Final Conference Cagliari, June 28, 2016 1/29 Pilot projects presentation Cagliari, June 28, 2016 University of Cagliari (lead partner) Giuseppe Desogus [email protected]

Transcript of FOSTEr in MED Pilot project Conference in Cagliari 28/06/2016: pilots presentation

Page 1: FOSTEr in MED Pilot project Conference in Cagliari 28/06/2016: pilots presentation

University of Cagliari (lead partner)Giuseppe Desogus [email protected]

Final Conference

Cagliari, June 28, 2016

1/29

Pilot projects presentation

Cagliari, June 28, 2016

University of Cagliari (lead partner)Giuseppe Desogus [email protected]

Page 2: FOSTEr in MED Pilot project Conference in Cagliari 28/06/2016: pilots presentation

University of Cagliari (lead partner)Giuseppe Desogus [email protected]

Final Conference

Cagliari, June 28, 2016

2/29

The aim was to promote BIPV technologies and have an objectively measurable and verifiable impact on the contexts involved.

Expected results• 5 Pilot projects realized• At least 85 kWp of PV panels installed (about

17 kWp per plant)

Pilot Projects - WP7

Page 3: FOSTEr in MED Pilot project Conference in Cagliari 28/06/2016: pilots presentation

University of Cagliari (lead partner)Giuseppe Desogus [email protected]

Final Conference

Cagliari, June 28, 2016

3/29

Selection criteria:• Public buildings•Relevant in local context – must be representative•Good publicity for the project - even in case the system was not visible from the street•Urban location•A complexity degree that permits to overcome the main barriers identified•Energy performance of the building.

Pilot Projects - WP7

Page 4: FOSTEr in MED Pilot project Conference in Cagliari 28/06/2016: pilots presentation

University of Cagliari (lead partner)Giuseppe Desogus [email protected]

Final Conference

Cagliari, June 28, 2016

4/29

Pilot Projects - WP7

Page 5: FOSTEr in MED Pilot project Conference in Cagliari 28/06/2016: pilots presentation

University of Cagliari (lead partner)Giuseppe Desogus [email protected]

Final Conference

Cagliari, June 28, 2016

5/29

Pilot Projects - WP7

Page 6: FOSTEr in MED Pilot project Conference in Cagliari 28/06/2016: pilots presentation

University of Cagliari (lead partner)Giuseppe Desogus [email protected]

Final Conference

Cagliari, June 28, 2016

6/29

Pilot Projects - WP7

• Location: Alexandria

Alexandria Commerce Chamber

Roof Integration in building

Page 7: FOSTEr in MED Pilot project Conference in Cagliari 28/06/2016: pilots presentation

University of Cagliari (lead partner)Giuseppe Desogus [email protected]

Final Conference

Cagliari, June 28, 2016

7/29

Pilot Projects - WP7

• Location: Beirut (Lebanon)

Industrial Research Institute

Façade Substitution of existing shadings with PV ones

Page 8: FOSTEr in MED Pilot project Conference in Cagliari 28/06/2016: pilots presentation

University of Cagliari (lead partner)Giuseppe Desogus [email protected]

Final Conference

Cagliari, June 28, 2016

8/29

Pilot Projects - WP7

• Location: Aqaba (Jordan)

Jordan University Roof Substitution of skylights with PV ones

Page 9: FOSTEr in MED Pilot project Conference in Cagliari 28/06/2016: pilots presentation

University of Cagliari (lead partner)Giuseppe Desogus [email protected]

Final Conference

Cagliari, June 28, 2016

9/29

Pilot Projects - WP7

• Location: Tunis (Tunisia)

Centre National de Formation de et d’Ingénierie de Formation

Canopy Extension of the roof a PV canopy

Page 10: FOSTEr in MED Pilot project Conference in Cagliari 28/06/2016: pilots presentation

University of Cagliari (lead partner)Giuseppe Desogus [email protected]

Final Conference

Cagliari, June 28, 2016

10/29

Pilot Projects - WP7

• Location: Cagliari (Italy)

AREA (regional agency public housing) headquarter

Façade Substitution of existing metal cladding with PV and integration of PV shadings

Page 11: FOSTEr in MED Pilot project Conference in Cagliari 28/06/2016: pilots presentation

University of Cagliari (lead partner)Giuseppe Desogus [email protected]

Final Conference

Cagliari, June 28, 2016

11/29

Pilot Projects - WP7

• All pilot projects are hosted on existingbuildings

• They dealt with the renovation/substitution ofbuilding elements

• The budget was not enough to work on thewhole building

Common issues

Page 12: FOSTEr in MED Pilot project Conference in Cagliari 28/06/2016: pilots presentation

University of Cagliari (lead partner)Giuseppe Desogus [email protected]

Final Conference

Cagliari, June 28, 2016

12/29

Pilot Projects - WP7

• Pilot actions are always time-consuming inEuropean cooperation projects

• In most of the countries BIPV is (was) a newtechnology (costs, skills and so on)

• BIPV always requires a balance betweenarchitecture and energy

Main difficulties and barriers

Page 13: FOSTEr in MED Pilot project Conference in Cagliari 28/06/2016: pilots presentation

University of Cagliari (lead partner)Giuseppe Desogus [email protected]

Final Conference

Cagliari, June 28, 2016

13/29

Pilot Projects - WP7

• Total power installed: 100 kWp

• Total annual production: 145 MWh

Pilot projects numbers:

Page 14: FOSTEr in MED Pilot project Conference in Cagliari 28/06/2016: pilots presentation

University of Cagliari (lead partner)Giuseppe Desogus [email protected]

Final Conference

Cagliari, June 28, 2016

14/29

www.fosterinmed.eu

We are social!www.twitter.com/fosterinmedwww.slideshare.net/fosterinmedwww.youtube.com/fosterinmedwww.facebook.com/fosterinmedhttp://ustream.tv/user/fosterinmedhttp://foursquare.com/fosterinmedwww.linkedin.com/company/fosterinmedwww.youtube.com/user/FOSTErinMED

FOSTEr in MED

Page 15: FOSTEr in MED Pilot project Conference in Cagliari 28/06/2016: pilots presentation

University of Cagliari (lead partner)Giuseppe Desogus [email protected]

Final Conference

Cagliari, June 28, 2016

15/29

UNICA (UNIversity of CAgliari)