Foundation Degree IT Project
Milestone 3: Implementation, Testing and Evaluation
Objectives
Richard Hancock2
Have an awareness of what to document during implementation
Be aware of what content could be included in a test plan Be aware of what content can be included in the project
evaluation
***
19/04/23
Implementation
Richard Hancock3
Description of how the solution is realised Selection of implementation method should be described and
justified – essentially describe what the step by step activities you performed are to bring about the system you designed
Discussion of technology used and how this was applied You may have discussed the technology in MS2, so spend more
time here describing how it was used, not why it was used Reference design considerations and discuss how particular
technologies/software were used to implement these features How design was converted to a working system
You may have changed things as you implement your system from the design, so describe those changes and why the changes were made
This needs to relate well to MS2, so make sure you reference particular instances in MS2 that have changed
19/04/23
Implementation
Richard Hancock4
Discussion of what was successfully implemented and what was not, and any key features of a challenging nature that involved more work than originally anticipated This is a good area to sing your praises if you found something
particularly difficult in your project to do, that was perhaps beyond your skill to complete, but you got it working anyway
That which has been successful should relate to the system objectives and system requirements defined in MS2
System documentation User manual Administrator information Technical support Annotated screen shots Comments in any code
19/04/23
Testing
Richard Hancock5
Testing should address the evaluation of the solution against its objectives and success criteria
Think about how you are going to test your implementation Describe the testing strategy and choice of testing method
Include planning and application of the tests You must design your tests and then apply the tests and document
the results Draw conclusions from the results and any modifications to
the design and implementation that may be recommended If you decide that in another version of your implementation
changes need to be made as a result of your testing then describe what needs to be changed and why
19/04/23
Evaluation
Richard Hancock6
Evaluation deals with success of project in academic terms, compared to the success criteria for the solution
Evaluate the degree of success in carrying out the project Exactly how successful has the project been at solving the initial
objectives or requirements; or was it a total disaster? What you have learned by doing the project
Time management skills Organisational skills Skills in the use of technology Research skills Writing skills Presentation skills
19/04/23
Evaluation
Richard Hancock7
Things you would do differently if project were to be repeated and any extra features you would recommend Look back at your testing and sum up any changes that would
be necessary based upon the testing results Value of the learning process to you and the extent to
which the project has added to the students professional and academic expertise Talk about the skills you have developed and how you intend
to put them to use in your professional life and future career planning
Gantt chart reflection - the actual time plan compared to the original time plan Did you stick to plan? If not, why, and how did you keep on
target. Or didn’t you? Use your original Gantt charts (MS2) and compare these with
updated ones in MS319/04/23
Summary
Richard Hancock8
Document your implementation as you carry it out using notes
Make sure you make references to the design as you implement the system and document it
As you implement something, test it and document the results
Evaluate the whole project experience, not just a part of it
Be realistic about your performance
***
19/04/23