USB STARTER G120
STARTER Software Commissioning G120 via USB Interface
Getting Started Edition (2012 03 )
IA&DT&BT Service & Support
Page 2-22
G120 USB STARTER G120
G120 STARTER
Key Words G120, STARTER, Basic commissioning, Parameter backing up
IA&DT&BT Service & Support
Page 3-22
1 ................................................................................................................. 4 2 USB ................................................................................................ 4 3 STARTER ....................................................................................... 5 3.1 STARTER ..............................................................................5 3.2 ....................................................................................................................7 4 “ ” ...................................................................... 8 4.1 “ ” .................................................................................................................8 4.2 ................................................................................................................8
4.2.1 ............................................................................................................. 9 4.2.2 .................................................................................................................... 9 4.2.3 .................................................................................................................. 14
5 ........................................................................................................ 14 5.1 .................................................................................................. 14 5.2 ...................................................................................................... 15 6 STARTER ................................................................... 15 6.1 PC/PG ....................................................................... 15 6.2 PC/PG ............................................................... 16 7 STARTER ........................................................................... 16 7.1 ........................................................................................... 16 7.2 ...................................................................................................... 18 7.3 STARTER ....................................................................................... 20
IA&DT&BT Service & Support
Page 4-22
1
G120 BOP-2 STARTER
STARTER
Windows XP Vista Windows 7 STARTER V4.2
PC STARTER
(http://support.automation.siemens.com/CN/view/zh/10804985)
USB PC
2 USB
1) STARTER
2) USB G120 FW4.4 SINAMICS G120
1 2
3 4
IA&DT&BT Service & Support
Page 5-22
3) USB STARTER
Accessible nodes
5
“Accessible Point” “DEVICE (STARTER, SCOUT)”
“PG/PC” “DEVICE (STARTER, SCOUT) -> S7USB” “S7USB”
“Update”
6
4) PC/PG S7USB 6
3 STARTER
3.1 STARTER
Project New with Wizard
1) “Find drive units online...”
2)
2
3
1
IA&DT&BT Service & Support
Page 6-22
7 8
3)
4) “DEVICE (STARTER, SCOUT)- S7USB” “S7USB”
9 10
5)
6)
11 12
7) “Device”
1
2
3
4
5
6
IA&DT&BT Service & Support
Page 7-22
13
3.2
USB
1) “Project” “New”
14
2)
15
3) “Accept” G120
7
1
2
IA&DT&BT Service & Support
Page 8-22
16
4 “ ”
4.1 “ ”
“ ”
STARTER
“Control_Unit”
17
4.2
18
3
IA&DT&BT Service & Support
Page 9-22
4.2.1 G120
STARTER
1) G120
19
2) STARTER
3) ROM
20
4)
21
4.2.2
STARTER
1) G120 “Configuration”
IA&DT&BT Service & Support
Page 10-22
22
2) V/f
23
3)
24
3
1
2
IA&DT&BT Service & Support
Page 11-22
4)
25
5) STARTER
26
STARTER “Induction motor[rotating]”
5
5
4
IA&DT&BT Service & Support
Page 12-22
27
6) “Identification of all parameters in standstill and turning”
28
7)
29
5 5
6
7
IA&DT&BT Service & Support
Page 13-22
8) “Only motor data calculate”
30
9) “Copy RAM to ROM” ROM
A07791
31
32
10) STARTER
STARTER “Control panel”
“Assume control priority”
“Enables”
8
9
9
IA&DT&BT Service & Support
Page 14-22
A07791
“Give up control priority”
33
4.2.3
G120
5
5.1
1) G120 “Expert list”
34
2) P1121=20
35
2
342
34
1
2
1
IA&DT&BT Service & Support
Page 15-22
5.2
STARTER P1120
1) P1120=20
36
2) P1120=20
37
6 STARTER
STARTER
6.1 PC/PG
1) STARTER
2) “Load project to PG”
1 1
2
IA&DT&BT Service & Support
Page 16-22
3) PG/PC
6.2 PC/PG
1) STARTER
2) “load project to target system”
3) “Copy RAM to ROM”
7 STARTER
7.1
1) “Create new user-define parameter list”,
38
2) “p840” “r21” “p” “r”
“p” “r”
39
1
2
3
IA&DT&BT Service & Support
Page 17-22
3) “Empt” “Save list”
4) “User-define parameter list”
40
5) “*.cdl”
41
6)
42
7) “Close tab”
4
5
6
IA&DT&BT Service & Support
Page 18-22
43
8) “Open user-defined parameter list”
44
9)
45
7.2
1) “Inputs/output”
7
8
9
IA&DT&BT Service & Support
Page 19-22
46
2) “Simulation”
47
3)
48
49
1
2
2
3
3
IA&DT&BT Service & Support
Page 20-22
7.3 STARTER STARTER
1) 1 STARTER “Alarm”
“Acknowledge all” “Acknowledge”
50
51
2) 2 “Diagnostics”
52
IA&DT&BT Service & Support
Page 21-22
“Control/status words”
53
“Missing”
54
“Interconnections” BICO
55
“Alarm history”
56
IA&DT&BT Service & Support
Page 22-22
G120 CU240-2DP FW4.4 STARTER
V4.2 CU
http://support.automation.siemens.com/CN/view/zh/76780454