FPSO’s & DNV EOCBR 514 – Newbuildings and Conversions Marcelo Spotorno Rio de Janeiro, 16.07.2009

description

DNV FPSO

Transcript of fpsopresentationjuly2009-110924105424-phpapp02

  • FPSOs & DNV

    EOCBR 514 Newbuildings and Conversions Marcelo Spotorno Rio de Janeiro, 16.07.2009

  • Det Norske Veritas AS. All rights reserved Slide 2 28 September 2011

    More than 140 years of managing risk

    Det Norske Veritas (DNV) was established in 1864 in Norway

    The main scope of work was to identify, assess and manage risk initially for maritime insurance companies

  • Det Norske Veritas AS. All rights reserved Slide 3 28 September 2011

    300 offices in 100 countries

    Head office Local offices

  • Det Norske Veritas AS. All rights reserved Slide 4 28 September 2011

    Our people a vital resource

    People are the core of DNV 97 nationalities 9000 employees

  • Det Norske Veritas AS. All rights reserved Slide 5 28 September 2011

    FPSO Market share

    ABS35 %

    DNV40 %

    LR12 %

    BV4 %

    CCS1 %

    Rina1 %

    Vietnam1 %

    Unknown6 %

    Source:- Mobile Production systems of the World, 7th Edition, 2007/2008, Clarkson Research Services Limited- Floating Production Systems - assessment of the outlook for FPSO vessels, production semis, TLPs and Spars, November 2007, International Maritime Associates Inc.

  • Det Norske Veritas AS. All rights reserved Slide 6 28 September 2011

    Petrojarl I

    the worlds first FPSO built for harsh environment(1986)

  • Det Norske Veritas AS. All rights reserved Slide 7 28 September 2011

    First FPSO GoM

    BW Yum KakNab

  • Det Norske Veritas AS. All rights reserved Slide 8 28 September 2011

    Chinook Cascade

    First FPSO for US GoM

    Cascade Chinook / First FPSO for US GoM

  • Det Norske Veritas AS. All rights reserved Slide 9 28 September 2011

    FPSOs/FSOs Newbuildings & Conversions

    BP Skarv-Idun Korea-Samsumg Newbuilding

    BW Pioneer - Cascade/Chinook Singapore Conversion

    Nexus 01 Korea-Samsumg Newbuilding

    Nexus 02 Korea-Samsumg Newbuilding

    P-58 - Baleia Azul Singapore Conversion

    Sevan 300 No. 04 China-Hantong Newbuilding

    Sevan 300 No. 05 China-Hantong Newbuilding

    Ichtys FPSO - Newbuilding

    FSO Rita Dubai Conversion

    Dynamic Producer Singapore Conversion

    Knock Dee FSO Dubai Conversion

    Deep Producer Singapore Conversion

  • Det Norske Veritas AS. All rights reserved Slide 10 28 September 2011

    DNV classed units around the world

    North Sea:

    FPSO: 18 Canada:

    FPSO: 1

    Gulf of Mexico:

    FPSO: 2

    Brazil:

    FPSO: 3

    West Africa:

    FPSO: 12

    North Africa:

    FPSO: 2

    Asia and Australia:

    FPSO: 15

  • Det Norske Veritas AS. All rights reserved Slide 11 28 September 2011

    FPSOs DNV fleet in Brazil

    SSP300 - Sevan Piranema

    Petrojarl Cidade de Rio das Ostras

    BW Cidade de So Vicente

  • Det Norske Veritas AS. All rights reserved Slide 12 28 September 2011

    DNV Offshore Standards

  • Det Norske Veritas AS. All rights reserved Slide 13 28 September 2011

    Benign Waters

    DNV OS-C-102 - Structural Design of Offshore Ships - World-wide operation - Benign waters - Environments at which the required to hull girder capacity

    calculated according to the LRFD method is less than the minimum section modulus according to the Main Class Requirements.

  • Det Norske Veritas AS. All rights reserved Slide 14 28 September 2011

    Benign Waters

    Alternative design procedures - Alternative 1 - Ship Rules - The hull scantlings are based on the main class

    requirements.No direct calculations of wave bending moments and shear forces are required.

    - Alternative 2 - LRFD method - The hull is designed according to the principles given in Ch.1. The midship section modulus may be less than the main class requirements. When design Alternative 2, LRFD method, is applied, the minimum midship section modulus according to the main class requirements may be reduced by maximum 25%.

  • Det Norske Veritas AS. All rights reserved Slide 15 28 September 2011

    P-58 - Nauticus Construction

    Default

    Innerstructure

    Outershell

    Thickness map

    Material map

  • Det Norske Veritas AS. All rights reserved Slide 16 28 September 2011

    You get an over-view from colour display and printed numbers.

    Gives you access to the dimensions and steel grades of plates, stiffeners and girders

    By clicking the structural parts you get more details

    Information dimensions and steel grades

  • Det Norske Veritas AS. All rights reserved Slide 17 28 September 2011

    Maintenance Steel renewal / weight

    Marking up all plates and/or stiffeners within a 3D zone by defining and extruding a polygon

    Plates and stiffeners can be marked up independently by using separate zones

  • Det Norske Veritas AS. All rights reserved Slide 18 28 September 2011

    Maintenance Coating Area Calculations

    Marking up all structures for complete or part of the compartment

    Marking up single structures for partial coating: top, one side (gray on aft side means not coated)

  • Det Norske Veritas AS. All rights reserved Slide 19 28 September 2011

    Maintenance Docking specifications

    Planning and cost control prior/during a docking of a vessel.

    Specification or for verification purposes of the figures given by the ship repair yard.

  • Det Norske Veritas AS. All rights reserved Slide 20 28 September 2011

    Maintenance Emergency Repairs

    Facilitates the documentation of damage:

    - Location - Extent - Type of structure

    No need for long and complex descriptions.

    Enables overview and control the expenses.

  • Det Norske Veritas AS. All rights reserved Slide 21 28 September 2011

    The Nauticus Coating Monitoring Tool takes advantage of 3D technology to visualise the coating status and calculate re-coating areas. The tool also supports a structured recording of coating inspection results referring to pre-defined cells/bays of the ballast tanks. Finally, it assists you in preparing the re-coating specification and estimates the costs.

    When tool is used one has stop to take a risk of unpredicted situations in respect to mintenance or failure.

    Monitoring - Coating Monitoring Tool

  • Det Norske Veritas AS. All rights reserved Slide 22 28 September 2011

    Thickness measurement support

    The Nauticus UTM Tool improves planning, execution and evaluation of ultrasonic thickness measurements.

    Monitoring UTM

    This improves UTM process: shorter time, improved quality and communication, input to maintenance strategy: better control and lower cost

  • Det Norske Veritas AS. All rights reserved Slide 23 28 September 2011

    0%

    5%

    10%

    15%

    20%

    25%

    1983 1988 1993 1998 2003 2008 2013

    Years

    Thic

    knes

    s D

    imin

    utio

    n t dim

    t sub

    t min

    Set of UTM readings from previous years

    Trend Curve

    The curve shows tendency of steel diminution within the years and can be used for prognosis

    Management Maintenance Strategy

    Coating Condition Status

  • Det Norske Veritas AS. All rights reserved Slide 24 28 September 2011

    Training Naming of Structure

  • Det Norske Veritas AS. All rights reserved Slide 25 28 September 2011

    Inspection of lower hopper knuckle especially in way of trv. web frames

    Inspection of upper hopper knuckle especially in way of trv. web frames

    Risk Based Inspection with Focus on Critical Areas

    Training Areas of Attention

  • Det Norske Veritas AS. All rights reserved Slide 26 28 September 2011

    FPSOs & DNVMore than 140 years of managing risk300 offices in 100 countriesOur people a vital resourceFPSO Market sharePetrojarl IFirst FPSO GoMChinook Cascade FPSOs/FSOs Newbuildings & ConversionsDNV classed units around the worldFPSOs DNV fleet in Brazil DNV Offshore StandardsBenign WatersBenign WatersSlide Number 15Information dimensions and steel grades Maintenance Steel renewal / weightMaintenance Coating Area CalculationsMaintenance Docking specificationsMaintenance Emergency RepairsMonitoring - Coating Monitoring ToolMonitoring UTMSlide Number 23Training Naming of StructureSlide Number 25Slide Number 26