project (SETEC-STONE)Megatonne project (SETEC-STONE)
Position between railway and road tunnel
Up to 5 independent shafts (various dimensions investigated)
130 m distance between shafts
Shafts of max diameter 65 m and max height 80 m
Total estimation of project (construction) 40+40 M € per shaft
<65 m
<8
0
m
<130 m
NNN07 - Hamamatsu 05.10.2007 M. Russo - Switzerland
Megatonne project (SETEC-STONE)Megatonne project (SETEC-STONE)
NNN07 - Hamamatsu 05.10.2007 M. Russo - Switzerland
The GeologyThe Geology
Trias Series
LSM Underground Facilities~1800 m overburden
Calcareous schists
NNN07 - Hamamatsu 05.10.2007 M. Russo - Switzerland
Geotechnics and Excavation ResultsGeotechnics and Excavation Results
• Geology: Calcitic Schists UCS (30-80 MPa)• Overburden: about 1800 m • Fractures 4 main systems• Exacavation profitable orthogonally to actual Tunnel (ENE)• Very little seepage (cracks filled)
•Rock temperature around 30°
Geology
NNN07 - Hamamatsu 05.10.2007 M. Russo - Switzerland
Projects milestones and relationshipsProjects milestones and relationships
Start of safety tunnel excavation
End of safety tunnel excavation
End of safety tunnel equipment
Operability of safety tunnel
2009 2010 2012 20142013 2015 20162011 2017
60
’00
0 m
3
LS
M e
xte
ns.
(3.5
mon
ths
excavatio
n)
Possib
le
sta
rting
p
oin
t Y0
of
“1
Mt”
exte
nsi
on
Y0 +
6 e
nd
of
civ
il work
s
NNN07 - Hamamatsu 05.10.2007 M. Russo - Switzerland
Steps forward (location)Steps forward (location)
Fréjus railway tunnel
(actual)
Fréjus Highway tunnel
Safety tunnel (planned)
40
0
m
Position 1 between railway and highway tunnelUse of exhaust duct of tunnel to site ventilationUnderpass of highway tunnelDifficult mucking through safety tunnelDifficult energy supply (foreseen on opposite side)Difficult ventilation once in service Between two excavations (known area)
Position 2 eastbound of highway
tunnelComplement to small extension (single management and supervision)Mucking through safety tunnelProblematic site ventilation (exhaust)
Location of Megatonne project close to
actual labHigh overburden (~1800 m)Good rock quality (experienced during tunnel excavation)
NNN07 - Hamamatsu 05.10.2007 M. Russo - Switzerland
Roadmap to preliminary designRoadmap to preliminary design
Optimize excavations and final dimensions (i.e. elmininating access, reducing inter-shaft links, optimizing shaft shapes).
Improove geologic knowledge (integrating knowledges from railway tunnel).
Define ventilation requirements of excavation according to design revision and new national regulations
Define needs in terms of cooling and purification equipment
Investigate on:
Compatibility of plannings among safety tunnel and Megatonne Project
Mucking solution via safety tunnel (by belt or by trucks);
Exact definition of interferences among safety tunnel operation and construction works (ventilation, waterelectricity supply, etc…)
Final destination of materials (Environnemental issues, possibility of re-use,…)
Refine costs estimations
NNN07 - Hamamatsu 05.10.2007 M. Russo - Switzerland
Fréjus site pre-study and beyond
NNN07 – HAMAMATSU
Workshop on Next Generation Nucleon Decay and Neutrino Detectors
Hamamatsu 05.10.2007Hamamatsu 05.10.2007 M. RussoM. Russo
Thank-you for your attention
My personal idea of
neutrino