Founded by Dr. Geary Rummler (1937- 2008) PDL Partners ......1 Performance Design Lab Rick Rummler,...

29
1 Performance Design Lab Rick Rummler, Performance Design Lab Performance Design Lab Founded by Dr. Geary Rummler (1937- 2008) PDL Partners: Alan Ramias, Rick Rummler, Cherie Wilkins Based in Arizona, USA 2

Transcript of Founded by Dr. Geary Rummler (1937- 2008) PDL Partners ......1 Performance Design Lab Rick Rummler,...

  • 1

    Performance Design Lab

    Rick Rummler, Performance Design Lab

    Performance Design Lab

    Founded by Dr. Geary Rummler (1937-2008)

    PDL Partners:Alan Ramias, Rick Rummler, Cherie Wilkins

    Based in Arizona, USA

    2

  • 2

    Performance Design Lab

    Research, consulting, training and coaching organization, founded by Dr. Geary Rummler

    Our theory base and methodologies have been adopted as the standard for◦ improvement initiatives within Fortune 100 companies, ◦ the consulting industry and business schools.

    Why “Lab”? Our fundamental belief is that performance can be designed, that

    performance improvement is not magic, but science.

    We continue to apply, evolve and expand the theory base and methodologies to:◦ Management systems ◦ Measurement◦ Strategy◦ Organization design◦ Business process management

    3

    Performance Design Lab

    Geary Rummler: Performance improvement and management pioneer

    ◦ “Pit a good performer…”◦ Organizations as Systems◦ “White space…”◦ 9 Performance Variables◦ Concept of “is” to “should” ◦ Process management◦ Swimlane charts◦ Provided the process improvement methodology for Six Sigma

    at Motorola◦ Serious Performance Consulting

    4

  • 3

    Performance Design Lab

    “The consultant’s consultant”

    5

    Performance Design Lab

    Performance Thinking participants will: Apply models to impact human and

    organization performance Distinguish between models and tools Identify the variables that impact human and

    organization performance Apply a set of proven models Identify and adapt models to address specific

    business situations

    6

  • 4

    Performance Design Lab

    Introduction to Performance Thinking Application of Four Performance Lenses ◦ The Anatomy of Performance◦ The Super System◦ The Human Performance System◦ The Effective Process Framework

    Summary and Close

    7

    Performance Design LabPerformance Design Lab

    Introduction

  • 5

    Performance Design Lab

    Organizations are complex systems

    Organization performance can be systematically designed, analyzed, improved, maintained

    But improving a complex system requires visualizing that system

    Visual models and tools are our stock in trade

    14

    Performance Design Lab

    How we view and understand performance is a function of the lens or mental model we use

    Models: Abstract representations of reality that reveal relationships (e.g., interdependencies, cause-effect, impact) important to performance

    Tools: Anything used as a means of accomplishing a task or purpose including communication, analysis and design

    When models are applied they become tools

    15

  • 6

    Performance Design Lab 16

    Performance Design Lab

  • 7

    Performance Design LabPerformance Design Lab

    Anatomy of Performance

    Performance Design Lab 27

    Financial Stakeholders

    ANY ENTERPRISE

    MANAGEMENT SYSTEM

    RESOURCES

    capital

    humanresources

    material/equipment

    MARKET

    Customers

    customer ordersrequirements &

    feedback

    products/services

    technology

    investments

    returnsCapital Market

    Labor Market

    Suppliers

    Technology Providers

    BUSINESS

  • 8

    Performance Design Lab 28

    Financial Stakeholders

    ANY ENTERPRISE

    MANAGEMENT SYSTEM

    RESOURCES

    capital

    humanresources

    material/equipment

    MARKET

    Customers

    customer ordersrequirements &

    feedback

    products/services

    COMPETITION

    technology

    investments

    returns

    BUSINESS ENVIRONMENTRegulatory/Legal Economy CultureNatural EnvironmentGeo-Political

    Capital Market

    Labor Market

    Suppliers

    Technology Providers

    products/services

    BUSINESS

    Organization

    Process

    Performance Design LabPerformance Design Lab

    Anatomy of PerformanceApplication

  • 9

    Performance Design Lab 30

    Performance Design Lab

    12

    3 45

    6

    7

    89

    31

  • 10

    Performance Design Lab

    # Finding # ofdisconnects % of total1 Management System 63 162 Linkage Parent to USA 37 103 Linkage Strategy to BUs 39 104 Work System 79 205 Ideologies 13 36 Talent Management 58 157 New Product Development 6 28 Enabling IT Infrastructure 50 139 Compliance, Governance, Audit 33 9

    Uncategorized 8 2

    32

    Performance Design LabPerformance Design Lab 33

  • 11

    Performance Design LabPerformance Design Lab 34

    OPERATIONS

    Advanced Product Design

    Manufacturing

    Materials

    Engineering

    Sales & Marketing

    Commercial Airlines

    Material Vendors

    market needs

    sales efforts

    A/C orders

    prints

    materialsprints

    orders

    materials

    technology

    design

    aircraft

    Aircraft Manufacturer

    Performance Design LabPerformance Design Lab

    Super System

  • 12

    Performance Design Lab 36

    Financial Stakeholders

    ANY ENTERPRISE

    MANAGEMENT SYSTEM

    RESOURCES

    capital

    humanresources

    material/equipment

    MARKET

    Customers

    customer ordersrequirements &

    feedback

    products/services

    COMPETITION

    technology

    investments

    returns

    BUSINESS ENVIRONMENTRegulatory/Legal Economy CultureNatural EnvironmentGeo-Political

    Capital Market

    Labor Market

    Suppliers

    Technology Providers

    products/services

    BUSINESS

    Performance Design Lab 37

    • Depicts the variables external to a given organization that might be factors in its performance

    • Helps to make clear the context in which the organization exists

    • Can model past, present or future conditions

    There are several standard components: • the Organization’s Products and Services • Markets, Customers and Channels• Financial Stakeholders • Resources• Competition• General Environment• the Organization itself.

  • 13

    Performance Design LabPerformance Design Lab

    Super System Application

    Performance Design Lab 39

    1. Earnings:a. Profits declined from 30% to 13% over

    past four years.b. No data on profits by product.

    Financial Stakeholders

    ANY ENTERPRISERESOURCES

    capital

    humanresources

    material/equipment

    MARKET

    Customers

    customer ordersrequirements &feedback

    products/services

    COMPETITION

    technology

    investments

    returns

    BUSINESS ENVIRONMENTRegulatory/Legal Economy CultureNatural EnvironmentGeo-Political

    Capital Market

    LaborMarket

    Suppliers

    Technology Providers

    Products/services

    5. Resources:a. Human Resources – increasing difficulty recruiting

    qualified engineers over the past 18 months. An engineering shortage is a direct threat to developing new products to compete with competitor CCC.

    b. Supplies/materials – Serious fire last quarter in prime facility of major component supplier has disrupted supply chain, causing some product delivery delays.

    c. Technology – Necessary to aggressively pursue and evaluate emerging electronic and metallurgical technologies to counter recent success of competitor CCC.

    d. Capital – Primary source of capital is Corporate, who is increasingly reluctant to invest more funds until they see an improvement in Belding Engineering earnings. The combination of lowered Belding Engineering earnings and no additional funding from Corporate has serious implications for new product development.

    6. Business Environment:a. Economy predicted to remain strong for next 3

    years.b. Federal legislation pending that could

    influence the way the industry disposes of certain production chemical by-products.

    3. Market:a. Industry continues to grow

    at about 15% per year. Analysts predict this will remain the case for the next decade.

    b. Overall revenue growth has averaged 12% for the past three years

    2. Products:a. Original (Introduced ten years ago – sales growth

    slowing each of last five years)b. Complex ( Introduced five years ago – sales remain

    almost the same each of the past three years)c. New (Introduced three years ago – growing an

    average of 75% per year since introduction)d. Two new products scheduled for launch early next

    year.e. Product performance:

    i. Rework on the increaseii. Increased delivery times

    4. Competition:a. Three major competitors

    - AAA – Comparable technology, features and price

    - BBB – Inferior technology, less features, lower prices

    - CCC – Newer technology, more features, slightly higher prices

    b. Market share summary:

    % Market ShareCompanyFour Year Ago This Year

    % Change

    Belding Eng 40 34 (15)AAA 27 22 (19)BBB 25 27 8CCC 5 14 180Other 3 3 0Total 100 100

  • 14

    Performance Design Lab 40

    RESOURCES

    Capital

    Human Resources

    Raw Matls/ Supplies

    Technology

    COMPETITION

    ANY BUSINESS

    CAPITALMARKET

    Earnings/Dividends

    NeedFor"It"

    "It"

    "It"Ordered

    PRODUCT/SERVICE MARKET

    GENERAL BUSINESS ENVIRONMENTPolitical - Regulatory - Economic - Cultural

    Customer

    Performance Design Lab 41

  • 15

    Performance Design Lab 42

    Performance Design Lab

    To understand scope and current condition To understand context To identify key relationships To compare and contrast To highlight, focus or reveal To dramatize complexity, issues, missing

    elements To single out what is important To test design ideas To model improvements

    43

  • 16

    Performance Design LabPerformance Design Lab 44

    “Definitely not. I might make better diagrams but certainly wouldn’t stop making them. On one level it’s like saying to a mathematician, ‘Couldn’t you do without all those formulas and numbers?’

    “You can list variables that affect organizational results, but words can’t show the relationships between things—a diagram can. I have a saying that if I can’t draw a picture of a problem, I don’t understand it and thus can’t explain the problem to the client.”

    You have been criticized for your abundant use of complex diagrams in your books. Given the chance, would you do them differently now?

    Interview with Geary Rummler for ASTD Magazine, 2007

    Performance Design Lab

  • 17

    Performance Design LabPerformance Design Lab

    Human Performance System

    Performance Design Lab

    Every performer in an organization is part of a larger system.◦ Every human performer is in a Human Performance

    System, often with technology as a resource.

    47

  • 18

    Performance Design LabPerformance Design Lab 48

    CONSEQUENCES

    PERFORMER

    + ‐OUTPUTINPUT

    FEEDBACK

    PERFORMER

    OUTPUTINPUT CONSEQUENCES + ‐

    Performance Design LabPerformance Design Lab 49

    Adequate and appropriate criteria (standards) with

    which to judge successful performance

    • Clear or sufficiently recognizable indications of the need to perform

    • Minimal interference from incompatible or extraneous demands

    • Necessary resources (budget, personnel, equipment) to perform

    • Sufficient positive consequences (incentives) to perform

    • Few, if any, negative consequences (disincentives) to perform

    Frequent and relevant feedback as to how well (or how poorly)

    the job is being performed

    • Necessary understanding and skill to perform

    • Capacity to perform both physically and emotionally

    • Willingness to perform (given the incentives available)

  • 19

    Performance Design Lab

    Every human performer exists as part of a larger Human Performance System.

    Human behavior is influenced by its consequences - People exhibit behavior that leads to positive

    consequences- Avoid behavior that leads to negative

    consequences. There are a finite number of variables (six)

    affecting human performance.

    50

    Performance Design Lab

    If we put a good performerin a bad system (HPS),

    the system will win every time

    51

  • 20

    Performance Design LabPerformance Design Lab

    Human Performance SystemApplication

    Performance Design LabPerformance Design Lab 53

    A. PERFORMANCE SPECIFICATIONS

    • Do performance standards exist?• Do performers know the desired

    output and performance standards?

    • Do performers consider the standards attainable?

    B. TASK SUPPORT

    • Can performers easily recognize the input requiring action?

    • Can the task be done without interference from other tasks?

    • Are job procedures and workflow logical?

    • Are adequate resources available for performance (time, tools, staff and information)?

    C. CONSEQUENCES

    • Are consequences aligned to support desired performance?

    • Are consequences meaningful from performer’s viewpoint?

    • Are consequences timely?

    D. FEEDBACK

    • Do performers receive information about their performance?

    • Is the information:• Timely?• Relevant?• Accurate?• Constructive?• Easy to understand?• Specific?

    E. KNOWLEDGE/SKILL

    • Do performers have the necessary knowledge and skill to perform?

    • Do performers know why desired performance is important?

    F. INDIVIDUAL CAPACITY

    • Are performers physically, mentally and emotionally able to perform?

  • 21

    Performance Design LabPerformance Design Lab

    Consequences

    Feedback

    Operators

    Input Spin @ PeakTarget: 200 MV

    B. Task Support

    • There is not record for a desk of what the latest standards/instructions are. There is only a historical e-mail thread that makes it difficult to discern what is current.

    • Lots of equipment used to handle high voltage is inoperable. Lots of equipment has unique requirements that must be memorized or accessed.

    • Adding to the chaos and work load: Last minute requests for permits from field. Unplanned building moves.

    A. Performance Specifications

    • The standard exists.

    • Standard is not known by all performers. Confusion about whether it is a rolling 15 minute average or real time.

    • Currently no one is at standard. The range is 205 -339. Is it realistic?

    C. Consequences

    • No positive consequences for meeting the target. No negative consequences for missing the target.

    • Poor performers are not dealt with – This is observed by all other performers.

    • No performance reviews

    F. Individual Capacity

    • Operators are physically, mentally, and emotionally able to perform this job.

    • Anger over toward management may be interfering.

    E. Knowledge and Skill

    • Training on skills that are then not used for long period of time (due to desk assignment). Training viewed as not helpful.

    • Not sure that the economics of the goal have been communicated. Comments about “no explanation of the numbers”, just “Do this”

    D. Feedback

    • Performance data is available via screen. There is no reporting after a shift or other interval.

    54

    Performance Design Lab

    IMMEDIATE DELAYED

    What Information? What Source? How Often?

    FEEDBACK: What feedback do the performers receive?

    What Information? What Source? How Often?

    FEEDBACK: What feedback do the performers receive?

    IMMEDIATE DELAYED

    INPUT/SIGNAL (WHAT INDICATES THAT ACTION IS REQUIRED?)

    INPUT/RESOURCES (What resources are

    available to assist the performers?)

    PERFORMER(S)

    DESIRED OUTPUT

    (What should the performers do?)

    UNDESIRED OUTPUT (What do the

    performers do?)CONSEQUENCES TO THE

    PERFORMER(S) (What happens to the performers when

    they take the undesired action?)

    CONSEQUENCES TO THE PERFORMER(S)

    (What happens to the performers when they take the desired action?)

    CONSEQUENCES TO

    THE ORGANIZATION

    CONSEQUENCES TO

    THE ORGANIZATION

    +

    PAD 3-014

    +

    +

    +

    55

  • 22

    Performance Design Lab 56

    “20% of apps have errors

    requiring us to go back to FC”

    Output

    FC MAO REP SALES SUPPORT

    SPECIALIST

    Fix errors

    Output Output

    “Est. 35% of apps requirecorrections. We don’t

    track that “

    Additional fallout or

    interventions

    ? Time spent on Apps and corrections

    by FC

    • 15 mins to fix

    • 5 mins to process

    100% of apps observed needed corrections

    Fix errors

    Performance Design Lab

    1. Hypothesizing and diagnosing the cause(s) of poor human performance

    2. Designing/Implementing changes at the job level -replacing the “is” HPS with a “should” HPS (Change management)

    3. Managing performance by managing the “performance system” rather than the individual

    4. Evaluating the likely impact of proposed policies/ changes on the HPS of employees. (Avoid the “Law of Unintended Consequences”)

    5. Understanding “culture” (the prevailing “expectations-consequence” relationships) and what must be done to change it.

    57

  • 23

    Performance Design Lab

    Fosters objective discussion of issues Makes complexity understandable without

    artificially simplifying (if a good one) Fosters shared understanding among

    stakeholders with diverse perspectives Promotes adoption and adaptation Fosters collaboration - suggestions to

    improve vs. criticism

    58

    Performance Design Lab

    Clarity of purpose Clarity of audience Perceived neutrality of creator/presenter Selection is based on an understanding of

    the set of variables impacting performance

    59

  • 24

    Performance Design Lab

    Performance Design LabPerformance Design Lab

    Effective Process Framework

  • 25

    Performance Design LabPerformance Design Lab 62

    Performance Design Lab 63

    1. Desired process outputs/results – the specifications of the desired business value milestone and required process outputs Requirements: Linked to organization and customer requirements; clear; and

    communicated to all parties designing, improving, performing and/or managing the process.

    2. Process design – the design of the work and value creation flow of a process Requirements: Embodies optimal work and value flow characteristics such as continuous

    and parallel flow and value add steps

    3. Underlying models – the models or principles and supporting algorithms which dictate process design e.g. staffing level models, inventory management models, resource allocation models, etc. Requirements: Align to the business requirements of the process

    4. Resources – the inputs provided by Contributing processes which enable the process to be performed as designed e.g. staffing levels, performance environment, budget, etc. Requirements: Align to the business requirements of the process

  • 26

    Performance Design Lab 64

    5. Inputs/triggers – the outputs from upstream processes and the events which feed and initiate the start of the process. Requirements: clearly defined and accounted for in the process design

    6. Jobs/roles – the people who perform the process, the associated hierarchy and the system of variables that influence their ability to produce the desired outputs Requirements: properly aligned and executed as specified by the process design

    7. Technology – the technology that performs or enables the performance of the process including hardware, software (i.e. systems, interfaces and applications) and data Requirements: properly aligned and executed as specified by the process design

    8. Process Performance Management System – the act of planning and managing at the process level of performance Requirements: Timely and actionable performance expectations.

    Performance Design LabPerformance Design Lab

    Effective Process FrameworkApplication

  • 27

    Performance Design Lab

    Confusing Offer Logic

    • Application Errors

    • Possibility of Duplication

    Lack of visibility –not sure when done

    • Accounts must be funded before sending –delay

    • Multiple interface

    • Difficult interfaces

    • Multiple error checks

    • Batching• Variation

    • Organization & Physical silos

    • Poor performance Support

    66

    Performance Design Lab 67

    Are the desired process outputs/results requirements Linked to Organization and Customer requirements? Clear? Communicated?

    Is the process designed to meet output requirements? Are the underlying models appropriate? Are necessary resources available? Do the required inputs/triggers meet input standards? Are jobs/roles properly aligned and executed (including organization

    structure)? Is the required technology aligned and executing? Is an appropriate Process Management System (PPMS)

    In place? Aligned? Executing?

  • 28

    Performance Design Lab

    • Official Clock Start• Push the Process

    Upstream• Single Source of

    Information• Clear

    Accountabilities

    • Establish Metrics• Push the process

    downstream• Eliminate NVA

    outputs• Sunset support

    costs

    • Document processes

    • Provide training• Eliminate task

    interference• Balance

    consequences• Provide feedback

    • Pull System• Task Combining• Customer-centric

    Redesign• Standardization• Harmonization• Activity-based costing• Push the process

    outward

    • Eliminate NVA support processes

    • Just-in-Time

    • Performance Specification Agreements

    • Designate process owners

    • Develop measurement systems

    • Clarify mgmt roles and responsibilities

    • Automate routine work

    • Integrate process enhancements into systems

    68

    Performance Design LabPerformance Design Lab

    Summary

  • 29

    Performance Design Lab 70

    Performance Design Lab

    Organization complexity is increasing -modeling will continue to be essential to understanding, changing and managing performance.

    Practitioners and Managers need models to: ◦ make effective and lasting changes/

    improvements, and◦ avoid unintended consequences.

    There is no excuse for not understanding the performance context associated with any problem/opportunity.

    71