Transcript of Forwarding letter MOEF Delhi 03.02.18environmentclearance.nic.in/writereaddata/Online/EDS/03...1000...
submitted to the Regional Office. � No packing/loading/unloading of LPG cylinders shall be made on
road/outside factory premises. Vehicles loaded/unloaded with LPG cylinders shall be parked inside the plant premises only and not on road sides.
� Road tankers should be equipped to the standard specified in national regulations reputable code. Vehicles should be mobilized during transfer operations and equipped to prevent untimely movement. Loading/unloading bays should be protected against impact. Fire-resistant coatings shall be provided to tanks/vessels.
� Sections of pipeline and storage systems that can be isolated with valves or blinds should be equipped with safety valves to protect against possible damage as liquid LPG expands with increases in temperature.
� High and low-level alarms shall be fitted to plant storage tanks which can detect overfilling. However, proper supervision shall be done every time.
� For the DG sets, emission limits and the stack height shall be in conformity with the extant regulations and the CPCB guidelines. Acoustic enclosure shall be provided to DG set for controlling the noise pollution.
� Water sprinkling has to be undertaken on regular basis to control the polluting particles.
27.3.14 Expansion of Epoxy Hardening Plant at Sy. Nos. 206 & 207, Village Luna,
Tahsil Padra, District Vadodara (Gujarat) by M/s Admark Polycoats Pvt Ltd - For EC [IA/GJ/IND2/35855/2015, J-11011/15/2016-IA II (I)]
27.3.14.1 The project proponent and the accredited Consultant M/s Ramans Enviro Services Pvt Ltd made a detailed presentation on the salient features of the project and informed that: i. The proposal is for expansion in manufacturing capacity of epoxy hardeners
from 1000 MT/month upto 2000 MT/month by M/s Admark Polycoats Pvt Ltd in the existing premises at Sy. Nos.206 & 207, Village Luna, Taluka Padra, District Vadodara (Gujarat).
ii. All Synthetic Organic Chemicals Industry located outside the notified industrial area are listed at S.N. 5(f) of Schedule of Environmental Impact Assessment (EIA) Notification under Category ‘A’ and appraised at Central level by Expert Appraisal Committee (EAC).
iii. The project proposal was considered by the Expert Appraisal Committee (Industry-2) in its 4th meeting held during 11-12 February, 2016 and recommended Terms of Reference (ToRs) for the project. The ToR has been issued by Ministry vide letter No. J-11011/15/2016-IA II (I); dated 31st March, 2016.
iv. Ministry has issued EC earlier vide letter no. J-11011/91/2009-IA-II (I) on 1st September, 2009 for expansion of Epoxy Hardeners Plant 35 MT/month to 1000 MT/month at Sr. No.207, Village Luna, Taluka Padra, District Vadodara (Gujarat).
v. Existing land area is 14,215 sqm, and no additional land will be used for proposed expansion.
vi. Industry has already developed greenbelt in an area of 33 % i.e., 5010 m2 out of 14215 m2 of area of the project.
vii. The estimated project cost is Rs.250 lacs including existing investment of Rs 510 lacs. Total capital cost earmarked towards environmental pollution control
27.3.14 Expansion of Epoxy Hardening Plant at Sy. Nos. 206 & 207, Village Luna, Tahsil Padra, District Vadodara (Gujarat) by M/s Admark Polycoats Pvt Ltd -For EC
[IA/GJ/IND2/35855/2015, J-11011/15/2016-IA II (I)]
Annexure - I
measures is Rs. 35 lacs and the Recurring cost (operation and maintenance) will be about Rs. 5 Lacs per annum.
viii. Total Employment will be 10 persons as direct & 10 persons indirect after expansion. Industry proposes to allocate Rs 6.25 lacs @ of 2.5% towards Corporate Social Responsibility.
ix. It is reported that no national parks, wildlife sanctuaries, Biosphere Reserves, Tiger/Elephant Reserves, Wildlife Corridors etc. lies within 10 km distance. River Mahisagar is flowing at a distance of 4.6 km in North-West direction.
x. Ambient air quality monitoring was carried out at 6 locations during 7th March, 2016 to 27th May, 2016 and submitted baseline data indicates that ranges of concentrations of PM10 (81.2 - 112.3 μg/m3), PM2.5 (39.5 - 53.8 μg/m3), SO2 (12.8 - 15.3 μg/m3) and NOx (17.0 - 25.8 μg/m3) respectively. AAQ modeling study for point source emissions indicates that the maximum incremental GLCs after the proposed project would be 0.03 μg/m3, 7.61 μg/m3 and 0.58 μg/m3 with respect to PM10, SOx and NOx.
xi. Total water requirement is 41 m3/day of which fresh water requirement of 41 m3/day and will be met from existing borewell on site.
xii. Power requirement after expansion will be 300 kVA including existing 200 kVA and will be met from Gujarat Electricity Board (GEB). Existing unit has 1 DG set of 320 kVA capacity, no additional DG sets are used as standby during power failure. Stack (height 5 m) will be provided as per CPCB norms for the existing DG sets of 320 kVA which will be used as standby during power failure.
xiii. Details of Solid waste/ Hazardous waste generation and its management –
Sr. No.
Waste Description
Category
Quantity (Per Annum) Disposal Consented
Ultimate
1 Used Oil 5.1 250 L 500 L Collection, storage and sale to registered recyclers or re-users.
2 Polymerized Solid Waste*
23.1 5 MT 15 MT To Common Hazardous Waste Incineration facility of NECL.
3 Discarded Containers 33.3 2000 nos. 400 MT
Collection, storage and transportation to registered / authorized recyclers - M/s Maruti Enterprise.
xiv. Public Hearing for the proposed project has been conducted by the State
Pollution Control Board on 19th April, 2017. xv. Details of Certified compliance report submitted by RO, MoEF&CC - MoEF&CC
RO Bhopal for issuance of Certified Compliance Report. However, the same is awaited.
xvi. There are no litigations pending against the project. xvii. Following are the list of existing and proposed products:
Sr. No. Name of Product Quantity in MT/month
Existing Proposed Ultimate
1 Epoxy Hardeners 1000 1000 2000
27.3.14.2 During deliberations, the EAC noted the following:-
The proposal is for expansion of epoxy hardeners manufacturing unit from 1000 MT/month upto 2000 MT/month by M/s Admark Polycoats Pvt Ltd in the existing premises of area 14215 sqm at Sy. Nos.206 & 207, Village Luna, Taluka Padra, District Vadodara (Gujarat). The project/activity is covered under category A of item 5(f) ‘Synthetic Organic Chemicals’ of the Schedule to Environmental Impact Assessment Notification, 2006, and requires appraisal at Central Level by the sectoral Expert Appraisal Committee (EAC) in the Ministry. The ToR for the project was granted on 31st March, 2016, and the public hearing was conducted by SPCB on 19th April, 2017. The EIA/EMP report is in compliance of the ToR issued for the project, reflecting the present environmental concerns and the projected scenario for all the environmental components. Issues raised during the public hearing have been duly addressed by the project proponent. The base line air quality data indicates that PM10 values are already exceeding the prescribed standards of 100 ug/m3. The same is bound to increase further with the implementation of the project, and may not be allowed. The Ministry has earlier accorded EC vide letter dated 1st September, 2009 for expansion of the Epoxy Hardening Plant from 35 TPM to 1000 TPM. No monitoring report on compliance status of EC conditions was made available. No details in respect of Epoxy hardeners were provided.
27.3.14.3 The EAC, after deliberations on the proposal, asked for the inputs and clarifications in respect of the deficiencies reported above. The proposal was, therefore, deferred.
27.3.15 Expansion of Grain based distillery from 80 to 160 KLPD & Co-generation Power Plant (2 MW to 5 MW) within the existing premises at Village & Tehsil Hathin, District Palwal (Haryana) by M/s Ashoka Distillers & Chemicals Pvt Ltd - For EC [IA/HR/IND2/50750/2016, J-11011/23/2016-IA II (I)]
27.3.15.1 The project proponent and the accredited Consultant M/s JM Enviro Net Pvt Ltd made a detailed presentation on the salient features of the project and informed that: i. The proposal is for expansion of Grain based Distillery from 80 to 160 KLPD &
Co-generation Power Plant (2 MW to 5 MW) by M/s Ashoka Distillers & Chemicals Pvt Ltd within the existing premises at Village & Tehsil Hathin, District Palwal (Haryana).
ii. The project proposal was considered by the Expert Appraisal Committee (Industry-2) in its 8th meeting held during 26th May, 2016 and recommended Terms of References (ToRs) for the project. The ToR was issued by Ministry vide letter No. J-11011/23/2016-IA II (I) on 15th July, 2016.
iii. All grain based distilleries having capacity more than 60 KLD are listed at S.N. 5(g) of Schedule of Environmental Impact Assessment (EIA) Notification under
27.3.14.3 The EAC, after deliberations on the proposal, asked for the inputs and clarifications in respect of the deficiencies reported above. The proposal was, therefore,deferred.
[SPAM]- FW: Reminder for Additional Information to PP
file:///T|/...%20Presentation/2nd%20Appraisal/FW%20%20Reminder%20for%20Additional%20Information%20to%20PP_16.01.2018.html[1/29/2018 10:03:47 AM]
Disclaimer :This email and any files transmitted with it are confidential and intended solely for the use of theindividual or entity to whom they are addressed. If you have received this email in error please notifythe system manager. This message contains confidential information and is intended only for the individualnamed. If you are not the named addressee you should not disseminate, distribute or copy this e-mail.Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete thise-mail from your system. If you are not the intended recipient you are notified that disclosing, copying,distributing or taking any action in reliance on the contents of this information is strictly prohibited. From: [email protected] [mailto:[email protected]] Sent: Monday, January 15, 2018 11:06 AMTo: [email protected]: [email protected]; [email protected]: Reminder for Additional Information to PP Email alert to proponent, if any, Additional details are sought by concerned Member Secretary
In reference to the proposal mentioned below, It is to request that the proponent shall submit the additional details asper the statement uploaded on the portal of Ministry.
1.ProposalNo.
: IA/GJ/IND2/35855/2015
2. File No. : J-11011/15/2016-IA II (I)3.Categoryof theProposal
: Industrial Projects-2
3. Name oftheproposal
: Admark Polycoats Pvt. Ltd
4. Date ofsubmission : 13 Jul 2017
6. DetailsSought :
The EAC, after deliberations on the proposal, asked for the inputs and clarifications in respectof the deficiencies reported. The proposal was, therefore, deferred.You are requested to uploadthe reply as stated above within 30 days otherwise proposal will be delisted from the website.
7. Name of the Project proponent along with contact details
a) Name of the proponent : ADMARK POLYCOATS PVT LTDb) State : Gujaratc) District : Vadodarad) Pincode : 391440
Note: ***This is an automatically generated email, please do not reply***
FW: ADS Alert(EC)
file:///T|/EIA/Admark%20Polycoats/EC%20Appraisal%20Presentation/2nd%20Appraisal/FW%20%20ADS%20Alert(EC).html[9/11/2017 1:13:53 PM]
Subject: FW: ADS Alert(EC)From: "Yogiraj" <[email protected]>Date: 9/11/2017 12:48 PMTo: "'RESPL \(gmail\)'" <[email protected]>, "'Dipti Pillai'" <[email protected]>CC: "'Mr. Suresh \(Admark Polycoats\)'" <[email protected]>
FYI Yogiraj Vaghela(Sr.Executive HR & Admin - HR Dept.)
Admark Polycoats Pvt. Ltd.Survey No.207,Village:Luna,Taluka: Padra Vadodara -391 440 (Gujarat), India.CIN : U24224 GJ2002 PTC040987 P : +91 2662 221586/87/83C : +91 9924443552E : [email protected] : www.admarkpolycoats.com
Disclaimer :This email and any files transmitted with it are confidential and intended solely for the use of theindividual or entity to whom they are addressed. If you have received this email in error please notifythe system manager. This message contains confidential information and is intended only for the individualnamed. If you are not the named addressee you should not disseminate, distribute or copy this e-mail.Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete thise-mail from your system. If you are not the intended recipient you are notified that disclosing, copying,distributing or taking any action in reliance on the contents of this information is strictly prohibited. From: [email protected] [mailto:[email protected]] Sent: Monday, September 11, 2017 11:43 AMTo: [email protected]: [email protected]: ADS Alert(EC) Reminder alert to proponent, if any, Additional details are sought by concerned Member Secretary
In reference to the proposal mentioned below, It is to remind that the proponent shall submit the additional details asper the statement uploaded on the portal of Ministry at the earliest.
1. Proposal No. : IA/GJ/IND2/35855/20152. File No. : J-11011/15/2016-IA II (I)3. Category of the Proposal : Industrial Projects-24. Name of the proposal : Admark Polycoats Pvt. Ltd5. Date of submission : 13 Jul 20176. Name of the Project proponent along with contact details
a) Name of the proponent : ADMARK POLYCOATS PVT LTDb) State : Gujarat
FW: ADS Alert(EC)
file:///T|/EIA/Admark%20Polycoats/EC%20Appraisal%20Presentation/2nd%20Appraisal/FW%20%20ADS%20Alert(EC).html[9/11/2017 1:13:53 PM]
c) District : Vadodarad) Pincode : 391440
Note: ***This is an automatically generated email, please do not reply***
~lrnf ~H'" 1 < GOVERNMENT OF INDIA
q liM <01, CR 'Q;Ct '" t'1 '" I~ qf{",O"1
4stlt'111
MINISTRY OF ENVIRONMENT, FOREST & CLIMATE CHANGE
SPEED POST ~~, ~~,
Regional Office, Western Region, . j~ ~ 'qq'1 "
"Kendriya Paryavaran Bhavan" fu;q; m; 'io-31Link Road No.3
E-5, ~ 'l'TVRavi Shankar Nagar, ~ (llovo)/Bhopal-462016 (M .P.)
Telefax: 0755-2465054 E-mail : rowz.bpl-mef(QJ.nic.in.
bbbdx.d y(QJ,gmai I.com
File No : 5-285/2009(ENVf 1 CJV b ~, To,
Dated :3 .1.2018
~w-m~,
~~, ~ m;r, \jj<'f ~, qlOl\q,u l, CR 'l'i \J1<'1ql~ qRqcl'1 <1'3t 1<'1 1Ol , ~ qlOljq,ul 1fiR,
"\J1R 6fllT xts, ~, ~ ~ -110003
Shri Gyanesh Bharti , Joint Secretary, Ministry of Environment, Forest and Climate Change Indira Paryavaran Bhawan Jorbagh Road, Aliganj NewDelhi-ll0003
Sub: Expansion of Epoxy Hardeners plant 35 MT/Month to 1000 MT/Month at Survey no. 207 , Village Luna, Taluka, Padra, Distt. Vadodara, Gujarat by MIs Admark Polycoats Private Ltd. Environmental Clearance reg.
Ref Min istry's letter no. F.No. J-II 0 I 1/9 1/2009-IA II (I) dated : 01.09.2009
~, li<1'3t""I"'<'I"1Ol <f; \3q~)cm ~ 'Cf.'! <f; ~ -q \3Cfil qRIOl)\J1'1I3lT q;'r qlOl\q,<u~1Ol 'i1'&: q;'lu l ~ ~
~ W1<I ~ mIT <f; ;';\jql<'l '1 'l'i certification of compliance <f; f.'I ihlljf1I,<, qlOljq,<~1Ol ~ ~ 01 .09.2009 cnT ~ IlfMc;'1 (lj'if.'lcR II ~) ~ &m ~ '<Ii"'<' ~ tl
1. Shri Shushil Srivastava, Additional Director, MOEF&CC Indira Paryavaran Bhawan, Jorbagh Road, Aliganj, New Delhi-l 10003
2. MIs Admark Polycoats Private Limited, Survey No. 207,Village - Luna, Taluka Padra, District- Vadodara, Gujarat-39 1440
1.
2.
3.
4.
5.
,··l I
Monitoring the implementation of Environmental safeguards Ministry of Environment, Forest & Climate Change
Western region , Regional Office, Bhopal MONITORING REPORT
PART-1 DATA SHEET
EC No.: F No. J-11011 /91/2009-IA-1J (I) dated 1s1 September, 2009
Project type : River- valley/ Mining / Project Type - 5(f), Category A -Industry / Thermal / Nuclear / Other Synthetic Organic Chemicals, (specify) (as per EIA Notification, 2006)
Name of the project Expansion of Epoxy Hardeners plant 35 MT/Month to 1000 MT/Month by M/s . Admark Pol ycoats Private Ltd., at Village - Luna, Tal - Padra , Distr. Vadodara, Gujarat
Clearance Letter (s) OM No. & date EC No.: F No. J-11 011 /91 /2009-IA-11 ( I) dated 1 s l September, 2009
.-
Location A) District (s) Vadodara B) State (s) Gujarat C) Location Latitude/Longitude 22°14'55.96" N , 73°3'11.2" E
Address for correspondence A) Add ress of the concerned Project Mr. K. N. Aras (CEO)
Chief Engineer (with Pin Code & Admark Polycoats Pvt. Ltd. telephone / telefax / fax numbers) S. Nos. 206 & 207, Village -
Luna, Taluka - Padra , District -Vadodara , Gujarat - 391440
--------------------------- CONTACT No - :9879564146
B) Address of the executive Project Mr. Su resh Bahadur (GM - Prod) Engineer / Manager (with Pin Code Admark Polycoats Pvt. Ltd . & telephone / telefax / fax numbers) S. Nos. 206 & 207, Village -
Luna , Taluka - Padra , District -Vadodara , Gujarat - 391440 -. CONTACT No.: 9727757093
r-~~~--~--------------------,-~~----c-~-------------r 6. Salient features Please refer Annexure - I
A) of the project B)of the environmental management
plans
7. Break-up of the project area A) Submergence area : Forest and
non-Forest B) Others
8. Break-up of the project affected population with enumeration of those losing house/dwelling units only, agricultural land only, both dwelling units & agricultural land & land less labourers/artisans: a) SC, ST/Adivasi b) Others (Please indicate whether these figures are based on any scientific and systematic survey carried out or only provisional figures , if a survey is carried out, give details and year of survey)
9. Financial details A) Project cost as originally planned
and subsequent revised estimates and the year of price reference :
B)Allocation made for environmental rnanagement plans with item wise and year wise break-up
Not applicable
Plot Area - 14215 sq.rn
Not applicable , since the proposed expansion was to be executed within the existing premises.
A) The cost estimated with the proposed 1000 MT/month project was Rs. 3. 5 crores at the time of issuance of EC in 2009. The tota l actual expenditure incurred is Rs. 4 crores at the time of commencement of expansion project in 2011. B) The average annual cost in curred towards EMP for the past th ree years has been Rs 18 lacs on an average . This includes cost associated with environmental rnonitoring , cost of disposal to CETP, cost of disposal of hazardous wastes, fund towards health and safety
.. measures and maintenance of pollution control equipments. Item-wise break up is given under Annexure -II.
," , C) Benefit cost ratio/ internal rate of C) Not assessed .
return and the yea r of assessment D) Whether it includes the cost of D)NA
environmental management as shown ip the above
E) Actual expenditure incurred on the E) Approximately Rs. 4 crores, project so far at the time of commencement of
expanded production in 2011 .
F) Actual expenditure incurred on the F) Approximately Rs . 18 lacs environmental management plans average annual expenditure is so far being incurred on the
environmental management plans.
10. Forest land requ irement Not applicable A) The status of approval for diversion
of forest land for non-forestry use B) The status of clea ring fe lling C) The status of compensatory
afforestation , if any D) Comments on the viability &
sustain abi lity of compensatory afforestation program in the light of actual field experience so far.
11 . The status of clear felli ng in non-forest Not applicable. areas (Such as submergence area or reservoir, approach roads) , if any with quantitative information required
12. Status of construction (Actual or Not applicable, since expansion planned) was completed prior to
commencement of production .
A) Date of commencement (Actual or 2009 planned)
B) Date of completion (Actual or 2011 planned)
13. Reason for delay if th e project is yet to Not applicable. start
14. Dates of site vis its a. The dates on which the project was -NA-monitored by the RO on previous occasions. if any b. Date of site visits for this monitoring
~ 18th November, 2017 by RO,
report Bhopal
.,
15. Details of correspondence with PA for obtaining action planslinformation on status of compliance to safeguards other than the routine leiters for logistic support for site visits.
Date & Letter from RO Date & Letter I Reply from PA No. : No.:
06/05/2017 Letter No.: Nil Request letter along with EC compl iance status for seeking certified compl iance report
0210612017 Letter No.: 5-285/2009(ENV)/336 Seeking certain information and comprehensive EC compliance report from the PP
22/06/2017 Letter No.: Nil Reply letter wi th submission of detailed EC compliance report, as requested.
23.11 .2017- Seeking additional information 08.12.2017 Final EC compliance report and comprehensive EC compliance report.
SALIENT FEATURES OFTHE PROJECT AFTER EXPANSION:
NAME OF PROJ ECT : Mis Admark Polycoats Pvt. Ltd.
TYPE OF PHOJ ECr , : Ex pans ion, by virtue of increase in production capacity at the existing
premises.
LOCATION : S. No 206 & 207 , Village - Luna, Tal - Padra, Dist - Vadodara
SCREENING : 5(f)
CATEGORY
PRODUCT PROFILE : Increase in production of Epoxy Hardeners from 1000 MTPM to
2000 MTPM
MANUFACTU R ING : . Epoxy hardeners of different types are manufactured by choosing the
PROCESS IN ORIEF requisite raw materials. Cardanol, extracted from Cashew Nut Sheel
Liquid is a major raw material. The manufacturing process involves
single stage process carried out in single reactor, using requisite raw
material combinations. The product may also be blended with epoxy
resins to form adduct hardeners for direct use.
RESOURCE REQUIREMENT :
SOURCE OF WATER & : Water supply is satisfied from bore well situated in the existing
QUANTITY prem ises. Same will be continued.
Existing water consumption: 26 KLD
Waler consumption at ultimate phase : 41 KLD
FUEL : At present, LDO: @ 300 Llday, Ultimate: LDO: @ 800 L/day
POWER : Exist ing power requirement: 200 KVA, through GEB
Power requirement at ultimate phase: 300 KVA, through GEB
WASTEWATER : EXisting: Industr ial : 5.0 KLD & Domestic: 3.2 KLD
GENERATIO N Ultimate: Industria l: 8.6 KLD & Domestic: 3.2 KLD
ENV IRONMENTAL MANAGEMENT SYSTEM:
EXISTING EFFL UENT : I'rescntly, the process effluent generated (3.6 KLD) is being sent to
TREATEMEN T PLA NT Mis Multichem, Nandesari for recovery ofamines.
!:m uent generated from utilities (1.4 KLD) is being collected and
, elll to CETP of EICL, Umaraya for treatment.
1J0mestic sewage'(:i .2 KLD) is being disposed through septic
tank/soak pit system.
PROPOSED : After the proposed expansion, the process em uc II I generat ion will
UPGRADATION I increase to 7.2 kLiday. The same \\ ill also be sell I 10 M/s 'Multichem,
MODIFICATION OF Nandesari for recovery or amines.
EXISTING EFFLUENT There will be no increase in the emuerll generate d rrom util ities,
TREATEMENT PLANT disposal through CETP will be conli nu ed.
Domestic sewage generat ion wi ll al-;o not increCl , e and its disposal
will be conti nued through septic ta ll k/soak pil S) "tem. ----
FLUE GAS EMISSION : Existin g:
From Thermic Flu id Heater and from D. G. sci or 320 KVA (for
operation in emergency situations only)
Proposed:
No additional flue gas em issions \\ ill be there up 0 11 expansion.
PROCESS GAS : Existing:
EMISSION There is no process gas emi ss ion frclIll the c>. istir 19 manufacturi ng
uni t.
Proposed:
No process gas emissions are envi ~agcd upon tIlL , proposed expansion
either. - --
HAZARDOUS WASTES : Discarded Containers and Used O il '.\ ill be !,ene l 'med, both wastes
will be disposed to authorized recye ;ers.
Polymeri zed Solid Wastes, may be ;:eneratecl ill r are case of fai lure of
batch, and will be disposed 10 CH II IF.
Annexure - II
Item wise and year wise breakup for allocation made for Environmental Managemcnt Plan (For past 3 years)
Sr. No.:
Parameter
I EHS mClIl agemcnt program 1--+-- -
2 Maintenance o f" tirc & cmergency
3
4
management measures
Occupat ional health su rvei ll ance
Environ mcntalmo ni toring program (incl. Green belt development)
TOTAL
Annual Cost allocation (in lacs)
2015 2016 2017 650000 690000 680000 250000 256000 280000
76000 76000 77000 797000 798000 798000
1773000 1820000 1835000
Sr. No.:
I
I PART - II & III
DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE FOR THE PERIOP OF J ANUA RY, 2017 TO JUN, 2017 TO CONDITIONS OF
ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT
EC No: J-llOll/91/2009-IA-II(I) dated 01.09.2009
EC Condition Compliance Status
D . 0, r.;"" 1110 •.• i. Th e company shall sen d all the PP Stated that
wastewater conta ining amines to ~ The entire quantity of wastewater Mis Mu lt ich em, Plot No.: 104, GIDC, containing amines is sent for amine Nandesari Guj arat, and shall not recovery to Mis Multichem, in GIDC invo lve itself in am ine recovery or Nandesari, Mis Multichem is holding wastewater treatment in the valid CC&Afrom GPCB (AWH-52980j. premises for wastewa ter containing ~ The details pertaining to amine water amines. sent to Mis Multichem for the past 6
months for recovery are shown herewith as Annexure - I.
~ From the same, the average monthly disposal to Multichem is around 57,4
kL/month & corresponding daily
quantity is 2.2 kL/day (against limit of 3.6 KLDj,
~ Excerpt of relevant chal/an from the records is also shown under Annexure -II.
In view of the above submission, the
condition may be considered complied.
Complied.
ii. The water requirem ent and
wastewater generation shall not
exceed 26.0 KLD and 3.6 KLD
respectively.
The wastewater 1.4 KLD generated
from util ities shall be sent to CETP of
Mis EICL, Umraya Gujarat.
"W!'.' .~ .k A .:::::~:~ ~." ", -.-'
----.----------~
PP sta ted that " r\ ~ The water requirement for domestic use
as well as cooling use has remained
below 26 KLD. The water consumption
data f or period since April'17 is attached
herewith as Annexure · III.
~ Industrial wastewater from process,
(which is currently about 2.2 KLD on an
average, against 3.6 KLD) is being sent
to Mi s Multichem for amine recovery
(Detai ls given under Annexure - I) .
Wastewate r from utilities (for which
current overage generation is @ 0.77
KLD, against limit of 1.4 KLD) is being
sent to CETP of EICL, Umaraya. Details
pertaining to disposal at EICL for since
April'17 arc included herewith as
Annexure - III.
In view of the above submission, the
condition may be considered complied.
Complied.
---------~-------------'---~ ~ , iii. Th e Co mpany shall obtain PP stated that
permiss ion for drawl of 26.0 KLD ~ The locotion of the unit is in Podro ground water fro m the CGWA/CGWB Taluka, Vadodaro District, Gujorot, which within th ree months f rom date of is under 'Safe' Category. iss~e of this letter and a copy shall ~
be submitted to th e Ministry's The copy of excerpt from Dynamic Ground Water Resources of India Report
Regional Office at Bhopal. of 2011 is attached herewith as Annexure - IV.
~ Also, as per then available guidance
document on CGWA website, the industry located in safe area and having groundwater abstroction less than 1000
KLD were exempted from obtaining NOC. ~ Thereafter, based on the Public Notice as
issued by CGWA regarding compulsory applicotion to be made to for NOC,
irrespective of categorization of industries, and considering our proposed
expansian plan, we made NOC applicotion to CGWA.
~ Copy of application is shown herewith as Annexure - V.
In view of the above submission, the
condition may be considered complied
subject to amendment to condition.
Complied subject to condition. _ _ _ _ _ _____ ----L_--=:.==-=-==.::..:....:..:....:.::.:..:.::.:.::.::.:..:.'--__ ---'
iv. The company shall provide the
monitoring arrangement w ith stacks/
vents and regular monitoring shall be
carried out and reports submitted to
the SPCB, CPCB and Ministry's
PP stat ed that _ 1\ " The unit hos provided odiquote
monitoring arrangem ents with the flue
gas stacks associated with LOO fired
Thermic Fluid Heaters and O.G. Sets.
-Regional Office at Bhopal. There are no process emissions as a part
of the current operations.
>- The stack monitoring is being carried out
regularly on quarterly basis. The
comparative statement pertaining to
stock analysis f or the past two years is
shown herewith as Annexure - VI.
>- The sum mary for the observations
during the period are as below, and they
are within the limits prescribed by
statutory authority : ~---r----'---~
Paramet M in
er
PM, in
mg/ NM
3
502, in
ppm
NOx, in
ppm
34.6
0.3
3.3
M ax Averag Permi
e
81.8 56.8
12.7 3.6
25.3 7.6
ssible
Limit
150
100
50
>- The reports w ill now be submitted
regularly to CPCB and Regianal Office
of MoEF&CC at Bhopal.
"'.
In view of t he above submission, the
condition may be considered partly
compli ed since report not submitted.
Partly Compli ed.
,---,-- ---------------,---------------------------, v. The propollent shall up load the PP stated that
stolus of compliance of the ~ The details pertaining to grant of EC in Sti pulated [( conditions, including 2009 are already updated on the
monitored data on t heir website and
sball update the some periodically.
it sh,,1 1 simu lt aneously be sent to the
Rep, ional Office-of MoEF, the ~
respective Zonal Office of (PCB and
th e SPCB.
The criteri a pol lu ta nt namely; SPM,
RSPM, SO, NOx (Ambient levels as ~
well as st ack emissions), in dicated
for th e project shal l be monitored
an d displayed at the convenient
location near the main gate of the
Co mpa ny in the public domain.
company website (www.admarkpolycoats.com).
The status of compliance of EC
conditions will now be regularly updated on the company website.
The compliance reports are being sent to
Regional Office of MoEF&CC in Bhopal;
henceforth it will also be sent to
respective CPCB zonal office as well as GPCB. Criteria pollutant levels are also being
displayed near the main gate, and updated regularly. Moreover, as per the guidelines of honourable Supreme Court
the same has been mandatory by GPCB.
In view of the above submission, the
condition may be considered partly
complied subject to status be
updated.
Complied subject to condition.
.-~~~----------~----~,-----~-------
vi. The process emissions and PP stated that • '\ particulate matter from various units >- There is no process emission os a part of -
shall conform to the standards the manufacturing process.
prescribed by the concerned >- Also, LOO is being used as a fuel for the
authorities from time to time. At no Thermic Fluid Heater. And as per the
time, the emission levels shall go periodic stack monitoring and analysis
beyond the stipulated standards. In reports, the emission levels stay within
the event of failure of pollution the prescribed regulatory s tandards. --- -control system(s) adopted by the Paramet Min Max Averag Permi
unit, the unit shall be immediately
put out of operation and shall not be
er
restarted until the desired efficiency PM, in
has been achieved. mg/ NM
3
34.6
e
69.2 53. 2
ssible
Limit
150
f-----+----- -- -- +----+---1 S02, in 0.3 12. 7 2.8 100
ppm
NOx, in 3.3 25.3 7.6 50
ppm
~ Ref Annexure - VI.
In view of the above submission, the
condition may be consi dered complied.
Compli ed. ~--+---------------------+-----~------ ---.- --------~
Fugitive emissions in the work zone PP stated that vii.
environment, product and raw >- Work zone monitoring is being dane in
materials storage area shall be line with the sta tu tory requirements and
regularly monitored. The emissions the results indicate that the
shall conform to the limits imposed concentration is with in the prescribed
by GPCB. limits. The details pertaining to the latest
work zane monitoring records are
included herewith under Annexure - VII.
Paramet Min
er
VOCas Xylene,
in
mg/ m3
VOCas
EDA, in
mg/ m3
2.8
3. 1
Max Averag TWA
e Cone.
8.3 4.7 435
3.5 3.3 25
However, it is not ind icated as to which
is the monitori ng age ncy and if NABL
accredited.
Complied subj ect t o above.
viii. I The proj ect aut l. orit ies shall PP stated that
I decontam inate bag/containers and ~ The bags and containers are being sold ~ shall be reu se or sol./-ou t to GPCB out to Mis Moruti Recyclers who are : registered deale rs. recognized and registered by GPCB.
I Incin erat ion ash sha I be sent to
I Common TSDf at Sura l . ~ Incinerator has been dismantled, hence i The sp ent oi l sha lt be sold to incineration ash is no longer generated.
i autho rized recyclers. ~ It is a practice to send used oil to GPCB recognized oil recyclers, as and when generated and collected in sufficient
quantity. The PP may approach MoEF&CC for
suitable amendment of the condition
since incinerator has been dismantled
entailing a perceived deviation in
process.
Complied subject to above
~--~-------- .---- -~--~--r-------~--~--------------~ ix. I During transfer of mat:"ia ls, spillages PP stated as under:
shall be avoid ed and garl and drains ~ Transfer of chemicals is done in line with
be constructed to avoi d mixing of the established SOPs and with aid of accidental spi ll age ages with vacuum pumps where required.
I domestic waste and storm dra ins. ~ Garland drains have also been constructed to ensure that domestic waste and storm drains are not
contaminated. In view of the above submission, the
condition may be considered complied.
Complied.
x.
xi.
xii.
The project authorities shall Develop
greenbelt 33% of project area as per ~
the guidelines of CPCB to mitigate of
fugitive emissions.
PP stated as under: .. ~
Out of present premise area, about 5000
sq.m is marked fo r plantation (35%).
Tree planta tion is being done and fu ll-grown trees arc already being
maintained over about 800 sq.m area,
rest being green space I gardens. Also,
about 2900 sq.m area has been
earmarked and is being currently used
fo r tree planta tion f or about 300 trees.
~ Photographs of thl? presen t greenbelt
are included herewith under Annexure -
Adequate financial provision shall be
made in the budget of the project for ~
implementation of the above
suggested environmental safeguards.
Fund so earmarked shall not be
diverted for any other purposes.
VIII.
However, along periphery thick
plantation/belt not yet developed. This
is to be developed in atime bound
manner.
Partly complied.
PP stated as under:
Average amount specifically being spent
for implementation of environment
m anagement sy.tem is about Rs. 18
lacs, based an pas t 3 years' average
expenditure.
~ The unit is also holding ISO 14001
certification f or its UVi5.
Occupational health surveillance of
the workers shall be done on a ~
regularly basis and records
maintained as per the Factories Act.
In view of t he above submission, the
cond ition may be considered complied.
Complied.
PP stated as und er:
As per sta tutory requirement under
Factories Act, the unit is engaging a qualified medical office r for conducting
six month ly occupational health
surveillance, for which records are being
maintained.
~ Few records in this regard are included
herewith as under Annexure - IX.
In view of t he ab ove submission, the condition may be considered complied.
Complied. '--_---'-____________ ---' _ _ _ ~ _ ______ ____ ....J
~ ,---, --. ---------~~--~--~-,------~--~---------------,
xiii. Th e company shall make the PP stated as under:
arril ngement for protection of ~ The unit has made all due arrangements poss ible fire hazards during for fire protection in various areas of the man ufacturing process in material plant. handling. ~ The details pertaining to fire protection
xiv. I Provision shall be mad e for the
I ho using of construction labour
, wit Ii in the site with all necessary ~
I infrJstructure and facilities such as
fu el for cooking, mob ile toilets,
mob ile STP, Safe drinking water,
meu ical health care, creche etc. The .,; '
hous in g may be in th e form of
I tem porary structures to be removed
i aft c· r t he completion of the project. l---c--:---i--'--' '0 : J,t
meosures are included herewith under:
~ All due precoutions have been taken for fire protection as required under
statutes as well os in line with OHSAS 18001.
~ Fire fighting focilities comprising of main pump (electrical), stand by pump, diesel driven pump, Hydrant
Pipeline Network, automatic fire detection and control system, Manual call points, fire alarms, fire
buckets, etc. Are avoilable as per the GFR and TAC guidelines.
~ About 50 nos. of fire extinguishers -of ABC, C02 as well as M.F. type have been placed at strategic locations within the plant.
~ 150 kL fire water sump is being
maintained in the unit for use during
any fire emergency. ~ Training is imparted to employees
W.r.t fire hazards, fire alarm, handling of fire extinguishers as well as regording on-site emergency plan.
In view of the above submission, the
condition may be considered complied.
Complied.
PP stated as under:
Due to availability of labour from local
area, labour colony was not required. However, provision of requisite sanitation facility as well as drinking water were provided to the engaged
labour.
Deemed complied. - ~" co,>
i. The project authorities shall strictly
adhere to the stipu lations of the ~
SpeS/state government or any
statutory body.
PP stated ;lS under:
Since commencement of production
operation, unit has obtained all requisite
permissions from statutory bodies - CTE
& CC&A from GPCB, Registration of
fac tory and license under Factories Act,
and appro val from PESO; the unit is complyin g with the conditions
thereunder; these permissions/consents
are also being renewed fro m time to
time. Copies of the consent order are
included under Annexure - X.
In view of the above su bmission, the
cond ition may be cons idered complied.
L-____ L-__________________________ ~ ____ C_o_m~p_li e_d ____ __
!
.. ii. No further expansion or
modifications in the plant shall be ~
carried out wi thout prior approval of
th e Ministry of Environment and
Forests. In case of deviations or
altera t ions in the project proposal
from those sub mitted to this
Ministry fo r clea rance, a fresh ~
reference shall be made to the
Ministry to assess th e ad eq uacy of ·
condit ions imposed and to add
additiona l environ ment,,1 protection ~
measu res req uired, if any.
PP stated as under:
The present production is alwoys remaining less than 1000 MT/month os per the prevailing EC. Production details
since April'1 7 are shown under Annexure - III, average production has been
around 570 MT/ month. We have duly made application to MoEF&CC for further expansion in manufacturing of epoxy hardeners from
1000 MT/month to 2000 MT/ month. Based on application for ToR made on
25/12/2015, ToR for expansion was issued vide J-ll011/15/2016-IA 31jJ3/2016.
letter II (I)
no.: dated
~ The draft EIA report for expansion was submitted and Public Hearing was conducted on site on 19jJ4/2017.
~ The final EIA report was then submitted
online for appraisal on 27jJ5/2017. ~ Appraisal presentation was scheduled on
29jJ8/2017. ~ As conveyed by the committee, the case
will be assessed on receipt of certified compliance report from MoEF&CC RO Bhopal.
In view of the above submission, the
condition may be considered complied.
Complied.
iii. The proj ect authorities sh all strictly PP stated as under:
comply with the rules and ~ The regulations under MSIHC, 1989 and
regulat ion s under Manufa cture,
Storage and Import of Hazardous
Ch emica ls Rules, 1989 as amended.
amendments are being complied with, according to statutory permissions
obtained under Factories Act. Authori zation from the SPCB shall be ~ Unit is holding authorization from 5PCB
for collection, treatment, storage, and
disposal of hazardous wastes vide Order No. : AWH - 59893, issued in 2014 and
obtai ned for collection, t reatment,
storage, and disposal of hazardous
wastes. "'. vdlid till 2018. ~ Unit is also holding approval from PESO.
In view of the above submission, the condition may be considered complied.
Complied. '---_-'-______________ L----=.:..:..c:~'_'_'_ ________ ____'
iv. Ambient air quality monitoring
stations shall be set up in the
downwind direction as well as where
maximum ground level
concentration are anticipated in
consultation with the State Pollution
Control Board.
--- ----------------~ PP stated as under :
Ambient air quality station is placed near
Main Gn te and near weight bridge of the
plant, the results pertainin g to the some
for thr post two years are included
hereunder under Anncxure - XI. '---'-'-,-----,
Paramet Min Max Averag Permi
er
43.7 80.0 PM10, in
pg/ m3 1--'-'::':"""--+ ---c---
PM2.5, 3.2 8.6
in
pg/ m3
S02, in
pg/ m3
NOx, in
pg/ m3 -=..c:;. _ _
>- The
7.7 36.?
16.2 33. R
- ------results indlra tc
concentrations
permissible limits.
or!?
e
59.5
6.4
21.6
25.5
that
within
ssible
Limit
100
60
80
80
the
the
However, monitoring agency including
if NABL accredited and whose
standa rds refe rred t o be l11entioned.
Compli ed subject to " bove. f---r-----:---::--------t-- -.- - - -'---------1
v. For control of process emiSSions, PP stated th at
stacks of appropriate height as per ~ The unit has stacks associated with the
the Central Pollution Control Board Th ermic Fluid Heaters (2 nos., 1 working,
guidelines shall be provided. The 1 standby), with 18 III height each.
scrubbed water shall be sent to ETP >- There are no process emissions and
for further treatment hence scrubber is no t IJeing used.
.;: '
~ Being LDO fired TFHs with stack height
as per guidelines of GPCB. APCM are nQt
required.
In view of t he above su bmission, the
conditi on may be co nsi dered complied.
Compli ed .
vi.
vii.
- - - - - -------,------------------, The cO lnp .lI1Y shall undertake pp stated that
1(> llowi ng Waste Minimization >- Waste minimization measures are being implemented, details are as under : t11easu re .
r Metuiny of quantities of active ingredients to minimize waste.
--- Reuse' ()J by-products from the proCL';S as ral1/ materials or raw
nlOtelio. Substitutes in other
processes ,. Maximizing recoveries
'" Use of au tomated material tfon!Jj er syst em to minimize
spillage
--- Use of "::Iosed Feed" system into botch reoctors.
Th e proje·ct authorities must strictly
comply wilh the rules and
regulat ions with regard to handling
and ciispoS <l l of hazardous wastes in
,lccoruan ce wi th the Hazardous
'Nust c's (r .'la .lJgen ,cnt, Handling and
lIans bO I,nu;l ry Movement) Ru les,
1008. Au [hOi iZution from the SpeB
shall be ob tain ed for
co II ecl ion/ trcatmen t/
slorage/d ,sposal of hazardous
vvastcs.
>- Metering is being done for the raw materials being utilized through mass flow meters for each reaction vessel.
>- There is no generation of by-products from the process.
>- Two stage condensers are associated with each reaction vessel 50 as to maximize solvent recovery.
~ Vaccum feed system and double mechanical seal for pumps are installed for proper and efficient
material transfer, and to prevent losses.
>- The reactions are carried out in close feed systems only.
In view of the above submission, the
condition may be considered complied.
Complied
PP stated that
>- The unit has obtained due authorization from GPCB vide order no.: AWH - 59893,
issued in 2014 and valid till 2018 for collection, treatment, storage and
disposal of hazardous wastes, and the conditions there under are being
complied with. In view of the above submission, the
condition may be considered complied.
Complied
,-----,-,-----,----,-----,-----,-----,----,--- ---:- .--- - - -----~. viii. The overall noise levels in and PP stated lha l
ix.
around the plant area sha ll be kept
well within the standards (85 dB A)
.j; Th e requisit r' noisl' pre"enlion m~asures
by providing noise control measures
including acoustic hoods, silencers,
enclosures etc. on all sources of >-
have been taken to ensure that noise
levels within the plant area remain
within limits.
Th e ambient noise levels are being
monitored leglllariv an quorterly basis
and based on the reports, it is
conforming to the Imits prescribed
under Factorie, Act
noise generation. The ambient noise
levels shall conform to the standards
prescribed under Environment
(Protection) Act, 1986 Rules, 1989
viz. 75 dB (day time) and 70 dB (night >time).
Noise level details for pas t three years
are included herewith under Annexure -
XII, from which it con be seen that the
noise levc/, remain within the
permissible lim it oj 90 dB(A) as
stipulated under Factories Act, 1948.
A separate Environmental
Management Cell equipped with
full-fledged laboratory Faci lities shall
be set up to carry out the
environmental management and
monitoring functions.
Para met I Min
er
Max Averag Permi
e ssible
Limit ~---1i-- - - --' - --!----1
Lab Area 48.3 I 66.8 ~---11-- - ,--- - ,
Admin 43.? I
58.1
Section - 1-
52.5
52.5
Utility 54.(' N.6 69. 2
Praducti 54.4 -176.6 : 63.4
an i
90
However, moni tori ng agency including if
NABL accredited and whose standards
refe rred to be mention ed.
Compli ed subject to above.
PP sta ted that
>- The estoblished Environment
"" .
Mana gement Cell, hp.aded by GM,
supervises the environmental
management aspect.~ as well as
monitoring jl)nctions.
However, personnel ' ith background
of environmental science or
engineering may be recruited.
Partly Comp~d.
~.# .• 7
/' / ' ''· ,-----x.
1 r;· --- -jI Tile project authoriti es shall provide
r,Jinwater h<Jrvest ing system and » ground w~l te r recharge.
PP stated that
For rain water harvesting, system
consisting of one recharge well has been provided & photograph of the same is
xi.
shown hereunder at Annexure - XIII. In view of the above submission, the
condition may be considered complied.
Complied - .-- ----- ---------+-----~----------------------~ The illl pl('men tat ion of th e project PP stated that
I Vis-a -\·is ( nvi ronmenlal action plans » i shall be monitored by M inistry's
R,'gio ll al Offi ce SPCIl / CPCB. A six » monthly com pliance sta tus report
·sha ll be submitted to mon itoring
Monitoring of parameters is being done on regular basis. The unit had initially submitted six monthly compliance report vide letter
dated 17;04/2010. agen cies. » Thereafter, since 2016, the submitted six
monthly EC compliance reports are
being submitted regularly since 2016. Supporting documents are included
herewith as Annexure - XIV. » The copies of the six monthly compliance
reports will now be regularly sent to lO
of CPCB and SPCB as well, which was not being addressed earlier. It may be seen that from later part of
2010 till 2015 report not submitted.
This should not be repeated.
'------'-_ .- - ---- Complied.
.:.
,---.-~------------~~~,-----~ -xii. The project proponent shall also PP stated lha ~
xiii.
submit si x monthly reports on the ~ Moni toring of narometers is being done
status of compliance of the on regular bosi';.
stipulated EC conditions including ~ The unit hod in itially submitted six
results of monitored data (both on monthly comr:ianc(' report vide letter
hard copies as well as by-mail) to the dated 17;tJ4/20 1O.
respective Regional Office of MoEF,
the respective Zonal Office of CPCB
and the SPCB.
~ Thereaftet; siwc 2().I6, the submitted six monthly [C compliance reports are
being submitted reg ularly since 2016.
Supporting documents are included
herewith as Annexure - XIV.
}- The copies of t i' e SIX monthly compliance
reports will no'v be regularly sent to zo of CPCB and SPCB as well, which was not
being addressed earlier.
A copy of clearance letter shall be
sent by the proponent to concerned ~
Panchayat, Zila Parishad/ Municipal
Corporation, Urban Local Body and
the Local NGO, if any, from whom
suggestions/representations if any, ~
were received while processing the
proposal. The clearance letter shall
also put up on the website of the
Company by the proponent.
"'.
It may be seen t hat from later part of
2010 till 201 :' report not submitted.
Th is should no' be repeat ed.
Compli ed.
PP stated t ha t
In absence af any specific
representation. fro m til e said authorities
/ bodies, sub'niS5ion of EC clearance letter was not required.
The details Pi rtal'ling to grant 01 EC
have been "/isp:ayerl an company
website. Copy '1 the EC will also be duly put up an website. (www. admark[Jo lycoats.com )
In view of the above submission, the
cond ition may be co nsidered complied.
Co mpli ed
,---- - I - .. -- --- ---------------,----------------------------------,
-. xiv. I Tile proj l 'c t proponent shal l inform PP stated that
the pu blic that the project has been ~ Complied, Copy of Ec.. has also been
xv.
accorded envi ronm ental clearance updated on company website
by th e M in istry and copies of the {www.admarkpolycoats.comj. cleara nce letter are avai lable with
the SPCB an d may also be ·seen at
Website of the Ministry at
I http://envfo r. nic. in. Th is shall be
advert ised withi n seven days from
t he date of issue of the clearance , letter, al least · in two local
newspapers that are widely
circulated in the region of which one
. shall be ill t he vernacula r language
of th e loccl lity concerned and a copy
01 th e sarne shal l be forwarded to
the Ministry's Regional Office.
However, regarding advertisement in
paper nothing has been mentioned.
This is to be submitted for being
qualified for complied.
Not Complied.
Th e environmental sta tement for PP stated that
each fin ancial year ending 31st ~ Being complied.
I March in Forrn -V as is mandated to ~ Form V {Environment Statement is being
b,' , ubllli tted by the project
pl oponelll to (he concerned State
Polluti on Control Board as prescribed ~
under th e Enviro nm ent (Protection)
Ru les, 1986 as amended
su bsequentl y, shal l also be put on
the websi te of the Company along
I w ith the statu s of co mpliance of EC
I condi t ions and shall also be sent to I
t he respect ive regional Office of the
MoEF by-mail.
updated each year through online portal
of GPCB. Form V will now be updated on company website and will also be sent to RO
MoEF&CC.
Partly Compiled since updating to be
done now.
Partly Complied.
xvi. Th e project authorit ies shall inform PP stated that
the Regional Office as wel l as the ~ No record has been submitted regarding
Minist ry, th e date of fin ancial closure
and fina l app roval of the project by
the concerned authorities and the
financial closure. ~ After grant of
commenced in 2011.
EC, project was
date of start of the project. ~ The total expenditure occurred from the soid expansion was approximotely Rs 16
crores . ..c ' The answer not given properly.
I '----_ . --.---~--Partly Complied.
1.0 Summary: ~
Out of30 total conditions, it may be seen that 17 are fu ll y c(11l11'I icd. :i a ' " p<l,tly complied,
I is not complied related to advertisemen t in nc\\ 'S paper. 6 arc c01l1plicd subject to
additional information and I is deemed com pl ied. These h,l\ 'c hcen explained in the
foregoing compliance report against each of the condi ti ons, and the 1'1' needs to take
necessary and time bound action for early compli ance in respect "I' thc reln :1Il 1 conditions.
2.0 Court cases and show cause/closure notice The PP has stated that there are no court cases regard ing the lilc i I i tl . I t liaS [, ,'en also stated by
PP that there is one show cause notice issued by GI'CI3 in J)( cen lbcr. 201 4. This is in
Appendix.
3.0 Response of PP to RO Bhopal's lettcr datcd 23.1 1.20 17 is a t Ap pendix .
v ~ Scientist "G . 'cientist 'c'
J C
b
D t~,
D
b
D
~
D
~'
~
~
~
&~J , ~
)
~
~
~
• ~
)
~
)
•
AD MAr-POLYCOATS PVT. ~ __ _ _
a 31," I' 7"'1" ., I ,.l . 0
To
Addit ional Principle Chief Conservator of Forests
The Reg ional Office - Western Region ,
Minist ry of Environment, Forest & Climate Change,
Kendriya Paryavaran Bhavan,
Link Road No. 03,
E-5, Ravi Shankar Nagar
Bhopal - 462016 (Madhya Pradesh)
sth December, 2017
APCCF 1--. Sc. 'G'
Sc. 'F'
fr;o '0' --
Sc. 'C'
Cour t Case (CdV.)/
SUBJECT Submission of details with rega rd to Is~ancJ of crrti fied
compliance report in connection with Expansion of Epoxy
RI\ (Env.) -,
REFERENCE
Dear Sir,
Hardeners plant - 35 MT/Month to 1000 MT/Month by Mis
Admark Polycoats , Private Ltd., at Village - Luna, Tal -
Padra, Distr. Vadodara, Gujarat.
Your letter no.: 5-285/2009 (ENV)/S85 dated 23/11/2017
Kind Attention : Shri B. B. Barman
With rega rd to the subject mentioned and in connection with our request for
issuance of certified compliance report, site verification visit was undertaken by
officials from your good office on 1Sth November, 2017. Based on the same, we
have received the aforementioned letter from your good office. We would like to
make the fo llowing submission in this regard for.your kind consideration:
I. The production for the past three years has never exceeded the capacity
(1000 MTPM) for which EC has been granted in 2009. We are herewith
production details for our unit as Annex&e - Ii. as supporting document.
II . W ith regard to greenbelt, we would like to state that out of out tota l present
Pagc l or 4
Epoxy Hardeners "Built to Perform"
) Rogd . Office & Wort,s: Survey No. 206·207 , Village: Luna, Taluka: Padra. District : Vadodara - 391 440, Gujarat. INDIA .
• Ph .: +91 2662221583,221 586 • Tele!ax: +91 2662221587 • E·mail: [email protected] • Website : www.admarkpolycoats.com
I
ADMARK POLYCOATS PVT. LTD.
premise area, about 5000 sq .m is marked for plantation (35%). Tree
plantation is being done and full-grown trees are already being maintained
over about 800 sq.m area (i ncluding peripheral greenbelt of 1 m width), rest
being green space 1 gardens over 1300 sq.m area. Also, about 2900 sq.m
area has been earmarked and is being currently used for tree plantation for
about 300 trees. In this regard, we assure that the plantation will be completed
within 2 years time period. Photographs of the present greenbelt are included
herewith as a part of the EC compliance document also.
iii. The details of Environment Management Plan (EMP) and risk assessment
have been included herewith under Annexure - B.
iv . Additiona l Details:
a) Details of court cases during past three years:
We would like to state that there have been no court cases against our
unit in the past three years.
b) Details of show cause 1 closure notice issued by GPCB/CPCB during last
three years and action taken thereof:
No show cause notices have been issued to the unit The unit had been
issued a closure notice in Dec' 2014. Details are as below:
Sr. Date of Reason for Compliance wrt Closure No.: Closure Closure 1 31/12/20 14 Seepage of The said wastewater was overflow from
wastewater utility (cooling bleed- off). Same was due to also conveyed to the authorities. damage in The hole observed in broken compound compound wall was sealed immediately after the wall of the visit By regular inspection around the premises periphery of the premises, it is being
ensured not to have such hole in our compound wall. Based on site verificati on, the said closl!f,e order was revoked by GPCB on 13/0'1/2015 .
c) Direction Issued by CPCB regarding online monitoring and complia nce
Pagc2or4
Epoxy Hardeners " Built to Perform " ____ ._.
Regel . Office & Worl,s : Survey No. 206-207. Village: Luna. Ta lu lla : Padm. Dislrici: Vadodara - 391 440. GUlar"l. I I~O I i\. . 11
Ph.: +91 2662 221583. 221SRG • Telelex : +~1 ?GG/ ??1SR7 • E·mail: inlo(a)admarkoolvcoals.com • Webslle. www.admall(llolvcOJ locOi
•
ADMARK POLYCOATS P VT. LTD.
thereof: No directions have been issued by CPCB.
d) Details of expansion/construction taken up without obtaining requisite EC:
No expansion has been carried out. EC application has been made for
proposed expansion and will be executed only after grant of EC.
v. Summary of results in tabular format for monitoring done for environmental
attributes have been included in the prescribed format as annexes to the
detailed EC compliance report. The environmental monitoring is being carried
out through M/s Eco Care Solutions, who are recognized as Schedule - II
auditors by GPCB vide letter no. : GPCB/EA-211 (2)/422745. However, they
are not accredited by NABL. In this regard , we hereby assure that
environmental monitoring will hence forth be carried out through NABL
accredited agency only.
VI. The details pertaining to personnel engaged in the Environment Management
Cell have been given hereunder as Annexure - C.
In addition to the above, the comprehensive EC compliance report is also
attached herewith as Annexure - D. The updated monitoring report is enclosed
herewith as Annexure - E.
We hope that the above documents will be in line with your requirement. We
' (.:;;> request you to kindly issued us certified compliance report .
With respect to our application for EC for expansion (increase in manufacturing
capacity from 1000 MT/month to 2000 MT/month), we will be able to represent our
case before the Expert Appraisa l Committee (EAC) for final appraisal only after
issuance of certified compliance report from your, end.
Thanking you.
Yours sincerely,
Page ) 01' 4
--------~~~~~~~~~~~:-:::-:~~=--.---) Regel. Office & Works: Survey No. 206-207, Village: Luna, Taluka : Paelra , Disl,-icl: Vileloelara - 391 440, GUlara!. INDII\,
Ph,: +91 2662 221583, 221586 . Telelax : +912662221587 • E-mail: [email protected] • Website: www.acimarkpotywot· •. co ... I
bO
CL
t Be
fEE
.al .= €
fiEE
!tts;.E
o
EE
E*B
Etr >
trE
.g U
c
I#EE
!*=E
='.
c (! o
oE
(o(u>(\1
=u
a-{FO
\trc
ssE*si+
>-
F{
q, :
'- e
LE
\LPcLL
3pEE
.9ee;S
gEfE
E-
EtE
!?EE
gcz
CU
f q.
EtE
sE :+
;E
GE
EG
EE
E<
(Jtoro(JFE
<
'o -co?E
5E
9l rrio
Yu
EE
EU
O-
^'6 3r:-oqqlE
:.=(o;tr-s g€(!.qolO
-lhE
rE
b;!
orrH
.> o
O
n9e,yo
H, f !
uE'r tgr
SE
EI ;;=
;s€l EE
=
Ei$gE
F
obI)dor
.EgFHa
6l
EE
.ao4
E eG
3
-€EE
EE
EH
€=
E .g=P=
sE
! eE
3
*E5E
=0JE
tr.E
€-€ 5v6t!e
--J-fl\)\oi5.b7
trEELO.
Btr
HsB
EE
EtrC
LtrES
B
€.EP
E':
,IE.H
E=
EfraE
EE
E:;3eE
p s
g E;=
r E 3E
caEB
ES
S
F->
6P
LE
PI
c-OoP
cL
U E
E->
(u0.r-.?e-U
oJ=.Y
U
(!
=
'- 6
C
O-
E;sere
.0 EttrE
3>
.clfE-oE
- e E 8;8
EA
eEtgE
g,gE
;EE
3EcaE
E#88
c.9.ET'EoIl,ooB
Eg!!qE
6
f <t
B=
;EtE
€E
;ssi3i€; =
5oE
o>q
*; EgE
fesE;
f xf ;iF
J = E
.us3=
ES
.ES
!?.:9F
o<.oE
e! g>.=
&P
;E
E E
:EE
EoE
E .E
Ep
qLo!=
(o5b6seor>
o!/=
>.gU
*iE
Eu.e"
_-vt O
r+E
OE
f:EE
63qi9r7=
--oEE
p s! 5E
HE
f,EuE
'=tro
ogbi'F!L-UF
o
E
6d,
;€{EE
EE
IET
EI;eiggE
;tEi
EglE
;s;E;gg
gEetigIir=
I'E
EE
i;g?E,E
,EE
isE
,
c),4o)
==I
qtooNt{orF
lF
{oF
{F
{a
o;z+ld.:#>orGfR96iNd3IEo0,E
Et
0,,
<utF
{oEootIlrtoogc.gcEo(J
fr
oO
CL
tnef
EU
EI .E
O
U
=1rs
fiEs
!tls;.E
i)
t!=ur
o =E
SE
Etr >
tr€E
Io.
r >
-8dE
:E
iE
.9
;ii:-^!
=.ts
rg tr 3
'Eo I
E:E
Ey
:ssego0<
6 g .
.=z E
id E
€ il# E E
>€>
si
qF $ H
H *
i.E
H
## P
E
E*E
aguE;T
,uE
E E
E:E
Ett?E
sg*gEgE
EE
EiE
eEi+
B f-i
rH
Egt$ !$E
g.B
e; E E
E
stEilE
IE"3 f
!t.g9r gE
qJ o
r.(!cp==
(rI'.EcL
E E
9 s E
UE
-\ E
gigE3,gE
UE
Egs$E
EgE
EE
6E
o.tobI)
.E=cL
E9
nEtAt
=t
E8.
taoG
rs=.E
=86E
=A
,E
tr.E
€-€ 5vvro?
EflE
€=
orEtr
.E€-E
Evvrt!--
ltt=
E .(!=LF3B
r-sil#
N".Itl,sELO
.B
.&r
netE
E6
Eg
Ets
E8
.2 >E
i€ H
.g orE
HE
;;eP
H;q
Ea.E
JEI.E
E=
EifE
?E*
?Cr(E
C
EE
e E
gE=
F;E
":E.E
*9
iEE
EE
EE
Eg
P9E
oIo.I .e E
->hE
.9{=tr
H-qg ! 3
bo g'..=
.:5'E
Er s
EE
-e'*E*
srS E
E
E 6
A =
Q B
E=
o.
EfqE
EE
c.9.t!,goI(Jo'gA
9t+
-oF
6.o*E
F-tP
GoJ i:
'=
-t:F
F6E
NE
-+
3>q
9SE
:e E
*, E:E
;E';€o
E6:L'L(E
V
E =
''t EE
A9J6
OE
EE
;.E
E$;E
ho>=
'=r./
lI(U6(tJ-C
l
o:P
-;v
=(E
pcr=
.c.cE
i; H
'Egre
s h Etr
vt
Ei.E
r+€ E
E;
N=
uvErE
XE
.E-
-c - -,,
!?ua=
,rO-H
E+
*EE
'E!
o, !Eo
cE
9 5
E(E
-h(oE
gFE
g(o q d a:
"EE
BT
EL
9a-u
co A -
o d!J 'rE
F-o(I,rl;
E€,*g;u0 .s ,;cL=
C
ot.9cr'=
66
00'EoE
b
EE
,Eg 5E'-(E
s6E
oE
o$-P
tA6E
.PE
'a.=.9rhEs'=
Ir;
E-c
(Y) cL
F(o(J
,Hj
x
IIotooNF
{o!F
{F
loF
{F
{Ictzlr*:oO
E
olooNs'o!EocotnF{
C)
!,ooT'
(,trto6,(Jtrlr!to.
l
EI
LIoIU
I
dicvll!otJ->or.!oET
'
ooo
A
ooo,t nef
EE
!, .=
cUJ-E
fiEE
iEt
EIoE
E=
o>
UE
c >tr
EE
E
EL
-L'
=o,
o:tsY
LE=
go{
+E
q,gdxIll!(E
HE
=".9
orE(\t
BE
; 9S
E_E
g.=E
EE
q€gJor.=s i trf(!l!.:3
.c,i:
>_c
dE:
T s.P
':9evtE
E 8:
EIE
E'Q
c I E
:Ecy
E H
€ro.eco-E
t2oo<
6.9 |
.=Z
EE
E.E
=orH
.e='=
=-l
or au
=O
coEc
v14L
>tr>
3a
.o',=
>
.cdE
:3 E
.P
u€.u:^^E
=.t
Hgts3
'Eo g
E:E
Ey
;:eg9bo<
d.g
I
.=z u E
IE
=*H
.e?
EE
=H
E
E -,nl
E3=
qqL
L.c
9! ot
.igEE
ET
?.9'EeE
EE
EE
ffl.EH
lr c^.L
(o
b+:E
iaotr.9
E i
IE
tEbI-a
tttHfia
668>s9
(!-L
ig.sEgE(oCLE>
,c=
(oE
=6tn(oo3PIEb_(,E
:orx.C
roto.sgT
' au
E;8
nE
fH-&,
E eE
3
EE
EE
.E gE
5vt^tE
?
E:E
€=
0.,E
tr
.E€-E
-Evt,1(E
C
rE.gELF3E
E.9CL
EoUoz
ttEELCL
ooo.cEE
stE
E6
E9
=E
SB
dEvl
E i t
v'=
=-cE
=goolE
Fc;
E€E
#qEF
-g-ru
IEH
-Ue
9 ;E H
E;
g:qr:o!oE
SU
EE
gItO
(!-6E6
dEorS
giEU
'tr=-cE
cL
E si S
5 E
E;.9<
;t:..E
E+
:9>
>E
E.o tr
iFH
EE
;.
no;sE
ES
E. 3;;
gE H
FE
L'5tr'trTiE
HgE
E.€e-
>-Y
.=.=
fe6H
=P
H5
--cr(lJo.rY(J
oo.g,8€.ch=8ELEL'ocr6>
E(lJ!
E#
Il!
g.9.ET'coIuooo-
(!JL!
EB
.9grtr=
86vto!:(Uc>
--E
E ft p;
3EI=
=E
3E9.=
oE'=
E-g
E: E
AT
;=gbg
VL
g# ; --sEP
eEL,q
c.=L',=
o.O
o. 9.r c 'F
.o5i(o=S
HiH
E
o-clE
P -p
co
+S
s€#+;E
EE
frEE
sE.s
Ei€ liE
E:ae
E=
n*$!;!'E.i=
sgBE
EE
g
i i ii; t g H g
.Ee*E
g6'[-'F: I E
E i g g:;
E E
; sE E
E € e
A
vt ^E
: (u *
(u'.=
#gEE
nEE
tg
:.gES
E
Er!F
;-L=vt
L
9=eE
[€ = E
(!Xq,3
E!#*P
-itr=L
(!oiolbotr.=E
E T
EE
T
E tr
CitJ
.9;sE)g
ooLP
-Plr,
'=g:E
EH
ET
$y, 1E
h
.9-ofCL
OJ
!PEE
t- c,
6ptoU
.i5(!-ccvt
g)P
(UE
O9t,.b9o--9Ua.qoE
EE
eC
LPqf
&
?
6gx
.:x
==o!ooNF{
Ol
F{
oFl
F{io
:2Itd;.i>oo.Eli
otqctF
fo;NigIElE
oE
Et0,<
utF{
oTIooT'
IUJooIJc.!gEL
Eo(J
oO
CL
f E
oE
EL,
c.9u.4, .t
cUJ?E
fiEs
!tlsd.9
o
E;.8
tr=o
>U
EE
.}EE
.gEc
Log=*=
E.
gHiU
E?
E r3 €E
E
pE€ E
E5
EE
EE
EE
{g* E
I
;sgr E
s.E
E t"l
P:
FI
s 6tlssS
l(lJP
>l
Fo.S
l
9o u'ts
o399too
;€E E
tE.=
.P;-=
cL
eE E
g E I
E;E
gaEE
H*E
EIg#
;P
- o o u
o
T E
E # =
'E E
<fooO€AA -a\&
IBpt6t
EE
vlool
gE.9trLF38
rEEE
3B
'.\(
\*)Q
c)
t]l,gELO
.tE
=netE
E6
E+
trEE
8
o:!iE uo.g
utCO
-
gEt E
"-'.8
!.oI
? 'o ..ij a-E
EfIE
.=P
tr=(J
!eL-
6q€E5
c E
6 62
;oocu(ucc'G
o=
E<
iqrooC
L^EL
TP
Eoo00(J.su>
ts_>(!C
L(oo-
fcL
.E,
.occL(!Jtroo L)5>Ll!ocL;>E
g_-geF
O-
c.9.E1'coIuo'dr
(Upgs
E;:=
E N
f E:
=E
E 3 +
E E
I €
* EiE
E E
g*g;
iiI€c+Itltt
* + E
* ; E a€ aJ e
EtfigE
IEaE
IEr gs # i
B g # E
E # E
# =
tE
*E
5Et+
E ; g=
+ x *'i =
:isi*;g+
EE
?$E
EH
E€f gE
E
Efliii?g* s E
5
EE
IEE
Et*E
EE
*E+
{,fto.g;"EP
t-t!6
=E
A:E
€= eE
= eiE
toEP
roP
l!5E
gor;
s t Y
jj;(EorcL
'X;eE
e=
<
t r oi
Ep€::
!(F-P
L
E9 3E
gO
PC
psE
.bEE
9o'E
oa'=.U
-c (U
s i
(oI
E
O 0.E
dEJx
x
=II
oiooNg!F{
rlot{F{Io
;z+'l u:lJ>0,o.tsf;Re5lNt3TElEo
EE
to<utF
{oEol!!,Il!oo(,t.gcEo(,
r{
1/30/2018 NOCAP
http://www.cgwa-noc.gov.in/ExternalUser/ApplicantHome.aspx 1/2
Information
Guidelines
Steps for Filling
Online Application
DocumentsRequired
Documents
Required for Online
Application
Industrial
Infrastructure
Mining
Track Status
Application Status
Online
Location
Area Type
Regional office
Location
CGWA
Headquarters
Contact Us
Contact
Government of India Central Ground Water Authority (CGWA)
Ministry of Water Resources, River Development and Ganga Rejuvenation
Application for Issue of NOC to Abstract Ground Water (NOCAP)Welcome : GWRMC
Previous Login Date Time: 27/01/2018 20:08:35 PM , IP Address: 123.201.57.107 Logout
Application Status
Application
No :
21-4/1621/GJ/IND/2016
Receive
Date :
24/01/2018
Name of
Industry :
ADMARK POLYCOATS PVT LTD
Application
Processing
Fee :
Rs. 1000.00/- (Rupees One Thousand Only) (Submitted: Yes)
Current
Stage :
Application Processing Stage
Current
Status :
In Process
Address : Central Ground Water Board West Central Region Swami Narayan CollegeBuilding, Shah Alam Tolnaka AHMADABAD GUJARAT
Current StatusApplication Verification
Receive
Date
From User
NameTo User Name
Forwarded
User NameAction Date
Action
Internal
Status
Action
Comment
Copy of
Application
Received On
15/11/2016 (Evaluation
Officer)
Central
Ground
Water Board
West Central
Region
(Evaluation
Officer)
Central
Ground
Water Board
West Central
Region
24/01/2018 Approved under
evaluation
25/11/2016
Application Processing
Receive
Date
From User
Name
To User
Name
Forwarded
User NameAction Date
Action
Internal
Status
Action
Comment
Ground
Water
Recom
Per Day
Ground
Water
Recom
Annual
24/01/2018 (Evaluation (Evaluation (Approval 24/01/2018 Forward Recomended 41.00 12792.00
Applicant Home Apply Feedback Change Password Profile
Annexure - IV(A)
1/30/2018 NOCAP
http://www.cgwa-noc.gov.in/ExternalUser/ApplicantHome.aspx 2/2
Officer)
Central
Ground
Water
Board West
Central
Region
Officer)
Central
Ground
Water
Board West
Central
Region
Officer)
Central
Ground
Water
Board
West
Central
Region
24/01/2018 (Evaluation
Officer)
Central
Ground
Water
Board West
Central
Region
(Approval
Officer)
Central
Ground
Water
Board West
Central
Region
NOC Processing
Receive Date From User NameTo User
Name
Forwarded
User NameAction Date
Action Internal
Status
Action
Comment
No Record for this Stage.
NOC Disbursement
Receive Date From User NameTo User
Name
Forwarded
User NameAction Date
Action Internal
Status
Action
Comment
No Record for this Stage.
Go Back
Annexure - IV (B)
GUJARAT POLLUTION CONTROL BOARDPARYAVARAN BHAVAN
Sector 10-A Gandhinagar 382010Phone (079) 23226295Fax (079) 23232156Website wwwgpcbgovin
By RPAD
AMENDMENT OF CONSOLIDATED CONSENT AND AUTHORIZATION (C C & A)
NO GPCB /CCA-VRD-200/[NOC-VRD-3204)/ID21562/ o;>c:<':/ 9;1-
TO,MIS. ADMARK POLYCOATS PVT. LTD.
. ~R. NO. 207, VILL. LUNA,V TAL. PADRA,
DIST. VADODARA.
date 30 /01/2014
Sub: - Amendment of Consolidated Consent and Authorization (CC& A) of this Board underthe provision the Water (Prevention and Control of Pollution) Act-1981, the airPrevention and Control of Pollution) 1981 and the Hazardous Waste (ManagementHandling & Trans boundary Movement) Rules 2008 framed under the Environmental(Proteclion) Act-1986
Ref - 1 Consent Order No. AWH-59893 dated 18/01/2014 and ItS validity up to 22/09/2018Issued Vide letter No GPCB/CC&A -VRD-200(2)/10-21562 /201971 dated 24/01/2014
The Board has granted Consolidated Consent (CC & A) order No. AWH-59893 dated18/01/2014 and its validity up to 22/09/2018 issued vide letter No GPCB/CC&A -VRO-200(2)/10-21562/201971 dated 24/01/2014 is corrected as under
1. In above referred CCA shall be read as under:
1.1 In condition no 41 of above referred order: the following shall be used as Fuel InbOiler/furnace/heater respectively
~ Sr. No.t 1
FuelLOO for Heater
--l- _ __ Quantity100 lIters/ day
INSTEAD OFThe following shall be used as Fuel in boiler/furnace/heater respectively.
Sr. No.12
FuelLOO for IncineratorLOO for Heater
---!_-
Quantity _ I
150 lIters/ day. I100 Llte~l~a"- __ I
1.2 In condition no 42.1 of above referred order ·the flue gas emission through stackattached to Thermic Fluid Heater & inCinerator shall conform to the following standards:
• ~)\ijClean Gujarat Green Gujarat I
ISO - 9001 - 2008 & ISO - 14001 - 2004 Certified Organisation
Annexure - IV(C)
- -- - ----------------
Parameter p'ermis-sibleStack Stack Air I
Stack attached to height in Pollution
I
! limitNo. meter Control
MeasuresThermic Fluid 18 Mt 1 PM 150 mg/NM3
Heater S02 100 ppmNOx 50 ppm
INSTEAD OF
Parameter 1 Permissiblelimit
P-M--- 1-150mg7N-M3
. S02 100 ppmI NO)( . ~~O ppm
AirPollutionControl
Measures
I Stack I
I No.
--~-
1 Thermic Fluid, 18 Mt, I Heater :IL~iner~BM_t __ 1:--:_
The flue gas emission through stack attached to Thermic Fluid Heater & incinerator shallconform to the following standards
Stack I Stackattached to height in
meter
2. The rest of the conditions of the above referred order no AWH-59893 dated 18/01/2014and Its validity up to 22/09/2018 Issued Vide letter No GPCB/CC&A -VRD-200(2)/ID-21562/201971 dated 24101/2014 shall remain unchanged
3. You are directed to comply these conditions JudiCiously
For and on behalf ofGUJARAT POLLUTION CONTROL BOARD
~fv-~(M.V.PATEL)
Environmental Engineer
Annexure - IV(D)
ANNEXURE IV(E)PHOTOGRAPHS OF GREENBELT WITHIN PREMISES
ANNEXURE IV(E)PHOTOGRAPHS OF GREENBELT WITHIN PREMISES
gg$..E
EE=
bo.s,2=ooExt!
6C
' .E
.J8*EJ-E
E
c-=
gsstFI
.j
EE
E
r! bo
LJ
9,;O
Eln-
$r\:00rlF
-{
ssg ro p!nb!.1'pltos a.!atels
= :,.sJ
9tr*O
'F
EE
uo,.sE(!>oo-
ocoo>.=
SC0Jlotri5E
Io.E.o
= !voE.!o
I(ucG,t
6,1
>c
sts9;!oP
Pg.
(uoC
c(J,'=->
. E-c
aE
i,r !s..,:-
e.L(J-P
I
E1
ilXtEI
zz
c=>
.<1
*\
ffi
*gCLN
oobngq'
a'Uocl c.t
,Fg
Sgo.Nrrobusa
Sgo.N6obusH
'
s(E^.
o. (J
bcg E
H
NoL)G'
L)o
St!o-N6ob(JE
P
s(E^.
o-(J
Ec
Es!i
oocoo.2
sE-qrCF
rE
BE
ru.ts i
ai# P
: =
,=gEcL^C
LLo<oo@
5EcL^o-:oooN
zz
zz
ooooN
..t:-cttt(ELoo<
lm
II
ooorcf,z
sfGI@
oC
LLEoorn
zoooctrN
ooolr)o?Q
=roor!E
ooolrll.r)r{F
lN
zoorf)r{
omoFl
t)@ooN
z\(n
qz
rr;z
zz
(oF{
.-i€C
i
r'{oqorJ)olc,
F.l
(Y)
Ol
c;
o6ci
r+o)ct
No)c;
l,)o)o
i I$rnr.rtrn
(n(oNtl(nN
zz
o00(n
z
z(.oN
I
rfto;@
I
NF{I
oI
u)(\
zo
zol\oN
(o(nF
loo(\
rnfY.l
F{
lnooN
(r1o)(\l
+o(oN
NrnN(Y
lN
rn(noo@N
(n<f
orlNF
{sfF
{
Nr-{rl
N
ostot\
rJtN
or-lu'!N
(n a\
tntn
E'gJ
==.gJ
ErJ
= f.gJ
p=E'
=
E'JrJ
E)EJ
pf.sJ
p:,ET
J
.s0o,d.xoC
LU
J
ocox
oc(!Pfco
!ULoEi5
oLo-cl!--o >-(J-c
>,
UJ(9
T'L'
Pt!lJ-t!ott'l
oEo(LEcoz
o9o-=
vY
ooco-Eo(goE
o.EEI'EILo
sttn
(o@
cr')or'{
r{t\l
!
F]
ilXFE
1
zz
IIIIiIIIIIl.l(,lurl-loItlo.t2lolutlzl<lo-lxI
u.r
lolurlv,tolo-lo1tr,lo-lrl-lolrItl<lo,IE
;lJ<lcoii"'loPlB
lile=lnsl;ulg_jl3;lE
--l=lqtIElurlzIlllloItI<IIl>IXlo
o
RgB
fPEE-
3
a?oz
zz
zP
E:6$=
z
EH
P-O
e
oa)l.-z
HE
EE
zF
Ez
=otD0;E
EJ
o<)
loz
oc)o(9tt
gooc/,!+
zEoooN
z
EoP
.ER
E>
-.=eE
ooolf,Iooor,
ootoNI
ooo
ooo(oI
oooN
ootr)I
ooN
oo(oIc)o(a
BE
.gEG
5EE
=>
==
(olo)loalco
(\tN
I(o(o
(oi-+,\z
€O)
z
,tt:ot,
.EOu
=o
3(Eoaos
;*l s*.E0rgE
A€s0c
._cOL
toJ(Uo3@tr
!,2
,cOg
to:](uoaos
cEs,
Etc).=
.Elt-
No)@$l
@(\t@(\l
c)14,c.,g)
r..C
')
0,EtroE
E@o?o
o)g)a
I
F-
g?o
(oo,c,Itq,o
coO)
c;I(oo?c)
l.-o?o
I
to,ci
\tqI
q
qI
@o)o
l6LI
E I E
go I €-
IEc -c
ooocr
>eJ
O&
@
IEc -E
o0Jo)cv
>eJ
O
<-
U)
6c -c
oc)ocr
>cJ
o<
U)
6oooE
! >
EJ
O&
u)
.(UcoO-JE'-
a6
c -c
oooE
v >
E=
E&
u)
oo(,
Lo<lE
oaE
3-9(l,
3o0)
.E{EE
=rE
oorog(J>
=(J
= so-cCD
=
o.tlE
Barlttou,uJo-
FzooFlrJo
oC'o'
o6E
6o-
of!,o'=3.i
pfEJ
P=.gJ(U
-9()
3uo'=o=6,=
!,EJ
p.gJoo)()
o3E'
o'-3.e
ooE
EE;
)-zrlo(L
o@o(L
ol'-
r6E
o@lr,o-
oorf,lf)o-
@(oro.L
rr,
tf(L
ocotl6IoocF
oc(l,P(U
Io.EE(U
= (Uco,c(L
o!,Eo.EEEE(Ed
bP,c(g(L:E
oco!,(uIopE(u>o(L
oEEo.Yo
;o5Eooo.r
otrop.EIo.gE(goo-
11)
.EooE.sbX
o)iE>
r(EO
I
ocoP(ETopE(uvEcoctL
I dest
(9t
lo(o
t\
I
IJ'trfxutzz
Final Rapid EIA Study Report – Admark Polycoats Pvt. Ltd., Padra, Vadodara, Gujarat
Chapter - 2
Ramans Enviro Services Pvt. Ltd. | Ahmedabad
2.9
within the premises. The water demand at the ultimate stage of this expansion will
continue to be met through the same borewell. The water requirement will increase from
26 kL/day to 41 kL/day upon the proposed expansion. The industrial water demand will
increase by 15 kL/day, which will be solely for utilities and firefighting. There will be no
increase in the domestic water requirement. The detailed water requirement break-up,
considering the current & ultimate stage is covered under Section 2.8.
Also, the project is located in Padra Taluka, which falls under ‘safe zone’ as per Dynamic
Ground Water Resources of India Report of 2011. We have also made an application to
CGWA for their approval in respect of withdrawal of groundwater for our project.
2.5.5 MANPOWER REQUIREMENT:
Manpower is one of the important resources for efficient and better working of the plant.
The unit is currently employing ~ 100 nos of people directly, as well as indirectly. However,
the prospects of increase in employment are limited since the proposed expansion will
take place in the existing premises itself. Approximately 5 to 10 additional personnel will
be directly employed as a part of the expansion project. Apart from that, about 10 local
personnel will indirectly be required for project assistance.
2.6 MANUFACTURING PROCESS:
Epoxy hardeners of different types are prepared by choosing the requisite raw materials.
The types of hardeners manufactured by Admark Polycoats Pvt. Ltd. are listed below:
Phenalkamine Hardener Phenalkamine Adduct Hardener
Polyamide Hardener Polyamide Adduct Hardener
Polyamine Hardener Cycloaliphatic Amine Hardener
Phenalkamide Hardener
The manufacturing process involves either single stage or dual stage process, depending
upon the desired end product. Both the stages are carried out in the same reactor, which
results in different type of hardeners, including adducts. The manufacturing process is
described below:
a) 1st Stage:
Final Rapid EIA Study Report – Admark Polycoats Pvt. Ltd., Padra, Vadodara, Gujarat
Chapter - 2
Ramans Enviro Services Pvt. Ltd. | Ahmedabad
2.10
1. Raw materials, depending on the product needed, are charged into a closed dual-coil
jacketed reaction vessel, equipped with stirrer.
2. Prior to initiation of the reaction, the air within the reactor is expelled using Nitrogen
gas, so as to maintain an inert environment within the reactor.
3. The raw materials are then heated up to the desired temperature through circulation
of thermic fluid.
4. Depending upon the type of hardener, reaction water may be generated. This amine
water (reaction water) is collected separately in an S.S tank and sent for recovery of
amines to M/s Multichem.
5. When the desired physical & chemical properties are obtained, the product hardener
is cooled through circulation of cooling water and drained for packing & sale.
6. This product from the 1st stage, (namely phenalkamine hardener, polyamide hardener,
phenalkamide hardener & polyamine hardener) is either sold directly or subjected to
Stage 2 to form adduct type hardeners.
b) 2nd Stage:
1. To manufacture adduct type hardener, the phenalkamine or polyamide hardener or
other bases formed in Stage - 1, are further reacted with desired quantity of epoxy
resin through heating in closed dual-coil jacketed reaction vessel assembly using
thermic fluid circulation.
2. The material formed is adduct type hardener, which is cooled using circulation of
cooling water and drained and packed for sale.
The solvents used to clean the reactor are reused in the next batch.
The process flow diagram for both stages are shown below under Figure 2.3 and Figure
2.4 respectively.
Final Rapid EIA Study Report – Admark Polycoats Pvt. Ltd., Padra, Vadodara, Gujarat
Chapter - 2
Ramans Enviro Services Pvt. Ltd. | Ahmedabad
2.11
aaaaaa
*Amine water from reaction is only produced during production of phenalkamine & polyamine type hardeners.
FIGURE 2.3: PROCESS FLOW DIAGRAM FOR EPOXY HARDENERS - STAGE 1
FIGURE 2.4: PROCESS FLOW DIAGRAM FOR EPOXY HARDENERS - STAGE 2
Closed Reaction
Vessel
CW IN
TF IN
CW OUT
TF OUT
Epoxy Hardener - Adduct Type
(Product)
Epoxy Resin Epoxy Hardener
(from Stage - 1)
Closed
Reaction Vessel
Amine
Recovery @
Multichem
Amine Water
from Reaction*
Solvents
&/or
Additives
Amines
Epoxy Hardener
(Product)
TF IN
TF OUT
CW IN
CW OUT
Final Rapid EIA Study Report – Admark Polycoats Pvt. Ltd., Padra, Vadodara, Gujarat
Chapter - 2
Ramans Enviro Services Pvt. Ltd. | Ahmedabad
2.12
MATERIAL REQUIREMENT PER TON OF PRODUCT OUTPUT:
The various raw materials used for the hardeners and their consumption, per ton of
product output is tabulated below for ease.
TABLE 2.6 : MATERIAL REQUIREMENT PER TON OF PRODUCT OUTPUT
Products →
Ph
ena
lkam
ine
Hard
en
er
Ph
ena
lkam
ine
Ad
du
ct
Hard
en
er
Po
lyam
ide
Hard
en
er
Po
lyam
ide
Add
uct
Hard
en
er
Po
lyam
ine
Hard
en
er
Ph
ena
lkam
ide
Hard
en
er
Cyclo
alip
ha
tic
Am
ine
Ha
rden
er
Product Quantity → 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Raw Materials utilized:
Cardanol 0.482 NIL NIL NIL NIL NIL NIL
Polyamines 0.173 NIL 0.290 NIL 0.080 NIL NIL
Para Formaldehyde 0.109 NIL NIL NIL NIL NIL NIL
Epoxy Resin NIL 0.150 NIL 0.063 0.280 NIL 0.148
Xylene 0.235 NIL NIL NIL 0.320 NIL NIL
Butanol 0.067 NIL NIL NIL NIL NIL NIL
Dimer Fatty Acid NIL NIL 0.580 NIL NIL NIL NIL
Ethyl Ether of Glycol NIL NIL NIL NIL 0.320 NIL NIL
Soya Fatty Acid NIL NIL 0.168 NIL NIL NIL NIL
Nonyl Phenol NIL NIL NIL NIL NIL 0.330 NIL
Isophorone diamine NIL NIL NIL NIL NIL 0.040 0.415
Jeffamine NIL NIL NIL NIL NIL 0.630 NIL
Benzyl Alcohol NIL NIL NIL NIL NIL NIL 0.437
Intermediate Product:
Phenalkamine Hardener NIL 0.850 NIL NIL --- --- --
Polyamide Hardener NIL NIL NIL 0.937 --- --- --
Wastewater stream:
Amine Water from Reaction [- 0.066] NIL [- 0.038] NIL NIL NIL NIL
All quantities are in Metric Tonnes.