Frank Zimmermann, 2016 - AHK · PDF fileFrank Zimmermann, 2016. ... practice and cost ... 22...

download Frank Zimmermann, 2016 - AHK  · PDF fileFrank Zimmermann, 2016. ... practice and cost ... 22 kV Services: • Evaluation of site survey and flood report • Conceptual design

If you can't read please download the document

Transcript of Frank Zimmermann, 2016 - AHK · PDF fileFrank Zimmermann, 2016. ... practice and cost ... 22...

  • ILF Consulting Engineers (Asia) Ltd.Professional Engineering Services for Photovoltaics in Vietnam

    Frank Zimmermann, 2016

  • Professional Engineering Services for Photovoltaics in Vietnam

    Frank Zimmermann - Biography

    Dipl.-Ing. MBA Frank Zimmermann

    Education:

    1997 2002 Sales: Wholesale and ConsumerSales- and ProjectengineerExport Manager, Frth, de

    2002 2005 Export Manager, Wuxi, cn

    2005 2009 Managing Director, Singapore, sg

    2009 2014 Managing, Haslach i.K., de

    Since 2014 Business Development Manager South East Asia for Renewable Energies,Senior Project Manager Photovoltaics of ILF Asiabased in Bangkok, th

    Sachverstndiger fr Photovoltaik (TV)Certified Expert for Photovoltaic Equipment (TUV)

    page 2

  • Professional Engineering Services for Photovoltaics in Vietnam

    The ILF Group

    ILF at a Glance

    1967 Year of establishment and development in a leading enterprise for engineering, consulting, and project management

    100% Private ownership and independent

    2,000+ Employees worldwide

    40+ Office locations

    6,000+ Projects

    100+ Countries

    220+ Mio. revenue

    ILF Asia

    Regional presence for ASEAN in Bangkok, Thailand

    Core competencies on site: renewable energies, focus on photovoltaic and hydropower

    page 3

  • Professional Engineering Services for Photovoltaics in Vietnam

    The ILF Group

    Service Portfolio

    Each ILF firm is a separate legal entity and has no liability for another such entitys acts or omissions.

    Appraise Select Define Execute Operate Close

    Decision Gates

    BusinessIdentificationBusinessIdentification

    Pre-/ Feasibility StudiesPre-/ Feasibility Studies

    Project FramingProject Framing

    Project DefinitionProject Definition

    Permit Application Design

    Basic Design, FEED, Tender Design

    Environmental & Social Impact Assessment

    Project Management

    Procurement

    Documentation for Investment Decision

    Permit Application Design

    Basic Design, FEED, Tender Design

    Environmental & Social Impact Assessment

    Project Management

    Procurement

    Documentation for Investment Decision

    Project RealisationProject Realisation

    Supply Chain Management

    Detailed Design

    Design Review

    Project Management

    Construction Supervision

    Commissioning & Trial Operation

    Supply Chain Management

    Detailed Design

    Design Review

    Project Management

    Construction Supervision

    Commissioning & Trial Operation

    Business ControlBusiness Control

    Operations Audit

    Due Diligence

    Optimisation Studies

    Modification Planning

    Rehabilitation Planning

    Maintenance Support

    Operations Audit

    Due Diligence

    Optimisation Studies

    Modification Planning

    Rehabilitation Planning

    Maintenance Support

    Business ClosureBusiness Closure

    Project Life Cycle

    ILFServices

    Due Diligence

    Conceptual Design

    Environmental & Social Impact Assessment

    Execution Strategies

    Due Diligence

    Conceptual Design

    Environmental & Social Impact Assessment

    Execution Strategies

    Due Diligence

    Decommissio-ning Planning

    Commission-ing

    Due Diligence

    Decommissio-ning Planning

    Commission-ing

  • Professional Engineering Services for Photovoltaics in Vietnam

    ILF Photovoltaic Introduction

    Our main focus

    Owners Engineer

    Lenders Engineer

    Independent Engineer

    Photovoltaic Project Phases

    1. Feasibility Study

    2. Conceptual Design

    3. Detailed Design

    4. Site Supervision

    5. Commissioning & PR Verification

    page 5

  • page 6

    Typical Content of an ILF Feasibility Study

    1. Introduction

    2. Site Assessment

    3. Technology Assessment and Selection

    4. Conceptual Plant Design

    5. Energy Yield Assessment

    6. Security and Monitoring System

    7. Legal Framework Review

    8. Project Implementation

    9. Operation and Maintenance Concept

    10. Environmental and Social Description

    11. Finance and Economic Analysis

    Professional Engineering Services for Photovoltaics in Vietnam

    Feasibility Study

  • page 7

    1. Introduction

    Summary, Introduction

    Project Methodology and Scope of Work

    2. Site Assessment

    Area AccessibilityConvenience of the location for raw materialtransport

    Soil and Geotechnical ConditionsCheck on soil and location-specific topics, e.g.:

    earthquake taiphoon / hurricanes (Philippines, Vietnam) floodings (Thailand)

    other environmental causes and impacts

    Professional Engineering Services for Photovoltaics in Vietnam

    Feasibility Study

  • page 8

    2. Site Assessment

    Irradiation & Weather DataConvenience of the location for raw materialtransport

    Shading Analysis Far shadings: mountains, trees, buildings

    other objects Near shadings: front table to rear table

    Option for Grid ConnectionsEvaluation of existing substations, feeders and power lines for optimized grid-connection

    Professional Engineering Services for Photovoltaics in Vietnam

    Feasibility Study

  • page 9

    3. Technology Assessment & Selection

    PV Module Selection Crystalline vs. Thin Film TechnologyEvaluation of various technologies for solarmodules, depending on location andapplication, e.g. tracking, hot areas etc.

    Inverter Selection String vs. CentralThe selection of the inverter topographic may varydue to the site-accessibility, local regulations orO&M aspects

    Central inverter concept

    String inverter concept

    Mounting Structure & FoundationScrew-pile, driven pile or concrete pile arecompared and proposed in the light of bestpractice and cost

    Driven pile Concrete pile

    Screw pile

    Professional Engineering Services for Photovoltaics in Vietnam

    Feasibility Study

  • page 10

    4. Conceptual Design

    PV Module Inclination & AzimuthOptimization of module inclination and azimuth,in case of single tracking systems, we assessbacktracking vs. true-tracking

    Layout of the PV power plantOptimized layout of the PV power plant according tothe site boundary, topography, exclusion areas, PVinverter concept and other technical parameters(civil works, grid connection etc.)

    Electrical system SLD of the PV power plantDC and AC single line diagram of the PV powerplant in phase with international standard andcountry specific grid code

    Professional Engineering Services for Photovoltaics in Vietnam

    Feasibility Study

  • page 11

    5. Energy Yield Assessment

    Shading AnalysisShading on tables of single-axis tracer via Sun Orb

    Evaluation of energy yield in PVSyst

    Professional Engineering Services for Photovoltaics in Vietnam

    Feasibility Study

  • page 12

    6. Security & Monitoring System

    Professional Engineering Services for Photovoltaics in Vietnam

    Feasibility Study

  • page 13

    7. Legal Framework Review

    Permits and Authorizations

    Connection Rights

    Contracting and Pricing System

    Land Ownership

    Tax Regulation

    8. Project Implementation

    Proposed Project Schedule

    Conceptual Design

    Permits, Long Lead Items

    Tender Design and EPC Selection Support

    Site Supervision

    Commissioning

    Warranty Phase

    Professional Engineering Services for Photovoltaics in Vietnam

    Feasibility Study

  • page 14

    9. Operation & Maintenance Concept

    Cleaning

    Security

    Maintenance Schedule (preventive maintenance plan)

    Personnel on Site

    Site or country-specific items

    10. Environmental & Social Description

    Site Selection Criteria

    The Environmental and Social Baseline

    Environmental and Social Impacts

    Conclusion

    Professional Engineering Services for Photovoltaics in Vietnam

    Feasibility Study

  • page 15

    11. Financial & Economic Analysis

    CAPEX Sensitivity Analysis Statistical Variation of Energy Production & Evolution

    P50, P75 and P90 production in 1st year

    Professional Engineering Services for Photovoltaics in Vietnam

    Feasibility Study

  • page 16

    Typical Conceptual Design

    1. General Area Layout

    Cadastral plan, geodata

    DWG file for site and area layout

    PV module type

    Type of substructure

    Shading and site topography

    etc.

    2. General Single Line diagram

    DC/AC electrical system

    String combiner boxes, string length

    MV-Substations and transformer stations

    etc.

    Professional Engineering Services for Photovoltaics in Vietnam

    Conceptual Design

  • page 17

    Typical Detailed design

    1. Detailed Area Layout

    Site survey with Geological Report

    Precise substructure layout and module table drawing

    Cable trenches, construction roads, borders, fences

    String numbering

    etc.

    2. Detailed Single Line Diagram

    Detailed DC/AC electrical system

    Fuse sizes in combiner boxes

    Earthing system

    etc.

    3. Detailed Calculations

    4. Monitoring System

    Professional Engineering Services for Photovoltaics in Vietnam

    Detailed Design

  • page 18

    Tender Design and Tender Process

    A invitation sent to potential contractors to inform them about the information required for the project.