VERGNET GROUP
• 20 Years of experience in wind and solar
projects grid connected and off grid
• Specialized in renewable projects in remote
areas on an EPC basis.
• Owner patented technology
• Achievement of the first wind project in Nigeria,
grid connected. Katsina wind farm, Katsina state
10MW
Tetiaroa – Polynésie française
FUNDAMENTALS FOR RENEWABLE
PROJECTS DEVELOPMENT : 1st step
• General political will to diversify the energy mix.
• Renewables are a stable source of energy at
constant OPEX prices.
• Identification of the natural resources through a
general masterplan by national entities
• Initiation of the first projects by national entities
• Training of local technical partners, development of
local know how through public/private partnership.
• Development of local fabrications as much as
possible through public incentives.
• Do not use sound effects, they slow down
slide transitions and the noise from projection
computer may distract audience.
FUNDAMENTALS FOR
RENEWABLE PROJECTS
DEVELOPMENT : 2nd step
• Opening of the market for private players : IPPs
for grid connected projects.
• Grid connection facilitation
• Stable legal frame for green IPPs with attractive
feed in tariffs according natural resource.
• Legal securement of PPAs / bank able projects
• Stable legal frame regarding import duties on
necessary imported equipments.
• Stable land law and land permits facilitation
• Do not use sound effects, they slow down
slide transitions and the noise from projection
computer may distract audience.
WIND AND SOLAR
MORE PROJECTS WITH HIGHER
PENETRATION RATIOS WITHOUT
STORAGE
• Wind and solar are fluctuant sources of energy.
• Risks of blackouts are high when overpassing
30% of wind and solar penetration on isolated
grids or weak grids without adapted technology
and know how for grid management.
• Storage costs are still very high despite
technology latest enhancements.
• Maximizing the penetration ratios make projects
more feasible and more cost effective.
Grid
Network analyzer
PV + inverter
Gensets
LOADS Wind turbines + PLC
One or several power analyzers are distributed on the grid
Most of the time, network analyzers are linked with an optical network
Voltage Frequency Current Flickers coef. Harmonics (%) Grid resilience
SCADA
All measured values are transmitted to Hybrid WizardTM
Optical fiber
Power instructions
Power instructions
Hybrid Wizard TM calculates in real-time new power instructions
Nouadhibou / Mauritania : measurement campaign and detailed analyses
Measurement campaign
on the grid
Load flow and steady
state studies
Electro Magnetic
Transient simulations
Short-circuit studies
Harmonics, flicker, etc.
Grid stability must drive the design and the operation of the hybrid system during life cycle
Nouadhibou Capacity factor : with and without safety margins
Capacity factor without safety margins
Capacity factor with safety margins
Max of wind (4,4 MW) and
Test of unforeseen transient events :
• Disconnection of one or several wind turbines
• Disconnection of the whole wind farm
• Starting of power load
• Disconnection of loads
• Disconnection of one diesel group
Risk of blackout
Impossible C = (Pload - Pgenset) / Pwind
Min load for diesel: 800kW (4MW each)
Wind farm maximum (12 m/s) : 4,4 MW
Nouadhibou : Actual average penetration of Renewables since June 2013 (no storage)
Conclusion
• Fundamentals are necessary for renewable
projects development
• Hybrid controlers are necessary to maximize
renewable penetration ratios on average on
weak or isolated grids without any risk of
blackout.
• Business plans are then more attractive for
IPP’s and savings for utilities are increased.
• Costs of storage of energy do not allow to make
large projects economically viable.
Presentation guidelines
• Rather use video clips if sound and recordings
are required for your presentation. Please
discuss this with the organizers so that
arrangements can be made to accommodate
your request.
Presentation guidelines
• Please do not number your slides
• Each slide should have a title
• 9 lines max on a text slide
• Maximum 10 words per line
• Caution: Red, orange or yellow lettering and
lines become unreadable when projected.
Presentation guidelines
• Rather use video clips if sound and recordings
are required for your presentation. Please
discuss this with the organizers so that
arrangements can be made to accommodate
your request.
Presentation guidelines
Use of pictures, graphics, tables, etc. is at the
discretion of the speaker:
• Keep diagrams simple and easy to view
• Make text readable with large font
• Use all space in rectangle
• Make sure your presentation is readable when
printed in black and white
Presentation guidelines
• Branded or company logos are only permitted
on the opening slide.
• Logos (other than that of the event logo) may not
be used throughout the presentation, unless
prior authorization has been obtained from the
organizers.
Presentation guidelines
• Deadline for submission of presentation for
the proceedings: 16 November 2015
• Please ensure that you bring a copy of your
power-point slides with you on a memory stick
the day of your presentation. If you change your
slides please email the organisers asap with the
updated copy.
Presentation guidelines
• For any additional information, please do not
hesitate to contact Natalie Bacon”
Email: [email protected]
• Phone: +27 21 700 3564
• Spintelligent (Pty) Ltd
Phone: +27 21 700 3500