Fred Luna, SBCAG Paul Martinez, Caltrans District 5 April 3, 2013

19
Fred Luna, SBCAG Paul Martinez, Caltrans District 5 April 3, 2013 SBCAG North County Subregional Committee State Route 246 Passing Lanes

description

State Route 246 Passing Lanes. Fred Luna, SBCAG Paul Martinez, Caltrans District 5 April 3, 2013 SBCAG North County Subregional Committee. State Route 246 Passing Lanes. Project Team Caltrans Santa Barbara County Association of Governments ( SBCAG) Santa Barbara County - PowerPoint PPT Presentation

Transcript of Fred Luna, SBCAG Paul Martinez, Caltrans District 5 April 3, 2013

Page 1: Fred Luna, SBCAG Paul Martinez,  Caltrans District  5 April 3, 2013

Fred Luna, SBCAGPaul Martinez, Caltrans District 5

April 3, 2013SBCAG North County Subregional Committee

State Route 246 Passing Lanes

Page 2: Fred Luna, SBCAG Paul Martinez,  Caltrans District  5 April 3, 2013

Project TeamCaltrans

Santa Barbara County Association of Governments (SBCAG)

Santa Barbara County

City of Lompoc

State Route 246 Passing Lanes

Page 3: Fred Luna, SBCAG Paul Martinez,  Caltrans District  5 April 3, 2013

State Route 246 Passing Lanes

Presentation Overview• Project Background

• Implementation under Measure A

• Phase I Improvements

• Corridor Constraints

• Project Status

• Cost and Funding

Page 4: Fred Luna, SBCAG Paul Martinez,  Caltrans District  5 April 3, 2013

State Route 246 Passing LanesBackground

Project Inception:• 2001 PSR looked at a variety of alternatives to achieve the purpose and

need for the projectProject Purpose:• To improve mobility (traffic flow) by reducing the length of traffic queues• To improve sight distance at the intersection of Tularosa Road and reduce

the length and severity of the approaching gradesProject Need:• Vehicles spend 65% of their time behind slower-moving traffic during the

peak hour.• Passing opportunities are limited by oncoming traffic during peak hours• Through traffic is delayed by left-turning traffic.

Page 5: Fred Luna, SBCAG Paul Martinez,  Caltrans District  5 April 3, 2013

State Route 246 Passing LanesBackground

Environmental Studies• In 2006, passing lanes (Alt. 2 of the PSR) were determined to be sufficient

to achieve a satisfactory level of service.• Project Alternative developed that included two sets of passing lanes and

channelization at public road intersections between Cebada Canyon Rd. and Domingos Rd. This became the preferred alternative.

• Environmental and engineering studies completed and the project approved with the preferred alternative in 2010.

• Significant mitigation for California Tiger Salamander proposed including culvert crossing and viaduct near Campbell Pond.

Page 6: Fred Luna, SBCAG Paul Martinez,  Caltrans District  5 April 3, 2013

State Route 246 Passing LanesFull Project

Page 7: Fred Luna, SBCAG Paul Martinez,  Caltrans District  5 April 3, 2013

State Route 246 Passing LanesMeasure A

• Measure A, passed in 2008, included $20 million for Route 246• Full project cost was estimated at $50 million - significant

additional STIP funding was needed to implement• Strategic Plan development identified a way to implement

project in phases to gain near term benefits• Caltrans concurred that western segment would provide

operational benefits alone in the near term

Page 8: Fred Luna, SBCAG Paul Martinez,  Caltrans District  5 April 3, 2013

• Eastbound passing lanes between Cebada Canyon Road and Tularosa Road

• Westbound passing lanes between Hapgood Road and Tularosa Road

• Intersection improvements including left-turn channelization at:• Tularosa Road• Hapgood Road (west)

• Realign roadway and lower the profile at Tularosa Road

State Route 246 Passing LanesWestern Segment

Page 9: Fred Luna, SBCAG Paul Martinez,  Caltrans District  5 April 3, 2013

State Route 246 Passing LanesWestern Segment

Page 10: Fred Luna, SBCAG Paul Martinez,  Caltrans District  5 April 3, 2013

State Route 246 Passing LanesWestern Segment

Tularosa Rd. Intersection • Eastbound Passing Lane• Westbound Passing Lane• Left-turn lane into Tularosa• Profile of highway lowered to improve sight

distance

Page 11: Fred Luna, SBCAG Paul Martinez,  Caltrans District  5 April 3, 2013

State Route 246 Passing LanesWestern Segment

Westbound Passing Lane Ending at Tularosa Rd.

Page 12: Fred Luna, SBCAG Paul Martinez,  Caltrans District  5 April 3, 2013

State Route 246 Passing LanesWestern Segment

Eastbound Passing Lane Approaching Tularosa Rd.

Page 13: Fred Luna, SBCAG Paul Martinez,  Caltrans District  5 April 3, 2013

State Route 246 Passing LanesWestern Segment

Intersection Improvements at Tularosa Rd.

Page 14: Fred Luna, SBCAG Paul Martinez,  Caltrans District  5 April 3, 2013

State Route 246 Passing LanesWestern Segment

Construct left-turn lane at Hapgood Rd. west, begin westbound passing lane.

Page 15: Fred Luna, SBCAG Paul Martinez,  Caltrans District  5 April 3, 2013

State Route 246 Passing LanesWestern Segment

Hapgood Rd. west looking west toward westbound passing lane.

Hapgood Rd. west looking east toward westbound passing lane.

Intersection Improvements at Hapgood Rd.

Page 16: Fred Luna, SBCAG Paul Martinez,  Caltrans District  5 April 3, 2013

Project Status• Environmental Document approved June 2010

(Will be revalidated during PS&E with changed limits)• Right of way acquisition, permitting and mitigation bank

credits for California Tiger Salamander being negotiated• Cooperative agreement between Caltrans and SBCAG

being prepared.• Early summer 2014: Ready to list for advertisement• Fall 2016: Roadway construction complete• Winter 2019: Planting and mitigation complete

State Route 246 Passing LanesWestern Segment

Page 17: Fred Luna, SBCAG Paul Martinez,  Caltrans District  5 April 3, 2013

Funding Plan

State Route 246 Passing LanesWestern Segment

Project Component

Current STIP Funding (x1000)

Measure A(x1000) TOTAL

Environmental and Design $ 6,394   $ 6,394

Right of Way $ 995 $ 750 $ 1,745

Construction $ 3,110 $20,000 $23,110

Total $10,499 $20,750 $31,249

Page 18: Fred Luna, SBCAG Paul Martinez,  Caltrans District  5 April 3, 2013

Comments and Questions

State Route 246 Passing Lanes

Page 19: Fred Luna, SBCAG Paul Martinez,  Caltrans District  5 April 3, 2013

For More Information

ContactPaul Martinez

Caltrans Project Manager at (805) 549-3198

or [email protected]