  • Foundation for Senior Living

    Stephen L. Hastings

    Director of FSL Real Estate Services

  • FSL Mission Statement

    FSL’s mission is to provide home- and community-based services and develop energy-efficient,

    affordable housing, to promote health, independence and dignity for all.

  • Case Studies of Two Rural Senior Multi-family Properties

    Highland Square in Cottonwood Arizona

    Yuma Senior Terraces in Yuma Arizona

  • Identify: Community Input/Guidance

    • Council

    • Neighborhood Leaders

    • Reports

    • Planning Department

    • Building Department

    • Realtors

    • Neighborhood surrounding site

  • Identify: Land• Zoning

    • Yield

    • Proximity

    • Transportation

    • Senior Center

    • Medical

    • Shopping

    • Fun

    • School Bells

  • Everything flows from the land

    • Get to know the site

    • Start with the six-sided box

    • Start small and work up…build a property, build a program

    • Our generation multi family

  • YST located in the “bottoms”

  • Market Study

  • Site Area Detractions

  • Safety Plans

  • Need

    • Market Study• Blind Flash of the Obvious (BFO)

    • Absorption Rate

    • Unit matrix by Incomes

  • FSL Focused on Strategic Investment

  • Strategic Purchase

  • What are we looking for in a modern multi-family project?

    • Sustainability

    • Lower operating costs

    • Stable operating costs

    • Adaptable to changing energy costs, pricing and opportunities

    • Defensive posture

    • Plan on 20 and 30 year horizons

  • Flagstaff Senior Meadows

  • Identify: Building Design Team

    • Architect

    • Engineer

    • Builder

    • Manager

    • Green

    • Amenities

    • $6,500 + $60,000 + $40,000 + $300,000 = $406,500

  • Identify: Application Design Team

    • In-house

    • Consultant

    • Investor

    • $406,500

  • Vanishing Finance for Affordable Housing

    • HUD 202• HUD 811• RD 515• RD with 515 Subsidy• HOME Investment Partnership• CDBG• NSP• HUD Transitional Housing• HUD Project Based Section 8

  • Funding

    • LIHTC (Experience Points)

    • HOME/CDBG

    • Section 8 (Like) Subsidies

    • Grants

    • Aging Farm and Home

    • Aging Rural Development

  • Highland Square

  • Highland Square

  • Highland Square

  • Yuma Senior Terraces

  • Yuma Senior Terraces

  • Issues to Attend to…

    • Construction Loan

    • Fair Housing

    • Davis Bacon

    • Section 3

    • Grand Opening

    • Perm Loan

  • Optimistic Development Calendar• November 2018 - Identify Land

    • March 2019 - Submit Applications for LIHTC, HOME and FHLB

    • June 2019 – Awards announced! Order construction documents, apply for construction loan and finalize Investor documents

    • December 2019 – Close sale of LIHTCs to Investor, close construction loan and other grants. Start Construction

    • December 2020 – Complete Construction

    • April 2021 – Complete Lease-up

    • August 2021 – Stabilize revenue/expense, perm mortgage placed

    • October 2021 – Cost Certification is Complete

    • November 2021 – IRS Form 8609 issued

  • Create a multi-family ecosystem that can adapt to change in the energy market

    • Third party• Community sources

    • Storage – Shared storage it introduces choice

    • Onsite generation

  • Advanced Controls

    • Multiple units working together in the aggregate to achieve common mission goals

    • New generation controls

  • Advanced Controls

    • Next Generation Onboard Diagnostics

    • Last generation system wide control systems are migrating into our thermostatic controls

    • Owner paid, owner controlled…not paid by the resident

  • Onboard diagnostic controls – Next generation systems

    • Prevents catastrophic failures

    • The filter in Unit 12 had reduced air flow

    • The compressor on Unit 32 is running hot

    • Real time diagnostics and repair extend the life of equipment and comfort of the units

    • Confidence that the repair work being done is what is needed

  • We can do with less

    • Saving water – What is one of the most wasteful daily uses of water?• Looped preheated

    water systems

    • Blue piping and gray water systems

  • Reduced demand for power production

    • LED lighting

    • Insulation• Icynene

    • ICF walls system

  • Healthy Homes

    • No VOCs and maintain it that way

    • In laminates

    • Adhesives

    • Paint

    • YST story

  • Healthy Homes

    • Quiet

    • Between floors, between walls

    • Spaces

    • Walk in closets

    • Gathering by floor

  • Thank you, from FSL Real Estate Services