![Page 1: Fort George G. Meade Post Removal Methane Gas Monitoring, Update Restoration Advisory Board Meeting November 15, 2012 1.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649cdc5503460f949a6973/html5/thumbnails/1.jpg)
Fort George G. Meade
Post Removal Methane Gas Monitoring, Update
Restoration Advisory Board Meeting November 15, 2012
1
![Page 2: Fort George G. Meade Post Removal Methane Gas Monitoring, Update Restoration Advisory Board Meeting November 15, 2012 1.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649cdc5503460f949a6973/html5/thumbnails/2.jpg)
2
Central portion of site, looking north
Picture of Site Shown During Last RAB Meeting (9/20/12)
![Page 3: Fort George G. Meade Post Removal Methane Gas Monitoring, Update Restoration Advisory Board Meeting November 15, 2012 1.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649cdc5503460f949a6973/html5/thumbnails/3.jpg)
3
Recent Picture of Site
(11/12/12)
Central portion of site, looking north
![Page 4: Fort George G. Meade Post Removal Methane Gas Monitoring, Update Restoration Advisory Board Meeting November 15, 2012 1.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649cdc5503460f949a6973/html5/thumbnails/4.jpg)
![Page 5: Fort George G. Meade Post Removal Methane Gas Monitoring, Update Restoration Advisory Board Meeting November 15, 2012 1.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649cdc5503460f949a6973/html5/thumbnails/5.jpg)
5
Buried Natural Gas Line Limits of ExcavationMethane results are in parts per million by volume
VMP-320
VMP-430
VMP-420
VMP-24 & 250
RI Monitoring Point
VMP-3011/2/12: 42,00010/22/12: 155,00010/15/12: 111,00010/10/12: 158,000
MP-E 11/2/12: 010/22/12: 010/15/12: 010/10/12: 0
VMP-3111/2/12: 38,00010/22/12: 27,00010/15/12: 31,00010/10/12: 33,000
![Page 6: Fort George G. Meade Post Removal Methane Gas Monitoring, Update Restoration Advisory Board Meeting November 15, 2012 1.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649cdc5503460f949a6973/html5/thumbnails/6.jpg)
Methane at VMP-30
• Mercaptan odor noted, but field tests for methyl mercaptan were negative
– Mercaptan is added to natural gas to give it a detectable odor
• Working with BGE and Picerne to shut off gas to unoccupied units and will measure change (if any) at VMP-30