The Site Master Plan has as its foundation an understanding of the purpose and vision of the First Presbyterian Church of Augusta, most of which was

articulated by earlier efforts. The architects focused on understanding and measuring the spaces needed to support the Church’s concept of ministry.

Page 3: FPCAugustaMP

Discussions with Church and ministry leaders focused on the opportunities and challenges before the Church, many of which are common to downtown

congregations.

Page 4: FPCAugustaMP

One of the biggest challenges to planning is anticipating the number of participants. Based on the recent past, Church leaders decided to use a total

attendance of 2,500 people, about double the current number. The 2,500 value is a benchmark, not a goal or a timeline.

[Years prior to 2009 appear to represent the number of adult members, rather than attendance, accounting for the abrupt change between 2008 and

2009. Attendance numbers were unavailable].

ATTENDANCE

Page 5: FPCAugustaMP

Existing spaces on both sides of Telfair Street were measured and their uses allocated and mapped. In the diagram above, purple represents worship and music; green,

fellowship; yellow, children’s discipleship; red, adult discipleship; and brown, administrative space.

Page 6: FPCAugustaMP

Space requirements needed to support on-campus ministry (and the Presbyterian Peninsula) were calculated. The page above represents one

such tally.

Page 7: FPCAugustaMP

The difference between the space that’s needed and the space available is the net space required to support ministry on campus.

Page 8: FPCAugustaMP

The greatest on-campus needs are in Nurture (which includes worship), Discipleship and Fellowship. The total need is offset by currently unassigned

space, such as the former Prestech building at the corner of Greene and Sixth Streets .

Page 9: FPCAugustaMP

Geographically, the campus consists of 1 ½ city blocks separated by a busy street.

Page 10: FPCAugustaMP

The Site Master Plan should address the objectives listed at top right. The best opportunities for new construction are represented in blue; secondary

sites, in orange.

Page 11: FPCAugustaMP

Within the main building, existing uses are crowded and present security challenges, and are unfriendly to first-time visitors.

Page 12: FPCAugustaMP

The Site Master Plan adds education space to “uncork” internal traffic jams, improve security for children and preschoolers, create community space,

improve entrances, and provide for flexible growth.

Page 13: FPCAugustaMP

Much of the growth in worship attendance will be accommodated by linking St. Andrews Hall and other venues to the existing sanctuary electronically.

The historic building will not be modified in any significant way.

Page 14: FPCAugustaMP

Development of the site to meet additional needs will be centered around a public green opposite the sanctuary. The Plan calls for a median in Telfair

Street to make crossing safer.

Page 15: FPCAugustaMP

The largest single building called for, a gymnasium and assembly space about 3 times the size of St Andrews Hall will be located at the corner of Seventh

and Telfair Streets, the site of a former school.

Page 16: FPCAugustaMP

The Plan preserves a site for new worship space, if the Church decides to construct it. Offices will be moved to small scale spaces on the Greene

Street side of the block.

Page 17: FPCAugustaMP

A three dimensional model of the site

Page 18: FPCAugustaMP
Page 19: FPCAugustaMP
Page 20: FPCAugustaMP
Page 21: FPCAugustaMP
Page 22: FPCAugustaMP
Page 23: FPCAugustaMP
Page 24: FPCAugustaMP

The Plan encourages the church to concentrate development at the Peninsula as much as possible, to increase its impact and reduce

development costs.

Page 25: FPCAugustaMP

The first phase of development is expected to be the renovation of the former Prestech Building for use in Youth Ministry. The project will free the

Telfair Building for Adult Discipleship and space in the main building for preschool growth.