France – Spain open season
ResultsLessons learned
![Page 2: France – Spain open season Results Lessons learned.](https://reader035.fdocuments.us/reader035/viewer/2022081811/56649e6b5503460f94b68b7b/html5/thumbnails/2.jpg)
France – Spain Open season at a glance
4 TSOs and 2 NRAs2 phases (2013 : western corridor - 2015 : eastern corridor)6 different products18 different development steps6 levels of price proposed
2
![Page 3: France – Spain open season Results Lessons learned.](https://reader035.fdocuments.us/reader035/viewer/2022081811/56649e6b5503460f94b68b7b/html5/thumbnails/3.jpg)
- 3 -
Results of the 2013 phase
Capacities allocated
/demand
27 /27 GWh/d
149 / 149 GWh/d
132 / 361 GWh/d
Capacities allocated
/demand
0 GWh/d
115 / 115 GWh/d
69 / 69 GWh/d
Development of an existing interconnexion point : Larrau
![Page 4: France – Spain open season Results Lessons learned.](https://reader035.fdocuments.us/reader035/viewer/2022081811/56649e6b5503460f94b68b7b/html5/thumbnails/4.jpg)
- 4 -
Results of the 2015 phase
Capacities allocated
/demand
0 / 200 GWh/d
0 / 13,6 GWh/d
0 / 13,6 GWh/d
Development of an existing interconnexion point : Biriatou
A very significant increase in interconnexion capacity (+120 GWh/d)
but demand not sufficient to trigger the eastern corridor
Capacities allocated
/demand
30,4 / 30,4 GWh/d
40,8 / 40,8 GWh/d
44,8 / 71,6 GWh/d
![Page 5: France – Spain open season Results Lessons learned.](https://reader035.fdocuments.us/reader035/viewer/2022081811/56649e6b5503460f94b68b7b/html5/thumbnails/5.jpg)
- 5 -
Lessons learned
South GRI proved to be an efficient platform to coordinate the projectStrong variation of demand between the two phases
Reluctance to commit long term in the second phase
Coordinated routes add significant complexity
Competing products sold simultaneously
Importance of tariff visibility